CC - Engineer Statement groundwater THE
(rJ-UIB 1-U-B COMPANIES v1 LANGGON MAPPING
GROUP INC.
J•U•B ENGINEERS, INC.
8 December 2020
Sonya Allen
Associate City Planner
City of Meridian
33 E. Broadway Avenue, Suite 102
Meridian, Idaho 83642
RE: PINE 43 PHASE 2
GROUNDWATER ELEVATIONS
Dear Sonya,
A geotechnical evaluation for the project site was performed by SITE Consulting, LLC,with subsurface
soil information summarized in their report dated August 25, 2020. According to the reports,seasonal
high groundwater can be anticipated at depths greater than 9-feet below the existing ground surface.
Based on the information provided in the geotechnical report,the roadway finished grade centerline
elevations were designed to be more than 3-feet above the anticipated groundwater elevations.
Please feel free to contact me at(208) 376-7330 if you have any questions
Sincerely,
J-U-B ENGINEERS, Inc.
Keith H. Morse, PE
Site Development Project Engineer
a 250 South Beechwood Ave Suite 201,Boise,ID 83705 p 208-376-7330 w www.jub.com