Loading...
CC - Landscape Plan Issue Description Date ISSUE -1-1-20 STREET NAMES 8-14-20 PARK RED/. ci-22-20 301 301 3. OP 3� �1 3� 301 3 301 301 301 301 301 30 301 3. TOP F}�yy TGP I I f ftb 6535 ,E ti>>1 �IL f 1 S�T ----- ------ I m I �111i HLl1 I I 911 � � I � --- ------- -----_— ---_ M ----- -------- -------- -------- -----14r M \ M 4 5 55 S 55 SS 55 55 _s — — — so w w ---- __-- ------_ w A Pew � I JENSENBELTS 0 ,IASSOCIATES Site Planning Landscape Architecture I ' ; I 1509 Tyrell Lane, Ste 130 I TOE I®I N, I OE TOE TOE Boise, Idaho 83706 OE TOE TOE TOE OE Ph. (208) 343-7175 TOE a s I I I www.jensenbelts.com I , I 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 I j I I 1 sl I I 1 I I I I I I I I N I I I I I sl I I I — — — — — — — — — — — — — — — 94 I s 72 / I \ I I 1 yl I I 1 I I 95 I I r I I I I I I 112 111 110 109 6 0 104 3 102 101 100 99 / I I Z 71 96 I z I I I s l I WI I I I 113 0°•. I O I 97 I I 70 ® I I 114 115 33 32 31 30 29 28 27 26 25 24 23 98 1 I 69 •• rM — I I L I O • I I wl W - ------—------ 49 ° 1 — — .• WI — Y I � / •�G 20 50 47 35 •5 • — 7 II i I WI 0 T II, 1 19 II ' * / I, I I i I � • Y w Z 51 36 • Z 46 • ` �I � I / / O •b� i ••• i• •• 9II � • � I'1 I / I 34 Z 52 37 ®• _ • i I N I � I I c/, I o= 45 ° 16 17 / I 53 44 38 ' J I ; f � as 17- 54 43 39 I 63 100 ,f, 1. REFER TO EACH INDIVIDUAL SHEET (L I) � J FOR COMPLETE LANDSCAPE PLANTING PLANS. U) 55 42 / 40 / / --� o • ° %� —S BOSC►1 WAY 1 � •a' • �� Z 62 1 \ 56 0 2. REFER TO SHT L2 4 L3 FOR PLANT \ B.O. SCHEDULE, LANDSCAPE NOTES, AND LL I DETAILS. 1 61 1 ® to / 3. t� -�� ; / �' I I I 10 3 I REFER TO SHT L4 FOR LANDSCAPE 59 SPECIFICATION AND IRRIGATION 58 J PERFORMANCE SPECIFICATION. 57 2 3 4 5 660 // I , 9 sl TOE TOE /EG/ �pn i0E TOE OE TOE TOE • TOE Pi— °E Job Number 1953 /�EG TOE PI PI PI PI PI �/ I I � I I i -<- -<- -<- -<- -<_ -<— _>- _>- _>- ->- ->- ->- ->- ->- Q EG EP EG Ep EG—EP EO >- -�- -�- -�- -�- -�- o— _ _ _ _ _ _ _ _ Drawn Checked EP -EP- ->- EP EP 'EP EP -' EP , EG EP EG EP EG EP EG EP EG EP EC EP EG EP EG EP EG EP EG EP EG _E—EG EP EG EP EG EP EG EP EG EP G EP EG <- -�EG -< EG -< EG ` J J N K C S -- -- -- -- -- -EP EP EP EP -- -- -- - -- -- -- - E. LAKE HAZEL ROAD Scale AS SHOWN PHASE 2 Sheet Title OVERALL LANDSCAPE PLAN DEVELOPER Sheet Number DEVCO LLC. NORTH JIM CONGER 0' 80' 160' 240' LO 4824 W. FAIRVIEW AVE BOISE, IDAHO 83706 SCALE I" = 80' (208) 336-5355 1 of 5 Sheets Issue Description Date ISSUE -1-1-20 STREET NAMES 8-14-20 FUTURE PHASE 3 3-HL f=LmAN7 5CHEEDJLE PARK REV. ci-22-20 ^ (REFERENCE SHEET L2) 2-IH o+ SYM COMMON NAME 3-BE EVERGREEN TREES 2-KF 4-5M KG KARL FUGHS CEDAR 2-KC RK ROYAL KNIGHT BLUE SPRUCE -1-GR o ... VP VANDERWOLF PINE NN N � ` Fr ��!`f�i 3-KF SHADE TREES (GLASS I11) pr++ 115 33 32 31 30 29 2$ 27 26 4-IH ® Flo NORTHERN RED OAK 25 ® SHADE TREES (GLASS 11) s` � r ftb 24 23 +® I HL SKYLINE HONEYLOGUST 3-KF 0 SN SENSATION MAPLE +ice 6535 5-5P ® TT TULIP TREE 2-KG ® FUTURE PHASE 3 DOG PARK ENTRY ORNAMENTAL TREES (GLASS I) 1iH STONE G LUMNS W/ IRON GA . 8-GR AG ADAMS GRABAPPLE SEE DTL ,1 4 2, SHT L3 3-KF AM FLAME AMUR MAPLE VISION H 3-I � TRIANGLE 1 - 2 SHRUBS/ORNAMENTAL 6RASSES/PERENNIALS 3-IH GOMMUNI 3-5N ( P) ® BA BLONDE AMBITION 6RAMA GRASS 7n ® s BE BLACK EYED SUSAN s \ 4-6L 2-KF 4-GR + ®-3 BL BLAGK LADE ELDERBERRY 3-LV 2-KF MAILBOXES KF GR RED FLOWER CARPET ROSE • IS LV _ EXISTING FENGING FL FINE LINE BUCKTHORN o • 0 2 SM -IH s o°o' PER PHASE I 6F 6OLDFLAME SPIRAEA ° '-6L kro-465F -C ®j (TYP) HL HENRY'S SUMAC H6 HENRYS GARNET SWEETSPIEE JENSENBELTS 2-FL 8-K ® ASSOCIATES 75E3E I-KG1 2 O I H IVORY HALO DOGWOOD 3-BE 2-KF 2-KF 3-IH LA N (�_ V -LY 2-KF 4-SP 3-LV 4-GR ®®® ® ®�®�® (r.�• ) 3-KF G�-5 KF KARL FORESTER REED GRASS 4-GR 3-FL 2-KF MAINTENANCE — LV HIDGOTE BLUE LAVENDER Site Planning _IH 2-KF - 4-SP ® , 5-GL SM SLOWMOUND MUHO PINE g 3-FL ENTRY. SEE so 8-BE ®® / SP SPILLED WINE WEIHEYA Landscape a Architecture 4-GR 47 DLTS 3 a o ® / 3-I H 2-KF ® 4-H6 (3 3-KG 2-GR SHT L3 su / / 1509 Tyrell Lane, Ste 130 4-GR 4-6L I_SN / ,� s Boise, Idaho 83706 1-6L 3-KG 4 CR YAWN Ph. (208) 343-7175 4-6L I-GL I-H6 X +Mr 3-GR I-SN I-KG 3-GR X 1 3-KF ® ® 5-KF 9 3-KG www.jensenbelts.com 3-KF 3-GR / II 11 317 o BENCH I-SN j j 5-I H 6 SOLID TAN VINYL 36 (NP) FENCED 006 PARK 5-KF � 5' BLAGK IRON 4_GL ® I � I � ° 5-KF 5-KF PRIVACY FENCE (TYP). 3 KG 1 SEE DTL 5, SHT L2 46 FENCE. SEE DTL 6, 4-I14 / 3-GR SHT L2 (TYP) 2-6L / / o �` I-KG O o s Ell 4' BLAGK IRON I-SN ® 3-GR 5-KF v fl FENGE (TYP). 6-KF L,4YyN I-SN 3-BE SEE DTL 6, SHT L2 4-6L (TYP) 2-KG 5-B 3--`AM o 1 37 3-KG - 2-6L I_ I I �`� / 6 TAN VINYL 3 H6 2_6L _ 2-SM o 3-TT PRIVACY FENCE. 45 3/4" PERMA BARK 21-6L ® I-KC v NORTH PERIMETER. SEE DTL 5, SHT L2 z z 6ROUNDGOVER 2-KG 5-BE + �, cr (TYP) IN DOG PARK AREA 4-GR 4-I H �� + _ O4-GR ® 4-KF � �� 3 BL J m 3-GR 5E 3- O ��� 6_ o �\\m 2 W I-SN -RK NOTE5 0 4-H6 2-6L -B 4- = I-VP 16 17 I_HRK *65 I-KG I-KG -L 3 8 3 6-KG 1. REFER TO SHT L2 L3 FOR PLANT 44 - fl -8-GR 2-SM 3- OG I 8-KF 11-21 BE M SGHEDULE, LANDSCAPE NOTES, DETAILS, I-KG 6L Q -TT 3IH+ LLAR AND GALGULATIONS. 2 O 6-KF *0 0 4- R TER B.O. - I-RK I-RK 2. REFER TO SHT L4 FOR LANDSCAPE AND 5-GR I-TT QO O / F �� 5-GR 3B�M 12-K 2B6L IRRIGATION SPEGIFIGATIONS. I-KG 13 4-SM 12-KF I-AM 4-Sp ® 0 5-SM I -6F 5-GR L I-VP 3-I H Q 3-IH s v 5-BE 0 5-GR - M w - b� \I -IH 43 39 I-KG ° O 65G / g� Z I-VP / _ 4-S / o R ,d - - - Q 4-6L 5-SM -/- - / _ - - - - W O I-KG / O 3-HG O 5 3�M b ` ® �d 3 - - - - // / v 4-6F T� --- - Z 0 / 1 4-SP / Q � / � a__ 3-6 3-IH ,� / � - 2-IH -SM w • 1 1 3-IH 1 2-KF - / I -2 BE oe 3-I H 4-GR / 3-FL o I-TT __ 3-6F �`' W W --- - J 4-GR 2-KF 42 / 3-FL 40 10-BE / / ,, 4-GR 2-KF 3_FL _ / 2-KF 2-KF 'L T • - �..� / 6-SP � • ADJ T PH. I� 4 SP 3 LV / 1 4-GR 4-CR -- 2-TT LAN APE g�SCH W�Y 3-BE 5-GR PER . 2 S -------- 2-KF 2-KF � � 3-IH 3-IH 5-HH I-6L � �, 2-FL so lift 8-KG 6-KF ® �' 3-GF i LAY O T J 0 0 0 0 0 0 0 3-BE I-BL NDSGA "^ ` • 3-TTI I I-RK * /BOULDER - - logo � � Q Z - 77 I-BL - �,,,,, - - 3-AG � - - B.0_ - -DO 2-SN - 2_KF - 4-BP - - 6-KF SH L TY / s _ W LL s 6-6L 3-5M i C.O. NORTH 6-5P' 0' 3 0' 6 0' 9 0' 4- R / ,40 j..5-GR o 6-BE �o o SCALE 1" = 50' I-H6 10 4-6L I-VP / / KEY MAP Job Number 1953 5-KF I-H6 / I 5-IH 7 Drawn Checked JJN Kcs II li I _ Scale AS SHOWN f Sheet Title _ 9 LANDSCAPE w - - TOE PLAN TOE OE TOE TOE TOE o i PI PI PI PI PI PI PI PI j ----------- - , I DEVELOPER j ;� , Sheet Number DEVCO LLC. JIM CONGER 4824 W. FAIRVIEW AVE BOISE, IDAHO 83706 - --------- (208) 336-5355 2 of 5 Sheets Issue Description Date ISSUE 7-1-20 STREET NAMES 8-14-20 PARK REV. q-22-20 V x 2" x 2" CEDAR STAKE, 2 PER TREE. SET STAKES PARALLEL TO PREVAILIN6 WIND. 5EGURE WITH RUBBER CINCH TIES. DO NOT PENETRATE ROOTBALL. SEE NOTE 3. ROOT GROWN TO BE 1-2" 6' O.G. POST GAP PLANT 5CH Z ULABOVE FINISH GRADE. 1Y2" x 5Y2" RAIL �Q �� �i`i TRUNK FLARE MUST BE VISIBLE '/8" x 6" VINYL SYM COMMON NAME BOTANICAL NAME PICKET PANELS SIZE C IN PLANTING BEDS: MULCH AS SPECIFIED. EVERGREEN TREES T[F 5-O MIN BRUSH AWAY FROM TRUNK. KG KARL FUGHS GEDAR GEDRUS DEODARA 'KARL FUGHS' 12'-14' HT B B RK ROYAL KNIGHT BLUE 5PRUGE PIGEA PUN6ENS 6LAUGA 'ROYAL KNIGHT' 10'-12' HT Bff B �. FERTILIZER TABS AS SPECIFIED VP VANDERWOLF PINE PINUS FLEXILIS 'VANDERHOLFS' 10'-12' HT BBBIfe J; III F SNIP BASKET 35 SHADE TREES (GLASS III) #i�� b ,2'-O" I i- TURN BACK BURLAP 1/3. RO NORTHERN RED OAK QUERGU5 RUBRA 2" GAL B 4 B tfy i 11 �� �' =I = = I I BAGKFILL W/ TOPSOIL MIX 6 SHADE TREES (GLASS II) III I I—III—III I �, AS SPEG'D � TAMP LOOSELY HL SKYLINE HONEYLOGUST 6LED I TS I A TRI AGANTHOS SKYGOLE' 2.5"-3" GAL B�BI - ; IN 4"-6" LIFTS X 5" x 5" SQ POST SN SENSATION MAPLE AGER NE6UNDO 'SENSATION' 2.5"-3" GAL B�B 2 x BALL DIA. < TT TULIP TREE LIRIODENDRON TULIPIFERA 2.5"-3" GAL BBB ORNAMENTAL TREES (GLASS 1) NOTES: AG ADAMS CRABAPPLE MALUS 'ADAMS' 2" GAL BBB I. REMOVE ALL TWINE, ROPE, OR BINDINGS FROM ALL TRUNKS. AM FLAME AMUR MAPLE AGER 61NNALA 'FLAME' 8'-10' HT BBB CLUMP 2. REMOVE BURLAP AND WIRE BASKETS FROM THE TOP 1/3 OF ALL ROOT BALLS AFTER PLANTING. IF SYNTHETIC, WRAP/BURLAP IS USED, IT MUST BE COMPLETELY REMOVED. SHRUBS/ORNAMENTAL 6RA55E5/PERENNIAL5 5. STAKING OF TREES TO BE THE GONTRAGTOR'S OPTION; HOWEVER, THE CONTRACTOR IS FOOTING PER MF6 RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND REMAIN RECOMMENDATIONS BA BLONDE AMBITION &RAMA GRASS BOUTELOUA 6RAGILIS 'BLOND AMBITION' I GAL STRAIGHT FOR A MIN OF I YEAR. ALL STAKING SHALL BE REMOVED AT THE END OF BE BLACK EYED SUSAN RUDBEGKIA FUL6IDA '60LD5TRUM' I GAL, 24" O.G. JENSENBELTS THE I YEAR WARRANTY PERIOD. BL BLAGK LAGS ELDERBERRY 5AMB0005 NI6RA 'EVA' 5 GAL ASSOCIATES 4. TREES PLANTED IN TURF AREAS: REMOVE TURF 3' DIA. FROM TREE TRUNK. NOTES: GR RED FLOWER GARPET ROSE ROSA 'FLOWER GARPET- NOARE' 3 6AL 1. VINYL FENGE STYLE MAY VARY SLIGHTLY. COLOR TO BE TAN. FL FINE LINE BUCKTHORN RHAMNUS FRANOULA 'RON W I LL I AMS' 5-6 HT 6F 60LDFLAME SPIRAEA SPIRAEA x BUMALDA '60LDFLAME' 3 6AL Site Planning TREE PLANT I NCB/STAK I NCB 6L ORO-LOW SUMAC, RHUS AROMATIGA '6RO-LOW' 5 6AL Landscape Architecture VINYL PRIVAGY FENGE H6 HENRY'S GARNET SHEETSPIRE ITEA VIR6INIGA 'HENRY'S GARNET' 5 6AL NOT TO 50ALE IH IVORY HALO DOGWOOD GORNUS ALBA 'BAILHALO' 5 6AL Bois TIdah Lane, Ste 130 NOT TO SCALE KF KARL FOERSTER REED GRASS GALAMAOROSTIS ARUNDINAGEA 'K.F.' 16AL Boise, Idaho 3 71 LV HIDGOTE BLUE LAVENDER LAVANDULA ANOUSTIFOLIA 'HIDGOTE BLUE' I GAL Ph. (208) 343-7175 SM SLOHMOUND MU60 PINE PINUS MUC70 'SLOWMOUND' 3 GAL www.jensenbelts.com SP SPILLED WINE HEI&ELA HEI6ELA FLORIDA 'BOKRASPIHI' 3 GAL i 3 OF MULCH AS SPECIFIED. 6' SOLID TAN VINYL 4' BLAGK IRON LAWN PRIVACY FENGE (TYP). x x x FENGE (TYP). BRUSH AWAY FROM STEM. 2" x 2" SQ POST 6' O.G. I x Val, SEE DTL 5, THIS SHT SEE DTL 6, THIS SHT HORIZONTALRAIL (.080 WALL MIN) 4" PICKET SPAGING 5/8" x 5/8" PICKETS TURN BAGK BURLAP, TOP 1/3 OF BALL. (.050 WALL) KEEP GROUND LINE SAME AS NURSERY. - -I I= FERTILIZER TABS AS SPECIFIEDNOTE5 —III =III= _ III=1 z Z Z PLANTING SOIL AS PER SPECS. o I. ALL PLANTING AREAS SHALL BE INSTALLED BE IN AGGORDANGE WITH CITY OF MERIDIAN GODS. REFER TO SHEET L4 - O W x SPEC SECTION 32 qO 00 - LANDSGAPE SPEGIFIGATIONS. J NOTE: DIG HOLE TWIGS THE SIZE OF ROOTBALL. � � 2. ALL PLANTING AREAS TO BE WATERED WITH AN AUTOMATIC UNDERGROUND IRRIGATION SYSTEM. REFER TO SHEET L4 - SPEC, SECTION 32 54 00 - IRRIGATION PERFORMANCE SPEGIFIGATION5. 2 SHRUE3 PLANTI NCB °°° °°° °°° °°° 5. LOCATE AND PROTEGT ALL UTILITIES DURING GON5TRUGTION. > W NOT TO SCALE o00 oc 000 000 000 O 24cc cc " °°° °°° 4. TREES SHALL NOT BE PLANTED WITHIN THE 10-FOOT GLEAR ZONE OF ALL AGHD STORM DRAIN PIPE, STRUGTURES, OR Q ° ° ° FAGILITIES IN PARKSTRIPS. SEEPAGE BEDS MUST BE PROTEGTED FROM ANY AND ALL CONTAMINATION DURIN6 THE °°° °°° °°° ° °°° °°° °°° Q °0° 0°0 °0° 0°0 CONSTRUCTION AND INSTALLATION OF THE LANDSGAPE IRRIGATION SYSTEM. ALL SHRUBS PLANTED OVER OR ADJACENT TURF 8" °°° °°°° CONCRETE TO SEEPAGE BEDS TO HAVE A ROOT BALL THAT DOES NOT EXGEED 18" IN DIAMETER. NO LAWN SOD TO BE PLAGED OVER MULCH FOOTING DRAINA6E SHALE SAND WINDOWS. AGHD STORMWATER BASINS AND SHALES SHALL BE LANDSGAPED AGGORDIN6 TO THE 12 'ADA COUNTY HIGHWAY DISTRICT STORMHATER MANAGEMENT BASIN REVEOETATION 6UIDANGE MANUAL' (OGTOBER 2017) IN Q PER SPEC APPENDIX D. cm vMYNy NOTES: 5. NO TREES SHALL IMPEDE THE 40' VISION TRIANGLE AT ALL INTERSEGTIONS. NO CONIFEROUS TREES OR SHRUBS OVER 3' INZ o I. WROUGHT IRON FENGE STYLE MAY VARY SLIGHTLY. POWDERGOAT HI6H AT MATURITY WILL BE LOCATED WITHIN SIGHT TRIANGLE OR AGHD ROW. AS TREES MATURE THE OWNER SHALL BE W Q 4„ COLOR TO BE BLACK. RESPONSIBLE FOR PRUNING TREE GANOPIES TO MEET AGHD REQUIREMENTS FOR MAINTAINING GLEAR VISIBILITY WITHIN 40' O III—III—III. STREET VISION TRIANGLE. a! IIIIIIII—III Z � I=1 I I1 111 I I 1111 I II I—III— I— III—� ' ' 6. TREES SHALL BE PLANTED NO CLOSER THAN 50' FROM INTERSEGTION STOP SIGNS. FINISH -III—III- ' GUT EDGE TOP SOIL Q W Q 7. GLASS 11 TREES AND LANDSGAPE IN FRONT OF BUILDING LOTS ON INTERIOR STREETS TO BE GOMPLETED DURING GRADE I RO N FENGE GONSTRUGTI ON ON THESE LOTS. TREE LOGATI ONS MAY BE ALTERED TO AGGOMMODATE DRIVEWAYS AND UTILITIES. TREES j MUST BE GLASS 11 AND SHALL NOT BE PLANTED WITHIN 5' OF WATER METERS OR UNDERGROUND UTILITY LINES. NOT TO SCALE PLANTER GUT BED EDGE 8. PLANT LIST IS SUBJEGT TO SUBSTITUTIONS OF SIMILAR SPEGIES DUE TO PLANT MATERIAL AVAILABILITY. BURLAP AND WIRE BASKETS TO BE REMOVED FROM ROOT BALL AS MUCH AS POSSIBLE, AT LEAST HALFWAY DOWN THE BALL OF THE J NOT TO SCALE TREE. ALL NYLON ROPES TO BE GOMPLETELY REMOVED FROM TREES. q. THERE ARE NO EXISTING TREES ON SITE. NO MITIGATION IS REQUIRED. Z LANDSCAPE BOULDERS BOULDER NOTES: W A 5' x 3' I. PROVIDE/INSTALL LANDSGAPE BOULDERS. B 4' x 2' 2 SIZES OF BOULDERS ARE G 2' x 2' APPROXIMATES. APPROX. SIZE SELECTION OF BOULDERS N SHALL BE APPROVED BY LANDSGAPE ARCHITECT Job Number 1953 PRIOR SITE DELIVERY. 2' COORDINATE PLACEMENT LAN�BCAFE CALIC.,ULATION5 OF BOULDERS WITH LANDSGAPE BOULDER 'G' LANDSGAPE ARCHITECT. LOCATION AREA REQU I RED PROVIDED Drawn Checked 2. BURY BOULDER APPROX. NUMBER OF TREES PROVIDED J J N K C S 1/3 OF DEPTH INTO ON COMMON LOTS: 78170 SF / 8000 SF 10 150 AS SHOWN GROUND WHEN PLAG I N6. Scale Sheet Title EXISTING TREES ON-SITE A VOLUNTEER ROADSIDE OR DITCH TREES (UNDESIRABLE DEAD OR/DYING SPEGIES). ALL EXISTING TREE WILL BE REMOVED. NO MITIGATION IS REQUIRED. LANDSCAPE 3' 2' PLAN LANDSGAPE BOULDER 'A' LANDSGAPE BOULDER 'B' DEVELOPER Sheet Number DEVCO LLC. JIM CONGER LANDSGAPE BOULDERS 4824 W. FAIRVIEW AVE BOISE, IDAHO 83706 L2 NOT TO SCALE (208) 336-5355 3 of 5 Sheets Issue Description Date ISSUE -1-1-20 STREET NAMES 8-14-20 EQ EQ PARK REV. ci-22-20 (TYP.) (TYP.) 48"x 51"ENTRY GATE (TYP.OF(2)) 20"x 20"COL.W/STONE VENEER SURROUND& PRE-FAB CAP --------, r ------- (TYP.OF(2)) -4 _ PLAN VIEW a � OF sir _ I I 4, �e4 ' e I a a'<a ° - - < : _ `n a' 4 36"x 36"x 12"FOOTING W/ .a atr, nI:a °. d °." ° _ I. d_ w I (3)#4 HORIZ.EVENLY ~ W I - '" -� - A a - a -°- ° I d - I SPACED EA.WAY as 26"x 26"x 2-1/2" t L q� _, J. _ < °° ° L °— — b J EL DORADO PRE-FAB. F- f d °a e - — — — I CHISELED EDGE SLOPED COLUMN CAP — — — (� a 2„x 2"BLACK POWDER t '°:,a °° I I I COATED METAL POST I I Iry Q": 'd ° _ �N4 oo I I 4 „ ATE FIELD VERIFY f�f S �� d- d - a I I 20"x 20"SOLID POURED COLUMN(TYP.OF(2)) '4 O °°,q .°_ °° �_ d s CULTURED STONE ,a a _ - '�d L_ — — — — — — SURROUND(TYP.) °° 4'TALL IRON FENCE n ° SECTION VIEW b_ OG PR P°AREQd, ° ° _ (TYP.) COL.TO COL. 26"x 26'x 2-1/2" tl.a .a °,Q ° 3"x 3"IRON FENCE 2"x 2"BLACK POWDER EL CHISELED EDGE SLOPED l<.d POST(TYP.) - COATED METAL POST W/ COLUMN CAP e< SOLID CAP AT BOTH ENDS& d d ` _ & a PRE-DRILLED 1/2"DIA.HOLES T.O.COLUMN T.O.GATE > d LL ° T�� d d GATE TCHARDWARE E ED d CULTURED STONE d > _ TO TE D " ET P S A ° SURROUND(TYP.) C.O.HINGE _ °e• (FIE D ERIF ) JENSENBELTS 4 "x 1"M L TE - ` ° °, POURED COLUMN d ° (FIELD ERIF ) a ° (TYP.OF(2)) ASSOCIATES P ° 1 2'x 4' OL EPDXIED I T C UM a #4 HOOP TIES ATTOP, Site Planning MIDDLE,&BTM. a GATE HINGE A D A Landscape Architecture LD D TO "ME L P T 94 FOOTING DOWELS AT C.O.HINGE d (TYP. F( )) a° EACH CORNER 1509 Tyrell Lane, Ste 130 LL - 4" o C.S B Boise, Idaho 83706 "CO G VE ILL Ph. (208) 343-7175 EQ EQ > B.O.GATE °° C9 GRADE/SIDEWALK ow www.jensenbelts.com a¢< d_ ° - 0 ° d 4'4" o -a ° S d— T.O.FTG. G" 6"x T2 F T NGVVT — - - — ° _ • _ _ - a d• _ _ DOG PARK AREA 1'- V- T-0" T-4" T-0" z z O a J DOC7 PREP. AREA 2 ENTR"r CHAT - DOCK PREP. AREA W SCALE : 1/2" - I'-O" SCALE : 1/2" - P-O" O m Q U CV o Z Z Q Q SECTION VIEW W O � J DOG PARK AREA z Q 6 4" 0 cr FIELD VERIFY T.O.GATE T.O.COLUMN 5'-4" 0. C.O.HINGE 3"x 3"IRON POST (TYP.) 1/2"0 x 18"DROP PIN J AT EA.GATE W/ 30"x 51"METAL GATE co COLLARS WELDED (TYP.OF(2)) c _ M � TO GATE � Q p 1"0 x 10"CONDUIT IN GATE HINGE HARDWARE a , GROUND-BORE OUT WELDED TO 2"METAL POST 3"DEPTH INTO CONC. (TYP.OF(4)) FOR DROP PIN p- LL o (4)1/2"0 x 3-1/2"BOLTS EPDXIED ° ° o� M C.O.HINGE INTO CONC.BASE AT EA.POST d o • p' '° ° 5"x 5"POST BASE B.O.GATE.� '° � -' ° •' , GRADE/SIDEWALK ° (2)3b"JC.51"GATES CONC. ENTRY PAD 4'TALL IRON FENCE 4"COMP.GvEL-FI�L 3"x3"IRON FENCE - T.O.FTG. Job Number 1953 POST(TYP.) EXTERIOR _� � � � � � � � � � � � Drawn Checked JJN KCS Scale AS SHOWN Sheet Title LANDSCAPE MA I NTENANGE ENTRANGE 4 MA I NTENANGE ENTRY C5ATE PLAN SCALE : 1/2" - 1'-0" SCALE : 1/2" - P-O" DEVELOPER Sheet Number DEVCO LLC. JIM CONGER 4824 W. FAIRVIEW AVE L 3 BOISE, IDAHO 83706 (208) 336-5355 4 of 5 Sheets Issue SECTION 32 90 00- LANDSCAPE WORK SECTION 32 84 00-SPRINKLER IRRIGATION (TWO-WIRE PERFORMANCE) Description Date PART 1 -GENERAL PART 2- PRODUCTS PART 3- EXECUTION PART 1 -GENERAL PART 3- EXECUTION ISSUE 7-1-20 STREET NAMES b-14-20 1.1 RELATED DOCUMENTS 2.1 TOPSOIL 3.1 PREPARATION -GENERAL 1.1 CONDITIONS AND REQUIREMENTS: 3.1 GENERAL PARK REV. ci-22-20 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and A. If deemed usable, native topsoil shall be stockpiled for re-use in landscape work. Topsoil shall be A. General Contractor shall be responsible for excavating planting areas to appropriate depths for A. General and Supplementary Conditions, and Division 1 General Requirements. A. Install system to provide for adequate protection against freeze damage. Division 1 Specification Sections. fertile, friable, natural loam, surface soil, reasonable free of subsoil, clay lumps, brush,weeds, roots, placement of topsoil as specified herein. B. Install system in accordance with approved Contractor design drawings. All stumps, stones larger than 1 inch in an dimension, and other extraneous or toxic matter harmful to 1.2 SUMMARY deviations from the plans must be approved, and clearly recorded on record drawing. p 9 Y B. Lay out individual tree and shrub locations and areas for multiple plantings. Stake locations and 1.2 SUMMARY plant growth. outline areas and secure Architect's acceptance before start of planting work. Make minor adjustments A. Work included: C. Installsystem and components in strict accordance with manufacturer's A. This Section includes provisions for the following items: 1. Contractor shall send a minimum of three (3) representative topsoil samples for testing. See as may be required. 1. Provide and install a complete and operating automatic irrigation system for recommendations. 1. Trees. testing requirements below. Contractor is responsible for whatever soil additives are all lawn and planting areas. D. Install quick coupler(s)on main supply line, approximately equal spacing, at 2. Shrubs; Ground cover. recommended by the tests. Submit to Architect for approval. Compost will be added to other 3.2 PREPARATION OF PLANTING SOIL 2. Connect to main water supply at existing site stubout as provided. valve box locations or intervals of approximately 200 feet, whichever is greater. 3. Lawns. additives and added regardless of test results. 3. Sleeving under paved areas (by others) Locate adjacent to paved surfaces, at valve boxes where practical. 9 A. Before mixing, clean topsoil of roots, plants, sod, stones, clay lumps, and other extraneous materials o1111111l1## 4. Topsoil and Soil Amendments. B. If quantity of stockpiled topsoil is insufficient, contractor to provide imported topsoil that is fertile, harmful or toxic to plant growth. 4. Obtain and pay for all permits and fees for the work of this section. 3.2 SURFACE CONDITIONS �, QF ##r`�// 5. Miscellaneous Landscape Elements. friable, natural loam, surface soil, reasonably free of subsoil, clay lumps, brush, weeds and other B. Mix specified compost and fertilizers with topsoil at rates specified. Delay mixing fertilizer if planting 5. Perform work on a design/construct basis, subject to the requirements of �tikP - / p P P p Y 9 p 9 mac, C. E r 6. Initial maintenance of landscape materials. litter, and free of roots, stumps, stones larger than 1 inches in any dimension, and other extraneous will not follow placing of planting soil in a few days. the Contract Documents, applicable codes, and good design practice. A. Examine the areas and conditions under which work will be performed. Notify B. Related Sections: The following sections contain requirements. or toxic matter harmful to plant growth. Compost: Lawn Areas: 1/4 compost, : 3/4 topsoil. 6. Winterization of system. Contractor of conditions detrimental to timely and proper completion of Section ap g P Y p 9 p project Shrub Areas: 1/3 compost, 2/3 topsoil. work. Do not proceed until unsatisfactory conditions are corrected. 1. Underground sprinkler system is specified in Section 32 84 00- Irrigation 1. Obtain topsoil from local sources or areas with similar soil characteristics to that of rotect site. �' 1.3 SUBMITTALS B. Locate all underground utilities and structures and notify Architect of any Obtain topsoil only from naturally well-drained sites where topsoil occurs in a depth of not less Fertilizer: Per soil test and manufacture's recommendations. � -. A. Within 30 days after Contractor's receipt of Owner's Notice to Proceed, submit: conflict with Section work. Protect structures and utilities. Repair or =tom, 1.3 QUALITY ASSURANCE than 4 inches. Do not obtain from bogs or marshes. C. For shrub and lawn area, mix planting soil either prior to planting or apply on surface of topsoil and y p • 1� �� o p g p p g pp Y p replace said structures or utilities damaged b this work at no cost to the Owner. ►t� *�* A. Subcontract landscape work to a single firm specializing in landscape work. 2. Composition: Topsoil shall contain from 1 to 20/° organic matter as determined by the Organic mix thoroughly before planting. 1. Manufacturer's printed product information and catalog cut sheets for all p 9 Y � y 5,5 N 9 Y p 9• � 5:' �ti B. Source Quality Control: Carbon, 6A, Chemical Analysis Method described in USDA Soil Survey Investigation Report system components;five copies. ♦f ��� 1. General: Ship landscape materials with certificates of inspection required by governing No. 1. Maximum particle size, 3/4-inch,with maximum 3% retained on 1/4-inch screen. 3.3 PREPARATION FOR PLANTING LAWNS B. Shop Drawings: Submit shop drawings for underground irrigation system including 3.3 SLEEVING -VZf P_ ,g ,,Nti1- authorities. Comply with regulations applicable to landscape materials. Other components shall conform to the following limits: A. After excavating and removing surface material to proper depth, loosen subgrade of lawn areas to a plan layout and details illustrating location and type of head, type and size A. Sleeving installed by others. Coordinate with other trades. ##It►111111W► 2. Do not make substitutions. If specified landscape material is not obtainable, submit proof of pH 6.5 to 7.5 minimum depth of 4 inches. Remove stones measuring over 1-1/2 inches in any dimension. Remove of valve, piping circuits, circuit GPM, pipe size, controls, and accessories. C. Record Drawings: At completion of this work, submit to the Contractor: 3.4 TRENCHING AND BACKFILLING non-availability to Architect, with proposal for use of equivalent material. Soluble Salts 600 ppm maximum sticks, roots, rubbish, and other extraneous matter. Limit preparation to areas which will be planted 3.Analysis and Standards: Package standard products with manufacturer's certified analysis. For Silt 25-50% 1. Record Drawings; reproducible and five prints. A. Trenching and backfilling shall be per applicable ISPWC Section. Y 9 p Y promptly after preparation. other materials, provide analysis b recognized laboratory made in accordance with methods Clay 10-30% 2. Operations and Maintenance information (2 copies), including: B. Cut trenches straight and without abrupt grade changes to allow the following P Y Y g Y Y 1. Spread topsoil mix to minimum depth of 4 inches for sodded lawns as required to meet lines, established b the Association of Official Agriculture Chemists, wherever applicable. Sand 20-50% a. Information including descriptive details, parts list, specifications, minimum cover: Y 9 pp grades, and elevations shown, after light rolling, addition of amendments, and natural settlement. 4. Trees, Shrubs and Groundcovers: Provide trees, shrubs, and groundcovers of quantity, size, 3. Contractor shall submit representative soil report on imported topsoil proposed for use for Place approximately 1/2 of total amount of topsoil required. Work into top of loosened subgrade to maintenance schedules and procedures for system components. 1. Main Lines and Sleeving: 18 inches. genus, species, and variety shown and scheduled for work complying with recommendations and approval. Report shall meet standards below. Contractor is responsible for whatever soil create a transition layer and then place remainder of planting soil. Add specified soil amendments b. Operation, adjustment of system and components instructions. 2. PVC Laterals: 12 inches. requirements of ANSI Z60.1 "American Standard for Nursery Stock". Provide healthy, vigorous additives are recommended by the test. Compost will be in addition to other additives and as required and mix thoroughly into upper 4 inches of topsoil. c. Winterization procedures. C. Surround lines with 2 inches of clean rock-free material on all sides. stock, grown in recognized nursery in accordance with good horticultural practice and free of added regardless of test results. d. Schedule indicating required open valve time to produce given precipitation disease, insects, eggs, larvae, and defects such as knots, sun-scald, injuries, abrasions, or 3.4 PREPARATION OF PLANTING BEDS amounts and seasonal adjustments. 3.5 MISCELLANEOUS VALVES disfigurement. C. Soil Testing e. Warranties and guarantees. A. Install maunal drain valves up stream. Install devise at mainline tap in accordance 9 9 A. Loosen subgrade of planting areas to a minimum depth of 6 inches using a culti-mulcher or similar 5. Label at least one tree and one shrub of each variety with attached waterproof tag with legible 1. Soil tests are required for this project(see above for requirements). Test shall be provided as equipment. Remove stones measuring over 1 1/2 inches in any dimension. Remove stocks, stones, with manufacturer requirements for complete operation. Install backflow provision designation of botanical and common name. follows: 1.4 GUARANTEE and connect to controller. JENSENBELTS 9 rubbish, and other extraneous matter. a. Where formal arrangements or consecutive order of trees or shrubs are shown, select stock a. Provide certified analysis at time of sample submitted (three samples imported topsoil). B. Spread planting soil mixture to minimum 12 inch depth required to meet lines, grades, and elevations A. Guarantee in writing all materials, equipment and workmanship furnished to be for uniform height and read. Amend soils per chemist's recommendations and as herein specified unless otherwise free of all defects of workmanship and materials. Within one year after date of 3.6 CIRCUIT VALVES ASSOCIATES 9 P P p shown, after light rolling and natural settlement. Add 1 1/2 inches of specified compost over entire A. Install in valve box, arranged for easy adjustment and removal. 6. Inspection: The Architect may inspect trees and shrubs either at place of growth or at site before approved by Architect. plantingarea and mix thoroughly into upper 6 inches of topsoil. Place approximately 1/2 of total amount Substantial Completion repair or replace all defective parts or workmanship that 9 Y 1 planting, for compliance with requirements for genus, species, variety, size, and quality. Architect 2. Test shall include, but not limited to recommendations on chemical distributions, organic of planng soil required. Work into top of loosened subgrade to create a transition layer, then place may be found at no additional cost to Owner. 1. Provide union on downstream side. retains right to further inspect trees and shrubs for size and condition of balls and roots stems, contents, H factors, and sieve analysis as necessary. Test#1T b Western Laboratories B. Fill and repair all depressions and replace all necessary lawn and planting which 2. Install valve box on bricks-four required. Site Planning 9 p Y p Y rY• Y remainder of the planting soil. 3. Install to flush with finish grade.insects, injuries and latent defects, and to reject unsatisfactory or defective material at an time (1-800-658-3858 is re uired. result from the settlement of irrigation trenches for one year after date of p g Landscape Architecture 1 1 rY Y ) q C. Apply Pre-Emergent per manufacturer's recommendation. 4.Adjust automatic control valves to provide flow rate of rated operating P during progress of work. Remove rejected trees or shrubs immediately from project site. 3. Contractor is responsible for whatever soil additives are recommended by the soil testing Substantial Completion. 1 p laboratory. C. Supply all manufacturer's printed guarantees. pressure required for each sprinkler circuit. Ste 130 Y 3.5 PLANTING TREES AND SHRUBS 1509 Tyrell Lane, 1.4 SUBMITTALS 4. Contractor shall coordinate, obtain and a for all soil tests. 5. Connect decoders per Hunter specifications. pay A. Set balled and burlapped (B&B)stock on layer of compacted planting soil mixture, plumb and in center Boise, Idaho 83706 A. General: Submit the following in accordance with Conditions of Contract and Division 1 Specification 5. If regenerative noxious weeds are present in the soil, remove all resultant growth including roots of pit or trench with top of ball at same elevation as adjacent finished landscape grades. Remove 1.5 QUALITY ASSURANCE Ph. (208) 343-7175 Sections. throughout one-year period after acceptance of work, at no cost to Owner. A. Contractor shall be licensed in the State in which this work is being performed. 3.7 PIPE INSTALLATION 9 Y p p burlap from sides of balls; retain on bottoms. When set, place additional backfill around base and A. La PVC pipe in accordance with standard and acceptable practice. Thrust B. Plant and Material Certifications: B. Contractor shall have at least two years prior experience in projects of equal Y pip p p www.jensenbelts.com sides of ball, and work each layer to settle backfill and eliminate voids and air pockets. Place fertilizer J 1. Certificates of inspection as required b governmental authorities. 2.2 H ADJUSTERS or larger scope. Provide minimum of three references and list of similar blocks to be used at points of intersection and change of direction in main line p q Y 9 P tablets in excavated area per manufacture's written instructions. When excavation is approximately 2. Manufacturer's or vendor's certified analysis for soil amendments and fertilizer materials. A. When pH does not comply with this specification, commercial grade aluminum sulfate shall be used 2/3 full, water roughly before placing remainder of backfill. Repeat watering until no more is absorbed. projects with owners' names, addresses, and phone numbers, when requested by pipe as per manufacturer's recommended specifications. Install manual drains. 3. Label data substantiating that plants, trees, shrubs and planting materials comply specified to adjust soil pH. Water again after placing final layer of backfill. Remove all ties from around base of trunk. Owner. B. PVC pipe joints, solvent welded except as indicated. Cut pipe square, deburr, requirements. C. Contractor shall employ on site at all times a foreman who is thoroughly wipe from surface all saw chips, dust, dirt, moisture and any foreign matter q B. Set container grown stock, as specified, for balled burlapped stock, except cut cans on 2 sides with an C. Mulch: Submit 1 gal bag of mulch sample for approval. 2.3 SOIL AMENDMENTS approved can cutter and remove can; remove bottoms of wooden boxes after partial backfilling so as experienced and competent in all phases of the work of this Section. which may contaminate the cemented joint. Apply cleaner/primer and solvent A. Compost: Compost: "Cascade Compost"from Cloverdale Nurse 208 375-5262 and NuSoil cement, make joints in accordance with manufacturer's recommendations. Use p p p Nursery( ) not to damage root balls. 1.5 DELIVERY, STORAGE AND HANDLING Compost(208)629-6912 or approved equal in equal amounts by volume. C. Dish top of backfill to allow for mulching. 1.6 SYSTEM DESCRIPTION Teflon thread sealant(tape)at all threaded joints. A. Sod: Time deliveryso that sod will be laced within 24 hours after stripping. Protect soda against B. Commercial Fertilizer: Fertilizer shall be complete, standard commercial brand fertilizer. It shall be A. Design requirements: C.Contractor shall size pipe according to schedule provided. Flow velocities shall p pp 9• 9 p D. Mulch pits, and planted areas. Provide not less than following thickness of mulch, and work into top o o drying and breaking of rolled strips. free-flowing and packaged in new waterproof, non-overlaid bags clearly labeled as to weight, of backfill and finish level with adjacent finish grades. 1. Minimum water coverage: Planting areas-85/°, Lawn areas-100/° not exceed 5 feet/second in all cases. Lateral lines shall be laid out and installed B. Trees and Shrubs: Provide fresh) du trees and shrubs. Do not rune prior to deliver unless manufacturer, and content. Protect materials from deterioration during delivery and while stored at (full head-to-head) per zone to balance the pressure loss and provide minimum fluctuation in system Y 9 p p Y 9 rY 1. Provide 3 inches thickness of mulch. otherwise approved by Architect. Do not bend or bind-tie trees or shrubs in such manner as to site. E. If season and weather conditions dictate, apply anti-desiccant, using power spray, to provide an 2. Layout system to obtain optimum coverage using manufacturer's standard operating pressures. damage bark, break branches, or destroy natural shape. Provide protective covering during 1. Commercial fertilizer"A"for trees and shrubs during planting; slow release A riform Planting heads. Spray on walks, walls or paved areas is not acceptable. Pipe Size Pipe Section Pipe Size Pipe Section 9 Y p P 9 9 9 P 9 9 9 adequate film over trunks, branches, stems, twigs and foliage. 3/4" 0-9 GPM 1 1/2" 26-34 GPM delivery. Do not drop balled and burlapped stock during delivery. 5-gram tablets 20-10-5 type or equal. F. Prune, thin out, and shape trees and shrubs in accordance with standard horticultural practice. Prune 3. Zoning shall be designed for optimum use of available pressure and efficient - C. Deliver trees and shrubs after preparations for planting have been completed and plant immediately. 2. Commercial fertilizer"B"for lawn areas, applied to bed prior to sodding, to be 16-16-17 applied at trees to retain required height and spread. Unless otherwise directed by Architect, do not cut tree distribution for types of plantings and shapes of planting areas. 1" 10 17 GPM 2" 51 50 GPM If planting is delayed more than 6 hours after delivery, set trees and shrubs in shade, protect from the rate of ten pounds per acre. leaders, and remove only injured or dead branches from flowering trees, if any. Prune shrubs to retain 4. Design pressures: Install pressure regulating equipment it necessary. 1 1/4" 18-25 GPM 2 1/2" 51 80 GPM weather and mechanical damage, and keep roots moist b covering with mulch, burlap or other 3. Commercial fertilizer"C"for lawn areas three to four weeks after planting sod. Organic Fertilizer 5. Provide/install approved fixed teen coupling device for air blow winterization. g p Y g p p g 9 natural character. Location shall be on main supply line downstream from main shut off valve. D. Techline Drip Line: Place in shallow furrow at 1"-2" below finish topsoil grade, below layer Z Z acceptable means of retaining moisture. Milorganite (6-0-2)type or equal. G. Remove and replace excessively pruned or misformed stock resulting from improper pruning. ev y D. Do not remove container-grown stock from containers until planting time. C. Herbicide: Pre-emergent for topical application in planting beds. Oxiadiazon 2G brand or H. Guy and stake trees immediately after planting, as indicated. 6. Install approved backflow prevention device n conformance with local or of specified mulch. Lay r uniform grid pattern in grou apped tree around areas (rows 18"-2 allow E. Do not dropor dump materials from vehicles during delivery or handling. Avoid an damage to pre-approved equal. Use in accordance with manufacturer's recommendation on all planting beds. g prevailing codes, and in approved site location. Provide for drainage apart max). Coil 20 linear feet at each balled and burlapped tree around base and to allow a p 9 rY 9• Y 9 pp q P 9 I. Apply approved herbicide to all shrub bed areas at manufacture specified rate. Re-apply as necessary for tree removal if required. Staple drip line eve 36" max. Flush all lines with full head O rootballs during deliver, storage and handling. for elimination of weeds. without erosive damage. q p p every J 2.4 PLANT MATERIALS of water prior to installation of flush valves at end of circuit runs. � 1.6 JOB CONDITIONS A. Quality: Provide trees, shrubs, and other plants of size, genus, species, and variety shown for 3.6 SODDING NEW LAWNS E. Flush Valves: Install flush valve at end of each drip line run. 0. A. Utilities: Determine location of underground utilities and work in a manner which will avoid possible landscape work and complying with recommendations and requirements of ANSI Z60.1 "American A. General: Install lawn sod in all areas designated on the drawings. PART 2- PRODUCTS damage. Hand excavate, as required. Maintain grade stakes until removal is mutual) agreed upon Standard for Nurser Stock". g g 3.8 SPRINKLER HEADS 9 q 9 Y 9 P Y B. Soil Preparation 2.1 PIPE AND FITTINGS A. Flush circuit lines with full head of water prior to head installation. w by parties concerned. B. Deciduous Trees: Provide trees of height and caliper scheduled or shown with branching 1. Any sod lawn areas that may have become compacted prior to sodding must be scarified to a B. Excavation: When conditions detrimental to plant growth are encountered, such rubble fill, adverse configuration recommended b ANSI Z60.1 for e and species required. Single stem trees except A. PVC 1120, ASTM D-1784, permanently marked with manufacturer's name, 1. Install heads at level with mulch or lawn. P 9 9 Y type p q 9 p depth of eight(8) inches by approved means, then finish graded as hereinbefore described. 2. Locate art-circle shrubbery heads to maintain a minimum distance of six � O 0. drainage conditions, or obstructions, notify Architect before planting. where special forms are shown or listed. C. Lay sod within 24 hours from time of stripping. Do not plant dormant sod or if ground is frozen. schedule rating, size, type. Solvent-weld type: p rY C. Adjacent Landscape: Protect planted areas adjacent to construction area. Replace or recondition to C. Deciduous Shrubs: Provide shrubs of the height shown or listed, not less than minimum number of D. Sod Placement 1. Pipe: inches (6")from walls and four inches (4")from other boundaries unless Q X Q prior conditions at project completion. canes required by ANSI Z60.1 for type and height of shrub. 1. Sod will be brought onto lawn areas by wheeled means with proper protection of sod beds. Sod a. Pressure lines: Schedule 40 solvent weld. otherwise indicated. Keep overspray to a minimum. D. Coniferous and Broadleafed Evergreens: Provide evergreens of sizes shown or listed. Dimensions layers shall be experienced, or if inexperienced, shall be constantly supervised by an experienced b. Lateral lines: Class 200 pvc. M Q 1.7 SEQUENCING AND SCHEDULING indicate minimums read for spreading and semi-spreading type evergreens and height for other c. Sleeving: Class 200 pvc. 3.9 CONTROL WIRE INSTALLATION p p g p 9 Yp 9 9 foreman. The Contractor shall insure that the base immediately ahead of sod layer is moist. Sod A. Bur wires beside or below main line pipe in same trench. A. PlantingTime: Proceed with, and complete landscape work as rapidly as portions of site become types, such as lobe, dwarf, cone, pyramidal, broad upright, and columnar. Provide normal quality 2. Fittings: Schedule 40 PVC, solvent-weld type. Install threaded joints where Y pip p p p Y p YP 9 PYq Y shall be laid tight with not gaps. Allowance shall be made for shrinkage. Lay sod with long edges B. Provide 36 inch loop in wires at each valve where controls are connected and 10 co available,working within seasonal limitations for each kind of landscape work required. evergreens with well balanced form complying with requirements for other size relationships to the perpendicular to primary slope. required at valves, risers, etc. p o 1. Plant or install all )ant materials during normal planting seasons from 15 March to 15 primary dimension shown. 3. Risers: Lawn and shrub heads-flexible and damage-resistant plastic at 100' maximum intervals between. p 9 p 9 P rY 2. Lay to form a solid mass with tightly fitted joints. Butt ends and sides of strips; do not overlap. C. Make all electrical joints (splices) in boxes only. Make electrical joints Z November. Stagger strips to offset joints in adjacent courses. Work on boards to avoid damage to subgrade "polypipe" riser. 1 ( p ) s Y 1 ■ 2. Correlate planting with specified maintenance periods to provide maintenance from date of 2.5 GRASS MATERIALS 4. Solvent: NSF approved solvent for Type I & II PVC. waterproof per Hunter requirements. O p g p p p or sod. Tamp or roll lightly to ensure contact with subgrade. Work sifted soil into minor cracks z� < substantial completion. A. Lawn sod: Provide strongly rooted sod, not less than 1 growing season old, and free of weeds and between pieces; remove excess to avoid smothering of adjacent grass. B. Polyethylene Pipe B. Coordination with Lawns: Plant trees and shrubs after final grades are established and prior to undesirable native grasses. Provide only sod capable of growth and development when )anted 1. Pipe: Class 100, 3/4" lateral line,for use on drip irrigation zone(s)where 3.10 AUTOMATIC CONTROLLER g p g Y p g p p 3. Sod shall be rolled with a two hundred (200) pound roller after installation to insure proper contact A. Install on site as approved. Verify location with Owner Representative. W Z J planting of lawns, unless otherwise acceptable to Architect. If planting of trees and shrubs occurs (viable, not dormant). between soil and sod. Final rolling must provide a uniform surface. After final rolling, the sod lawn drip tubing c not otherwise used. le Y p Q after lawn work, protect lawn areas and promptly repair damage to lawns resulting from planting 1. Provide sod of uniform ad sizes with maximum 5% deviation in either length or width. Broken 2. Fittings: Schedule 80 PVC. B. Install typewritten legend inside controller door. Coordinate power with electrical. p p p y p g g p g p g shall be mowed and watered. Approval of sod lawns shall be based on uniform, healthy and C. Install controller per Hunter details and specifications. operations. pads or pads with uneven ends will not be acceptable. Sod pads incapable of supporting their vigorous growth with no dry or dead spots. C. Clamps: Stainless Steel. p 0 ir 1-- own weight when suspended vertically with a firm grasp on upper 10%of pad will be rejected. 4. Add fertilizer"B"at the manufacturer's recommended application rate. C. Drip Line: Netafim Techline Dripperline, with .6 GPH drippers at 18" spacing. Q W 1.8 SPECIAL PROJECT WARRANTY B. Provide sod composed of: Rhizomatous Tall Fescue RTF from the The Turf 3.11 TESTING p ( ) E. Water sod thoroughly with a fine spray immediately after planting. 2 SPRINKLER HEADS A. Do not allow or cause any work of this Section to be covered up or enclosed A. Warranty lawns through specified lawn maintenance period, until Final Project Acceptance. Company, Meridian, ID (208)888-3760 or approved equal. F. Sodded Lawn Establishment 2. � J B. Warrant trees and shrubs, for period of one year after date of substantial completion, against A. Description:Appropriate for application in throw, pressure and discharge. Each until it has been inspected and tested. Y p Y p 9 1. The Contractor shall be responsible for first mowing, subsequent mowings and fertilizing of sod defects including death and unsatisfactory growth, except for defects resulting from neglect by 2.6 MISCELLANEOUS LANDSCAPE MATERIALS lawn areas until Final Acceptance of the project. type of head shall be of a single manufacturer. B. Pressure testing: Owner, abuse or damage b others, or unusual phenomena or incidents beyond Landscape A.Anti-Desiccant: Emulsion type,film-forming agent designed to permit transpiration, but retard 1. Lawn heads: pop-up type. 1. Make necessary provision for thoroughly bleeding the line of air and debris. 9 Y p Y p YP 9 9 9 p p 2. Mowing shall be done by an approved reel type mower. Mower blades shall be set at two (2) testing,Installer's control. excessive loss of moisture from plants. Deliver in manufacturer's fully identified containers and mix inches high for all mowings. B. Manufacturer: Rainbird or Hunter. 2. Before 9 cap all risers, and install all valves. C. Remove and replace trees, shrubs, or other plants dead or in unhealthy condition during warrant in accordance with manufacturer's instructions. 3. Fill all main supply lines with water. Pressurize to 100 psi. Close air supply J p p Y g y 3. Subsequent fertilizing shall occur three to four weeks after installation. Apply fertilizer as per the 2.3 AUTOMATIC CONTROL SYSTEM and test for leakage. Test shall be approved if no greater than 5 psi loss period. Make replacements during growth season following end of warranty period. Replace trees B. Mulch: Mulch for planting beds shall be Premium Ground Cover(blend of Cascade Compost and Manufacturer's recommended application rate. Verify all methods of application. Contractor shall W Q and shrubs which are in doubtful condition at end of warrant period; unless, in opinion of Architect, Black Lava Fines from Cloverdale Nurser 208-375-5262 , consistent in appearance, and shall A. General; Furnish Hunter ACC-99D-PP controller with plastic pedestal. occurs in 15 minutes. Y p p ) Y( ) pP notify the Architect in writing that the fertilizer applications have occurred and on what dates. B. Wiring: Hunter ID2 12 AWG Heavy-Duty Dut Decoder Cable 4. Fill all zone lines with water to static pressure. Hold for 15 minutes. it is advisable to extend warranty period for a full growing season. contain no toxic substance detrimental to plant life. g� Y- Y C. Mulch inside Dog Park Area to be 3/4"dark color PermaBark. 3.7 MAINTENANCE C. Decoder: Hunter ICD Decoders 1,2A and 6 station as necessary. Inspect for leakage. D. Stakes and Guys: Provide stakes and deadmen of sound new hardwood, treated softwood, or 5. Contractor shall provide all required testing equipment and personnel. Test LL Y A. Begin landscape maintenance immediately after planting. Maintenance shall continue until Project redwood,free of knot holes and other defects. Provide wire ties and guys of 2-strand, twisted, Final Acceptance. 2.4 VALVING shall be performed in presence of Architect. Contractor shall make notice liable galvanized iron wire, not lighter than 12 a.with zinc-coated turnbuckles. Provide not less A. Manual valves: brass or bronze for direct burial, gate valves, 150 pound class, of test(48) hours in advance. P g g 9 B. Maintain trees, shrubs, and other plants by pruning, cultivating, and weeding as required for healthy 6. Provide required testing equipment and personnel. than 2 inch diameter rubber or plastic hose, cut to required lengths and of uniform color, material, growth. Restore planting saucers. Tighten and repair stake and guy supports and reset trees and threaded connection with cross type handle designed to receive operating key. q gP and size to protect tree trunks from damage b wires. B. Automatic circuit valves: high impact plastic with corrosion-resistant internal 7. Repair leaks, and retest until acceptance by the Architect. p 9 Y shrubs to proper grades or vertical position free required. Restore or replace damaged wrappings. parts. Low power solenoid control, normally closed, with manual flow C. Coverage inspection: upon completion of all systems, perform a coverage test Spray as required to keep trees and shrubs free of insects and disease. adjustment. to determine if coverage of water afforded all areas is complete, adequate and C. Maintain lawns by watering,fertilizing, weeding, mowing, trimming, and other operations such as 1. Standard sprinkler valve for spray shall be Rainbird PEB-PRS-D. Use scrubber uniform. Change heads, nozzles, orifices and/or adjustment as directed to tolling, regrading and replanting as required to establish a smooth, acceptable lawn, free of eroded or bare areas. valve if not connected to potable water. provide uniform coverage. 2. Drip Control Zone Kit: Hunter PCZ-101. D. Final inspection: D. Maintain lawns for no less than period stated above, or longer as required to establish acceptable C. Quick coupler valve: brass or bronze construction with hinged top. 1. Clean, adjust, and balance all systems. Verify that: Job Number 1953 lawn. a. Remote control valves are properly balanced; D. Manual drain valves: p p Y 3.8 CLEANUP AND PROTECTION 1. Bronze construction, straight type, 150 pound class, threaded connections, b. Heads are properly adjusted for radius and arc of coverage; A. During landscape work, keep pavements clean and work area in an orderly condition. with cross type operating handle designed to receive operating key. Calco, c. The installed system is workable, clean and efficient. B. Protect landscape work and materials from damage due to landscape operations, operations by other Champion 100, or approved equal. E. Winterization: Winterize system at the end of first season of system operation. Drawn Checked Review procedures with Owner Representative. contractors and trades, and trespassers. Maintain protection during installation and maintenance 2. Size: 3/4 inch. pJJN KCS periods. Treat, repair, or replace damaged landscape work as directed. E. Pressure Regulator: Netafim Model PRV075HF35, 3/4", one per zones. F. Flushing Valve: Netafim Model TLFV-1, two per zone (each end). Scale AS SHOWN 3.9 INSPECTION AND ACCEPTANCE G. Filter: Netafim Model DF075-120, 3/4"filter; one per drip zone. END OF SECTION A. When landscape work is completed, including maintenance,Architect will, upon request, make an H. Air Relief Valve: Netafim Model TLAVRV, Sheet Title inspection to determine acceptability. 2.5 MISCELLANEOUS B. When inspected landscape work does not comply with requirements, replace rejected work and LANDSCAPE A. Chemicals: primer and solvent glue as required by pipe manufacturer. continue specified maintenance until reinspected by Architect and found to be acceptable. Remove rejected plants and materials promptly from project site. B. Valve box- high impact plastic, green in color. C.Valve cover and frame-compatible with valve box with provision for locking. SPECIFICATIONS END OF SECTION D. Drainage backfill -clean gravel or crushed stone, graded from 3" maximum to 3/4" minimum. D��ELOPER Sheet Number DEVCO LLC. JIM CONGER 4824 W. FAIRVIEW AVE BOISE, IDAHO 83706 L4 (208) 336-5355 5 of 5 Sheets