Loading...
Narrative - 3100 E. Florence St. 1505 Westlake Ave N Seattle, WA 98109 Phone: (206) 336 -2863 Fax: www.crowncastle.com Via on line permit system Citizens Access Portal December 5, 2020 City of Meridian Idaho Planning Division 33 East Broadway Ave. Suite 102 Meridian, Idaho 83643 RE: Eligible Facilities Request to modify equipment on a communications tower located at: 3100 E. Florence St, Meridian, Idaho. 83642 Parcel No. R0375650030 City of Meridian Certificate of Zoning Compliance Application Completed address verification: LDAV-2020-0727 Crown Site Number: 825952 Application No. 524483 Carrier: T-Mobile T-Mobile Site ID: SLO6024A, Meridian Retail Crown Castle USA Inc. (“Crown Castle”) on behalf of T-Mobile is submitting the attached Eligible Facilities Request application for a Certificate of Zoning Compliance to modify transmission equipment on a telecommunications tower located at 3100 E. Florence St., Meridian, Idaho 83642. T-Mobile proposes to modify this existing site as follows: Proposed Tower Scope of Work:  Remove (3) RRU-RRUS32 B2  Remove (3) Antennas AIR – 21  Install (3) Antennas AIR6449 -B41  Install (3) RRU-4424 B25 1505 Westlake Ave N Seattle, WA 98109 Phone: (206) 336 -2863 Fax: www.crowncastle.com  Install (3) 6’ T-arms  Install (1) 6x12 4AWG Hybrid cable  Proposed Ground Scope of Work:  Install (1) 6160 cabinet and (1) B160 Battery cabinet  Install (1) BB 6648 Module  Install (1) BB6630 Module  Install (1) PSU 4813  Install new concrete pad, gate, bollards and wall extension to match existing wall Itemized list of submittal documents for a Certificate of Zoning Compliance:  Meridian City addressing approval – LDAV-2020-0727  Narrative – see this letter  Ada County Property Report  Construction Drawings  Vicinity Map  Warranty Deed for the subject property  Affidavit of Legal Interest signed and notarized by the property owner  CZC checklist.  Crown Castle Authorization to submit for permits  Prior CZC approvals:  CZC- A-2016-0276 & CZC A-2019-0238 Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012, commonly known as the “Spectrum Act” (Pub. Law No. 112-96, 126 Stat 156), mandates that state and local governments “may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station.” Additionally, if “the reviewing State or local government determines that the application is incomplete” [they] “must provide written notice to the applicant within 30 days of receipt of the application, clearly and specifically delineating all missing documents or information.” Under federal law, an Eligible Facilities Request is deemed granted with written notification in sixty (60) days after an application is filed with a local jurisdiction, excluding tolling. 1505 Westlake Ave N Seattle, WA 98109 Phone: (206) 336 -2863 Fax: www.crowncastle.com T-Mobile is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval of requests to modify existing personal wireless service facilities. If you should require more information regarding the Spectrum Act, please do not hesitate to contact me with your questions. Sincerely, Gary Abrahams For CCI on behalf of T-Mobile 206-349-4279