Loading...
CC - Engineer Statement f +CENGINEERING P. C . Civic Engineering * Project Management DATE: December 22, 2020 TO: City of Meridian 33 E. Broadway Ave Meridian, ID 83642 RE: Warrick Subdivision #4 To whom it may concern: Based on a geotechnical report and experience with various projects in this immediate area, groundwater is at least 5 feet below existing ground elevation. All streets have been designed so that the centerline of the street is at least 3 feet above seasonal groundwater. Respectfully submitted, 1 � 941 4 Of S. Chad S. Kin a a, P.E. CK Engineering, P.C. CK Engineering 13oo E.state St suite 102 Eagle,ID 83616 208.869.0590 mobile chad(,.ck-engineersxom