Loading...
BLD D Certificate of ValuesMeridian Building Services Certificate of Value — Page 1 Applicant I=I 2Otj yUNOI=-t_ 45t )r [s =,: j— 4 C44W I =C�2c Project Address tSc. 7 E. O V i=C I c\t t o Q Tenant I l N V f r O W N The project values a e the total fair market value, This shall include all labor, materials and equipment, as well as aB labor, materials and equipment supplied by others, The project value cannot be reduced by labor, material or equipment that is donated. The values below will be verified and adjusted if required by the Meridian Building Official utihig the most current publication of the building valuation data published by the International Code Council, The Total Project Value below is used to establish the Building Permit fee only. The Electrical, Plumbing, Mechanical, Fire Sprinkler, and Fire Alarm values are included in the Total Project Value. In addition to the building permit, subcontractors will be required to apply for each respective permit individually and pay a separate fee based upon the scope of work submitted for that particular discipline. Total Project Value Value This is the total value of all construction work (including overhead and profit). This includes but not limited to finish work, paint, roofing, electrical, plumbing, heating, medical gas, process piping, gas piping, generator, elevators, air conditioning, fire suppression and indication systems as well as permanent systems and equipment. Show each component breakdown below and include above. Does this value include labor, materials and/or equipment supplied by others? Yes � No_ If no, additional permits will be required for this work. Please specify Electrical Total value of ail electrical work performed on the job including overhead and profit. Does this value include labor, materials and/or equipment supplied by others? Yes No_ If no, additional permits will be required for this work. Please specify Plumbing Total value of all plumbing work performed on the job including overhead and profit. Does this value include labor, materials and/or equipment supplied by others? Yeses No_ If no, additional permits will be required for this work. Please specify Total value of all mechanical work performed on the job including overhead and profit. Does this value include labor, materials and/or equipment supplied by others? Yes No_ If no, additional permits will be required for this work. Please specify Fire Sprinkler Value $ j� � Ph: 205.887.2211 + �re roU r-�eridianCjYl%u� � h'tLF3,: /diiTenp�rtal m ai�n� ib�,oy /citizenacces,i Rev: 7/2018 Certificate of Value — Page 2 Total value of all sprinkler work performed on the job including overhead and profit. Does this value include labor, materials and/or equipment supplied by others? Yes_ No_ If no, additional permits will be required for this work. Please specify Fire Alarm Value $ 1XItA Total value of all fire alarm work performed on the job including overhead and profit. Does this value include labor, materials, equipment supplied by others? Yes_ No_ If no, additional permits are required for this work. I hereby attest the information herein is true and correct. I have also selected one of the two required options below for this project. ll of the values provided are estimates only. The project has not been bid and awarded. TRUE (If true you will be required to submit a new certificate of value after the project is bid and a aided and before building, mechanical, electrical, plumbing and fire permits are issued). Provide the actual bid date . 2. All of the values herein are accurate. This project has been bid. Bid documents and/or proposals have been received. TRUE Signature/' L_ Printed lame �� ✓(C?:� P i 1 Date z o t 34-?-�2u� MCI-1t.1Pc., I Email Phone MrCompany/Firm Fax Ph: 208.587.2211e www.raeridia�rdiL,�i� e hi4ns:Ifatlze;,nggrtalmeridiancitV o_r;;(ci4izenaccess_ Rev: 7/2018