Loading...
ElevationsFINISH FLOOR 100' -0" T.O.P. -OFFICE 112' -0" T.O.P. -GARAGE 116' -0" T.O. PARAPET 114' -0" T.O. PARAPET 2 115' -0" 1234 1 1 1 2 2 22 3 3 3 4 5 5 76 8 88 8 8 9 10 101010 12 13 13 13 14 14 A FINISH FLOOR 100' -0" T.O.P. -OFFICE 112' -0" T.O.P. -GARAGE 116' -0" T.O. PARAPET 114' -0" T.O. PARAPET 2 115' -0" ABCD 1 13 2 3 5 14 12 2 2 11 FINISH FLOOR 100' -0" T.O.P. -OFFICE 112' -0" T.O.P. -GARAGE 116' -0" T.O. PARAPET 114' -0" T.O. PARAPET 2 115' -0" A B C D 7 1 1 2 1 3 5 6 5 11 12 11 12 13 13 FINISH FLOOR 100' -0" T.O.P. -OFFICE 112' -0" T.O.P. -GARAGE 116' -0" T.O. PARAPET 114' -0" T.O. PARAPET 2 115' -0" 1 2 3 4 1 1 12 22 2 3 3 3 4 67 8 8 8 8 9 11 12 13 13 11 CLIENT:JOB NUMBER CONSULTANT 725 E 2nd St Meridian, ID 83642 208.884.2824 PROFESSIONAL SEAL THIS DOCUMENT IS THE PROPERTY OF NEUDESIGN ARCHITECTURE, LLC AND IS NOT TO BE DUPLICATED WITHOUT WRITTEN AUTHORIZATION. © NEUDESIGN ARCHITECTURE LLC DRAWN BY N O T FO R PER MI T20106LAND SOLUTIONS OFFICEMERIDIAN, ID 83642A-211LAND SOLUTIONSEXTERIOR ELEVATIONS ALB NO. DESCRIPTION DATE C CZC/DR 11/23/20 B 60% SET 11/13/20 A PRELIMINARY DRAWINGS 10/7/20 3/16" = 1'-0"1 NORTH ELEVATION 3/16" = 1'-0"2 EAST ELEVATION 3/16" = 1'-0"3 WEST ELEVATION 3/16" = 1'-0"4 SOUTH ELEVATION 5 3D View 163D View 2 ELEVATION NOTES # Note 1 STUCCO 2 METAL SIDING 3 STUCCO TRIM 4 STANDING SEAM METAL ROOF 5 CANOPY 6 PARAPET CAP 7 PARAPET CAP OVER STUCCO TRIM 8 STOREFRONT 9 MAN DOOR 10 OVERHEAD DOOR 11 SCUPPER AND DOWNSPOUT 12 GUTTER AND DOWNSPOUT 13 STUCCO RELIEF 14 METAL BRACE