Loading...
PZ - Pre-app Notes CITY OF MERIDIAN PRE-APPLICATION MEETING NOTES Project/Subdivision Name: Pine Street Date:(12/17/19) 2/4/20 Applicant(s)/Contact(s):Jane Suggs,Shawn Brownlee City Staff: (Bill, Denny,Tom,Joe, Stacey Yarrington)Sonya, Kim W.,Joe B.,Joe D.,Steve,Jason, Brian,Tyson, Bill Location:3513,3515 and 3720 W. Pine Ave. Size of Property: 35.8 Comprehensive Plan FLUM Designation: MU-C(residential s/b 6-15 units/acre)&MDR(3-8 units/acre) Existing Use: Rural residential/ag Existing Zoning: R-15, RUT&R1 Proposed Use: SFR(81 units),MFR(216 units)(297 units total)(107 bldg. lots/25 common lots) Proposed Zoning: R-8, R-15 Surrounding Uses: SFR(west&NE),school&Western Ada Recreation property(ballfields)to north, rural residential/ag(SE) Street Buffer(s)and/or Land Use Buffer(s):25'wide street buffer required along N.Ten Mile Rd.,an arterial street&a 20'wide street buffer required along the future extension of W. Pine Ave.,a collector street, landscaped per the standards in UDC 11-3B-7C Open Space/Amenities/Pathways:a 10'wide multi-use pathway is required along the Ten Mile Creek and Drain along the north&south''/z of east boundaries of the site per the Pathways Master Plan(in a 14'wide easement); pedestrian bridge s/b provided to Fuller Park—coordinate with Kim Warren, Park's Dept.888-3579;provide minimum 10%qualified open space and site amenities per the standards listed in UDC 11-3G-3 for overall development&additional qualified open space&amenities for the multi-family development per the standards in UDC 11-4-3-27)—submit qualified open space exhibit&useable open space exhibit that excludes drainage areas,street buffers&waterways—recommend subsurface drainage areas to allow more usable common area Access/Stub Streets: Pine Ave.should be extended as a collector street through the site(w/the 1st phase of development)per the Master Street Map;stub street to property at SEC Waterways/Flood plai n/Topography/Hazards:Ten Mile Creek runs along west boundary and is required to remain open&be protected during construction;the Ten Mile sub drain runs along north boundary of site—comply with UDC 11-3A-6 Floodplain—need to complete a hydrologic study for A zone; no-rise certification for Pine Ave. bridge;floodplain permit required(Jason Korn) Sewer/Water: Sewer is available and goes to trunk line on the north side of the project area;coordinate w/AI Christy in Public Works on street lights History: AZ-05-051 (Ord.06-1233, Ellensburg—no DA), (CUP-05-047&PP-05-052—expired) Additional Meeting Notes:TIS is required, must be"accepted"by ACHD prior to application submittal to the City • Include strip of land along the west boundary(#S1210131665)of Parcel#S1210131700 in annexation&plat boundary • Annexation w/R-8&R-15 zoning;density should be consistent with corresponding FLUM designation;submit concept building elevations—SFR attached (depict"0"lot lines on plat)&multi-family units are required to comply w/design standards in Architectural Standards Manual • Preliminary plat to subdivide property;comply with subdivision design&improvement standards listed in UDC 11-6C-3(common driveways) ➢ Existing homes being retained must comply with the R-8 setbacks in UDC Table 11-2A-6;existing structures not being retained should be removed prior to City Engineer signature on the final plat for the phase in which they are located—vacate existing access easements(home at SWC to be accessed from west via Newland St. ➢ Provide landscaping along pathways per the standards in UDC 11-313-12C;and fencing in accord w/11-3A-6C&11-3A-7 adjacent to common areas,pathways and waterways ➢ Easements greater than 10'are required to be in a common lot that is a minimum of 20'wide per UDC 11-3A-6D • A conditional use permit is required for a multi-family development in the R-15 district;comply w/standards in UDC 11-4-3-27 • Provide quest parking for MFR development;submit parking plan that depicts available on-street parking after 26'driveways • Provide transition from MFR to SFR(townhomes/attached?) • Addressing—one main address off Pine Ave.for the clubhouse w/building letters assigned to each apartment building;if access for existing homes proposed to remain is off internal streets(not Pine),addresses will change—notify property owners of this change • Staff recommends submitting pedestrian&vehicular connectivity plan showing how proposed development will"connect"the general area • Police Dept.would like to see the Ten Mile/Pine intersection upgraded/improved before or concurrent with proposed development Note:A Traffic Impact Study(TIS) will be required by ACHD for large commercial projects and any residential development with over 100 units. To avoid unnecessary delays&expedite the hearing process, applicants are encouraged to submit the TIS to ACHD prior to submitting their application to the City. Not having ACHD comments and/or conditions on large projects may delay hearing(s)at the City. Please contact Mindy Wallace at 387- 6178 at ACHD for information in regard to a TIS, conditions,impact fees and process. Other Agencies/Departments to Contact: X Ada County Highway Dist. (ACHD) ❑ Nampa Meridian Irrigation Dist. (NMID) ❑ Public Works Department ❑ Idaho Transportation Dept. (ITD) ❑ Settler's Irrigation District ❑ Building Department ❑ Republic Services ❑ Police Department X Parks Department ❑ Central District Health Department ❑ Fire Department ❑ Other: Application(s) Required: ❑ Administrative Design Review X Annexation to R-8(& R-15 if necessary) ❑ Comprehensive Plan ❑ Alternative Compliance ❑ City Council Review Amendment—Map CITY OF MERIDIAN PRE-APPLICATION MEETING NOTES ❑ Comprehensive Plan Amendment—Text ❑ Final Plat Modification ❑ Short Plat X Conditional Use Permit for MFR dev. ❑ Planned Unit Development ❑ Time Extension—Council ❑ Conditional Use Permit X Preliminary Plat ❑ UDC Text Amendment Modification/Transfer ❑ Private Street ❑ Vacation ❑ Development Agreement Modification ❑ Variance ❑ Final Plat ❑ Rezone ❑ Other Notes: 1)Applicants are required to hold a neighborhood meeting in accord with UDC 11-5A-5C prior to submittal of an application requiring a public hearing(except for a vacation or short plat);and 2)All applicants for permits requiring a public hearing shall post the site with a public hearing notice in accord with UDC 11-5A-5D.3(except for UDC text amendments, Comp Plan text amendments, and vacations). The information provided during this meeting is based on current UDC requirements and the Comprehensive Plan.Any subsequent changes to the UDC and/or Comp Plan may affect your submittal and/or application. This pre-application meeting shall be valid for four(4)months.