Z - Project Final Acceptance Letter - Hill's Century Farm Commercial Onsite RoadsEIDIAN,-
�J
February 02, 2021
Steven Hart, Manager KM Engineering
Brighton Corporation 9233 W. State St.
2929 W. Navigator Dr. Suite 400 Boise, ID 83714
Meridian, ID 83646
Mayor Robert E Simison
City Council Members:
Treg Bernt Brad Hoaglun
Joe Borton Jessica Perreault
Luke Cavener Liz Strader
RE: Hill's Century Farm Commercial Onsite Roads — Final Acceptance
Dear Mr. Steven Hart:
Installation of this project's sanitary sewer and/or domestic water systems has been
satisfactorily completed in accordance with the approved plans. These systems have passed
the required testing in accordance with City of Meridian Standard Specifications and Drawings,
and therefore are hereby accepted by the City for ownership and normal maintenance.
Record drawings submitted to us for this project are also accepted and are being forwarded to
the Idaho Department of Environmental Quality. The engineer of record is responsible for
certification of the record drawings as to horizontal and vertical location of all public water and
sewer facilities installed.
In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of
Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works
Construction, Current Edition, the installation and materials of the sewer and domestic water
systems are to be warranted against defect by the owner for a period of two -years from the date
of this letter.
Sincerely,
Warren Stewart, P.E.
City Engineer
cc. City Clerk
PW - Water Division
PW - Wastewater Division
PW - Construction Division
File
Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642
Phone 208-898-5500. Fax 208-898-9551 . www.meridiancity.org