Loading...
Building Plans_Page_2a) o m o ?> N I C) m L r' U 0 n (DCo (Lo s a rn U cu m st 3 m m Q. L c m mm �D Z m HOLE NUMBER OF I1.OI@ COLUMNS COLUMN SIZE DEPTH DHOLE IAMETER FOOTING SIZE COLUMNS H ALL ROOF, SIDE, END AND GABLE STEEL WITH PAINTED SCREWS REQUIRED 2 2x6 JACKBRACING AT OPEN ENDWALLS 8' O.C. (NOT NEEDED AT FULL LENGTH COLUMNS) SIDEWALL 4—PLY 2x8x20'-0" 4'-10' 24"0 4"x14'0 PRECAST CONCRETE FOOTING 8 F— = LOCATION ON FLOOR PLAN FOR JACKBRACING CORNER 4—PLY 2x8x2O'—O" 4'-10" 24"0 4"x14'0 PRECAST CONCRETE FOOTING 4 (SEE DIAPHRAGM ACTION and MISC. DETAILS SHEET) Iqf� 6.0 CUBIC YARDS OF 2500 PSI MINIMUM CONCRETE NEEDED FOR POURED FOOTINGS ANCHOR ALL COLUMNS WITH (1) #4x12' REBAR IN CONC. BACKFILL FOR UPLIFT NOTE COLUMN SETS ON TOP OF FOOTING - CHECK COLUMN CHART FOR EXACT FOOTING SIZE REOUIREMENTS POURED CONC. (1) #412" REBAR BACKFILL FOOTING COLUMN ANCHOR DETAIL NOTE: FACE ALL OPEN BAY COLUMNS WITH 2x6 TREATED LUMBER ATTACHED TO COLUMN WITH (1) 20d NAIL AT 12" O.C. (STAGGERED) IF SAVE HEIGHT IS 14' OR TALLER, INSTALL FACING TO FOOTING TREATED 2x6 FACING -GIRTUNE BUILDING COLUMN TREATED 2x6 FACING FACING DETAIL L SIDEWALL GIRTS 4-PLY 2xB SIDEWALL COLUMN INTERMEDIATE CLEARSPAN TRUSS 4-PLY 2x8 SIDEWALL COLUMN r SIDEWALL GIRTS TYPICAL TRUSS PLACEMENT DETAIL CLEARSPAN ENDWALL TRUSS (BEAR TRUSS ON 1-PLY OF CORNER COLUMN TO FOOTING) 2x4 EAVE PURUN---*.-,Ff f 26 KNEE BRACE ATTACHED CLEARSPAN ENDWALL TRUSS ATTACHED TO COLUMN WITH (2) TO BACK SIDE OF TRUSS 10d NAILS WITH AT TOP ANNDD BOTTOM CHORDS (BUTT TIGHT TO COLUMN AT 1 2'4x7" BOLTS BOTTOM AND ATTACH WITH AND NAIL WITH (2) M A35 FRAMING ANCHOR) 20d NAILS PER BOLT 2x6 KNEE BRACE BUTT 2-PLY 2x6 KNEE BRACE TIGHT TO COLUMN AND NAILED TOGETHER WITH (1) 10d NAIL AT 6" O.C. BOTTOM CHORD OF TRUSS 1 3'-0" AND ATTACHED WITH TRUSS REPAIR PLATES 16fANA35 FRAMING /// DUUKE 2x6 CHOR KNEE BRACE TRUSS REPAIR TRUSS REPAIR \-C_EARSPAN PLATE PLATE TRUSS KNEE BRACE DETAIL PURLIN LAYOUT BUILDING COLORS ROOF: HARTFORD GREEN SIDES/GABLES: ANDQUE BRONZE WAINSCOT: SUDE DOOR(S): TRIM (TYP.): F&J TRIM: HARTFORD GREEN BUILDING ACCESSORIES (1) CLEARY WEATHERVANE (OWNER LOCATE) CONT. PURLIN DESIGN CONSTRUCTION FOREMAN NOTE BE SURE TO MAINTAIN THE OVERALL LAP DISTANCE AND THE SPACING FROM PURUN END TO CENTER OF TRUSS AS SHOWN (1) 60d NAIL TOE -NAIL EACH (1) 60d NAIL EACH PURUN IVPURUN WITH EACH PURUN (1) 10d NAIL (4) 10d- NAILSH12MIN. 18' MIN. 12" MIN. TRUSS PURLIN LAPS AT FIRST TRUSS FROM EACH ENDWALL TOE -NAIL EACH PURUN WITH (1) 10d NAIL 15" MIN, 12' MIN. 12" MIN. TRUSS ALL REMAINING PURLIN LAPS 10' 20' 12' 10' 44'-0' 8'-11 1/4" 9'-0' 8'-0' 9'-0' 9'-0 3/4' OPEN BAY OPEN BAY OPEN BAY OPEN BAY OPEN BAY zZ So m C. USE CLEARSPAN TRUSS h ATTACH ALL PURUNS TO TRUSS WITH AT BOTH ENDWALLS ne "9 54 -9 1 60d NAIL AND TOE -NAIL WITH (SEE DIAPHRAGM ACTION and �� -a x �1; 10d NAIL, ALSO ATTACH ROOF f II �2 II MISC. DETAILS SH" STEEL TO PURUNS AT 9' O.C. W j 8'-11 1/4' 9'-0' 8'--0' 9'-0' 9'-0 3/4' OPEN BAY OPEN BAY le OPEN BAY OPEN BAY OPEN BAY CLEARY BUILDING CORP. 190 PAOLI STREET / P.O. BOX 930220 VERONA, WI53593 / (800)373-5550 DRAWN BY: WALDERA DATE DRAWN: 1 I I 1 2O PLAN REVISIONS: NUMBER DATE BY 1 2 3 4 10d F-- Z O m a ► L Z W a ¢ Z LU uI 0 W N Ln Yll zZ v�i¢� cn X �a i--i m bu) b � W LU o O 3 a a m cn m PROJECT NUMBER: 2020 05677 Q SHEE NUMBER: 20 STE,��DFE� 10655 rJ� R" 1� �9 u- D