Loading...
CC - Landscape Plan - I Issue LAND GAPE W. OVERLAND ROAD Description Date BUFFS TYP) 155UE 11-25-20 II C - 7 uGT I BASE REV. I-Ib-21 T o H P - �' 3-G -- FLAN7emu (REFERENCE SHEET L3) INA 5-KF A\ \ ♦� I r� V �\ SYM COMMON NAME �����' F. EVERGREEN TREES LAWN \� m - (TYP) \� \ \ s HS HOOPS BLUE SPRUGE 0- ftb \\\\ \ SR SKY ROGKET JUNIPER + \V \ \ WP VANDERWOLFS PINE t 6535IV- ti I I ° 4 GM 3 KF 3 SM UNPLATTED SHADE TREES (GLASS 111) -GL YP \ \ LP BLOODGOOD LONDON PLANETREE 3_IH �\ �\ \ ss SO SWAMP OAK 1-HS \ \ \ \\I I-VP 5 WIDE PAVED o �c \ SHADE/STREET TREES (GLASS 11)I \ + \\ \\ \\\ \ \ 3-Syy 10 PATHWAY (TYP) \\\\ \ \ \ GP GHANTIGLEER PEAR z o_ 71 5-SM \\ \ \ \ HL SKYLINE HONEYLOGUST ®i 4-GM y A F� TT TULIP TREE I 3-KF C) M 5-F \ \\ �\\ S \ ORNAMENTAL TREES (GLASS 1) C) n 4-GR 9 �� \�� �� JENSENBELTS - \ V A GG CANADA RED GHOKEGHERRY o 5-SR \\ \\ ASSOCIATES z 3 KF \ \ HM HOTW I N65 MAPLE I � � � � 4-GM � A� + V� \� � A F� SHRUBS/ORNAMENTAL GRA55E5/PERENNIAL5 Site Planning 3Q`� 5-IH 8 \ BE BLACK EYED SUSAN Landscape Architecture T II 5-K/ GB GRIM50N PYGMY BARBERRY 1509 Tyrell Lane, Ste 130 \ GM WALKERS LOW GATMINT Boise,� ��\ Idaho 83706 5 HT IRON \\ \ \ \���\G `Ss Ec GR RED FLOWER GARPET ROSE Ph. (208) 343-7175 o FENCE. GRO-LOW SUMAC 4-I14 12 \ SEE DTL 5, + \ ����\�\ \ I IVORY HALO DOGWOOD www.jensenbelts.com SHT L5 (TYP � y \���� E ss _ KF KARL FOERSTER REED GRASS • y�y y y �y � \ SM SLOWMOUND MU60 PINE I 4-GR \ 6 3-CM ERR y y�\ SW SUMMERWI NE NI NEBARK 5-KF 2-KF 4-IH FT) 4 Lv 0 CK 1 BLOCK � + v � o A 3 Kr BLOCK 1 \ 5 4-KF ��P/RR + U 13 5-GR - _ LAWN 6 PRI VAGY VINYL FENGE 00 \ ALONG PERIMETER PROPERTY LINES $ GOMMON AREAS Z SEE DTL 4, SHT L5 (TYP) 3 > J SS L _ _ 5' VINYL FENGE ALONG Cf) Cn COMMON OPEN �— _ SPACE/PATHWAY (TYP) 14 \ h \, ��/ 2 SEE DTL 5, SHT L5.Ld W o CD \ w — — LAWN ' - (TYP) I-LP Lj� I �7 15 / NOTE! _ Z Cn I � W o Q I ® � 2-HL I I. REFER TO SHT L3 FOR PLANT SCHEDULE, h LANDSCAPE NOTES, DETAILS, AND GALGULATIONS. W T E 3-KF 2-5W 80R ��. L II 3-5M 6-SR 2-CG2 2. REFER TO SHT L4 FOR LANDSCAPE AND I-cc 5-BE 19 �i-K> -SW I-LP�''� IIIIII 4 Hs IRRIGATION (PERFORMANCE) SPEGIFIGATIONS. 6-GB "" J I I I I 16 a - - � - - �— �� ' _ 0 ® � ®® o /� L� I a _ J m m c� \ 3-Sw 5-5B R 5-F 3-5M Z 3-SW W 18 2 VISION _ LL 7 — — TRIANGLE (TYP) — \ — _ _ \ _ 5-5M 67S Q � -- o — / 3-GR 3-SW 5-B I I ° 6 HT SOLID 2 BLOCK 2 _ N DTL 4, - KEY MAP � VINYL FENCE � �0 17 \ 3 18 _ SHT L3 (TYP) Job Number 2002 ° _ _ J - - Q Drawn Checked ° LE BLOCK 3 KCS KCS W ° I I Scale AS SHOWN m 3 0 / ° " n I� „ % '^� Sheet Title 19 i - LANDSCAPE a ° a� EXISTING ! PLAN / Cz FENGE ly (TYP)log - ---- --,-- - EP — \ w / 4 Sheet Number 15 I 4j 5 20 W L � I � I — — — NORTH �� � Ll / _ I_MATCHLINE L1 N I 30' 60' 90, 1 of 4 Sheets MATCHLINE L2 SGALE 1" = 30� Issue Description Date 155UE 11-25-20 BASE REV. I-18-21 PLANT 5CoHEr%LE (REFERENCE SHEET L3) AP"IIIIINAl�f�i SYM COMMON NAME , C. Or�i EVERGREEN TREES HS HOOPS BLUE SPRUGE SR SKY ROCKET JUNIPER MATCHLINE L1 WP VANDERWOLFS PINEt535 � Monson o SHADE TREES (GLASS III) rIilyti��1 MATCHLINE L2 5 EXISTING I / o BUILDING �! � \ LP BLOOD600D LONDON PLANETREE SO SWAMP OAK W 14 w \ 6 11111 — 21 SHADE/STREET TREES (GLASS 11) '-Z-Z1 EXISTING �0 GP GHANTIGLEER PEAR / \\ �TEYNi )E I HL SKYLINE HONEYLOGUST V I TT TULIP TREE 05 For,-, 6' HT SOLID \\ 6 / VINYL FENCE \ \� _ / z ORNAMENTAL TREES (GLASS I) SEE DTL 4, JENSENBELTS EP — I C C \� CANADA RED GHOKEGHERRY SHT L3 (TYP) 13 \\ \ ` } HM HOTHIN65 MAPLE ASSOCIATES f 22 w \ SHRUBS/ORNAMENTAL (5RA55E5/PERENNIAL5 Site Planning _ _ /`) / \ LLI Q BE BLACK EYED SUSAN Landscape Architecture / 7 7 7 7 7 7 / �— / o GB CRIMSON PYGMY BARBERRY W O \ \ GM WALKER'S LOW CATMINT Bois TIdah Lane, Ste 130 IQ BLOCK 2 / LL X 7 w Boise, Idaho 837os A / �V A Z Q 6LL GRO-LOW SUMAC,RPET ROSE Ph. (208) 343-7175 / 12 L \ / N IH IVORY HALO D06HOOD www.jensenbelts.com CO3-- a 7 �� / KF KARL FOERSTER REED GRASS IDAHO 23 I / SM SLOWMOUND MU60 PINE POTTERY \' I \ \ \ SW SUMMERWINE NINEBARK � � � I � BARN ,' o IW X \ BLOCK 3 ✓ — — _ ---- — w > 1 y X X 8 \ A BLOCK 1 1 11 JK — (z-Z-Z-Z-Z 0 °i 9 \� I LAWN /— \\ z 24 I-GC I-CC I' 6-IH I-GG �— \ 3-KF 6-SR 6-SR -KF X \ O 4-GR 5-BE _ 5-BE 4-GR \ \ 0 6' PRI VAGY VINYL FENCE ALONG PERIMETER PROPERTY =e EP ® _ I \ LINES COMMON AREAS Z \ T \ 1 ® ® ® VISION SEE DTL 4, SHT L5 (TYP) 2 TT ° 9 � \ � �� � 3-GB - --� - �.��" TRIANGLE \ \ p 3-GB � � � � (TYP) v \ J \ r � � 0 I-SO� I-�' _ 3_SM � 3-SM � � 6-� \ � � � 3 GR 6 SR COMMON I OPEN P`LON6 \ \ Toe 25 —C b ® V — 3-SW 5-BE 5-SW �C a TOE - 1 \ X , X SPACE/PATHWAY (TYP) 2-6L I HW R � I-VP 2-SW 4-S BOU E ® LAWN / ® SEE DTL 5, SHT L5. Im W 6-5R I-HW P ® (TYP) p 5-BE 2-SW AREA \ fl — 2-TT _ SATIN _ . DAVE T T. _ U V � V y� 2- 7-GR - - �, AREA W/ " V — _ -GB PUBLI ART Z 0 LP II / Q Z \ R I. REFER TO SHT L5 FOR PLANT SCHEDULE, _ T LANDSCAPE NOTES, DETAILS, AND J c 6L + _ �� E GALGULATIONS. FALL CREEKON NO.MEADOWS SUBDIVISION NO.1 -GP 4-TT E� �� AND 8' W PARKSTRIP — 2. REFER TO SHT L4 FOR IIRRI6 TION PERFORMANGEDSPEG FIGATIONS. Q 0Gy -� �°/q ' / I C\ W/ LAWN 4 —I � � Q 0 S \ 9 v X LL TREES O yi j \\ EXISTING TREES -- � i TO BE REMOVED� OSEE \ 13. V _ \ SHT L3 (TYP) 0 X BLOCK 4 J E X 3 l � X X 4 5 Q \ � \ Z < X\ X X I ~ � w LL �RR P/RR _ \ PALL G�EK ` \ ���• 5U8L;1v1 4NDoWs Pi R KEY MAP / FALL CREEK MEADOWS \ / SUBDIVISION NO.2 Job Number 2002 � Drawn Checked KCS KCS Scale AS SHOWN Sheet Title i LANDSCAPE PLAN Sheet Number I I j . 0' 30' NORTH 60' 90' L2 2 of 4 Sheets SCALE I" = 30' Issue Description Date 155UE 11-25-20 BASE REV. I-18-21 8' x 2" x 2" CEDAR STAKE, 2 PER TREE. . . ��� OF / I� SET STAKES PARALLEL TO PREVAILING POST GAPPLANT 5CHE:%LE ��1111�111�1#/## DO NOT PENETRATE ROOTBALLGH TIES. 6 O G I Y2 x 5 Y2 RAIL SEE NOTE 3. /g" x 6" VINYL SYM COMMON NAME BOTANICAL NAME S 1 ZE ��� �C. � PICKET PANELS EVERGREEN TREES ROOT GROWN TO BE 1-2" ABOVE FINISH GRADE. HS HOOPS BLUE SPRUGE PIGEA PUNSENS HOOPSII 6-8 HT BBB TRUNK FLARE MUST BE VISIBLE SR SKY ROCKET JUNIPER JUNIPERUS SGOPLULORUM 'SKYROCKET' 6-8' HT BBB J' �115 HP VANDERWOLFS PINE PINUS FLEXILIS 'VANDERWOLFS' 6-8' HT BBB sir ''vIN PLANTIN6 BEDS: ' 5'-0" MIN MULCH AS SPECIFIED. SHADE TREES (GLASS 111) }�►t1 111 11 BRUSH AWAY FROM TRUNK. FERTILIZER TABS AS SPECIFIED LP BL00D600D LONDON PLANETREE PLATANUS x AGERIFOLIA 'BL00D60OD' 2" GAL BBB SO SWAMP OAK QUERGUS BICOLOR 2" GAL BBB SNIP BASKET 4 � 5" x 5" SO POST 2'-O'�Mtt�I L i- - TURN BACK BURLAP 1/3. < SHADE/STREET TREES (GLASS 11) =III—I L I—I L =I I I- BAGKFILL W/ TOPSOIL MIX -III—III—III—III III- G P GHANTIGLEER PEAR PRRUS GALLERYANA '&LEN'S FORM' 2" GAL B4 B 1 _;III-III- AS SPEG'D TAMP LOOSELY IF HL SKYLINE HONEYLOGUST OLED I TS 1 A TRI AGANTHOS I NERM I S 'SKYGOLE' 2" GAL B 4 B IN 4"-6" LIFTS 2 x BALL DIA. TT TULIP TREE LIRIODENDRON TULIPIFERA 2" GAL B4B FOOTING PER MF6 ORNAMENTAL TREES (GLASS 1) JENSENBELTS NOTES: RECOMMENDATIONS I. REMOVE ALL TWINE, ROPE, OR BINDINGS FROM ALL TRUNKS. CC GANADA RED GHOKEGHERRY PRUNUS VIRSINIANA 'GANADA RED' 6-8' HT. MULTI-STEM ASSOCIATES 2. REMOVE BURLAP AND WIRE BASKETS FROM THE TOP 1/3 OF ALL ROOT BALLS AFTER HM H0THIN65 MAPLE AGER TATARICUM 'SARANN' 6-8' HT. MULTI-STEM PLANTING. IF SYNTHETIC WRAP/BURLAP IS USED, IT MUST BE COMPLETELY REMOVED. 3. STAKING OF TREES TO BE THE GONTRAGTOR'S OPTION; HOWEVER, THE CONTRACTOR IS SHRUBS/ORNAMENTAL SRASSES/PERENNIALS Site Planning RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND REMAIN Landscape Architecture STRAIGHT FOR A MIN OF I YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF NOTES: BE BLACK EYED SUSAN RUDBEGKIA FULOIDA 'OOLDSTRUM' I GAL THE I YEAR WARRANTY PERIOD. I. VINYL FENGE STYLE MAY VARY SLIGHTLY. GB CRIMSON PYGMY BARBERRY BERBERIS THUNBER611 'CRIMSON PYGMY' 3 GAL 1509 Tyrell Lane, Ste 130 4. TREES PLANTED IN TURF AREAS: REMOVE TURF 3' DIA. FROM TREE TRUNK. GM WALKER'S LOW CATMINT NEPETA x FAASSENII 'WALKER'S LOW' I GAL Boise, Idaho 83706 GR RED FLOWER CARPET ROSE ROSA 'FLOWER GARPET- NOARE' 3 GAL Ph. (208) 343-7175 OL ORO-LOW SUMAC, RHUS AROMATIGA 'ORO-LOW' S GAL www.jensenbelts.com I H IVORY HALO DOGWOOD GORNUS ALBA 'BA I LHALO' S GAL KF KARL FORESTER REED 6RA55 GALAMA61R0STIS ARUNDINAGEA 'K.F.' I GAL SM SLOWMOUND MUC70 PINE PINUS MUC70 'SLOWMOUND' 3 GAL TREE PLANT I NCB/STAK I NCB 4 V I N-rL PR I VAG''r FENGE SW SUMMERWINE NINEBARK PHYSOGARPUS OPULIFOLIA 'SEWARD' S 6AL NOT TO SCALE NOT TO SCALE 6' VINYL FENGE ALONG 5' VINYL FENGE ALONG III PERIMETER PROPERTY COMMON OPEN 6 H 2" x 2" SQ POST ' O.G. x I LAWN LINES (TYP) SPACE/PATHWAY (TYP) (.080 WALL MIN.) HORIZZONTAL RA I L 4" PICKET SPAG I NG SEE DTL 4, THIS SHT. SEE DTL 5, THIS SHT. O �/S" x 5/S" P I GKETS (.050 WALL) Z MULCH AS SPECIFIED. �I BRUSH AWAY FROM STEM. X m W 1. ALL PLANTI N6 AREAS SHALL BE INSTALLED BE IN AGGORDANGE WITH G I TY OF MERIDIAN GODS. REFER TO SHEET L4 - SPEC, SEGTION 32 ci0 00 - LANDSGAPE 5PEGIFIGATI0N5. 0. L TURN BACK BURLAP, TOP 1/3 OF BALL. KEEP GROUND LINE SAME AS NURSERY. 2. ALL PLANTING AREAS TO BE WATERED WITH AN AUTOMATIC, UNDERGROUND IRRIGATION SYSTEM. REFER TO ° °°° °°° °°° SHEET L4 SPEC SEGTION 32 84 00 IRRIGATION PERFORMANGE SPEGIFIGATIONS. � Q U ° ° ° ° ° ° L I- °00 000 000 000 _ FERTILIZER TABS AS SPECIFIED 000 000 N 000 000 3. LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION. .. CD °°° °°° °°° °°° III III= 1=i =l 1= _ III- PLANTING SOIL AS PER SPEGS. 000 °oo0 000 °000 4. TREES SHALL NOT BE PLANTED WITHIN THE 10-FOOT CLEAR ZONE OF ALL AGHD STORM DRAIN PIPE, 0 CONCRETE STRUGTURES, OR FAG I L I T I ES IN PARKSTR I P5. SEEPAGE BEDS MUST BE PROTECTED FROM ANY AND ALL U Q Z 1211 FOOTING CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRR16ATI0N SYSTEM. Q NOTES: NOTE: DIG HOLE TWIGS THE SIZE OF ROOTBALL. I. IRON FENGE STYLE MAY VARY SLIGHTLY. ALL GALVANIZED 5. NO TREES SHALL IMPEDE THE 40' VISION TRIANGLE AT ALL INTERSEGTIONS. NO CONIFEROUS TREES OR j SHRUBS OVER 3' HIGH AT MATURITY WILL BE LOGATED WITHIN 516HT TRIANGLE OR AGHD ROW. AS TREES POWDERGOATED BLACK. MATURE, THE OWNER SHALL BE RESPONSIBLE FOR PRUNING TREE CANOPIES TO MEET AGHD REQUIREMENTS W FOR MAINTAINING CLEAR VISIBILITY WITHIN 40' STREET VISION TRIANGLE. 6. TREES SHALL BE PLANTED NO GLOSER THAN 50' FROM INTERSEGTION STOP SIGNS. Q SHRUE3 PLANTI NCB I RON FENGE -i. TREE LOCATIONS MAY BE ALTERED TO AGGOMMODATE UTILITIES. TREES SHALL NOT BE PLANTED WITHIN 5' J 2 NOT TO SCALE NOT TO SGALE OF WATER METERS OR UNDERGROUND UTILITY LINES. 0 13. 8. PLANT LIST IS SUBJECT TO SUBSTITUTIONS OF SIMILAR SPECIES DUE TO PLANT MATERIAL AVAILABILITY. O J BURLAP AND WIRE BASKETS TO BE REMOVED FROM ROOT BALL AS MUCH AS POSSIBLE, AT LEAST HALFWAY DOWN THE BALL OF THE TREE. ALL NYLON ROPES TO BE COMPLETELY REMOVED FROM TREES. ci. ALL EXISTING TREES ON SITE ARE TO BE REMOVED AND MAY REQUIRE MITIGATION. VERIFY ALL MIT16ATI0N Z REQUIREMENTS FOR TREES TO BE REMOVED WITH MERIDIAN CITY FORESTER PRIOR TO REMOVAL. SEE LANDSCAPE GALGULATION, THIS SHEET, FOR NUMBER OF ADDITIONAL TREES PROVIDED FOR MITIGATION. TURF 8 MULCH LAN�5CAFE C Q PER SPEC, LOCATION BUFFER WIDTH LENGTH REG2U I RED PROVIDED () W. OVERLAND RD. 12' 100' / 55' = 3 TREES 3 TREES o � Job Number 2002 411 I I'`� COMMUNITY PATHWAY 500' / 100 = 5 TREES 6 TREES 1IIII — III—III I1 i — -III III—III- COMMON AREA 5-7,3-70 / 8,000 = 8 TREES 52 TREES Drawn Checked ' 1 ,11111jI1I1i1��� ..III=� � KCS KCS FINISH GUT EDGE TOP SOIL GRADE TOTAL NUMBER OF TREES: 16 TREES 61 TREES S c a I e AS SHOWN Sheet Title ALL EXISTING TREES ON SITE ARE TO BE REMOVED AND MAY REQUIRE MITIGATION. VERIFY ALL MIT16ATI0N REQUIREMENTS FOR TREES TO BE REMOVED WITH MERIDIAN LANDSCAPE CITY FORESTER PRIOR TO REMOVAL. PLANTER GUT BED EDGE EXTRA TREES PROVIDED ABOVE THOSE REQUIRED FOR MITIGATION: PLAN 45 TREES (2" GAL) _ q0 GAL INCHES NOT TO SCALE ENGINEER DEVELOPER Sheet Number CIVIL INNOVATIONS, PLLC SOUTHPOINT, LLC BEN THOMAS L 3 1043 E. PARK BLVD. STE 101 P.0 BOX 6385 BOISE, ID 83712 BOISE, IDAHO 83707 Phone (208) 884-8181 3 of 4 Sheets Issue Description Date SECTION 32 90 00- LANDSCAPE WORK SECTION 02810-SPRINKLER IRRIGATION I55UE 11-25-20 PART 1 - GENERAL PART 2- PRODUCTS PART 3- EXECUTION PART 1 -GENERAL PART 3- EXECUTION BASE RE\/. I-lb-21 1.1 RELATED DOCUMENTS 2.1 TOPSOIL 3.1 PREPARATION -GENERAL 1.1 CONDITIONS AND REQUIREMENTS: 3.1 GENERAL A. Drawings and general provisions of Contract, including General and Supplementary A. If deemed usable, native topsoil shall be stockpiled for re-use in landscape work. Topsoil A. General Contractor shall be responsible for excavating planting areas to appropriate depths A. General and Supplementary Conditions, and Division 1 General Requirements. A. Install system to provide for adequate protection against freeze damage. Conditions and Division 1 Specification Sections. shall be fertile, friable, natural loam, surface soil, reasonable free of subsoil, clay lumps, for placement of topsoil as specified herein. B. Install system in accordance with approved Contractor design drawings. All brush, weeds, roots, stumps, stones larger than 1 inch in any dimension, and other B. Lay out individual tree and shrub locations and areas for multiple plantings. Stake locations 1.2 SUMMARY deviations from the plans must be approved, and clearly recorded on record drawing. 1.2 SUMMARY extraneous or toxic matter harmful to plant growth. and outline areas and secure Architect's acceptance before start of planting work. Make A. Work included: C. Install system and components in strict accordance with manufacturer's A. This Section includes provisions for the following items: 1. Contractor shall send a minimum of three (3) representative topsoil samples for testing. minor adjustments as may be required. 1. Provide and install a complete and operating automatic irrigation system for recommendations. 1. Trees. See testing requirements below. Contractor is responsible for whatever soil additives are all lawn and planting areas. D. Install quick coupler(s)on main supply line, approximately equal spacing, at 2. Shrubs; Ground cover. recommended by the tests. Submit to Architect for approval. Compost will be added to 3.2 PREPARATION OF PLANTING SOIL 2. Connect to main water supply at existing site stubout as provided. valve box locations or intervals of approximately 200 feet, whichever is greater. �o011111ligl, 3. Lawns. other additives and added regardless of test results. A. Before mixing, clean topsoil of roots, plants, sod, stones, clay lumps, and other extraneous 3. Sleeving under paved areas (by others) Locate adjacent to paved surfaces, at valve boxes where practical. �� 4. Topsoil and Soil Amendments. B. If quantity of stockpiled topsoil is insufficient, contractor to provide imported topsoil that is materials harmful or toxic to plant growth. 4. Obtain and pay for all permits and fees for the work of this section. %� k _�C. _E 5. Miscellaneous Landscape Elements. fertile, friable, natural loam, surface soil, reasonably free of subsoil, clay lumps, brush, B. Mix specified compost and fertilizers with topsoil at rates specified. Delay mixing fertilizer if 5. Perform work on a design/construct basis, subject to the requirements of 3.2 SURFACE CONDITIONS �Iv 6. Initial maintenance of landscape materials. weeds and other litter, and free of roots, stumps, stones larger than 1 inches in any planting will not follow placing of planting soil in a few days. the Contract Documents, applicable codes, and good design practice. A. Examine the areas and conditions under which work will be performed. Notify S B. Related Sections: The following sections contain requirements. dimension, and other extraneous or toxic matter harmful to plant growth. Compost: Lawn Areas: 1/4 compost, : 3/4 topsoil. 6. Winterization of system. Contractor of conditions detrimental to timely and proper completion of Section 1. Underground sprinkler system is specified in Section 32 84 00- Irrigation 1. Obtain topsoil from local sources or areas with similar soil characteristics to that of project Shrub Areas: 1/3 compost, 2/3 topsoil. work. Do not proceed until unsatisfactory conditions are corrected. W. �L site. Obtain topsoil only from naturally well-drained sites where topsoil occurs in a depth Fertilizer: Per soil test and manufacture's recommendations. 1.3 SUBMITTALS B. Locate all underground utilities and structures and notify Architect of any ► 1.3 QUALITY ASSURANCE of not less than 4 inches. Do not obtain from bogs or marshes. C. For shrub and lawn area, mix planting soil either prior to planting or apply on surface of A. Within 30 days after Contractor's receipt of Owner's Notice to Proceed, submit: conflict with Section work. Protect structures and utilities. Repair or ! b ;5 titi A. Subcontract landscape work to a single firm specializing in landscape work. 2. Composition: Topsoil shall contain from 1 to 20% organic matter as determined by the topsoil and mix thoroughly before planting. 1. Manufacturer's printed product information and catalog cut sheets for all replace said structures or utilities damaged by this work at no cost to the Owner. !;,p .. urce Quality Control: Organic emical hod A Soil Survey nts; five B. S. General: Ship landscape materials with certificates of inspection required by governing Investigation bReport No. 1. Maximumslpart particle size, 3/4bndchnwi with maximum 3% retained 3.3 PREPARATION FOR PLANTING LAWNS B. Shoe Drawings: t shop drawings for underground irrigation system including 3.3 SLEEVING f 1111 P 9 P 9 9 9 Y 9 authorities. Comply with regulations applicable to landscape materials. on 1/4-inch screen. A. After excavating and removing surface material to proper depth, loosen subgrade of lawn plan layout and details illustrating location and type of head, type and size A. Sleeving installed by others. Coordinate with other trades. 2. Do not make substitutions. If specified landscape material is not obtainable, submit proof Other components shall conform to the following limits: areas to a minimum depth of 4 inches. Remove stones measuring over 1-1/2 inches in any of valve, piping circuits, circuit GPM, pipe size, controls, and accessories. of non-availability to Architect, with proposal for use of equivalent material. pH 6.5 to 7.5 dimension. Remove sticks, roots, rubbish, and other extraneous matter. Limit preparation to C. Record Drawings:At completion of this work, submit to the Contractor: 3.4 TRENCHING AND BACKFILLING 3.Analysis and Standards: Package standard products with manufacturer's certified Soluble Salts 600 ppm maximum areas which will be planted promptly after preparation. 1. Record Drawings; reproducible and five prints. A. Trenching and backfilling shall be per applicable ISPWC Section. analysis. For other materials, provide analysis by recognized laboratory made in Silt 25-50% 1. Spread topsoil mix to minimum depth of 4 inches for sodded lawns as required to meet 2. Operations and Maintenance information (2 copies), including: B. Cut trenches straight and without abrupt grade changes to allow the following accordance with methods established by the Association of Official Agriculture Chemists, Clay 10-30% lines, grades, and elevations shown, after light rolling, addition of amendments, and a. Information including descriptive details, parts list, specifications, minimum cover: wherever applicable. Sand 20-50% natural settlement. Place approximately 1/2 of total amount of topsoil required. Work maintenance schedules and procedures for system components. 1. Main Lines and Sleeving: 18 inches. 4. Trees, Shrubs and Groundcovers: Provide trees, shrubs, and groundcovers of quantity, 3. Contractor shall submit representative soil report on imported topsoil proposed for use for into top of loosened subgrade to create a transition layer and then place remainder of b. Operation, adjustment of system and components instructions. 2. PVC Laterals: 12 inches. size, genus, species, and variety shown and scheduled for work complying with approval. Report shall meet standards below. Contractor is responsible for whatever planting soil. Add specified soil amendments as required and mix thoroughly into upper 4 c. Winterization procedures. C. Surround lines with 2 inches of clean rock-free material on all sides. recommendations and requirements of ANSI Z60.1 "American Standard for Nursery soil additives are recommended by the test. Compost will be in addition to other inches of topsoil. d. Schedule indicating required open valve time to produce given precipitation Stock". Provide healthy, vigorous stock, grown in recognized nursery in accordance with additives and added regardless of test results. amounts and seasonal adjustments. 3.5 MISCELLANEOUS VALVES good horticultural practice and free of disease, insects, eggs, larvae, and defects such as 3.4 PREPARATION OF PLANTING BEDS e. Warranties and guarantees. A. Install manual drain valves up stream. Install devise at mainline tap in accordance knots, sun-scald, injuries, abrasions, or disfigurement. C. Soil Testing A. Loosen subgrade of planting areas to a minimum depth of 6 inches using a culti-mulcher or with manufacturer requirements for complete operation. Install backflow provision JENSENBELTS 5. Label at least one tree and one shrub of each variety with attached waterproof tag with 1. Soil tests are required for this project(see above for requirements). Test shall be provided similar equipment. Remove stones measuring over 1 1/2 inches in any dimension. Remove 1.4 GUARANTEE and connect to controller. ASSOCIATES legible designation of botanical and common name. as follows: stocks, stones, rubbish, and other extraneous matter. A. Guarantee in writing all materials, equipment and workmanship furnished to be a. Where formal arrangements or consecutive order of trees or shrubs are shown, select a. Provide certified analysis at time of sample submitted (three samples imported B. Spread planting soil mixture to minimum 12 inch depth required to meet lines, grades, and free of all defects of workmanship and materials. Within one year after date of 3.6 CIRCUIT VALVES stock for uniform height and spread. topsoil).Amend soils per chemist's recommendations and as herein specified unless elevations shown, after light rolling and natural settlement. Add 1 1/2 inches of specified Substantial Completion repair or replace all defective parts or workmanship that A. Install in valve box, arranged for easy adjustment and removal. 6. Inspection: The Architect may inspect trees and shrubs either at lace of growth or at site otherwise approved b Architect. compost over entire planting area and mix thoroughly into upper 6 inches of topsoil. Place may be found at no additional cost to Owner. 1. Provide union on downstream side. Site Planning p Y p P 9 pp Y p P 9 9 Y� pP p Y before planting, for compliance with requirements for genus, species, variety, size, and 2. Test shall include, but not limited to recommendations on chemical distributions, organic approximately 1/2 of total amount of planting soil required. Work into top of loosened B. Fill and repair all depressions and replace all necessary lawn and planting which 2. Install valve box on bricks-four required. Landscape Architecture quality.Architect retains right to further inspect trees and shrubs for size and condition of contents, pH factors, and sieve analysis as necessary. Test#1T by Western subgrade to create a transition layer, then place remainder of the planting soil. result from the settlement of irrigation trenches for one year after date of 3. Install top flush with finish grade. balls and root systems, insects, injuries and latent defects, and to reject unsatisfactory or Laboratories (1-800-658-3858) is required. C. Apply Pre-Emergent per manufacturer's recommendation. Substantial Completion. 4.Adjust automatic control valves to provide flow rate of rated operating 1509 Tyrell Lane, Ste 130 defective material at any time during progress of work. Remove rejected trees or shrubs 3. Contractor is responsible for whatever soil additives are recommended by the soil testing C. Supply all manufacturer's printed guarantees. pressure required for each sprinkler circuit. Boise, Idaho 83706 immediately from project site. laboratory. 3.5 PLANTING TREES AND SHRUBS Ph. (208) 343-7175 4. Contractor shall coordinate, obtain and pay for all soil tests. A. Set balled and burlapped (B&B)stock on layer of compacted planting soil mixture, plumb and 1.5 QUALITY ASSURANCE 3.7 PIPE INSTALLATION 1.4 SUBMITTALS 5. If regenerative noxious weeds are present in the soil, remove all resultant growth in center of pit or trench with top of ball at same elevation as adjacent finished landscape A. Contractor shall be licensed in the State in which this work is being performed. A. Lay PVC pipe in accordance with standard and acceptable practice. Thrust www.jensenbelts.com A. General: Submit the following in accordance with Conditions of Contract and Division 1 including roots throughout one-year period after acceptance of work, at no cost to Owner. grades. Remove burlap from sides of balls; retain on bottoms. When set, place additional B. Contractor shall have at least two years prior experience in projects of equal blocks to be used at points of intersection and change of direction in main line Specification Sections. backfill around base and sides of ball, and work each layer to settle backfill and eliminate or larger scope. Provide minimum of three references and list of similar pipe as per manufacturer's recommended specifications. Install manual drains. B. Plant and Material Certifications: 2.2 pH ADJUSTERS voids and air pockets. Place fertilizer tablets in excavated area per manufacture's written projects with owners' names, addresses, and phone numbers,when requested by B. PVC pipe joints, solvent welded except as indicated. Cut pipe square, deburr, 1. Certificates of inspection as required by governmental authorities. A. When pH does not comply with this specification, commercial grade aluminum sulfate shall instructions. When excavation is approximately 2/3 full, water roughly before placing Owner. wipe from surface all saw chips, dust, dirt, moisture and any foreign matter 2. Manufacturer's or vendor's certified analysis for soil amendments and fertilizer materials. be used to adjust soil pH. remainder of backfill. Repeat watering until no more is absorbed. Water again after placing C. Contractor shall employ on site at all times a foreman who is thoroughly which may contaminate the cemented joint. Apply cleaner/primer and solvent 3. Label data substantiating that plants, trees, shrubs and planting materials comply final layer of backfill. Remove all ties from around base of trunk. experienced and competent in all phases of the work of this Section. cement, make joints in accordance with manufacturer's recommendations. Use specified requirements. 2.3 SOIL AMENDMENTS B. Set container grown stock, as specified, for balled burlapped stock, except cut cans on 2 Teflon thread sealant(tape)at all threaded joints. C. Mulch: Submit 1 gal bag of mulch sample for approval. A. Compost: Compost: "Cascade Compost"from Cloverdale Nursery(208)375-5262 and sides with an approved can cutter and remove can; remove bottoms of wooden boxes after 1.6 SYSTEM DESCRIPTION C.Contractor shall size pipe according to schedule provided. Flow velocities shall NuSoil Compost(208)629-6912 or approved equal in equal amounts by volume. partial backfilling so as not to damage root balls. A. Design requirements: not exceed 5 feet/second in all cases. Lateral lines shall be laid out and installed 1.5 DELIVERY, STORAGE AND HANDLING B. Commercial Fertilizer: Fertilizer shall be complete, standard commercial brand fertilizer. It C. Trees planted in turf area: Remove turf 3'dia around tree trunk. Dish top of backfill to allow 1. Minimum water coverage: Planting areas-85%, Lawn areas- 100% (full head-to-head) per zone to balance the pressure loss and provide minimum fluctuation in system A. Sod: Time delivery so that sod will be placed within 24 hours after stripping. Protect sod shall be free-flowing and packaged in new waterproof, non-overlaid bags clearly labeled as for mulching. 2. Layout system to obtain optimum coverage using manufacturer's standard operating pressures. Z against drying and breaking of rolled strips. to weight, manufacturer, and content. Protect materials from deterioration during delivery D. Mulch pits, and planted areas. Provide not less than following thickness of mulch, and work heads. Spray on walks, walls or paved areas is not acceptable. Pipe Size Pipe Section Pipe Size Pipe Section B. Trees and Shrubs: Provide freshly dug trees and shrubs. Do not prune prior to delivery and while stored at site. into top of backfill and finish level with adjacent finish grades. 3. Zoning shall be designed for optimum use of available pressure and efficient 3/4" 0-9 GPM 1 1/2" 26-34 GPM unless otherwise approved by Architect. Do not bend or bind-tie trees or shrubs in such 1. Commercial fertilizer"A"for trees and shrubs during planting; slow release Agriform 1. Provide 3 inches thickness of mulch. distribution for types of plantings and shapes of planting areas. 1" 10-17 GPM 2" 35-50 GPM O manner as to damage bark, break branches, or destroy natural shape. Provide protective Planting 5-gram tablets 20-10-5 type or equal. E. If season and weather conditions dictate, apply anti-desiccant, using power spray, to provide 4. Design pressures: Install pressure regulating equipment as necessary. 1 1/4" 18-25 GPM 2 1/2" 51-80 GPM covering during delivery. Do not drop balled and burlapped stock during delivery. 2. Commercial fertilizer"B"for lawn areas, applied to bed prior to seeding or sodding, to be an adequate film over trunks, branches, stems, twigs and foliage. 5. Provide/install approved fixed tee or coupling device for air blow winterization. co Z C. Deliver trees and shrubs after preparations for planting have been completed and plant 16-16-17 applied at the rate of ten pounds per acre. F. Prune, thin out, and shape trees and shrubs in accordance with standard horticultural Location shall be on main supply line downstream from main shut off valve. D. Techline Drip Line: Place in shallow furrow at finish grade, below layer of immediately. If planting is delayed more than 6 hours after delivery, set trees and shrubs in 3. Commercial fertilizer"C"for lawn areas three to four weeks after planting (sod)or after practice. Prune trees to retain required height and spread. Unless otherwise directed by 6. Install approved backflow prevention device in conformance with local or specified mulch. Lay in uniform pattern in groundcover areas, or as per shrub Q shade, protect from weather and mechanical damage, and keep roots moist by covering with first mowing (seed). Organic Fertilizer Milorganite (6-0-2)type or equal. Architect, do not cut tree leaders, and remove only injured or dead branches from flowering prevailing codes, and in approved site location. Provide for drainage pattern layout. Coil 20 linear feet at each balled and burlapped tree around > .J mulch, burlap or other acceptable means of retaining moisture. C. Herbicide: Pre-emergent for topical application in planting beds. Oxiadiazon 2G brand or trees, if any. Prune shrubs to retain natural character. without erosive damage. base and to allow for tree removal if required. Flush all lines with full head of D. Do not remove container-grown stock from containers until planting time. pre-approved equal. Use in accordance with manufacturer's recommendation on all planting G. Remove and replace excessively pruned or misformed stock resulting from improper pruning. water prior to installation of flush valves at end of circuit runs. 0. E. Do not drop or dump materials from vehicles during delivery or handling. Avoid any damage beds. H. Guy and stake trees immediately after planting, as indicated. E. Flush Valves: Install flush valve at end of each drip line run. a to rootballs during deliver, storage and handling. I. Apply approved herbicide to all shrub bed areas at manufacture specified rate. Re-apply as PART 2- PRODUCTS 2.4 PLANT MATERIALS necessary for elimination of weeds. 3.8 SPRINKLER HEADS Im III 1.6 JOB CONDITIONS A. Quality: Provide trees, shrubs, and other plants of size, genus, species, and variety shown 2.1 PIPE AND FITTINGS A. Flush circuit lines with full head of water prior to head installation. A. Utilities: Determine location of underground utilities and work in a manner which will avoid for landscape work and complying with recommendations and requirements of ANSI Z60.1 3.6 SODDING NEW LAWNS A. PVC 1120,ASTM D-1784, permanently marked with manufacturer's name, 1. Install heads at level with mulch or lawn. D 0. possible damage. Hand excavate, as required. Maintain grade stakes until removal is "American Standard for Nursery Stock". A. General: Install lawn sod in all areas designated on the drawings. schedule rating, size, type. Solvent-weld type: 2. Locate part-circle shrubbery heads to maintain a minimum distance of six mutually agreed upon by parties concerned. B. Deciduous Trees: Provide trees of height and caliper scheduled or shown with branching B. Soil Preparation 1. Pipe: inches (6")from walls and four inches (4")from other boundaries unless B. Excavation: When conditions detrimental to plant growth are encountered, such rubble fill, configuration recommended by ANSI Z60.1 for type and species required. Single stem trees 1. Any sod lawn areas that may have become compacted prior to sodding must be scarified a. Pressure lines: Schedule 40 solvent weld. otherwise indicated. Keep overspray to a minimum. CO a U adverse drainage conditions, or obstructions, notify Architect before planting. except where special forms are shown or listed. to a depth of eight(8) inches by approved means, then finish graded as hereinbefore b. Lateral lines: Class 200 pvc. C.Adjacent Landscape: Protect planted areas adjacent to construction area. Replace or C. Deciduous Shrubs: Provide shrubs of the height shown or listed, not less than minimum described. c. Sleeving: Class 200 pvc. 3.9 CONTROL WIRE INSTALLATION CIO recondition to prior conditions at project completion. number of canes required by ANSI Z60.1 for type and height of shrub. C. Lay sod within 24 hours from time of stripping. Do not plant dormant sod or if ground is 2. Fittings: Schedule 40 PVC, solvent-weld type. Install threaded joints where A. Bury wires beside or below main line pipe in same trench. �- 2.. D. Coniferous and Broadleafed Evergreens: Provide evergreens of sizes shown or listed. frozen. required at valves, risers, etc. B. Bundle multiple wires together with tape at ten feet(1 0') maximum intervals. 1.7 SEQUENCING AND SCHEDULING Dimensions indicate minimum spread for spreading and semi-spreading type evergreens D. Sod Placement 3. Risers: Lawn and shrub heads-flexible and damage-resistant plastic C. Provide 36 inch loop in wires at each valve where controls are connected and U) < Z A. Planting Time: Proceed with, and complete landscape work as rapidly as portions of site and height for other types, such as globe, dwarf, cone, pyramidal, broad upright, and 1. Sod will be brought onto lawn areas by wheeled means with proper protection of sod "polypipe" riser. at 100' maximum intervals between. become available, working within seasonal limitations for each kind of landscape work columnar. Provide normal quality evergreens with well balanced form complying with beds. Sod layers shall be experienced, or if inexperienced, shall be constantly 4. Solvent: NSF approved solvent for Type I & II PVC. D. Make all electrical joints (splices) in boxes only. Make electrical joints w o Q required. requirements for other size relationships to the primary dimension shown. supervised by an experienced foreman. The Contractor shall insure that the base B. Polyethylene Pipe waterproof per manufacturers requirements. 1. Plant or install all plant materials during normal planting seasons from 15 March to immediately ahead of sod layer is moist. Sod shall be laid tight with not gaps. Allowance 1. Pipe: Class 100, 3/4" lateral line, for use on drip irrigation zone(s)where 15 November. 2.5 GRASS MATERIALS shall be made for shrinkage. Lay sod with long edges perpendicular to primary slope. drip tubing is not otherwise used. 3.10 AUTOMATIC CONTROLLER 3: W 2. Correlate planting with specified maintenance periods to provide maintenance from A. Lawn sod: Provide strongly rooted sod, not less than 1 growing season old, and free of 2. Lay to form a solid mass with tightly fitted joints. Butt ends and sides of strips; do not 2. Fittings: Schedule 80 PVC. A. Install on site as approved. Verify location with Owner Representative. date of substantial completion. weeds and undesirable native grasses. Provide only sod capable of growth and overlap. Stagger strips to offset joints in adjacent courses. Work on boards to avoid 3. Clamps: Stainless Steel. B. Install typewritten legend inside controller door.Coordinate power with electrical. 2 B. Coordination with Lawns: Plant trees and shrubs after final grades are established and prior development when planted (viable, not dormant). damage to subgrade or sod. Tamp or roll lightly to ensure contact with subgrade. Work C. Drip Line: Netafim Techline Dripperline, with .6 GPH drippers at 18"spacing. C. Install controller per manufacturers requirements. Q to planting of lawns, unless otherwise acceptable to Architect. If planting of trees and shrubs 1. Provide sod of uniform pad sizes with maximum 5% deviation in either length or width. sifted soil into minor cracks between pieces; remove excess to avoid smothering of a occurs after lawn work, protect lawn areas and promptly repair damage to lawns resulting Broken pads or pads with uneven ends will not be acceptable. Sod pads incapable of adjacent grass. 2.2 SPRINKLER HEADS 3.11 TESTING from planting operations. supporting their own weight when suspended vertically with a firm grasp on upper 10% 3. Sod shall be rolled with a two hundred (200) pound roller after installation to insure A. Description: Appropriate for application in throw, pressure and discharge. Each A. Do not allow or cause any work of this Section to be covered up or enclosed O 0. of pad will be rejected. proper contact between soil and sod. Final rolling must provide a uniform surface. After type of head shall be of a single manufacturer. until it has been inspected and tested. 1.8 SPECIAL PROJECT WARRANTY B. Provide sod composed of: Rhizomatous Tall Fescue (RTF)from the The Turf final rolling, the sod lawn shall be mowed and watered. Approval of sod lawns shall be 1. Lawn heads: pop-up type. B. Pressure testing: A. Warranty lawns through specified lawn maintenance period, until Final Project Acceptance. Company, Meridian, ID (208)888-3760 or approved equal. based on uniform, healthy and vigorous growth with no dry or dead spots. B. Manufacturer: Rainbird or Hunter. 1. Make necessary provision for thoroughly bleeding the line of air and debris. O J B. Warranty trees and shrubs, for a period of one year after date of substantial completion, 4. Add fertilizer"B"at the manufacturer's recommended application rate. 2. Before testing, cap all risers, and install all valves. against defects including death and unsatisfactory growth, except for defects resulting from 2.6 MISCELLANEOUS LANDSCAPE MATERIALS E. Water sod thoroughly with a fine spray immediately after planting. 2.3 AUTOMATIC CONTROL SYSTEM 3. Fill all main supply lines with water. Pressurize to 100 psi. Close air supply 3: < neglect by Owner, abuse or damage by others, or unusual phenomena or incidents beyond A. Anti-Desiccant: Emulsion type, film-forming agent designed to permit transpiration, but retard F. Sodded Lawn Establishment A. General; Furnish low voltage system manufactured expressly for control of and test for leakage. Test shall be approved if no greater than 5 psi loss Z Landscape Installer's control. excessive loss of moisture from plants. Deliver in manufacturer's fully identified containers 1. The Contractor shall be responsible for first mowing, subsequent mowings and fertilizing automatic circuit valves of underground irrigation systems. Provide unit of occurs in 15 minutes. C. Remove and replace trees, shrubs, or other plants dead or in unhealthy condition during and mix in accordance with manufacturer's instructions. of sod lawn areas until Final Acceptance of the project. capacity to suit number of circuits as indicated. 4. Fill all zone lines with water to static pressure. Hold for 15 minutes. warranty period. Make replacements during growth season following end of warranty period. B. Mulch: Mulch for planting beds shall be Premium Ground Cover(blend of Cascade Compost 2. Mowing shall be done by an approved "reel"type mower. Mower blades shall be set at B. Control Enclosure: Maufacturer's standard wall mount with locking cover, Inspect for leakage. Replace trees and shrubs which are in doubtful condition at end of warranty period; unless, and Black Lava Fines)from Cloverdale Nursery(208-375-5262), consistent in appearance, two (2) inches high for all mowings. complying with NFPA 70. 5. Contractor shall provide all required testing equipment and personnel. Test 0 in opinion of Architect, it is advisable to extend warranty period for a full growing season. and shall contain no toxic substance detrimental to plant life. 3. Subsequent fertilizing shall occur three to four weeks after installation. Apply fertilizer as C. Circuit Control: each circuit variable from approximately 5 to 60 minutes. shall be performed in presence of Architect. Contractor shall make notice C. Stakes and Guys: Provide stakes and deadmen of sound new hardwood, treated softwood, per the Manufacturer's recommended application rate. Verify all methods of application. Including switch for manual or automatic operation of each circuit. of test(48) hours in advance. Q or redwood, free of knot holes and other defects. Provide wire ties and guys of 2-strand, Contractor shall notify the Architect in writing that the fertilizer applications have occurred D. Timing Device: Adjustable 24-hour and 7 or 14 day clocks to operate any time 6. Provide required testing equipment and personnel. twisted, pliable galvanized iron wire, not lighter than 12 ga. with zinc-coated turnbuckles. and on what dates. of day and skip any day in a 7 or 14 day period. 7. Repair leaks, and retest until acceptance by the Architect. co Provide not less than 2 inch diameter rubber or plastic hose, cut to required lengths and of E. Wiring: Solid or stranded direct-burial type as recommended by manufacturer C. Coverage inspection: upon completion of all systems, perform a coverage test uniform color, material, and size to protect tree trunks from damage by wires. 3.7 MAINTENANCE of control unit; type AWG-UF, UL approved. to determine if coverage of water afforded all areas is complete, adequate and A. Begin landscape maintenance immediately after planting. Maintenance shall continue until uniform. Change heads, nozzles, orifices and/or adjustment as directed to Project Final Acceptance. 2.4 VALVING provide uniform coverage. B. Maintain trees, shrubs, and other plants by pruning, cultivating, and weeding as required for A. Manual valves: brass or bronze for direct burial, gate valves, 150 pound class, D. Final inspection: Job Number 2002 healthy growth. Restore planting saucers. Tighten and repair stake and guy supports and threaded connection with cross type handle designed to receive operating key. 1. Clean, adjust, and balance all systems. Verify that: reset trees and shrubs to proper grades or vertical position as required. Restore or replace B. Automatic circuit valves: high impact plastic with corrosion-resistant internal a. Remote control valves are properly balanced; damaged wrappings. Spray as required to keep trees and shrubs free of insects and disease. parts. Low power solenoid control, normally closed, with manual flow b. Heads are properly adjusted for radius and arc of coverage; Drawn Checked C. Maintain lawns by watering, fertilizing, weeding, mowing, trimming, and other operations adjustment. c. The installed system is workable, clean and efficient. such as tolling, regrading and replanting as required to establish a smooth, acceptable lawn, 1. Drip Control Zone Kit: Hunter PCZ-101. E. Winterization: Winterize system at the end of first season of system operation. K CS K CS free of eroded or bare areas. 2. Standard sprinkler valve shall be Rainbird PEB-PRS-B. Review procedures with Owner Representative. AS SHOWN D. Maintain lawns for no less than period stated above, or longer as required to establish C. Quick coupler valve: brass or bronze construction with hinged top. One per zone. Scale acceptable lawn. D. Manual drain valves: END OF SECTION 1. Bronze construction, straight type, 150 pound class, threaded connections, Sheet Title 3.8 CLEANUP AND PROTECTION with cross type operating handle designed to receive operating key. Calco, A. During landscape work, keep pavements clean and work area in an orderly condition. Champion 100, or approved equal. LANDSCAPE B. Protect landscape work and materials from damage due to landscape operations, operations 2. Size: 3/4 inch. by other contractors and trades, and trespassers. Maintain protection during installation and E. Manual Flushing Valve: Netafim Model TLSOV, two per zone (each end). SPECIFICATION maintenance periods. Treat, repair, or replace damaged landscape work as directed. 2.5 MISCELLANEOUS 3.9 INSPECTION AND ACCEPTANCE A. Chemicals: primer and solvent glue as required by pipe manufacturer. A. When landscape work is completed, including maintenance, Architect will, upon request, B. Valve box- high impact plastic, green in color. make an inspection to determine acceptability. C. Valve cover and frame-compatible with valve box with provision for locking. B. When inspected landscape work does not comply with requirements, replace rejected work D. Drainage backfill -clean gravel or crushed stone, graded from 3" maximum to ENGINEER DEVELOPER Sheet Number and continue specified maintenance until reinspected by Architect and found to be acceptable. 3/4" minimum. Remove rejected plants and materials promptly from project site. CIVIL INNOVATIONS, PLLC SOUTHPOINT, LLC END OF SECTION BEN THOMAS 1043 E. PARK BLVD. STE 101 P.0 BOX 6385 L4 BOISE, ID 83712 BOISE, IDAHO 83707 Phone (208) 884-8181 4 of 4 Sheets