Loading...
PZ - Landscape Cover Updated LANDSCAPE & IRRIGATION NOTES: 1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. 2. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION START-UP. 3. NEW CONIFER AND DECIDUOUS TREE PLANTING,SEE DETAIL B AND C/L1.0.CONTRACTOR SHALL STAKE ALL TREES DEEMED NECESSARY, I.E..... FROM BEING BLOWN OVER, PLANTED WITH LOOSE ROOT BALL, ETC.CONTRACTOR'S OPTION. 4. NEW SHRUB PLANTING.SEE DETAILA/L1.0. 5. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. 6. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3"OF SMALL(1"MINUS)BARK CHIPS. SUBMIT FOR APPROVAL. 7. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. 8. FINISH GRADES TO BE SMOOTH AND EVEN GRADIENTS WITH POSITIVE DRAINAGE IN ACCORDANCE WITH SITE GRADING PLAN. 9. IN ALL PLANTER BED AND LAWN AREAS,THE TOP 6 INCHES OF TOPSOIL WILL BE AMENDED AT A RATIO OF 3 CUBIC YARDS OF ORGANIC MATTER PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. 10. FERTILIZE ALL TREES AND SHRUBS WITH'AGRIFORM'PLANTING TABLETS.QUANTITY PER MANUFACTURER'S RECOMMENDATIONS. 11. ALL PLANTING BEDS SHALL HAVE A MINIMUM OF 18"OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM OF 12"TOPSOIL.SPREAD, COMPACT AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW SURFACE OF WALKS AND CURBS IN PLANTING BED AREAS, 1 1/2"AT SOD LAWN AREAS,AND 1" REMOVE DEAD/DAMAGED AT SEED LAWN AREAS. BRANCHES AND PRUNE TO 12. REUSE EXISTING SURFACE TOPSOIL STOCKPILED ON THE SITE.VERIFY SUITABILITY OF SURFACE SOIL INTERNATIONAL SOCIETY OF TO PRODUCE TOPSOIL MEETING REQUIREMENTS AND AMEND WHEN NECESSARY.TOPSOIL SHALL BE ARBORICULTURE STANDARDS; A LOOSE, FRIABLE,SANDY LOAM,CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS,WEED REMOVE DEAD/DAMAGED BRANCHES Q IMPROPERLY PRUNED TREES SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A PH OF 5.5 TO 7.0. IF ON-SITE TOPSOIL AND PRUNE TO INTERNATIONAL (AS DETERMINED BY THE DOES NOT MEET THESE MINIMUM STANDARDS,CONTRACTORS ARE RESPONSIBLE TO EITHER:A) SOCIETY OF ARBORICULTURE LANDSCAPE ARCHITECT) PROVIDE APPROVED IMPORTED TOPSOIL,OR B.)IMPROVE ON-SITE TOPSOIL WITH METHODS A - STANDARDS; IMPROPERLY PURNED SHALL A REMOVED AND APPROVED BY LANDSCAPE ARCHITECT. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES TREES (AS DETERMINED BY THE REPLACED. ARE INSUFFICIENT. CLEAN TOPSOIL OF ROOTS, PLANTS,SODS,STONES,CLAY LUMPS AND OTHER LANDSCAPE ARCHITECT) SHALL BE EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. IF IMPORTED TOPSOIL FROM OFF-SITE REMOVED AND REPLACED. TREE WRAP TRUNK PROTECTION, SOURCES IS REQUIRED, PROVIDE NEW TOPSOIL THAT IS FERTILE, FRIABLE, NATURAL LOAM,SURFACE " SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH,WEEDS AND OTHER LITTER,AND FREE OF -- /,? REMOVE AFTER INSTALLATION / RUBBER CINCH TIE ROOTS,STUMPS,STONES LARGER THAN 2 INCHES IN ANY DIMENSION,AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. RUBBER CINCH TIE 1 2"x 2" CEDAR STAKE a. OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS (LENGTH AS REQUIRED) TO THAT FOUND AT PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY,WELL-DRAINED SITES 2"x2" CEDAR STAKE (LENGTH DO NOT PENETRATE ROOTBALL. WHERE TOPSOIL OCCURS IN A DEPTH OF NOT LESS THAN 4 INCHES. AS REQUIRED) - DO NOT SEE NOTE 1. SET STAKES B. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL ROOTBALL. SEE NOTE 1. SET l PARALLEL TO PREVAILING WIND. � TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE -, STAKES PARALLEL TO PREVAILING TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE WIND. 2" THICK BARK MULCH LAYER, KEEP 2" THICK BARK MULCH LAYER, KEEP ARCHITECTS REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A BARK MULCH 3"AWAY FROM TRUNK FROZEN OR MUDDY CONDITION.ACIDITY/ALKALINITY RANGE-PH.5.5 TO 7.6. BARK MULCH 3"AWAY FROM TRUNK BACKFILL WITH SOIL PLANTING MIX. 13. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE --- OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. BACKFILL WITH SOIL PLANTING MIX. SEE SPECIFICATIONS FOR ADDITIONAL 14. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH iv SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. INSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH INFORMATION. 3" BARK WATER RETENSION HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. FINISH GRADE FINISH GRADE MULCH BASIN — \ 15. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO-ZONES. 16. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS AND =11II COMMERCIAL SLOW RELEASE -11II II — COMMERCIAL SLOW RELEASE 18"AT PLANTER BEDS. -I == - FERTILIZER TABLETS - II -III— —III—III- I'I III I I I II 11= i III I II I� FERTILIZER TABLETS I I III I I-1I I—I I1= 17. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEMS OR POP-UP SPRAY SYSTEMS.ANNUALS, —i Ili COMMERCIAL _ BACKFILL WITH SOIL PERENNIALS GROUND COVERS OR SHRUB MASSINGS SHALL HAVE A POP-UP SPRAY SYSTEM. 11=III=III-III=III=III=III=III=1 11=III=III=III=III=III=III=III=11 11=III 11=III=111 III-III „III III-III III REMOVE BURLAP AND TWINE -111 IIIIIIIII=III_III III REMOVE BURLAP AND TWINE FERTILIZER 1 III- PLANTING MIX. SEE 18. ELECTRONIC WATER DISTRIBUTION/TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM -TIII I= -III11I FROM TOP OF ROOTBALL. IF - - FROM TOP OF ROOTBALL. IF TABLETS �I, __ - - - -III III SPECIFICATIONS FOR CONTROLLER REQUIREMENTS ARE AS FOLLOWS: 2x ROOTBALL DIAMETER I-III-III-I F - I1=1I1=1I1=1I1=I ADDITIONAL INFORMATION 2x ROOTBALL DIAMETER SYNTHETIC BURLAP IS UTILIZED SYNTHETIC BURLAP IS UTILIZED —III„ III11I IIII -PRECISE INDIVIDUAL STATION TIMING 3x ROOTBALL DIAMETER , TO WRAP THE ROOTBALL, IT _ 3x ROOTBALL DIAMETER ✓ _ TO WRAP THE ROOTBALL, IT —1I -i —i -RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES SHALL BE COMPLETELY REMOVED. 1 SHALL BE COMPLETELY REMOVED. -AT LEAST ONE PROGRAM FOR EACH HYDROZONE CONIFEROUS TREE PLANTING DECIDUOUS TREE PLANTING SHRUB PLANTING -SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF SET ROOTBALL ON NATIVE SET ROOTBALL ON NATIVE -POWER FAILURE BACKUP FOR ALL PROGRAMMED INDIVIDUAL VALVED WATERING STATIONS WILL NOT TO SCALE UNDISTURBED SUBSOIL NOT TO SCALE UNDISTURBED SUBSOIL NOT TO SCALE BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. 19. ALL EXISTING COTTON WOOD TREES TO BE REMOVED. TREE PLANTING NOTES 1. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR.ALL STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 2. REMOVAL OF BURLAP AND TWINE FROM TOP OF ROOTBALL MAY BE POSTPONED FOR 90 DAYS AT IRON FENCE CONTRACTOR'S OPTION. PICKETS 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT BEFORE PROCEEDING. 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING METHOD.SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO o PREVENT SLIPPAGE. FO VINYL PRIVACY 6. DEEP SOAK TREE TWICE WITHIN THE FIRST 24 HOURS. FENCE PANELS o 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. FINISH GRADE IRON RAIL LANDSCAPE LEGEND 1" SPACE 1" SPACE FINISH GRADE DECIDUOUS TREE (ASH, NORWAY MAPLE, LINDEN) 1 BAG POST MIX CONCRETE 1 BAG POST MIX (EACH HOLE) FOOTING (TYP.) (EACH HOLE) CONCRETE CONIFEROUS TREE FOOTING (TYP.) SOLID VINYL FENCING 4' IRON FENCE SHRUB NOT TO SCALE NOT TO SCALE CLIMBING ROCK GAZEBO 0 EXISTING TREES PLAZA LAWN AREA (SOD) 13 0 NEW 6' VINYL FENCE NEW 4' IRON FENCE EXISTING FENCE w LANDSCAPE DESIGNER COMPASS POINTE PRELIMINARY THE 3 BROTHERS LANDSCAPING CO. LANDSCAPEI SITE AMENITY PLAN 2565 W TARGEE ST s N BOISE,ID 83705 NE%4 OF THE%4 OF SECTION 30 (208) 899-2108 TOWNSHIP 3 NORTH,RANGE 1 EAST OF THE BOISE MERIDIAN MERIDIAN,ADA COUNTY,IDAHO E OWNER/DEVELOPER PLANNER / CONTACT BUTLER REALTY LLC STEVE ARNOLD T M SHEET 1 OF 2 0 40' 80' 1629 MAIN ST A-TEAM LAND CONSULTANTS DRAWN BY: CJ SHERLOCK REDWOOD CITY, CA 94063 1785 WHISPER COVE AVE. Land Development&Real Estate Services DATE: January 15, 2021 SCALE: 1" = 40' BOISE,ID 83709 FILE: CP_LSCAPE_COVER.dwg 208-871-7020