Loading...
PZ - Applicant's Request to Continue (3) Charlene Way From:Sonya Allen Sent:Tuesday, January 19, 2021 12:09 PM To:Adrienne Weatherly; Charlene Way; Chris Johnson Cc:Mike Wardle - Brighton Corp. (mwardle@brightoncorp.com); Bill Parsons Subject:TM Center Preliminary Plat - Request for Continuance Attachments:TM Center Appl Narr Up-date 01-18-21.pdf From: Mike Wardle <mwardle@brightoncorp.com> Sent: Monday, January 18, 2021 2:59 PM To: Caleb Hood <chood@meridiancity.org>; Bill Parsons <bparsons@meridiancity.org>; Sonya Allen <sallen@meridiancity.org> Cc: Cameron Arial <carial@meridiancity.org>; Bill Nary <bnary@meridiancity.org>; David Turnbull <dturnbull@brightoncorp.com>; Jon Wardle <jwardle@brightoncorp.com> Subject: TM Center Preliminary Plat External Sender - Please use caution with links or attachments. All, The TM Center Subdivision preliminary plat (attached narrative revision) was submitted May 29, 2020. Due to the related Ten Mile Crossing Sub Area Plan/PUD proposal, the August 6, 2020, P&Z Commission hearing was “continued” to allow for concurrent consideration. There have been four subsequent pre-plat continuances. - With commercial and high-density residential zoning in-place for all potential uses from the initial annexation applications; - With no perceived conflicts with existing DA’s for those potential uses; and - With the “redirection” from a Ten Mile Crossing Sub Area Plan PUD to a Master DA/Design Guidelines . . . . . . We don’t feel there is justification to further delay the preliminary platting process. stth Thus, we respectfully request that the preliminary plat be continued one last time, from January 21 to the February 18 P&Z Commission public hearing, while we work through the Ten Mile Crossing Master DA/Design Guidelines. Michael D. Wardle, Director of Planning BRIGHTON CORPORATION 2929 W. Navigator Dr., Suite 400, Meridian, ID 83642 Direct 208.287.0512 l Mobile 208-863.6150 mwardle@brightoncorp.com 1 4� BRIGHTON CORPORATION WISED January 18, 2021 Caleb Hood, Planning Manager City of Meridian Planning Department Meridian City Hall Subject: TM Center Subdivision Preliminary Plat Dear Mr. Hood, 1 : Given the "re-direction" of Brighton's Ten Mile Crossing proposal from a Sub-Area Plan PUD to a Master DA with design guidelines, we request immediate action to schedule the continued hearing for: • TL;Q QJ4L3=;ffQ] p� TM Center Subdivision, a preliminary plat encompassing previously un-platted TM Creek East parcels, along with the Calnon, Ten Mile Center, and Bainbridge Franklin properties acquired by Brighton in 2017 and 2019. M--di-W-Ation of the, go*omiog 2929 W Navigator Dr.,Suite 400, Meridian, ID 83642 1 www.BrightonCorp.com 1208.378.4000 Fax: 208.377.8962 TM CENTER PRELIMINARY PLAT TM Center Subdivision is a 132.42-acre, 85-lot commercial and high-density residential project encompassing the annexed and zoned Brighton properties (below) not part of the previously- approved TM Crossing and TM Creek project preliminary plats. - N TM CREEK z� e _ ' TM CENTER SUBDIVISION - �oc PRELIMINARY PLAT -- J W ' I - f . I 7 - r TM CROSSING .or 1 - 84 - LOTTING Seventy-four(74) of the project's 85 lots depicted on the following page are commercial, with C-C and C-G zoning. The nine (9) lots between Tenmile Creek and Cobalt Drive (Lots 16-24, Block 3) will, at the completion of minor rezoning in conjunction with the -RE ^_-Q n'�� nT T'' subsequent Master DA/Design Guidelines process,be R-40, high-density residential; Lot 16 is a portion of the TM Creek Phase 2 apartment site. Two common lots are proposed: • Lot 15, Block 3, the Tenmile Creek amenity corridor, featuring a 10-foot wide multi-use pathway on the south side of the creek and Nampa-Meridian's maintenance road on the north. • Lot 1, Block 4, adjacent to and parallel with Franklin Road, will be deeded to the Nampa- Meridian Irrigation District for the relocation of the Von Lateral. 2 li II tir I Q + O O r I ' o 0 r v a D Q 3"Ma IWHON39 I � o ° MIX bc i I I d �a 0 0 0 0 3 ROADWAY CIRCULATION SYSTEM Initial project phases established principal Ten Mile Road intersections at Cobalt and Vanguard; and, in 2019, the Franklin Road intersection at Wayfinder. The development of TM Center Subdivision will complete the internal roadway connections between Ten Mile Road and Franklin Road through the system of collector roadways depicted below in conformance with the current TMISAP. • In 2020, Wayfinder Ave. was constructed between the Vanguard and Cobalt roundabouts, completing the first of two north/south public street connections. The second will be the `future" Benchmark Avenue extension from Navigator in TM Crossing to Franklin Road. • Cobalt Drive, the east/west collector connection from Ten Mile to Wayfinder to Benchmark is more than two-thirds complete—from Ten Mile Road to the eastern boundary of the TM Creek Apartments-Phase 2 project site (below). - - - rankli - - a REEK -- m Cobal _ — (U CENTER _. OSS TM CR NavigaLO Navigator V6 10 oc V Y vA 1 r � l 4 AMENITY CORRIDORS &PATHWAY SYSTEM Amenities are typically associated with residential projects. However, the Ten Mile Crossing employment, retail and high-density residential "community"will benefit from an 8-to 10-foot wide on- and off-street multi-purpose pedestrian pathway system depicted below. That system is off to a good start with two key components: The improved Tenmile Creek amenity and 10-foot pathway corridor from Franklin Road to Wayfinder; and the 10-foot pathway along the relocated Purdam Drain from the Navigator/Ten Mile Road underpass easterly, past the Paylocity building. Both, pictured below, will be expanded with Phase 2 of the TM Creek apartments, and the recently-completed LaSalle Building at the southeast corner of the project. - Franklin V6p \' 7 EiUtY DO Multi-Purpose Pathways TEN+;+MILE Roads&Pathways Ten Mile Crossing District F Navigator N-igator 8'to 10'Pathways CORRIDOR c N �• MI-L-- A third off-street componenta dual sidewalk "boulevard"along the City's sewer main corridor north of the Ameriben Building—is partially complete. The existing sidewalk on the north boundary of Ameriben's property will be extended to Vanguard on the west and to,.T ._ Benchmark on the east. A second,parallel sidewalk will be added to the north with a planter bed between the two sidewalks with future TM Center Subdivision development phases. In addition to those off-street facilities, multi-purpose pathways along Wayfinder and Benchmark will connect Tenmile Creek and the Purdam Drain; and provide a link to the existing 10-foot pathway adjacent to Ten Mile Road. Combined, that 3.5-mile "system"will provide Ten Mile Crossing employees and residents with active/passive options and `pause-and-enjoy" stations. All of the above, , is in addition to the sidewalks along the public streets! 5 ��r_rnr.r n r rrn n r.rrrrr > > > > , > C-2-vossing Sub Are- PUBLIC TRANSPORTATION (Excerpt from City File H-2020-0114 Application Narrative) The first public transportation facilitya bus stop location at the northwest corner of the Vanguard and Wayfinder roundabout—has been provided at Ten Mile Crossing. That facility, the result of proactive and continuing coordination with Valley Regional Transit (VRT), is the first of many stops anticipated within the project as the business and residential population of Ten Mile Crossing increases. VALLEY REGIONAL TRANSIT BUS STOP TEN MILE CROSSING SUWAREA PLAN �. On April 6, 2020, the Valley Regional Transit Board approved the fixed-route connecting The Village at Meridian and Ten Mile Crossing illustrated on the following page, and issued this statement: "VRT has been working with the City of Meridian, local businesses, and the general public to develop a new route serving the heart of Meridian. The proposed alignment from Ten Mile and 6 Franklin roads to Kleiner Park via Pine will connect approximately 21,000 jobs with almost 20,000 people. It will support the significant employment and residential developments being planned for downtown Meridian....given that the service will only run during the rush hour period, it was determined that Pine Street provided the most direct access to the largest employment centers along the corridor....This new route is the first ValleyRide fixed-route service in Meridian that serves the downtown area. It is expected to begin service in early 2021. " z z rr W Cherry Ln a m � a a W+PinerAve Meridian ---4"raMkNq Rd E Franklin Rd -n i Q w Q ' r C V C J J i - - Ln U7 I 1 1 111 1 • _• LA_----- --�'" W Overland Rd E Overland Rd E Over 3000 ft ,n ZI °°°° ®Egg= C)Maphox C Olp�'_RnStreetMap Dialogue with VRT will continue with additional bus stop locations anticipated in future development phases as the public transportation system expands. RESIDENTIAL—NOW AND IN THE FUTURE The existing Ten Mile Center and Calnon development agreements, combined, require a minimum of 593 dwelling units. There was no such requirement for TM Crossing and only a reference to a density range of 16 to 25 dwellings per gross acre for the TM Creek R-40 zoned parcel. • Approved Multi-Family. There are 475 approved residential units within the bounds (Blue outlined area below) of the forth-coming Ten Mile Crossing Sub-Area Plan: The 240 Lofts at Ten Mile, the first multi-family TM Creek project completed in 2019; and the 235 Phase Two Flats at Ten Mile units currently under construction. Additional residential units are 7 anticipated east of The Lofts and The Flats in the high-density residential corridor between Wayfinder and Benchmark, south of Tenmile Creek. FRANKLIN RD CAF 4LI TRI CREEK OA 4 1 NO 02 TM.GLE TWEL _' �y CREEK NO 04 C+ p�gS NO,O1C___ ,� -___ T111 CREED", -- 0 / R Y EST+47 NO 03 W - ;_ -C _ FUTURE L '- 475 APPROVED RESIDENTIAL S NO 02-= MULTI-FAMILY DEVELOPMENT FiiTF DWELLINGS TM CENTER p_p _S E SUB PRE-PLAT I� O TA EST ZBOUNDARY W C-G R PLAC TM CROSSING TM CROSSING SUB-AREA PLAN - "------' T�4 CROSSING1 BOUNDARY NO 02 CURRENT MERIDIAN ZONING BASE • Future Residential Development. TN-R and R-8 residential zoning is in place for the development of Treasure Valley Investments' and Calnon properties east of Benchmark Avenue "circled"in the graphic on the prior above. That area has not yet been preliminary-platted; thus, potential unit counts are unknown. With 475 multi-family units approved and constructed, or under construction within the Ten Mile Crossing complex—plus the un-platted R-40, TN-R and R-8 properties, the number of residential units will far exceed the current DA-mandated minimum of 593 dwellings. "Future Residential" will be addressed in greater detail in the Ten Mile Crossing °--'- r-aa 12 ~ Master DA/Design Guidelines process and subsequent residential preliminary plats. PROJECT PHASING Market demand will determine the ultimate phasing of TM Center Subdivision. Conceptually, six phases are possible. Phase 1 depicted below is already underway as a portion of the 235-unit Flats at Ten Mile apartment project mentioned on the prior page. Phase 2 was facilitated last year with the completion of Wayfinder Avenue from Vanguard to Cobalt, between the existing roundabouts. 8 The development of Phases 3 through 6 may vary in area and sequence—the result of product need and market demand. W7 ------- 0 -- ----- -- --- - I Ll Ir TEN ***M I L E 7 Phasing Plan Conceptual—subject to change I 7J ------------ E N BUILDING ELEVATIONS Included in the appended submittal documents are fourteen (14) slides of existing and approved buildings at Ten Mile Crossing: Commercial, office, retail and residential structures including multi- story office buildings; single-story commercial structures (medical, hospice, gym, restaurant and food service, retail, auto service); and the first two multi-family projects. Until completion of the Ten Mile Crossing Sob ^~e-as "'a~ Master DA/Design Guidelines, these elevation "typicals" are to be the guide—the point-of-reference—for consideration and approval of Design Review submittals. "FUTURE" DEVELOPMENT AGREEMENT MODIFICATIONS The pending Ten Mile Crossing Sul- Pla - Master DA/Design Guidelines will address the "Governing Conditions"of the development agreements listed below. A review of the DA's specific to the TM Center preliminary plat has not identified any impediment to the proposed preliminary 9 platting action. Development proposals submitted prior to Sub 0---- Plan Master DA/Design Guidelines approval, and associated zoning modifications, are expected to be compliant with the current DA's and underlying zoning. TM CROSSING (AZ 12-005/CPAM 12-001 /PP 12-003) • Original Instrument#114002254 Recorded January 9, 2014 • Addendum Instrument#2016-062220 Recorded July 13, 2016 • 2na Addendum Instrument#2017-051907 Recorded June 8, 2017 • TMC Expansion Instrument#2019-011700 Recorded February 13, 2019 TM CREEK/TM CREEK EAST (AZ 13-015/PP 13-020) • Original Instrument#114045759 Recorded June 12, 2014 • Ist Addendum Instrument#2016-073497 Recorded August 11, 2016 • 2na Addendum Instrument#2017-113747 Recorded November 29, 2017 TREASURE VALLEY INVESTMENTS (AZ 14-001) • Original Instrument#2014-065514 Recorded August 13, 2014 CALNON PROPERTIES (AZ CPAMH-2015-0017) • Original Instrument#2016-030845 Recorded April 13, 2016 BAINBRIDGE FRANKLIN (AZ H-2018-0057) • Original Instrument#2019-077071 Recorded August 21, 2019 CONCLUDING STATEMENT We look forward to presenting the TM Center preliminary plat to the Planning& Zoning Commission and City Council as soon as possible—in advance of the subsequent, separate Master DA/Design Guidelines process. Please let me know if you have questions or require additional information for expedited response. For Brighton et al, Michael D. Wardle Director of Planning 10