Loading...
CC - Engineer Statement groundwater THE (rJ-UIB 1-U-B COMPANIES v1 LANGGON MAPPING GROUP INC. J•U•B ENGINEERS, INC. 8 December 2020 Sonya Allen Associate City Planner City of Meridian 33 E. Broadway Avenue, Suite 102 Meridian, Idaho 83642 RE: PINE 43 PHASE 2 GROUNDWATER ELEVATIONS Dear Sonya, A geotechnical evaluation for the project site was performed by SITE Consulting, LLC,with subsurface soil information summarized in their report dated August 25, 2020. According to the reports,seasonal high groundwater can be anticipated at depths greater than 9-feet below the existing ground surface. Based on the information provided in the geotechnical report,the roadway finished grade centerline elevations were designed to be more than 3-feet above the anticipated groundwater elevations. Please feel free to contact me at(208) 376-7330 if you have any questions Sincerely, J-U-B ENGINEERS, Inc. Keith H. Morse, PE Site Development Project Engineer a 250 South Beechwood Ave Suite 201,Boise,ID 83705 p 208-376-7330 w www.jub.com