Loading...
CC - Engineer Statement km E N G I N E E R I N G December 4,2020 Project No.20-145 City of Meridian 33 E. Broadway Ave.,Suite 210 Meridian, Idaho 83642 RE: Bainbridge Subdivision No. 12 Meridian, ID To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets within Bainbridge Subdivision No. 12 are designed a minimum of three (3) feet above the seasonal high ground water elevation as stated in the "Mid-Season Groundwater Report-Bainbridge Phase 11" dated July 6, 2020, prepared by NRS. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP C Kevin McCarthy, P.E. Principal 9233 West State Street • Boise,Idaho 83714 • 208.639.6939 • kmengllp.com