2020-11-30 Parks Pathways Conditions
Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Joseph Dodson
Project Name: Mile High Pines AZ,PP,CUP File No: H-2020-0099 Date: 11.30.2020
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map (available online) and
Master Pathways Plan Document Chapter 3. Any proposed adjustments to pathway alignment
shall be coordinated through the Pathways Project Manager.
2. Prior to final approval, the applicant shall submit a public access easement for one multi-use
pathway running parallel to the south property line for the length of the project. This pathway
shall connect proposed pathway west of Mile High Pines with Ten Mile Road. Submit easement
document to the Planning Division for Council approval and subsequent recordation. The
easements shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side). Use standard
City template for public access easement.
3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways
Master Plan Chapter 3.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
Rev. 01.30.20