Loading...
Stapleton Subdivision No.2 FP-2020-0014 Order Item#8. BEFORE THE MERIDIAN CITY COUNCIL HEARING DATE: JANUARY 26,2021 ORDER APPROVAL DATE: FEBRUARY 9, 2021 IN THE MATTER OF THE ) REQUEST FOR FINAL PLAT ) CONSISTING OF 63 BUILDING ) CASE NO. FP-2020-0014 LOTS AND 8 COMMON LOTS ON ) 10.6 ACRES OF LAND IN THE R-15 ) ORDER OF CONDITIONAL ZONING DISTRICT FOR ) APPROVAL OF FINAL PLAT STAPLETON SUBDIVISION NO. 2 ) BY: C4 LAND, LLC ) APPLICANT ) This matter coming before the City Council on January 26, 2021 for final plat approval pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the Administrative Review is complete by the Planning and Development Services Divisions of the Community Development Department, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat, the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of"PLAT SHOWING STAPLETON SUBDIVISION NO. 2, LOCATED IN THE E '/2 OF THE SE 1/4 OF SECTION 25, T.3N., R.1W., B.M., CITY OF MERIDIAN, ADA COUNTY, IDAHO, 2021, HANDWRITTEN DATE: 1/5/2021,by KEVIN M. BORAH, PLS, SHEET 1 OF 6," is conditionally ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR STAPLETON SUBDIVISION NO. 2—FP-2020-0014 Page I of 3 Page 139 Item#8. approved subject to those conditions of Staff as set forth in the staff report to the Mayor and City Council from the Planning and Development Services divisions of the Community Development Department dated January 26, 2021, a true and correct copy of which is attached hereto marked"Exhibit A" and by this reference incorporated herein. 2. The final plat upon which there is contained the certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: 2.1 The plat dimensions are approved by the City Engineer; and 2.2 The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash surety has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight(28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian,pursuant to Idaho Code § 67-6521. An affected person being a person who has an ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR STAPLETON SUBDIVISION NO. 2—FP-2020-0014 Page 2 of 3 Page 140 Item#8. interest in real property which may be adversely affected by this decision may, within twenty- eight(28) days after the date of this decision and order, seek a judicial review pursuant to Idaho Code§ 67-52. By action of the City Council at its regular meeting held on the 9th day of February , 2021. By: Robert E. Simison Mayor, City of Meridian Attest: Chris Johnson City Clerk Copy served upon the Applicant,Planning and Development Services Divisions of the Community Development Department and City Attorney. By: Dated: 2-9-2021 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR STAPLETON SUBDIVISION NO. 2—FP-2020-0014 Page 3 of 3 Page 141 Item#8. EXHIBIT A STAFF REPORTC�WE COMMUNITY DEVELOPMENTDEVELOPMENT DEPARTMENT t D A H 0 HEARING 1/26/2021 0 DATE: Legend RUT R-15 Project Location TO: Mayor&City Council R"g R-4 RUT R-" U FROM: Sonya Allen,Associate Planner 208-884-5533 SUBJECT: FP-2020-0014 Stapleton No. 2 R-8 LOCATION: Southwest corner of W. Harris St. and S. Meridian Rd./SH-69.,in the SE '/4 of RUT Section 25,Township 3N.,Range 1 W. R-4 I-L RU1T R-4 I. PROJECT DESCRIPTION Final Plat consisting of 63 buildable lots and 8 common lots on 10.6 acres of land in the R-15 zoning district. II. APPLICANT INFORMATION A. Applicant: C4 Land,LLC—4824 W.Fairview Ave.,Boise, ID 83706 B. Owner: Same as Applicant C. Representative: Laren Bailey,DevCo 4824 W. Fairview Ave., Boise, ID 83706 III. STAFF ANALYSIS Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary plat in accord with the requirements listed in UDC 11-6B-3C.2. Because the same number of buildable lots and amount of common area is proposed as shown on the approved preliminary plat, Staff deems the final plat in substantial compliance with the approved preliminary plat as required. Page 1 Page 142 Item#8. IV. DECISION Staff: Staff recommends approval of the proposed final plat with the conditions noted in Section VI of this report. V. EXHIBITS A. Preliminary Plat(date: 1/29/2019) PRELIMINARY PLAT FOR slEEfrnoo[ Lo S IN P NE SUBDIVISION LOCAIID N THE NE I j4 OF THEE 1J4 CF�CIIIXJ 25 T\]wRL911 P 3 IV[]RTH,RNlGE 1 W6i,0..AI. � MfRINVW NM COUNTY,ILW10 Pf>.3 °aunwr 5nm fionr[5 _ ___ is —T7 'a.. tl�3 a pEj R i`, • u�=3i ai _ 1 PbpTPGlW x �� d f SPTS4(d'E f � lE I � e c � 3 tl1R1E TnBIE IDI SILYlRY - 1 !r L—a f J �i ii Ip I r-� � . t n m 1.1. = e E; RuraaEn rpe sraalETow uc �I r�— � � I� .. •.�• muwEart.�ou nvE ' I I LQ°fiI IYRCAL SECTION - jgBT -- •�..aw � JU — � r�lsxw x®zrlsw d x I181• 652I i.a...... ,.ix a ii.�, � kx: I . SIREET9ECTplATENIPRYCE:-1� -. ll'TYPICALS'IRE£T?ECT10N;1•, TT��SIE�H��.� PP1.0 Page 2 Page 143 Item#8. B. Final Plat(date: 1/5/2021) STAPLETON SUBDIVISION NO. 2 B0OK—•pAr_F - LOCATED IN THE E112 OF THE SE114 OF SECTION 25, T.3 N.,R.I W.,9 M.,CITY OF MERIDIAN, ADA COUNTY,IDAHO acm.a �+1arelcv Aura q� `un 202I n ,a„r so�.os•E+xurg as7sm•e----_ a w.erenssr- -- - --------- ---------•—'-�---ss�zrzrE iv�aor-----—'---'------•------------ r.�z•r v.a.�3 •..nermze•w�xs.n• xer�vsrw,�.�;--- � , �.w�rrrm •�� � � w.nnro 1 w.wear wwru� 1 ---- ' N 1 �wa*rrp ; �� . •I e cn,aTiEv naemavx aF n.rml6e ursau. `� ��' � s �-- -- - -rc�•mrw mesa—- -- -- '�S lxav Jaw iasar .. +ice uvF wvurs,v�.cesf,ae ..+m s.�v,�uraver.-rmwo wwsr rrm.,,�,• snnnw, a nectar,-vHs�:r.-., - M sees�raoFefae.ww�+rw roveeRr l�1r� 100 1 wx,u .no cwrvt awes .. ... .. �n�mey wr w.ea�urm��ix+�er xnrcris�iiai��auk� r�ie�f,r=xrs�n�A [ems SEE Art[Ta 0�6 FQC 0F�Ff/E.KH•u 51QGf[YE4tli . �V�� ea5uami.rnnAOm Srcewlwc E.�nevr 4vIN .. ... __ .e,erwwuc°`.xm" w 'evmr sw.een.e�c+mwoati<a...werxr rerlm.�,e. WASH . .. �ra���w.x.a.r•.r.Rrrr•�r.,,,r.�rx. r-�,,,�,. h 203C S. G936 AVE. EMMETT,ETT ID 83fiI7 (208)M-8104 vw+ .�..,... I•rr .. .,.. TV[JI FAx(208)395-8P 05 un xuc��x,rnrr u.. �m ^'°".'A xe�o �;r �,.:. "x•„.2� �.�. 1-oaa��ur✓c �!�WWW.-CAWTOOTNL5,COM ,rmarmxvx.n......x x,r•_,..n c_w�r.mae neoww 10E6 1ltW! AyC9r R9 !�! 1�1� Page 3 Page 144 STAPLETON SUBDIVISION NO.2 BOOK_PAGE --—-------- ----------------------------- 7m-- fay 4 A �F- L -j L ­2 —5 WAS AVE. 19 63617 (208)39&8104 FAX(208)398 www.'AwmGTHL5.cLlm —1 zxr—� STAPLETON SUBDIWSrON NO.2 BOOK—,PAGF--. A It di ki qL looSW [NCTZMAVE 195 �ID� I FAX(208)3 98-8105 f-'�-,WWA4*M0THUC0M 7z- Page 4 Item#8. STAPLETON SUBDIVISION NO.2 a00x—,PAGF_ -=— mar---wuz. ---------------- 106, ti ----- sn,n•Aruw�ns,osu xw sxxn�,. CST T���mi'o-�xrirmF'�ri f 20305 WA43MGTON AYE. M EMMET7�10 BU6I7 10 >3 (708)398-3104 �+ AZL _f/FAX(208)398-8105 kw.�mC ,ss.wc Mx. "'�"m�•,",•°` Gail 5ur✓ey rr,,,!C WSW 54VITOOTHL5,MM Page 5 Page 146 Item#8. C. Landscape Plan(dated: 12/18/20) E + . W.HARRIS STREET FUTURE 9TAPLETON SUBDIVISION I � ��' PHASE q � h� _ - 1 I..m _FUTURE BTAPLETON SUBDIVOION PRA , f V Zo C — � _ _ :a= 2 4 m � L) FUTURE ¢ (/J Z STAPLETON ' SUBDIV181ON PHASE O � F STAPLETON W suBuivm qN J N J --- - PHASE 1 Q wD 2 F a E fn a — j -� 'll I �••pVERALL PLAN L0 • m W,HARRIS STREW VA ,1 se u s1" s� si RADrANr RIDGE Z 0 d o_ z _ C a PLANT SGHEGULE � a � - I d¢ Q it m� r g s I o u .... —.._. J � v I J ' a a a ' f`OTES W.HYHDAIhN STREET31 :n »xrxro xxx.n. o.,•`."`.'. 'iii— KEV MAP _ '~ ;. + + 3 3 _ — �}._- ® L1 Page 6 Page 147 Item#8. PL^_M1.I SCHEDULE y W NdRR15 Si RCEi MEN z o � : . �2 z a < '" NOTES Q 0 Wa ,Ig w.npolA rnloce oA O mm. W a HJNE L2 u O - ` U 1 MA =L8 , KEY MAP - L2 UNPBLpPE PLAN - L2 FFPLANT SGHEC�ULI A CH LfTCLM L3 Mil o ,ten y y W.HYNDIA-STREET e .' W - Zx pa z Lu 11* s n m W U o z / J vWi � O fn a a 0 KEY MAP L2 LANDSCAPE PLAN L3 Page 7 Page 148 FL.ANT SSHM;IJLE vl�'.7 i;lil%'�11111.��­ "MurMM, I'Lill"I'l W'Wil.V JEIi MIJ111.1-III T'I IIIIII.-TAKI— cc r-11 .......... CIO .............. 4L LLI M T LIT eEo­1 L4 MOE` Z 0 z 5 < 0ENTRY OATF-11ARK41LI—IRGUNV (L 9) 0 z _j 0 T__ LLI _j Zo v co MAINFFNArGF FNFF_AN6F Ut­iNrFNW.FFHFIi L5 Page 8 Item#8. D. Site Amenity Details PROJECT AMENITIES As the developer have researched and interviewed homeowners and followed the city ordinance to plan the most productiveamenities for this area and thisdevelopment. The amenity package exceeds the III uirementofMeridian Clity Development fiode,which requires that the application have two amenities,one of 10 required open space and a second that meets the requ i rements of city cod e_We are proposing three additions[amen iti es for a total of fie including a regional pathway extension and a neighborhood park including a play structure, climbing dome,swing set, climbing rock boulders,half basketball oourt,and seating areas_ Proposed Amenities: +4-1WN FENCE Large Ha If-Acre Park-The h alf-acre park ,VilI contain the following recreation _ �# 6h5Krt76�L i 6r6 WHEELfacilities: COURT TRAZIS Enclosed Fencing for Child Safety 3 49 Basketball court _ Play structures - S% lng4 < ;ENTRY#9 Climbing:Rocks and a Dome Structure IFOR Big Wheel Track 541iwC+a--� so hoo Scenic viewing area wf bench seating - Attractive landscaping and pedestrian 1 +^ pathways f3TRAJUU9r � `f DOM�i G 1. o Dog Park DDME Fully FenoEd P*weIIIc2� aII cuMaEN Double Protection Gate BOU4E75Rr Seating Areas o Pathway- A 10'regional pathway will be provided at the +J southwest aornerofthe project area.This pathway wills •ILI connectto proposed pathways in other previously approved developments to the west_And will provide a regional connertiontothe retaii and commercial - components ofthe Mixed-use Development_ Along Meridian Road nearly 1,200 linear feet of 10'Regional Pathway will also be providedthefull length ofthe project -- I . from Harris Street to the southern boundary of the project. Page 9 Page 150 Item#8. TOPVIEW � ® FOFKIOS AGES 1-12 PON GENERAL NOEER WnE 5Ne P d.�aq Wall wl Talesw'Ge . Rlae 9taim Gp4.1 72" 1. 6B' Betllack gfk ulhla rrramm L � � +--r—tr was smv Rwf Firepole ValFal 38" l.etltlLi Rbbd L J Pyremltl Roof oue&id Tum e Transfer slae� S1RIlLRIPEw',R35AFF1FA PI-1—I➢P20PE5EM PLAYCRA 1.. M7:9/If IDIWWN W.TNom-¢ AN.OSE ZONE M K 33 Lc DgRecreation SW NEW ®F 5.1. E VIEW ® FSI oNEs/1(m20¢a£ NHY.Rvn�a Page 10 Page 151 Item#8. SW VIEW ,wvi SW VIEW SIIIIKTUPL:fRE4C1910 onic.E9/Vmxa I oxaww ai':inrnm Page 11 Page 152 Item#8. swr, 3S 4p., ga• 1C 3YI 12, Pole steal be Dw9rLxM or 3 =':.::_=i d ameler RS4a Tkm oaared gahamed EIEe Wtirg•Mtr an E p.wall Vkknes- DeMp EMI aEater.gmEe-cf:-._: :a ID%v Tor a W buy InW the ground and a W e7CEr6ImIoT Ule front oT Um pole 1D II1e TaCe of II1e Ua[dJbald.TA'7'_ :'"=I�13�110�4 d]a�tl goltan Ztd:l)dlla C�d�'b snail SJppat��atrYa bwkbcard and;nrre--drEa ti:_"•::_�Ie shill be dagglec E:".r.:hE 7m rnLns dl-L—^- to Ire ndmlrrd pole section 1N P LnebaClDmrc M ellr.}=:=::-_:: Y1e badlboard dudre:_,.�oesrb:r etm;.)ockMardsjppatbrdcasahall nv)l n COrS def=�eq".Pde rmi :3 ' -Lr5 &C- lrr--: Backteab steal D�E wrsiucLee o';as: .... .. :51.7 x c=•- ::ac PtRAR :. - --'E-nlrlmu pl r allrgS Jrraw hckress sha be 3AF.Armnur.-:3` s..p..r ros Ehal o==x<. -rear�f --:7a3l:rl:�KneEE or'1e wUcard snail be 1;.T.The tadLoar r sral to ma[aJ vats a r'.��e:;� �=: :: - - - _ ::a:�t 'n Eh and nawE an drdaF612EC o!d•Ig'_EYp00E'E Egr.afE 31d tt0lder.eadiW3N Era :i-- - v. - _ --.- =T EYV3 be�LY x ancfM43lsgS•E•danele'Pl.^,I-Did call drawn eabonsbeel9rg'.cl;rmviLom3,.1rs'3—,- '=: ksnadxn r}lcn rwt prdOed.�.eackpYate gall be a n inlarm M F rrkk Rim shall be wpported by a 1 2-dL3re:- m m—fax—.I+vmng r arvrsre steal be Inc Jded.Rmshallrady a 1-pealhtl dwaianty,ha'eai warms pmbrWco3ted T.i>-=rd ce rade Ir tre UrA hEUWUDn n be Dort-pletedlnaoeardancewM rnanurj=xWs lnstrlcOmmi. Dorwt"edrewlrgw,'_rllre Eys-.efn"wEkX1 approAM31 ly 179#. • PRODUCT SPECIFICATION >,--TCLCIi-].TY FFMM blLk1HLl1 Fdh GOC6l3ECK PLAYGRNM SVSTT3t 603 L Skeet,Lhmhm,H E 6W&-Phom:(000)247-1668-Fax:(BOO)63 OMB-xvw.bisonnc.carn-in sorlinc.carn Page 12 Page 153 Item#8. E. Common Driveway Exhibit ---------�� ----------- TREAR ZERO SEaA.OK Sz60 LOT LINE ? 2OA4' FRONT I �SEiBACK �^-�I 63 24,04' CUMMON ZERO 5ET&ACK 12.04' REAR DRIVE LOT LINE 59 ! LOT 57 TAkES ACCESS SETBACK I———————————l ` I FROM RADIANT RIDGE -——————————— ti DR. DRIVEWAY LOCATED ON EAST SIDE OF LOT. 1 \ 58 61 � J \ 64q JJJJ`` — — f J W RADLANT RIDGE DR � ss / 25 249 27 28 N 20 0 2D IQ STAPLETON SUBDIVISION NO- 2 COMMON DRIVE EXHIBIT-LOTS 57-65 BLOCK 1 Page 13 Page 154 Item#8. F. Emergency Access Exhibit N S er"P arY I �maround IT II aCceas la trams �� � I •d8 ire[ f'' s['e_`vrFl6'.f1R'.1LMF �. 1 nesman and Raaam -- dgem ct wnne In a11a6e3 I I evelopment is fimlted to _ 0 tomes u ntil the sewnd .____ 1I ccess to Harris Street is constructed. emparary miner a - ---- around I - I o e:rear: I Rooal ad Conarswcred — I ntcry p"Se 1 # LL, I =":.l STAPLErON SUBDIVISION NO.1 dr 2 FIR[ACUSS tXHlgn- Page 14 Page 155 Item#8. VI. CITY/AGENCY COMMENTS & CONDITIONS A. Planning Division Site Specific Conditions: 1. Applicant shall comply with all previous conditions of approval associated with this development(H-2018-0129,Development Agreement#2019-110907). 2. The applicant shall obtain the City Engineer's signature on the subject final plat within two years of the City Engineer's signature on the previous phase final plat; or apply for a time extension,in accord with UDC 11-613-7. 3. Prior to submittal for the City Engineer's signature, have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. The final plat prepared by Kevin M. Borah, Sawtooth Land Surveying, LLC, dated 1/5/2021, included in Section VII.B shall be revised as follows: Legend: a. Include the recorded instrument number for the ACHD sidewalk easement. b. Include the recorded instrument number for the ACHD storm drain easement. Notes: c. Note#5: Delete note;Homeowner's Associations are not governed by the City of Meridian. d. Note#6: ". . . Lot 19,Block 6, and Lot 1,Block 7 are reserved as common area. . ." e. Note#7: Include recorded instrument number for ACHD license agreement. f. Note#13: ". . . Lot 19,Block 6, are servient to and contain the ACHD storm water drainage system. . ." g. Note#14: Include recorded instrument number of ACHD sidewalk easement. h. Note#15: "The bottom of structural footing shall be set a minimum of 12-inches above the highest established normal ground water elevation." Face of the plat: i. Depict the north/south shared lot line between Lots 50 and 51,Block 1 (Sheet 1). j. Include the Surveyor's Narrative(Sheet 3). k. Include the recorded instrument number for the ACHD sidewalk easement(Sheet 4). 5. The landscape plan prepared by Jensen Belts Associates, dated 12/18/20, shall be revised as follows: a. Re-number the lots consistent with the final plat. b. Include the total linear feet of parkways and the required number of trees in the Landscape Calculations table per the standards listed in UDC 11-3B-7C.3. 6. Future homes constructed in this development shall substantially comply with the conceptual elevations approved with H-2018-0129 included in the Development Agreement. 7. The building lots along the perimeter of the development adjacent to W. Harris St., except for Lots 60 and 62, Block 1, shall be restricted to a single-story in height as proposed by the Developer in accord with the Development Agreement. Page 15 Page 156 Item#8. 8. Prior to issuance of any Certificates of Occupancy within this phase of development,the W.Harris St. roadway improvements,including curb,gutter and detached sidewalk and street buffer landscaping along the full length of the project boundary along W. Harris St. shall be constructed. 9. All single-family attached and multi-family structures shall comply with the design standards listed in the Architectural Standards Manual. An application for Design Review shall be submitted and approved for all attached dwelling units prior to submittal of building permit applications. 10. All development within the Northwest gas pipeline easement shall comply with the Williams Gas Pipeline Developer's Handbook. 11. Address signage for emergency wayfinding purposes shall be provided at the public street for homes accessed by the common driveway on Lot 61,Block 1. 12. A perpetual ingress/egress easement is required to be filed with the Ada County Recorder for all common driveways,which shall include a requirement for maintenance of a paved surface capable of supporting fire vehicles and equipment. A copy of the recorded easements shall be submitted to the Planning Division prior to signature on the final plat by the City Engineer; or, a note including this information may be included on the plat. 13. Staff s failure to cite specific ordinance provisions or conditions from the preliminary plat and/or development agreement does not relieve the Applicant of responsibility for compliance. B. Public Works Site Specific Conditions: 1. The water main in W Harris Street that this development is connecting to is actually a 12-inch, not a 10-inch. 2. Common Driveways with four or more lots need to have a private sewer line that will be the responsibility of the HOA. A manhole in the common driveway located at the property boundary is required with a lid that states"Private". 3. Provide at least 5'of separation between storm drain line and SSMH G-2. 4. Changes to Phase 1 of the development construction plans impact this phase. Drawings need to be updated to show changes to Phase 2. The City has discussed this with the applicant. The applicant is to continue to work with public works and provide the updated drawings. 5. There is no need to show the future lights on Meridian Road. Lights on Meridian Road will require a future installation agreement and deposit pursuant to Section 6-4 B of the Meridian Design Standards. General Conditions: 6. Sanitary sewer service to this development is available via extension of existing mains adjacent to the development. The applicant shall install mains to and through this subdivision; applicant shall coordinate main size and routing with the Public Works Department,and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 7. Water service to this site is available via extension of existing mains adjacent to the development. The applicant shall be responsible to install water mains to and through this Page 16 Page 157 Item#8. development, coordinate main size and routing with Public Works. 8. All improvements related to public life,safety and health shall be completed prior to occupancy of the structures. Where approved by the City Engineer, an owner may post a performance surety for such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC 11-5C-3B. 9. Upon installation of the landscaping and prior to inspection by Planning Department staff,the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 10. A letter of credit or cash surety in the amount of 110% will be required for all incomplete fencing, landscaping, amenities,pressurized irrigation,prior to signature on the final plat. 11. The City of Meridian requires that the owner post with the City a performance surety in the amount of 125% of the total construction cost for all incomplete sewer, water infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The applicant shall be required to enter into a Development Surety Agreement with the City of Meridian. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 12. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 13. In the event that an applicant and/or owner cannot complete non-life,non-safety and non-health improvements, prior to City Engineer signature on the final plat and/or prior to occupancy, a surety agreement may be approved as set forth in UDC 11-5C-3C. 14. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. 15. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 16. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 17. Developer shall coordinate mailbox locations with the Meridian Post Office. 18. All grading of the site shall be performed in conformance with MCC 11-1-4B. 19. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. 20. The engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 21. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed Page 17 Page 158 Item#8. in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 22. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 23. Street light plan requirements are listed in section 6-7 of the Improvement Standards for Street Lighting (http://www.meridiancity.org/public_works.aspx?id=272). All street lights shall be installed at developer's expense. Final design shall be submitted as part of the development plan set for approval, which must include the location of any existing street lights. The contractor's work and materials shall conform to the ISPWC and the City of Meridian Supplemental Specifications to the ISPWC. Contact the City of Meridian Transportation and Utility Coordinator at 898-5500 for information on the locations of existing street lighting. 24. The applicant shall provide easement(s)for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat, but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement(on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2" x 11" map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted,reviewed, and approved prior to signature of the final plat by the City Engineer. 25. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. 26. Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Water Department at (208)888-5242 for inspections of disconnection of services. Wells may be used for non- domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources. 27. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact the Central District Health Department for abandonment procedures and inspections. 28. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water(MCC 9-1-28.C.1).The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized,the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. 29. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. Page 18 Page 159