Narrative - 3100 E. Florence St.
1505 Westlake Ave N
Seattle, WA 98109
Phone: (206) 336 -2863
Fax:
www.crowncastle.com
Via on line permit system
Citizens Access Portal
December 5, 2020
City of Meridian Idaho
Planning Division
33 East Broadway Ave.
Suite 102
Meridian, Idaho 83643
RE: Eligible Facilities Request to modify equipment on a communications tower located at:
3100 E. Florence St, Meridian, Idaho. 83642
Parcel No. R0375650030
City of Meridian
Certificate of Zoning Compliance Application
Completed address verification: LDAV-2020-0727
Crown Site Number: 825952
Application No. 524483
Carrier: T-Mobile
T-Mobile Site ID: SLO6024A, Meridian Retail
Crown Castle USA Inc. (“Crown Castle”) on behalf of T-Mobile is submitting the attached Eligible Facilities
Request application for a Certificate of Zoning Compliance to modify transmission equipment on a
telecommunications tower located at 3100 E. Florence St., Meridian, Idaho 83642.
T-Mobile proposes to modify this existing site as follows:
Proposed Tower Scope of Work:
Remove (3) RRU-RRUS32 B2
Remove (3) Antennas AIR – 21
Install (3) Antennas AIR6449 -B41
Install (3) RRU-4424 B25
1505 Westlake Ave N
Seattle, WA 98109
Phone: (206) 336 -2863
Fax:
www.crowncastle.com
Install (3) 6’ T-arms
Install (1) 6x12 4AWG Hybrid cable
Proposed Ground Scope of Work:
Install (1) 6160 cabinet and (1) B160 Battery cabinet
Install (1) BB 6648 Module
Install (1) BB6630 Module
Install (1) PSU 4813
Install new concrete pad, gate, bollards and wall extension to match existing wall
Itemized list of submittal documents for a Certificate of Zoning Compliance:
Meridian City addressing approval – LDAV-2020-0727
Narrative – see this letter
Ada County Property Report
Construction Drawings
Vicinity Map
Warranty Deed for the subject property
Affidavit of Legal Interest signed and notarized by the property owner
CZC checklist.
Crown Castle Authorization to submit for permits
Prior CZC approvals:
CZC- A-2016-0276 & CZC A-2019-0238
Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012, commonly known as the “Spectrum Act”
(Pub. Law No. 112-96, 126 Stat 156), mandates that state and local governments “may not deny, and shall approve, any
eligible facilities request for a modification of an existing wireless tower or base station that does not substantially
change the physical dimensions of such tower or base station.” Additionally, if “the reviewing State or local government
determines that the application is incomplete” [they] “must provide written notice to the applicant within 30 days of
receipt of the application, clearly and specifically delineating all missing documents or information.” Under federal law,
an Eligible Facilities Request is deemed granted with written notification in sixty (60) days after an application is filed
with a local jurisdiction, excluding tolling.
1505 Westlake Ave N
Seattle, WA 98109
Phone: (206) 336 -2863
Fax:
www.crowncastle.com
T-Mobile is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval
of requests to modify existing personal wireless service facilities. If you should require more information regarding the
Spectrum Act, please do not hesitate to contact me with your questions.
Sincerely,
Gary Abrahams
For CCI on behalf of T-Mobile
206-349-4279