Loading...
PZ - Geotech Report MATERIALS 10 February 2020 40 TESTING & Page # 1 of 18 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections Mr. Jarron Langston Epic Development, LLC 917 South Allante Place Boise, ID 83709 208-724-6239 Re: Limited Geotechnical Engineering Report Shafer View 2 East Shafer View Drive Meridian, ID Dear Mr. Langston: In compliance with your instructions, MTI has conducted a limited soils exploration for the above referenced development. Fieldwork for this investigation was conducted on 3 February 2020. The proposed development is in the southern portion of the City of Meridian, Ada County, ID, and occupies portions of the NW'/4 and NE'/4SW'/4 of Section 31, Township 3 North, Range 1 East, Boise Meridian. This project will consist of a residential subdivision with an unknown number of lots to be developed on approximately 39 acres. MTI has not been informed of the proposed grading plan. Authorization Authorization to perform this exploration and analysis was given in the form of a written authorization to proceed from Mr. Jarron Langston of Epic Development, LLC to Monica Saculles of Materials Testing and Inspection (MTI), on 24 January 2020. Said authorization is subject to terms, conditions, and limitations described in the Professional Services Contract entered into between Epic Development, LLC and MTI. Our scope of services for the proposed development has been provided in our proposal dated 24 January 2020 and repeated below. Scope of Investigation The scope of this investigation included review of geologic literature and existing available geotechnical studies of the area, visual site reconnaissance of the immediate site, subsurface exploration of the site, field and laboratory testing of materials collected, and engineering analysis. Our scope of work did not include foundation design, pavement design, or earthwork recommendations. Regional Geology The project site is located within the western Snake River Plain of southwestern Idaho and eastern Oregon. The plain is a northwest trending rift basin, about 45 miles wide and 200 miles long,that developed about 14 million years ago(Ma)and has since been occupied sporadically by large inland lakes. Geologic materials found within and along the plain's margins reflect volcanic and fluvial/lacustrine sedimentary processes that have led to an accumulation of approximately 1 to 2 km of interbedded volcanic and sedimentary deposits within the plain. Along the margins of the plain, streams that drained the highlands to the north and south provided coarse to fine-grained sediments eroded from granitic and volcanic rocks,respectively. About 2 million years ago the 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 40 TESTING & Page #2 of 18 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections last of the lakes was drained and since that time fluvial erosion and deposition has dominated the evolution of the landscape. The project site is underlain by "Gravel of Amity Terrace" as mapped by Othberg and Stanford (1993). The Amity terrace is the fifth terrace above the modern Boise River and represents the first level of Quaternary incision by the Boise River. The terrace, which has been correlated with Deer Flat terrace deposits to the west, is modified extensively by erosion and faulting. Where little erosion has taken place the terrace is mantled with loess 1.6-7 feet thick. General Site Characteristics The site to be developed is approximately 39 acres in size. Currently, the majority of the site exists as an agriculture field. McBirney Lateral runs east to west along the southern property boundary. The eastern portion of the site consists of undeveloped land. Another lateral runs roughly south to north separating the agriculture field to the west from the undeveloped land to the east. To the south of the site is an existing residential development. The remainder of the surrounding property consists of agriculture fields and undeveloped land. Vegetation on the site consists primarily of agricultural crops, bunchgrass, other native weeds and grasses and a few mature trees. The portion of the site that is agriculture fields has a slight drop in elevation from south to north dropping away from McBirney Lateral. The eastern,undeveloped portion of the site also has a slight drop in elevation from the northeast to the west and southwest dropping to the other lateral on site. Regional drainage is south and west toward Indian Creek. Stormwater drainage for the site is achieved by percolation through surficial soils. The site is situated so that it is unlikely that it will receive any stormwater drainage from off-site sources. Stormwater drainage collection and retention systems are not in place on the project site,but were noted along Shafer View Drive in the form of curb, gutter, and drop inlets. Exploration and Sampling Procedures Field exploration conducted to determine engineering characteristics of subsurface materials included a reconnaissance of the project site and investigation by test pit. Test pit sites were located in the field by means of a Global Positioning System (GPS) device and are reportedly accurate to within fifteen feet. Upon completion of investigation, each test pit was backfilled with loose excavated materials. Re-excavation and compaction of these test pit areas are required prior to construction of overlying structures. In addition, samples were obtained from representative soil strata encountered. Samples obtained have been visually classified in the field by professional staff, identified according to test pit number and depth, placed in sealed containers, and transported to our laboratory for additional testing. Subsurface materials have been described in detail on logs provided in the Enclosures section. Results of field and laboratory tests are also presented in the Enclosures section. MTI recommends that these logs not be used to estimate fill material quantities. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 40 TESTING & Page # 3 of 18 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections Laboratory Testing Program Along with our field investigation, a supplemental laboratory testing program was conducted to determine additional pertinent engineering characteristics of subsurface materials necessary in an analysis of anticipated behavior of the proposed structures. Laboratory tests were conducted in accordance with current applicable American Society for Testing and Materials (ASTM) specifications, and results of these tests are to be found on the accompanying logs located in the Enclosures section. The laboratory testing program for this report included: Atterberg Limits Testing—ASTM D4318 and Grain Size Analysis—ASTM C 117/C 136. Soil and Sediment Profile The profile below represents a generalized interpretation for the project site. Note that on site soils strata, encountered between test pit locations, may vary from the individual soil profiles presented in the logs, which can be found in the Enclosures section. Sandy lean clay with gravel fill materials were noted at ground surface in test pit 4. These materials were brown, slightly moist, stiff to very stiff, and contained fine to coarse-grained sand, fine to coarse gravel, and 5- inch minus cobbles. Underlying the surficial materials in test pit 4 and at ground surface in the other five test pits, lean clay soils were encountered. These soils were brown to light brown, slightly moist to dry, and stiff to very stiff. Below lean clay soils in test pits 1, 2, 3,and 5, silt with sand soils were discovered. These soils were light brown, dry to slightly moist, stiff to hard, and contained fine to medium-grained sand. Varying degrees of calcium carbonate cementation were noted. Underlying the silt with sand soils in test pit 1, silty sand sediments were encountered. These sediments were light brown, slightly moist, medium dense, and contained fine to medium-grained sand. Silty gravel with sand sediments were found underneath the lean clay soils in test pit 4 and the silt soils in test pit 5. These sediments were light brown, dry, loose to dense, and contained fine to coarse-grained sand, fine to coarse gravel, and 6- inch minus cobbles. Moderate calcium carbonate cementation was noted throughout these sediments in test pit 4. At depth in test pits 2, 3, 5, and 6 and below the silty gravel with sand in test pit 4, poorly graded gravel with sand sediments were discovered. These sediments were light brown to brown and tan, dry to slightly moist, loose to dense, and contained fine to coarse-grained sand, fine to coarse gravel, and 6-inch minus cobbles. In test pit 6,clay content was noted within the upper 1.5 feet. At depth in test pit 4,poorly graded sand with gravel sediments were encountered. These sediments were light brown to brown, slightly moist, medium dense to dense, and contained fine to coarse-grained sand and fine to coarse gravel. During excavation, test pit sidewalls were generally stable, except in test pit 5 where the more granular sediments excessively sloughed. Moisture contents will affect wall competency with saturated soils having a tendency to readily slough when under load and unsupported. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 40 TESTING & Page #4 of 18 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections Groundwater During this field investigation, groundwater was not encountered in test pits advanced to a maximum depth of 14.4 feet bgs. Soil moistures in the test pits were generally dry to slightly moist throughout. In the vicinity of the project site, groundwater levels are controlled in large part by residential and agricultural irrigation activity and leakage from the McBirney Lateral. Maximum groundwater elevations likely occur during the later portion of the irrigation season. MTI has previously performed 2 geotechnical investigations within 0.50 mile of the project site. Information from these investigations has been provided in the table below. Groundwater Data P%e Approximate Distance Direction from Site Groundwater Depth from Site (mile) (feet bgs) June 2006 0.35 North 9.0* October 2015 0.35 North Not Encountered to 16.6 *Test pit was advanced adjacent to Carlson Lateral. Furthermore, according to United States Geological Survey(USGS) monitoring well data on site, groundwater was measured at a depth of 90 feet bgs,which equates to a groundwater elevation of 2,648 feet above mean sea level (msl). For construction purposes, groundwater depth can be assumed to remain greater than 20 feet bgs throughout the year. However, seepage may occur near the laterals. Soil Infiltration Rates Soil permeability,which is a measure of the ability of a soil to transmit a fluid,was not tested in the field. Given the absence of direct measurements, for this report an estimation of infiltration is presented using generally recognized values for each soil type and gradation. Of soils comprising the generalized soil profile for this study, lean clay and silt soils generally offer little permeability, with typical hydraulic infiltration rates of less than 2 inches per hour. Silty sand and silty gravel with sand sediments usually display rates of 4 to 8 inches per hour. Calcium carbonate cementation noted within the silts with sand and silty gravels with sand may reduce those values to near zero. Poorly graded sand and gravel sediments typically exhibit infiltration values in excess of 12 inches per hour. Infiltration testing is generally not required within these sediments because of their free- draining nature. It is recommended that infiltration facilities constructed on the site be extended into the native, clay-free poorly graded gravel with sand sediments that was found in every test pit except test pit 1. Excavation depths of approximately 5.3 to 7.2 feet bgs should be anticipated to expose these clay. -free poorly graded gravel with sand sediments. Because of the high soil permeability, ASTM C33 filter sand, or equivalent, should be incorporated into design of infiltration facilities. An infiltration rate of 8 inches per hour should be used in design. Actual infiltration rates should be confirmed at the time of construction. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 5 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections General Comments Based on the subsurface conditions encountered during this investigation and available information regarding the proposed development,the site is adequate for the planned construction. When plans and specifications are complete, and if significant changes are made in the character or location of the proposed development, consultation with MTI must be arranged as supplementary recommendations may be required. Often, questions arise concerning soil conditions because of design and construction details that occur on a project. MTI would be pleased to continue our role as geotechnical engineers during project implementation. Additionally, MTI can provide materials testing and special inspection services during construction of this project. If you will advise us of the appropriate time to discuss these engineering services, we will meet with you at your convenience. MTI appreciates this opportunity to be of service to you and looks forward to working with you in the future. If you have questions, please call (208) 376-4748. Respectfully Submitted, Materials Testing & Inspection �4 1 - I3 Hunter Hayes, E.I. Reviewed by: Elizabeth Brown, P.E. Staff Engineer Geotechnical Services Manager *44L Reviewed by: Monica Saculles, P.E. Senior Geotechnical Engineer Enclosures: Warranty and Limiting Conditions Vicinity Map Site Map Geotechnical Investigation Test Pit Logs Geotechnical General Notes Important Information About This Geotechnical Engineering Report 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 6 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections WARRANTY AND LIMITING CONDITIONS MTI warrants that findings and conclusions contained herein have been formulated in accordance with generally accepted professional engineering practice in the fields of foundation engineering, soil mechanics, and engineering geology only for the site and project described in this report. These engineering methods have been developed to provide the client with information regarding apparent or potential engineering conditions relating to the site within the scope cited above and are necessarily limited to conditions observed at the time of the site visit and research. Field observations and research reported herein are considered sufficient in detail and scope to form a reasonable basis for the purposes cited above. Exclusive Use This report was prepared for exclusive use of the property owner(s), at the time of the report, and their retained design consultants ("Client"). Conclusions and recommendations presented in this report are based on the agreed-upon scope of work outlined in this report together with the Contract for Professional Services between the Client and Materials Testing and Inspection("Consultant"). Use or misuse of this report,or reliance upon findings hereof, by parties other than the Client is at their own risk. Neither Client nor Consultant make representation of warranty to such other parties as to accuracy or completeness of this report or suitability of its use by such other parties for purposes whatsoever, known or unknown, to Client or Consultant. Neither Client nor Consultant shall have liability to indemnify or hold harmless third parties for losses incurred by actual or purported use or misuse of this report. No other warranties are implied or expressed. Report Recommendations are Limited and Subiect to Misinterpretation There is a distinct possibility that conditions may exist that could not be identified within the scope of the investigation or that were not apparent during our site investigation. Findings of this report are limited to data collected from noted explorations advanced and do not account for unidentified fill zones,unsuitable soil types or conditions,and variability in soil moisture and groundwater conditions. To avoid possible misinterpretations of findings, conclusions, and implications of this report, MTI should be retained to explain the report contents to other design professionals as well as construction professionals. Since actual subsurface conditions on the site can only be verified by earthwork, note that construction recommendations are based on general assumptions from selective observations and selective field exploratory sampling. Upon commencement of construction, such conditions may be identified that require corrective actions, and these required corrective actions may impact the project budget. Therefore, construction recommendations in this report should be considered preliminary, and MTI should be retained to observe actual subsurface conditions during earthwork construction activities to provide additional construction recommendations as needed. Since geotechnical reports are subject to misinterpretation, do not separate the soil logs from the report. Rather, provide a copy of, or authorize for their use, the complete report to other design professionals or contractors. Locations of exploratory sites referenced within this report should be considered approximate locations only. For more accurate locations, services of a professional land surveyor are recommended. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 7 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections This report is also limited to information available at the time it was prepared. In the event additional information is provided to MTI following publication of our report, it will be forwarded to the client for evaluation in the form received. Environmental Concerns Comments in this report concerning either onsite conditions or observations, including soil appearances and odors, are provided as general information. These comments are not intended to describe, quantify, or evaluate environmental concerns or situations. Since personnel, skills, procedures, standards, and equipment differ, a geotechnical investigation report is not intended to substitute for a geoenvironmental investigation or a Phase II/III Environmental Site Assessment. If environmental services are needed, MTI can provide, via a separate contract, those personnel who are trained to investigate and delineate soil and water contamination. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection Vicinity Map Plate 1 MAP NOTES: am rtd . •Delorme Street Atlas •Not to Scale 55 Beatty 1W FRANKSN RI} TFRAN�LINR E FRANKLIN RI} E FRANKLIN Ra F LEGEND - I Approximate Site Location ,Fczjll !E -- . rn 7 46 a w �.3 55 Uj rn uF 1 J� 88 N E VICTORY ID Shafer View 2 East Shafer View Drive II Meridian,ID Site ocati0 Modified from DeLorme by:HH 7 February 2020 Drawing:13200142g rn p m MATERIALS TESTING & Co INSPECTION 2791 S.Victory View Way Phone: 208 376-4748 Boise,ID 83709-2835 Fax: 208 322-6515 E-mail: mti@mti-id.com Site Map Plate 2 I I NOTES: I I I •Not to Scale I I I I I I I I I I I I I I I I LEGEND Approximate Site I Boundary I I TP-3 I I TP-2 _ ___ Approximate MTI Test I I Pit Location I I I I \ I I TP-5 i I I TP-1 — —- ICI 8 /• = \ �/ �. Io1 TP-41. N I I I I I I i Shafer View 2 I I HAFER VIEW VE \. i East Shafer View Drive I I Meridian,ID I I \\.TP-6 i Drawn by:HH I \ 7 February 2020 I I � I I Drawing:B200142g I I I I 1 I I j MATERIALS I I — j TESTING & I I j INSPECTION I I I I j 2791 S.Victory View Way Phone: 208 376-4748 I I Boise,ID 83709-2835 Fax: 208 322-6515 I j E-mail: mti@mti-id.com I I MATERIALS 10 February 2020 TESTING & Page # 10 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections GEOTECHNICAL INVESTIGATION TEST PIT LOG Test Pit Log#: TP-1 Date Advanced: 3 Feb 2020 Logged by: Hunter Hayes, E.I. Excavated by: Struckman's Backhoe Service Location: See Site Map Plates Latitude: 43.552528 Longitude: -116.393332 Depth to Water Table: Not Encountered Total Depth: 14.4 Feet bgs Depth Field Description and USCS Soil and Sample Sample Depth Lab (Feet b s) Sediment Classification Type (Feet b s) Qp Test ID Lean Clay (CL): Brown, slightly moist, stiff 0.0-1.2 to very stiff. 2.0-2.5 --Organics and low zone noted throughout. Silt with Sand (ML): Light brown, dry, very stiff to hard, with fine to medium-grained 1.2-11.0 sand. --Moderate calcium carbonate cementation throughout. Silty Sand(SM): Light brown, slightly moist, 11.0-14.4 medium dense, with fine to medium-grained sand. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 11 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections GEOTECHNICAL INVESTIGATION TEST PIT LOG Test Pit Log#: TP-2 Date Advanced: 3 Feb 2020 Logged by: Hunter Hayes, E.I. Excavated by: Struckman's Backhoe Service Location: See Site Map Plates Latitude: 43.553721 Longitude: -116.390716 Depth to Water Table: Not Encountered Total Depth: 11.3 Feet bgs Depth Field Description and USCS Soil and Sample Sample Depth Lab (Feet b s) Sediment Classification Type (Feet b s) Qp Test ID Lean Clay (CL): Brown, slightly moist, very 0.0-1.6 stiff. 3.0-3.5 --Organics noted to a depth of 0.4 oot b s. Silt with Sand (ML): Light brown, dry, very stiff to hard, with fine to medium-grained 1.6-7.1 sand. --Moderate calcium carbonate cementation throughout. Poorly Graded Gravel with Sand (GP): Light 7.1-11.3 brown, dry to slightly moist, medium dense, with fine to coarse-grained sand, fine to coarse gravel, and 6-inch minus cobbles. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 12 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections GEOTECHNICAL INVESTIGATION TEST PIT LOG Test Pit Log#: TP-3 Date Advanced: 3 Feb 2020 Logged by: Hunter Hayes, E.I. Excavated by: Struckman's Backhoe Service Location: See Site Map Plates Latitude: 43.553737 Longitude: -116.388732 Depth to Water Table: Not Encountered Total Depth: 11.1 Feet bgs Depth Field Description and USCS Soil and Sample Sample Depth Lab (Feet bgs) Sediment Classification Type (Feet bgs) Qp Test ID Lean Clay (CL): Brown, slightly moist, very 0.0-1.4 --Organics noted to a depth of 0.5 foot bgs. 3.0-4.0 --Plow zone noted to a depth of 0.8 foot bgs. Silt with Sand (ML): Light brown, slightly moist to dry, very stiff to hard, with fine to 1.4-5.6 medium-grained sand. --Moderate calcium carbonate cementation from 3.0 to 5.6 eet bgs. Poorly Graded Gravel with Sand(GP): Light 5.6-11.1 brown, dry to slightly moist, medium dense to dense, with fine to coarse-grained sand,fine to coarse gravel, and 6-inch minus cobbles. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 13 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections GEOTECHNICAL INVESTIGATION TEST PIT LOG Test Pit Log#: TP-4 Date Advanced: 3 Feb 2020 Logged by: Hunter Hayes, E.I. Excavated by: Struckman's Backhoe Service Location: See Site Map Plates Latitude: 43.552152 Longitude: -116.385728 Depth to Water Table: Not Encountered Total Depth: 13.1 Feet bgs Depth Field Description and USCS Soil and Sample Sample Depth Lab (Feet b s) Sediment Classification Type (Feet b s) Qp Test ID Sandy Lean Clay with Gravel Fill (CL- FILL): Brown, slightly moist, stiff to very 0.0-1.0 stiff, with fine to coarse-grained sand,fine to 1.5-2.0 coarse gravel, and 5-inch minus cobbles. --Organics noted to a depth of 0.5 oot b s. 1.0-2.2 Lean Clay (CL): Brown to light brown, slightly moist to dry, stiff to very stiff, Silty Gravel with Sand (GM): Light brown, dry, dense, with fine to coarse-grained sand, 2 2-6 7 fine to coarse gravel, and 6-inch minus cobbles. --Moderate calcium carbonate cementation throughout. Poorly Graded Gravel with Sand(GP): Light 6.7-10.3 brown, dry to slightly moist, dense, with fine to coarse-grained sand,fine to coarse gravel, and 6-inch minus cobbles. Poorly Graded Sand with Gravel (SP): Light 10.3-13.1 brown to brown, slightly moist, medium dense to dense, with fine to coarse-grained sand and fine to coarse gravel. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 14 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections GEOTECHNICAL INVESTIGATION TEST PIT LOG Test Pit Log#: TP-5 Date Advanced: 3 Feb 2020 Logged by: Hunter Hayes, E.I. Excavated by: Struckman's Backhoe Service Location: See Site Map Plates Latitude: 43.552996 Longitude: -116.384904 Depth to Water Table: Not Encountered Total Depth: 9.5 Feet bgs Depth Field Description and USCS Soil and Sample Sample Depth Lab (Feet b s) Sediment Classification Type (Feet b s) Qp Test ID Lean Clay (CL): Brown, slightly moist, stiff 0.0-1.2 2.0-2.5 to very stiff. Silt with Sand (ML): Light brown, dry, stiff to very stiff, with fine to medium-grained 1.2-4.0 sand. GS 2.0-2.5 A* --Intermittent weak calcium carbonate cementation throughout. Silty Gravel with Sand (GM): Light brown, 4.0-7.2 dry, loose to medium dense, with fine to coarse-grained sand, fine to coarse gravel, and 6-inch minus cobbles. Poorly Graded Gravel with Sand (GP): Light brown to tan, dry, loose to medium dense, 7.2-9.5 with fine to coarse-grained sand, fine to coarse gravel, and 6-inch minus cobbles. --Refusal due to excessive sloughing. Lab Test ID M LL PI Sieve Analysis (% assin ) % - I - 1!10 #40 #100 #200 A* 13.2 NP I NP 96 91 76 63 51.2 *Sieve results may be skewed due to cementation. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 15 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections GEOTECHNICAL INVESTIGATION TEST PIT LOG Test Pit Log#: TP-6 Date Advanced: 3 Feb 2020 Logged by: Hunter Hayes, E.I. Excavated by: Struckman's Backhoe Service Location: See Site Map Plates Latitude: 43.550395 Longitude: -116.384849 Depth to Water Table: Not Encountered Total Depth: 12.9 Feet bgs Depth Field Description and USCS Soil and Sample Sample Depth Lab (Feet b s) Sediment Classification Type (Feet b s) Qp Test ID Lean Clay (CL): Brown, slightly moist, stiff 0.0-3.8 2.0-2.5 to very stiff. Poorly Graded Gravel with Sand(GP): Light brown to brown, dry to slightly moist, 3.8-12.9 medium dense to dense, with fine to coarse- grained sand, fine to coarse gravel, and 6- inch minus cobbles. --Clay content noted in upper 1.5 feet. 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti ccbmti-id.com CopyrightThong Inspection Testing&Inspection MATERIALS 10 February 2020 TESTING & Page # 16 of 18 40 I NS PE CTION b200142g_limited_geotech AN ATLAS COMPANY ❑Environmental Services ❑Geotechnical Engineering ❑Construction Materials Testing ❑Special Inspections GEOTECHNICAL GENERAL NOTES UNIFIED SOIL CLASSIFICATION SYSTEM Major Divisions Symbol Soil Descriptions Gravel&Gravelly GW Well-graded gravels;gravel/sand mixtures with little or no fines Soils<50% GP Poorly-graded gravels;gravel/sand mixtures with little or no fines Coarse-Grained coarse fraction GM Silty ravels;poorly-graded gravel/sand/silt mixtures Soils<50% passes No.4 sieve GC Clayey gravels;poorly-graded gravel/sand/clay mixtures passes No.200 Sand&Sandy SW Well-graded sands;gravelly sands with little or no fines sieve Soils>50% SP Poorly-graded sands;gravelly sands with little or no fines coarse fraction SM Silty sands;poorly-graded sand/gravel/silt mixtures passes No.4 sieve SC Clayey sands;poorly-graded sand/gravel/clay mixtures ML Inorganic silts; sandy,gravelly or clayey silts Silts&Clays Lean clays; inorganic, gravelly, sandy, or silty, low to medium-plasticity Soils>50% Fine-Grained LL<50 CL clays passes No.200 OL Organic,low-plasticity clays and silts sieve Silts&Clays MH Inorganic,elastic silts; sandy, gravelly or clayey elastic silts LL>50 CH Fat clays;high-plasticity,inorganic clays OH Organic,medium to high-plasticity clays and silts Highly Organic Soils PT Peat,humus,h dric soils with high organic content RELATIVE DENSITY AND CONSISTENCY MOISTURE CONTENT AND CEMENTATION CLASSIFICATION CLASSIFICATION Coarse-Grained Soils SPT Blow Counts N 7Descriptioon Field Test Ver Loose: <4 Absence of moisture,dus ,dry to touch Loose: 4-10 Slightly Moist Damp,but not visible moisture Medium Dense: 10-30 Moist Visible moisture Dense: 30-50 Wet Visible free water Very Dense: >50 Saturated Soil is usually below water table Fine-Grained Soils SPT Blow Counts N Description Field Test Very Soft: <2 Weak Crumbles or breaks with handling or slight Soft: 2-4 finger pressure Medium Stiff: 4-8 Moderate Crumbles or breaks with considerable finger Stiff. 8-15 pressure Very Stiff: 15-30 Strong Will not crumble or break with finger pressure Hard: >30 PARTICLE SIZE ACRONYM LIST Boulders: > 12 in. GS grab sample Cobbles: 12 to 3 in. LL Liquid Limit Gravel: 3 in.to 5 mm M moisture content Coarse-Grained Sand: 5 to 0.6 min NP non-plastic Medium-Grained Sand: 0.6 to 0.2 mm PI Plasticity Index Fine-Grained Sand: 0.2 to 0.075 mm Qp penetrometer value, unconfined compressive strength, Silts: 0.075 to 0.005 mm tsf Clays: <0.005 mm V vane value,ultimate shearing strength,tsf 2791 S Victory View Way•Boise,ID 83709•(208)376-4748•Fax(208)322-6515 als www.mti-id.com•mti anmti-id.com CopyrightThong Inspection Testing&Inspection IMPOPIOnt InfOPM81100 Rhout ■ GeolechnicalmEngineeping Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. While you cannot eliminate all such risks, you can manage them. The following information is provided to help. The Geoprofessional Business Association (GBA) will not likely meet the needs of a civil-works constructor or even a has prepared this advisory to help you—assumedly different civil engineer.Because each geotechnical-engineering study a client representative—interpret and apply this is unique,each geotechnical-engineering report is unique,prepared geotechnical-engineering report as effectively as solely for the client. possible. In that way, you can benefit from a lowered Likewise,geotechnical-engineering services are performed for a specific exposure to problems associated with subsurface project and purpose.For example,it is unlikely that a geotechnical- conditions at project sites and development of engineering study for a refrigerated warehouse will be the same as them that,for decades, have been a principal cause one prepared for a parking garage;and a few borings drilled during of construction delays, cost overruns, claims, a preliminary study to evaluate site feasibility will not be adequate to and disputes. If you have questions or want more develop geotechnical design recommendations for the project. information about any of the issues discussed herein, contact your GBA-member geotechnical engineer. Do not rely on this report if your geotechnical engineer prepared it: Active engagement in GBA exposes geotechnical • for a different client; engineers to a wide array of risk-confrontation • for a different project or purpose; techniques that can be of genuine benefit for • for a different site(that may or may not include all or a portion of everyone involved with a construction project. the original site);or before important events occurred at the site or adjacent to it; e.g.,man-made events like construction or environmental Understand the Geotechnical-Engineering Services remediation,or natural events like floods,droughts,earthquakes, Provided for this Report or groundwater fluctuations. Geotechnical-engineering services typically include the planning, collection,interpretation,and analysis of exploratory data from Note,too,the reliability of a geotechnical-engineering report can widely spaced borings and/or test pits.Field data are combined be affected by the passage of time,because of factors like changed with results from laboratory tests of soil and rock samples obtained subsurface conditions;new or modified codes,standards,or from field exploration(if applicable),observations made during site regulations;or new techniques or tools.If you are the least bit uncertain reconnaissance,and historical information to form one or more models about the continued reliability of this report,contact your geotechnical of the expected subsurface conditions beneath the site.Local geology engineer before applying the recommendations in it.A minor amount and alterations of the site surface and subsurface by previous and of additional testing or analysis after the passage of time-if any is proposed construction are also important considerations.Geotechnical required at all-could prevent major problems. engineers apply their engineering training,experience,and judgment to adapt the requirements of the prospective project to the subsurface Read this Report in Full model(s). Estimates are made of the subsurface conditions that Costly problems have occurred because those relying on a geotechnical- will likely be exposed during construction as well as the expected engineering report did not read the report in its entirety.Do not rely on performance of foundations and other structures being planned and/or an executive summary.Do not read selective elements only.Read and affected by construction activities. refer to the report in full. The culmination of these geotechnical-engineering services is typically a You Need to Inform Your Geotechnical Engineer geotechnical-engineering report providing the data obtained,a discussion About Change of the subsurface model(s),the engineering and geologic engineering Your geotechnical engineer considered unique,project-specific factors assessments and analyses made,and the recommendations developed when developing the scope of study behind this report and developing to satisfy the given requirements of the project.These reports may be the confirmation-dependent recommendations the report conveys. titled investigations,explorations,studies,assessments,or evaluations. Typical changes that could erode the reliability of this report include Regardless of the title used,the geotechnical-engineering report is an those that affect: engineering interpretation of the subsurface conditions within the context - the site's size or shape; of the project and does not represent a close examination,systematic inquiry,or thorough investigation of all site and subsurface conditions. the elevation,configuration,location,orientation, function or weight of the proposed structure and Geotechnical-Engineering Services are Performed the desired performance criteria; the composition of the design team;or for Specific Purposes, Persons, and Projects, . project ownership. and At Specific Times Geotechnical engineers structure their services to meet the specific As a general rule,always inform your geotechnical engineer of project needs,goals,and risk management preferences of their clients.A or site changes-even minor ones-and request an assessment of their geotechnical-engineering study conducted for a given civil engineer impact.The geotechnical engineer who prepared this report cannot accept responsibility or liability for problems that arise because the geotechnical conspicuously that you've included the material for information purposes engineer was not informed about developments the engineer otherwise only.To avoid misunderstanding,you may also want to note that would have considered. "informational purposes"means constructors have no right to rely on the interpretations,opinions,conclusions,or recommendations in the Most Of the "Findings" Related in This Report report.Be certain that constructors know they may learn about specific Are Professional Opinions project requirements,including options selected from the report,only Before construction begins,geotechnical engineers explore a site's from the design drawings and specifications.Remind constructors subsurface using various sampling and testing procedures.Geotechnical that they may perform their own studies if they want to,and be sure to engineers can observe actual subsurface conditions only at those specific allow enough time to permit them to do so.Only then might you be in locations where sampling and testing is performed.The data derived from a position to give constructors the information available to you,while that sampling and testing were reviewed by your geotechnical engineer, requiring them to at least share some of the financial responsibilities who then applied professional judgement to form opinions about stemming from unanticipated conditions.Conducting prebid and subsurface conditions throughout the site.Actual sitewide-subsurface preconstruction conferences can also be valuable in this respect. conditions may differ-maybe significantly-from those indicated in this report.Confront that risk by retaining your geotechnical engineer Read Responsibility Provisions Closely to serve on the design team through project completion to obtain Some client representatives,design professionals,and constructors do informed guidance quickly,whenever needed. not realize that geotechnical engineering is far less exact than other engineering disciplines.This happens in part because soil and rock on This Report's Recommendations Are project sites are typically heterogeneous and not manufactured materials Confirmation-Dependent with well-defined engineering properties like steel and concrete.That The recommendations included in this report-including any options or lack of understanding has nurtured unrealistic expectations that have alternatives-are confirmation-dependent.In other words,they are not resulted in disappointments,delays,cost overruns,claims,and disputes. final,because the geotechnical engineer who developed them relied heavily TO confront that risk,geotechnical engineers commonly include on judgement and opinion to do so.Your geotechnical engineer can finalize explanatory provisions in their reports.Sometimes labeled"limitations,' the recommendations only after observing actual subsurface conditions many of these provisions indicate where geotechnical engineers' exposed during construction.If through observation your geotechnical responsibilities begin and end,to help others recognize their own engineer confirms that the conditions assumed to exist actually do exist, responsibilities and risks.Read these provisions closely.Ask questions. the recommendations can be relied upon,assuming no other changes have Your geotechnical engineer should respond fully and frankly. occurred.The geotechnical engineer who prepared this report cannot assume responsibility or liabilityfor confirmation-dependent recommendations fyou Geoenvironmental Concerns Are Not Covered fail to retain that engineer to perform construction observation. The personnel,equipment,and techniques used to perform an environmental study-e.g.,a"phase-one"or"phase-two"enviromnental This Report Could Be Misinterpreted site assessment-differ significantly from those used to perform a Other design professionals'misinterpretation of geotechnical- geotechnical-engineering study.For that reason,a geotechnical-engineering engineering reports has resulted in costly problems.Confront that risk report does not usually provide environmental findings,conclusions,or by having your geotechnical engineer serve as a continuing member of recommendations;e.g.,about the likelihood of encountering underground the design team,to: storage tanks or regulated contaminants.Unanticipated subsurface • confer with other design-team members; environmental problems have led to project failures.If you have not • help develop specifications; obtained your own environmental information about the project site, review pertinent elements of other design professionals'plans and ask your geotechnical consultant for a recommendation on how to find specifications;and environmental risk-management guidance. • be available whenever geotechnical-engineering guidance is needed. Obtain Professional Assistance to Deal with You should also confront the risk of constructors misinterpreting this Moisture Infiltration and Mold report.Do so by retaining your geotechnical engineer to participate in While your geotechnical engineer may have addressed groundwater, prebid and preconstruction conferences and to perform construction- water infiltration,or similar issues in this report,the engineer's phase observations. services were not designed,conducted,or intended to prevent migration of moisture-including water vapor-from the soil Give Constructors a Complete Report and Guidance through building slabs and walls and into the building interior,where Some owners and design professionals mistakenly believe they can shift it can cause mold growth and material-performance deficiencies. unanticipated-subsurface-conditions liability to constructors by limiting Accordingly,proper implementation of the geotechnical engineer's the information they provide for bid preparation.To help prevent recommendations will not of itself be sufficient to prevent the costly,contentious problems this practice has caused,include the moisture infiltration.Confront the risk of moisture infiltration by complete geotechnical-engineering report,along with any attachments including building-envelope or mold specialists on the design team. or appendices,with your contract documents,but be certain to note Geotechnical engineers are not building-envelope or mold specialists. GEOPROFESSIONAL BUSINESS SEA ASSOCIATION Telephone:301/565-2733 e-mail:info@geoprofessional.org www.geoprofessional.org Copyright 2019 by Geoprofessional Business Association(GBA).Duplication,reproduction,or copying of this document,in whole or in part,by any means whatsoever,is strictly prohibited,except with GBAs specific written permission.Excerpting,quoting,or otherwise extracting wording from this document is permitted only with the express written permission of GBA,and only for purposes of scholarly research or book review.Only members of GBA may use this document or its wording as a complement to or as an element of a report of any kind. Any other firm,individual,or other entity that so uses this document without being a GBA member could be committing negligent or intentional(fraudulent)misrepresentation.