CC - Engineer Statement km
E N G I N E E R I N G
December 4,2020
Project No.20-145
City of Meridian
33 E. Broadway Ave.,Suite 210
Meridian, Idaho 83642
RE: Bainbridge Subdivision No. 12
Meridian, ID
To Whom It May Concern:
Please accept this letter as certification that the centerline elevations of the proposed streets within
Bainbridge Subdivision No. 12 are designed a minimum of three (3) feet above the seasonal high
ground water elevation as stated in the "Mid-Season Groundwater Report-Bainbridge Phase 11"
dated July 6, 2020, prepared by NRS.
Please feel free to contact me at 208.639.6939 should you have questions or require any additional
information.
Sincerely,
KM Engineering,LLP
C
Kevin McCarthy, P.E.
Principal
9233 West State Street • Boise,Idaho 83714 • 208.639.6939 • kmengllp.com