Loading...
CC - Revised Landscape, Preliminary Plat, Hospital Concept Plan NOTE: CALCULATIONS SHOWN BELOW ARE TO DETERMINE THE REQUIRED NUMBER OF TREES PER CITY OF MERIDIAN UDC AND ARE NOT OPEN SPACE CALCULATIONS. REFER TO THE OPEN SPACE EXHIBIT FOR OFFICIAL QUALIFIED OPEN SPACE CALCULATIONS. GENERAL LANDSCAPE NOTES COLLECTOR OPEN SPACE LOT AREAS LANDSCAPE QUALIFIED 1. CONTRACTOR SHALL LOCATE AND IDENTIFY EXISTING UNDERGROUND AND OVERHEAD BUFFER BLOCK # LOT # LOT AREA (SF) QUALIFIED AREA (SF) AREA (ACRES) REQUIRED PROVIDED UTILITIES WITHIN CONTRACT WORK AREAS PRIOR TO CONSTRUCTION. CONTACT DIG MEASURED LINE, INC. ® 1.800.342.1585. PROVIDE ADEQUATE MEANS OF PROTECTION OF FROM BACK OF 6,070 UTILITIES AND SERVICES DESIGNATED TO REMAIN. REPAIR UTILITIES DAMAGED DURING FUTURE 1 1 9,648 0.14 1.00 1.00 SITE WORK OPERATIONS AT CONTRACTOR'S EXPENSE. ATTACHED (7') EXCLUDES 20' LANDSCAPE BUFFER FRONTAGE SIDEWALK 1 19 2,230 2,230 0.05 0.00 0.00 2. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR BY 1 30 4,400 4,290 0.10 1.00 2.00 TYPE AND SIZE SHOWN. OTHERS 2 1 25,218 24,036 0.55 3.00 3.00 3. ALL PLANTED BEDS TO RECEIVE A MIN. 3" DEPTH ORGANIC PERMABARK MULCH WITH 2 9 2,040 0 0.00 0.00 0.00 PERMEABLE FABRIC WEED BARRIER. SUBMIT SAMPLE TO OWNER FOR APPROVAL PRIOR _ TO ORDERING AND INSTALLING. THE USE OF MULCH OR ROCK AS THE ONLY GROUND 2 27 1,020 0 0.00 0.00 0.00 COVER IN REQUIRED PLANTING ARES IS PROHIBITED. IMPERMEABLE PLASTIC WEED 3 1 20,125 20,125 0.46 3.00 3.00 BARRIERS ARE PROHIBITED. - - W. CHINDEN BLVD. (HWY 20/26) 3 13 2,040 0 0.00 0.00 0.00 4. ALL TREE, TURF, PLANT MATERIAL, AND IRRIGATION PROPOSED WITHIN THE PLANTER 4,895 STRIP BETWEEN BACK OF CURB AND SIDEWALK SHALL BE INSTALLED BY THE HOME - 4 1 8,068 0.11 1.00 1.00 BUILDER IN CONJUNCTION WITH THE INDIVIDUAL LOT DEVELOPMENT. _ _ _ _ _ _ _ EXCLUDES 20' LANDSCAPE BUFFER 5. ALL TREES PLANTED IN THE PARK STRIP (BY BUILDER) TO BE CENTERED BETWEEN 5 1 1,020 0 0.00 0.00 0.00 BACK OF CURB AND SIDEWALK AND ARE SUBJECT TO THE ACHD DEVELOPMENT r 5 15 1,038 0 0.00 0.00 0.00 AGREEMENT FOR LANDSCAPING. o Q \ ' 6 1 1,020 0 0.00 0.00 0.00 6. FENCING WITHIN SUBDIVISION, ALONG SIDE AND REAR LOT LINES SHALL BE INSTALLED � &E V)L 6 6 1,020 0 0.00 0.00 0.00 BY BUILDER/HOMEOWNER IN CONJUNCTION WITH INDIVIDUAL LOT DEVELOPMENT AND w o Z m 6 12 33,450 33,450 0.77 4.00 4.00 SHALL COMPLY WITH THE STANDARDS ESTABLISHED IN THE SUBDIVISION'S CC&RS. Lo o g 6 18 1,247 0 0.00 0.00 0.00 \ I SCHEMATIC } 6 23 1,020 0 0.00 0.00 0.00 ACHD LANDSCAPE NOTES LAYOUT I Q 7 1 1,025 0 0.00 0.00 0.00 1. TREES SHALL NOT BE PLANTED WITHIN THE 10' CLEAR ZONE OF ALL ACHD STORM 1 11 _ - FUTURE I Q 7 15 2,324 877 0.02 0.00 0.00 DRAIN PIPE, STRUCTURES, OR FACILITIES. O EXCLUDES 20' LANDSCAPE BUFFER BLOCK 8 U 8 1 1,020 0 0.00 0.00 0.00 2. SEEPAGE BEDS MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THELA CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. I gp 8 4 7,735 7,735 0.18 1.00 3.00 °C 8 12 2,324 2,324 0.05 0.00 0.00 C-G I z 8 17 627 0 0.00 0.00 0.00 GENERAL IRRIGATION NOTES 8 27 31,011 31,011 0.71 4.00 5.00 1. ALL PLANT MATERIALS TO BE WATERED BY THE DEVELOPMENT OR SUBDIVISION - - 8 43 3,293 1,460 0.03 0.00 0.00 PRESSURIZED IRRIGATION SYSTEM. IRRIGATION OF COMMON AREAS SHALL BE VIA THE e - _ _ - EXCLUDES 20' LANDSCAPE BUFFER SUBDIVISION'S PRESSURIZED IRRIGATION SYSTEM. IRRIGATION OF INDIVIDUAL LOTS AND 2,836 LANDSCAPING ALONG THE FRONTAGE OF PRIVATE LOTS SHALL BE PRESSURIZED I o I - - _ - _ _ 8 44 6,696 0.07 0.00 1.00 IRRIGATION WATER, AND THE RESPONSIBILITY OF THE INDIVIDUAL LOT OWNERS. w g PPL6.0 EXCLUDES 20' LANDSCAPE BUFFER / Q w z o a I 8 47 36,367 36,367 0.83 5.00 5.00 2. COVERAGE; THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE ONE HUNDRED � w w w w PPL5.0 PERCENT (100%) COVERAGE WITH HEAD TO HEAD SPACING OR TRIANGULAR SPACING o UJ o o M/a M/a M/a a 174,652 Z v>>_ 9 1 198,094 4.01 22.00 22.00 AS APPROPRIATE. g m ui N 80 8 5 4 EXCLUDES 20' LANDSCAPE BUFFER o:o o_ 9 25 842 0 0.00 0.00 0.00 3. MATCHED PRECIPITATION RATES: SPRINKLER HEADS SHALL HAVE MATCHED PRECIPITATION - - U Z I 9 BLOCK 12 RATES WITHIN EACH CONTROL VALVE. Z Q zo 6 9 29 6,483 6,483 0.15 1.00 3.00 m 8 6 3 4. IRRIGATION DISTRICTS: SPRINKLER HEADS IRRIGATING LAWN OR OTHER HIGH WATER I I 10 1 17,141 5,348 0.12 1.00 0.00 DEMAND AREAS SHALL BE CIRCUITED SO THAT THEY ARE ON THE SEPARATE ZONE OR I EXCLUDES 20' LANDSCAPE BUFFER DISTRICT FROM THOSE IRRIGATING TREES, SHRUBS, OR OTHER REDUCED WATER I FUTURE R-15 11 7 22,262 22,262 0.51 3.00 3.00 DEMAND AREAS. 877 5. OVERSPRAY: SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO PPL6.0 12 1 2,185 0.02 0.00 0.00 IMPERVIOUS SURFACES SUCH AS STREETS, SIDEWALKS, DRIVEWAYS, AND PARKING 6 68 69 0 EXCLUDES 20' LANDSCAPE BUFFER AREAS. I - - P L5.0 O • ' . 65 12 22 2,040 0 0.00 0.00 0.00 2 8 0 4 ® 12 33 22,254 22,254 0.51 3.00 3.00 \ 3 6 12 47 2,240 2,240 0.05 0.00 0.00 I 0 9 3 5 6 8 9 4 64 63 © © 60 0 g N. HIGHFIRE LOOP 12 65 3,616 0.00 0.00 0.00 •• ' .• • EXCLUDES 20' LANDSCAPE BUFFER LOST RAPIDS ST. ® 13 1 42,469 42,469 0.97 5.00 5.00 52 4,826 O Z q 6 63 6465666 14 1 14,258 0.11 1.00 0.00 © © © © EXCLUDES 20' LANDSCAPE BUFFER - - I O O : g�: 's' © 14 22 1,956 0 0.00 0.00 0.00 Y ' pC ,8, ' '. 5:• BLOCK 14 15 6 1,179 0 0.00 0.00 0.00 U ® m �:=: © TOTAL OPEN SPACE TREES 10.54 59.00 64.00 z O 9 ® 49 4g ® @) @ © 49 PPL5.0 FUTURE 6 / PPL5.0 ' ® 4 , - - SCHOOL PW. WILDFIRE DR.. 4 ( q PPL4.0 PPL4.o� 13 W. WILDFIREST. 46 STREET TREE CALCULATIONS (1TREE/35 LF) © 0 STREET NAME CALCULATION REQUIRED PROVIDED © Oj 1 45 BLOCK 12 20, Lq<<FCTO ® l 0 O 44 84 N. MCDERMOTT RD. 842 LF/35 24.00 27.00 ND R O O z w eDFFER E - - I M I �,`� Q 43 W. CHINDEN BLVD. (HWY 20/26) BY OTHERS 0.00 0.00 d d I 0 u 40 @) BLOCK 13 ® Z ® N. RUSTIC OAK WAY 4794 LF/35 137.00 138.00 I BLOCK 1 d i d a ® 3 6 ? m , 0 ® TOTAL STREET TREES 161.00 165.00 BLOCK 8 z O Q O © o m a © _ __ 40 PATHWAY CALCU LATIONS REQUIRED PROVIDED © z 9 ® O5 010 i O2 © 10' WIDE MULTI-USE PATHWAY WITHIN ® © < 1 z'• ® ' . .. 0 2833 LF/100 PER LF 28 28 RESIDENTIAL BOUNDARY © J J © G © O O 3 © 3 d d BLOCK 3 5' WIDE PATHWAY O . . © OC 9• O ® BLOCK # LOT # CALCULATIONS REQUIRED PROVIDED BLOCK 3 © © © W 3 ® © q/�sq © © 1 19 114 LF/100 PER LF 1 2 5 O W. STURGILL PEAK ST. O O © 2 © I ® SIX � W, F O © 2 1 285 LF/100 PER LF 3 5 1 ® W FI 4 9 :-'-'-'- - ® 1 RELI 4 2 2 : :• O RELI NE cr 6 12 189 LF/100 PER LF Lu 1 w > P 5 o I 2 Q © ® I © 8 Oj �� • ® © _ 8 12 121 LF/100 PER LF 1 2 O © g 3 w ® 3 O © © 0 BLOCK 12: 8 27 118 LF/100 PER LF 1 5 Z 3 9 0 2 © I © C7 © •:�. :. © 1 Q�P I © 9 1 827 LF/100 PER LF 8 8 ® BLOCK 2 O O �• :; 3:: . . .. 1- 4 W. PARACHUTE DR. �- ' ' a 6 9 12 47 112 LF/100 PER LF 1 2 U I O5 13 1 77 LF/100 PER LF 1 1 O O O ® O TOTAL TREES REQUIRED/PROVIDED BLOCK 4 1 2O ® Q 6 7 g O O O O z 5 ® 0 © © 0 q ® ® 18 27 : - . . © BLOCK 5 9 p 1 " 20' - - - O 2 W. PARACHUTEDR. O3 O < I MITIGATION REQUIREMENTS O 6 0 _ d o COLLECTOR ' THERE ARE NO HEALTHY TREES > 4" CAL. PROPOSED FOR REMOVAL o LANDSCAPE 2 8 5 BLOCK 11 z BUFFER I © o O ® � O © O ® O © © © O = = o © TOTAL TREES REQUIRED/PROVIDED 273 293 O © BLOCK 6 © ® 0 -' : : : : : : : : ' N - N ��\]/ ® © ® z I U a � } © © 0 0 ® © © ® © 9 BLOCK 10 O O O ® O O O Z } 5 6 3 a w . . . .. . . . . . . . Q :: • . . . . .. PPL3.0 RES SUBDIVISION LQW. SMOKEJUMPER ST. � � �� � � � � � � � � � 3P TT RID E UBDIV Q BLOCK15 z BLOCK a 0 PPL4.0 MERIDIAN, IDAHO w O O ® ® O 6 0 1 O 3 ® O ° LANDSCAPE COVER SHEET g _ - - O O O z _ - - _ ���•����E O F ID ,••��� LL ••••••.91y �•. d I d COLLECTOR ',* : �v�SSA YE.•FAO* '. O BUFFER CONTACT INFORMATION . . z LANDSCAPE OWNER LANDSCAPE CONSULTANTJ,'; La 16s%% •: E N G I N E E R I N G PROVIDENCE PROPERTIES, LLC KM ENGINEERING, LLP �•• Q•••;1/19/2Q••¢�,��. 9233 WEST STATE STREET 714 700 SUITE SOUTH ALLEN ST 9233 WEST ATE STREET ,����� SCA �P, PHOINE(08)63936939 Q ND 4 LANDSCAPE SITE E PLAN ••..,,,...•• NE(20 1p.com z w _ MERIDIAN, IDAHO 83642 PHONE: (208) 639-6939 0 150 300 450 PHONE: (208) 433-8800 FAX: (208) 639-6930 DATE: 8/26/2020 om CONTACT: ALYSSA YENSEN, PLA a Plan Scale: 1" = 150' EMAIL: ayensen@kmengllp.com PROJECT: 18-140 SHEET NO. J W Or- W PLANT SCHEDULE W W W W W W r W DECIDUOUS TREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS CITY W ACER X FREEMANII 'JEFFSRED' 2"CAL. 50'X30' CLASS II 67 ATUMN BLAZE MAPLE W W � r W W O W W W W' lW • FRAXINUSAMERICANA'AUTUMN PURPLE' 2"CAL.B&B 45'X45' CLASS II 77 W r k W W AUTUMN PURPLE ASH • W W W W W BLOCK 1 k I r. W W W W • FRAXINUS PEN NSYLVAN ICA'PATMORE' 2"CAL.B&B 40'X20' CLASS II 23 W r W 'PATMORE'ASH • W W k W W W © GLEDITSIA TRIACANTHOS'SKYLINE' 2"CAL. 35'X30' CLASS II 77 W W k SKYLINE HONEY LOCUST 5 O W W 9 O W W O 1 O EVERGREEN TREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS CITY W W W 11 812 6 , PICEA PUNGENS 6'-8' B&B 60'X30' EVERGREEN 22 4 '�a�, COLORADO SPRUCE W W �A O •W W W 15 PINUS FLEXILIS'VANDERWOLF'S PYRAMID' 6'-8' B&B 25'X15' EVERGREEN 30 O VANDERWOLF'S PYRAMID PINE `�• .Y W •'r. W W O S O 7 O SOD/SEED BOTANICAL/COMMON NAME CONT CITY W W M M M� ' W W M\ r ® 9W I W W • 9 W WI1 �• A A' .y W -S�s1 \M r X TURF SOD RHIZOMATOUS SOD 490,557 SF _M r W RHIZOMATOUS TALL FESCUE \S _M ._ 'Y W � X Y W W W W W W \ , W W W W W W W W W S M ' ® W M OTHER SYMBOLS DESCRIPTION 4 W W W• Uj r W W W W W W \ \ W ••W 'Y W W W W W W W S. s S_ 41 ' r © W W W —x x— 6' SOLID VINYL FENCE. W I�, W W W W W W W ••- S• S_s M W W W • W W W W W W W W .r M W W W W 6' SOLID VINYL FENCE WITH LATTICE TOP. r W W W W W W W S W W W W W • \ W W W W W W W W W O W W W W y r W W W W BLOCK 3 W W W O s W F�R M 8' CMU WALL (BY OTHERS). r. r: �^ • W -S_s ELINEDR _M- i W W W W W • W W 5' OPEN VISION WROUGHT IRON FENCE. _M W W W W W W ® •• r r r S W W .•W W _s _M W O _ W. STURGILL PEAK ST. 2 WWWWWWWW WW•WW © s s s WwW . 4 W W W W W W O r S r W W W W W W W W N W W W 1 W W 7 S_ VV FIRE M N Co r r S_LINE Cr.CT M_ W W W W W W W W W W W W O r •r• S• S_ �. W W W• W W 'Y W S S_ sKEY NOTES (TYPICAL) r. • W W W W W • • W W W 1 W Co ,W W W W W W W O W r W S w W W W W W S W •Y W W W W W W 1. INSTALL 3' DIAMETER SHOVEL CUT TREE RING, WITH BARE EARTH SURFACE AT ALL U� 'Y e > � W W W W W •W TREES WITHIN TURF AREAS. W •• N Q W W W W W W W W W W L r O Z r W W W W W Y ® 2. 40' CLEAR VISION TRIANGLE. NO TREES SHALL BE PLANTED WITHIN A CLEAR VISION W W W 2 W W W W W W W © W r r O TRIANGLE. THE MAXIMUM HEIGHT OF ANY VEGETATIVE GROUND COVER AT MATURITY W W W W W W W W W W W W © WITHIN THE CLEAR VISION TRIANGLE SHALL BE 3' FROM THE ADJACENT STREET GRADE. W W W r• (n W W W W W W O W W .. i.. `Y 5 W W W W W W W O W W O I 3. TREES PLANTED IN PARK STRIPS TO BE CENTERED IN STRIP. W •• W r � •' W W W W W W W W W W W W W O � r � � r W O O r W W W W W W I 4. 6' HEIGHT SOLID VINYL FENCE. COLOR TAN. SEE DETAIL PPL3.0-2. W W W O '• W W W W W W O W W '• 9 O W W W W W W W I 5. 5' HEIGHT CLEAR VISION WROUGHT IRON FENCE. SEE DETAIL PPL3.0-5. W W W W W W W © W W W W O 6. 6' HEIGHT SOLID VINYL FENCE WITH LATTICE TOP. COLOR TAN. SEE DETAIL PPL3.0-3. 7. LARGE TOT LOT STRUCTURE, SEE DETAIL PPL5.0-7. W W IM M M M M M M M r r r W 1 ® 4 W. PARACHUTE DR. _M_ 4 8. SMALL TOT LOT STRUCTURE, SEE DETAIL PPL5.0-8. S SSS M W W OO O I 9. REGIONAL PATHWAY, 10—FOOT WIDE. SEE CIVIL PLANS. S SSS SQ_ _M_ '• s_ M_M W W U7 W 1 2 10. SCHEMATIC POCKET PARK/DOG PARK. FINAL DESIGN TO BE ESTABLISHED WITH FINAL s s .,,• PLAT SUBMITTAL. M_M r O I p s W W W _M M 11. SCHEMATIC CLUBHOUSE AND POOL. FINAL DESIGN TO BE ESTABLISHED WITH FINAL O5 W _sus _M ® 0 I Ja PLAT SUBMITTAL. M d 12. SCHEMATIC R-15 LAYOUT. FINAL DESIGN TO BE APPROVED THROUGH SEPARATE W W s_s 2 M :r I SUBMITTAL. M�M r NJ 13. FUTURE DEVELOPMENT. W W �• ` s_s Pq M_M '• I 14. CHINDEN BLVD. IMPROVEMENTS BY OTHERS. W •• W s----_s RACHUTE _M NJ 1 W• © ssDR• �M� ' f J `W 15. 8' CMU WALL BY OTHERS. SEE REFERENE DETAIL PPL3.0-4. N W BLOCK 5 3 1 �� �s M W W s r W O O W •W,• s _MGM 16. R-15 TOWNHOME OUTDOOR COMMUNITY GATHERING AREA/MEW. x x x xems_ NJ x x s Z 17. R-15 TOWNHOME OUTDOOR AMENITY AREA. SCHEMATIC AMENTIES INCLUDES OUTDOOR 3 3 _J�) s J AMENITY SPACE: PAVILION/BBQS/SEATING/FIRE PIT. FINAL DESIGN TO BE ESTABLISHED O r V AS A PART OF THE FINAL PLAT. 18. ARBOR. SEE REFERENCE DETAIL PPL3.0-6. 4 r 3 I C 19. MAILBOX CLUSTER. LANDSCAPE PLAN o � 0 50 100 150 N 3 Og Plan Scale: 1" = 50' � r N < 3 J I © w r 2 BLOCK 6 r N L a V 3 a z O 4 N d d Q • I r 0 I z w a 3 } W W W W S W W W W . r W W W © W W W W PRESCOTT RIDGE SUBDIVISION z Q t• .i N < r r .�.3 R r W r O o M M M M M M M M M M M M �; M M MERIDIAN IDAHO a 2 W. SMOKEJUMPER ST. I LANDSCAPE PLAN U d s s s s s s s s s s s s s s s s s- � u N 3 Issisolootoo O g ��•�� E O F ID 1LL Z W r w 3 W I : ; •SSA 1�%. 10 a BLOCK 15 • C '• * ' v �: z (, 1 2 W z W I •• LA-165 i i •• . ' Z © 3 '•J'� % 11/19/2( G .. O ® 5 0 3 O : 2 '• •' � ENGINEERING • • ¢ 9233 WEST STATE STREET W BOISE, Z r W I SCA4�'P� PHONE 208H63936939 Q W 3 r W ,000 ##assists �� kmengllp.com z W W I DATE: 8/26/2020 a x x s 4 W PROJECT: 18-140 �— SHEET NO. Lu PPI-2.0 I I PLANT SCHEDULE KEY NOTES (TYPICAL) REMOVE DEAD/ DAMAGED BRANCHES AND PRUNE TO DECIDUOUS TREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS CITY 1. INSTALL 3' DIAMETER SHOVEL CUT TREE RING, WITH BARE EARTH SURFACE AT ALL X� INTERNATIONAL SOCIETY OF TREES WITHIN TURF AREAS. ARBORICULTURE STANDARDS; 1 IMPROPERLY PRUNED TREES ACER X FREEMANII'JEFFSRED' 2"CAL. 50'X30' CLASS II 67 2. 40' CLEAR VISION TRIANGLE. NO TREES SHALL BE PLANTED WITHIN A CLEAR VISION \ p (AS DETERMINED BY THE ATUMN BLAZE MAPLE TRIANGLE. THE MAXIMUM HEIGHT OF ANY VEGETATIVE GROUND COVER AT MATURITY 4 I LANDSCAPE ARCHITECT) WITHIN THE CLEAR VISION TRIANGLE SHALL BE 3' FROM THE ADJACENT STREET GRADE. O O O SHALL BE REMOVED AND0 FRAXINUSAMERICANA'AUTUMN PURPLE' 2"CAL. B&B 45'X45' CLASS II 77 W (2)—BVC WOOD TREE p0 00 O REPLACE. AUTUMN PURPLE ASH 3. TREES PLANTED IN PARK STRIPS TO BE CENTERED IN STRIP. 5 STAKES(MIN. 6' HT) O TRUNK FLARE. LOCATE PRIOR 4. 6' HEIGHT SOLID VINYL FENCE. COLOR TAN. SEE DETAIL PPL3.0-2. j W CHAINLOCK 0000 O TO PLANTING. FLARE SHALL i W In t W W TREE TIES O BE VISIBLE AFTER PLANTING. FRAXINUS PEN NSYLVAN ICA'PATMORE' 2"CAL. B&B 40'X20' CLASS II 23 O 1 •PATMORE'ASH 5. 5' HEIGHT CLEAR VISION WROUGHT IRON FENCE. SEE DETAIL PPL3.0-5.6" MULCH PER PLAN KEEP 1 3ff MIN 1"-2" AWAY FROM TRUCK 6. 6' HEIGHT SOLID VINYL FENCE WITH LATTICE TOP. COLOR TAN. SEE DETAIL PPL3.0-3. 2 IN FLARE GLEDITSIA TRIACANTHOS SKYLINE' 2"CAL. 35 X30 CLASS II 77 ul < W FINISH GRADE SKYLINE HONEY LOCUST 7. LARGE TOT LOT STRUCTURE, SEE DETAIL PPL5.0-7. I 6 W YG W 3 ROOT— 3" HT. WATERING BASING 8. SMALL TOT LOT STRUCTURE, SEE DETAIL PPL5.0-8. BALL I BERM EVERGREEN TREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS CITY g, REGIONAL PATHWAY, 10—FOOT WIDE. SEE CIVIL PLANS. DEPTH - FERTILIZER TABLETS FOLD BACK BURLAP FROM PICEA PUNGENS 6'-8'B&B 60'X30' EVERGREEN 22 10. SCHEMATIC POCKET PARK/DOG PARK. FINAL DESIGN TO BE ESTABLISHED WITH FINAL 2 ; M p,NKER DR s I i I I i I I I I I I I i TOP i OF ROOTBALL. ,�I COLORADO SPRUCE PLAT SUBMITTAL. : N M� NJ.T s/• REMOVE WIRE BASKET. 11. SCHEMATIC CLUBHOUSE AND POOL. FINAL DESIGN TO BE ESTABLISHED WITH FINAL / NOTE: REMOVE TREATED ROOT—s BALL BACKFILL SOIL MIX GENTLY I/ PINUS FLEXI LIS'VAN DERWOLF'S PYRAMID' 6'-8'B&B 25'X15' EVERGREEN 30 PLAT SUBMITTAL. OR SYNTHETIC BURLAP PACK BACKFILL USING WATER s COMPLETELY. REMOVE WIDTH TO SETTLE SOIL AROUND VANDERWOLF'S PYRAMID PINE 12. SCHEMATIC R-15 LAYOUT. FINAL DESIGN TO BE APPROVED THROUGH SEPARATE 1 M 5 s/ I / ANY SOIL AND/OR ROOTBALL SUBMITTAL. ® r s I MULCH AWAY FROM 8" MIN PLANTING PI 8" MIN ROOTBALL ON UNDISTURBED TREE CROWN AFTER 13. FUTURE DEVELOPMENT. , •• PIT SHALL BE A MIN. 2 TIMES WIDER SOIL SOD/SEED BOTANICAL/COMMON NAME CONT CITY s s I INSTALLATION. THAN ROOTBALL AT BASE AND A MIN. 3 TIMES WIDER THAN ROOTBALL W TURF SOD RHIZOMATOUS SOD 490,557 SF 14. CHINDEN BLVD. IMPROVEMENTS BY OTHERS. W s�� •, W W I J AT FINISH GRADE. DEPTH SHALL BE RHIZOMATOUS TALL FESCUE SAME AS THE ROOTBALL. 15. 8' CMU WALL BY OTHERS. SEE REFERENE DETAIL PPL3.0-4. /V d NOTES: 1. THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED W W STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR A MINIMUM OF 1 YEAR. ALL OTHER SYMBOLS DESCRIPTION 16. R-15 TOWNHOME OUTDOOR COMMUNITY GATHERING AREA/MEW. (n W W W W •Y W W W © W STAKING SHALL BE REMOVED AT THE END OF THE ONE YEAR WARRANTY PERIOD. 17. R-15 TOWNHOME OUTDOOR AMENITY AREA. SCHEMATIC AMENTIES INCLUDES OUTDOOR 1 , = DECIDUOUS TREE PLANTING AND STAKING DETAIL —x x— 6' SOLID VINYL FENCE. AMENITY SPACE: PAVILION/BBQS/SEATING/FIRE PIT. FINAL DESIGN TO BE ESTABLISHED AS A PART OF THE FINAL PLAT. W 4 W W W W �"""t` (� NTS D 6' SOLID VINYL FENCE WITH LATTICE TOP. • � � W W W W W W ,�pr •W Z•Y er # I W 18. ARBOR. SEE REFERENCE DETAIL PPL3.0-6. W W W W W W W N W W W W W W W W W W W W W 8' CMU WALL (BY OTHERS). W W 10 I W 5' OPEN VISION WROUGHT IRON FENCE. .� .• W W ,� ��, 4 �, � � z W W W W W / W W � f S ® '• W W W W W W W X W W (n � it ' •11 _�•� J E` - _ _ __ ___ W W W W W W W W W W Z .. W W W W W W W W W W W W W W W W W W © N •f I �• J • • r T U BLOCK FILLED SOLID WITH GROUT. _ W W W W W W W W W W •Y I I - . . . ♦ . . U) W Z W W W O W W W W W © I _ . . . . `. Z cW z � G FINISH GRADE ,y 6YS,1•�.�_J.(�„ W W W W W .� .� BLOCK 2 c� ` I � (n �'-'w DOWELS. (n RAI 111I1 W W W o W W W W W Og Q w TOP OF FOOTING. W W W W W W W W W W W W z W W •Y W W W W •y © 5 op d � © — N Z W 1 W 1 1 4 v, w N 0 VARIES wQ- W Y W I wz Z W W I ujUZw V © o ow� g $ Z0 / W o 6 W W N REFERENCE PHOTO NOTES: 5 1. NOT FOR CONSTRUCTION. FOR REFERENCE ONLY. FINAL DETAIL TO BE PROVIDED BY STRUCTURAL ENGINEER. W W W W W W W W W:t s —FOOT HEIGHT VINYL FENCE —FOOT HEIGHT VINYL FENCE WITH LATTICE TOP 8' CMU WALL M M M M M M M M M M M M M M M M NTS NTSf ' 4NTS 1 s W. PARACHUTE DR. M s s s s s s s s S s s s s s s S S�— N z { --0 2 M W W W W .y W W W 1• •1 IW W W W W W W W W W W W W W W p W .Y• .Y W W i S ' �'+'� � J W W W W W W W W W W W W O - W W W W W W W W W W W W Mill1 1� O W W W W W W W W W W W W 3 4 O f O 1• 9 I ' - �'• ?'J'•r W N W W W W W W W W O O O 1 II ` 1 I;' 1 'I W N W W W W W W W W W W l � WW �, W ,, W ,, W �. W �. W �. , �, W �, W �, W �, © _ .. .. ..w_' ...1: -'.,,yc�� .,` •�.�..'. � 1 ' 1 V/ I W W W W 3 �: j'1.: i _ t: '".r TM"". A.%' ,I•'.1� � .'•ai:;�.�7 i4.F#ti'.r. 1 F ` � _ z ,. ', .n S.fti• y �. i.S 11� • W W W W W W W W W W W W S•- S 4 5 �� JW W W W W •W W W W W W W f I :}� kS,i: � ,5' c -..[. erg` 3 IT _ W 1 . > 7�-.^• _ ,t a , W W W W W W W W W W W 3 f I 'fL i �.••� ...N..�:, y 's .Yr 3 •-��.� ��y' • - f l -� W W W W W W W W W W W © K a ,�• i`. to��.. �+'_r •ri��Y+ - tiJ _� —���Il,���.' - VW W W W W W W W W W W W �• �• W W W W W (V) QW W W W W W W W J I Cj W W W W W W W '!' ® a_ 5—FOOT HEIGHT WROUGHT IRON FENCE ARBOR J W W W W 7 W W W W W W W W W W = NTS NITS d W W W W W W W W M W W W W W W W W W W N W •Y •Y W• W W W W W W W U WWWWWLR/Wl _ W W W W Q W W W S 7 ~ r r r r s r r I o M M M M M M O MATCH LINE — SEE SHEET PPL4.0 6 W. SMOKEJUMPER ST. I 1 S S S S S (s S S S �� s s s s s s s s 5 s s s s s s s s s s s S W. SMOKEJUMPER ST. w �s f 2 s s s s s s r s s s s 5 s' s WR/wf .� J 1 •• S S •• f. .S 1' I— W ` 3 r PRESCOTT RIDGE SUBDIVISION `�' z MERIDIAN, IDAHO 00 1 ® O W W ' Q LANDSCAPE PLAN O a O O ® @) @ } I W W O O O O O • ILL AY10 t Za W g I • n • • w � ENGINEERING X X X X W I W © ;�`J'�,•• 11/19/2Q.•••G�•: 1 X X X � 9•••••••• 9233 B0 WEST 83714ET 4 3 oo•,•DsC'4,••.• PHONE(208)639-6939 Q LANDSCAPE PLAN 4 kmengllp.com z o ' DATE: 8/26/2020 a 0 50 100 150 PROJECT: 18-140 2 Plan Scale: 1" = 50' SHEET NO. J W a MATCH LINE - SEE SHEET PPL5.0 PLANT SCHEDULE DECIDUOUSTREES BOTANICAL/COMMON NAME s s sW. WILDFIRE DR.; s s s s50� MATCH LINE - SEE SHEET PPL5.0 �� I I mmm--mw=—W. LOST RAPIDS ST.�r s�5 s 9 ACER X FREEMANII 'JEFFSRED• W W W W W - MAN ATUMN BLAZE MAPLE W W W W W n5 W W �� I S W W W W W •l ' W W 3 J' W� W W W W W W W W •n**141 0 FRAXINUS AMERICANA AUTUMN PURPLE' 6 ` WWWW AUTUMN PURPLE ASH I x . W W W W I / W J W W '•\ __\\ • 3 •I W W •. W W W f 45 • Co FRAXINUS PEN NSYLVAN ICA•PATMORE' 'PATMORE'ASH W W W W W W I © •• W W W W W W W W W 4 S� I• W W W •Y W W W W W W 5 W W W W W W I GLEDITSIA TRIACANTHOS•SKYLINE' •• W W W W W W W W W W W W ® W 9 W• /W © •, W W W W W W f 44 SKYLINE HONEY LOCUST I W W W W W W W W W W W W W W N W W W W W W N W W W W W W W W V I x W W N W W W W Q> I W W W W W W W W W W W W `Y W i `L "�WAh� W W W W W W EVERGREEN TREES BOTANICAL/COMMON NAME > W W W W W W W W W W W - '#• . / W • /W W W W W W W W W 5 W W W W W W W W W W W W € W O ��\ Aj� I � � W W W W W W W W W W W W W '��}�'Y'+�", /./MT•! W `Y `Y `Y •Y •Y W `Y `Y `Y `L •Y W •Y •Y f W � � / OO I W W W W W W W W ,i, W }Vr _J `Y W `Y `Y `Y W `Y `Y `Y `Y W W •Y `Y `Y `Y W •y I r O W I N W W W W W W W W W 43 • El E3 PICEA PUNGENS ��AM^ CO LO RA D 0 SPRUCE W W W `Y `Y •Y •Y •Y •Y `Y `Y `Y •Y •Y �Y �Y •Y `Y `Y •Y •Y W y r, 3 � JGj / W W W W W O 6 W W W W •Y •Y •Y W W W W •Y •Y •Y W •Y %W W W W W W •. •. W W N � W W W W W W W W W W W W W W `Y •Y W `Y f '• \. / O i 1 .. W W W W W W W W W W W W W W W W W W O O U '�" W W W W W .y •Y •Y •Y •L .y .y .y •Y PINUS FLEXILIS VANDERWOLF S PYRAMID' S0 Q VANDERWOLF'S PYRAMID PINE I " Co 5 W BLOCK 13 Y ZW W W W W W •y W W •Y •Y `Y `Y `Y `L •Y •Y •Y I ,i, / C W W W • P W W W W W W W W W W 4 W •Y •Y •Y W W W W •Y •Y •Y W W W W W W .. .. .. .. W W � W .. .. W •Y •Y •Y •Y SOD/SEED BOTANICAL/COMMON NAME W W W W $ V W W W W W W W W W W W •. .. .. •. W •Y •Y •Y W W W W •Y •Y •Y O •I 7 W W W W W W W W W W W W W W W O W�`W W W •y .y W W •Y •Y •Y •Y W W •• W W W W W W W W W W W y TURF SOD RHIZOMATOUS I . W WIAi^` W . W . W W W • y I (n W W W W W W W W W RHIZOMATOUS TALL FESCUE � �'W � �, �, �, �, �, 5 ® �. .� .� ��,� �+"""� W W W W W W W W W / W 7 •f• • 1� f. •`Y� W W •y •y � 9 \v11Ay4.� W W W `Y •Y •Y W W W W •Y 'i • W O / � •I W W W W W W W W W W �" W `Y W' W j W W W W W W W W •I i / : y W W �' /.�,rp \� W W W W `Y `Y `Y W /• • /W / W W W W W W W W W W W .y /.11.�"�•,. � f• •/W I • OTHER SYMBOLS DESCRIPTION I „ W W • ' y� W W •W W W W W W W •L •Y •Y •Y •Y A W W W W f• W W •Y •Y •Y W `Y W W W 'i' W W W W W W W W W `Y `Y `Y •W W (7 W W •. W W W •. •. W W 1, y W W W W •. •. W W 4O —x x— 6' SOLID VINYL FENCE. W W W W W Y tS W W W W W W W W W W W y " " f W 3 \ Cy/ 6 I w • O W W W W W W W W W W 5 W W W W 8 W W W • W W W W W W C7 W W W W Q 6' SOLID VINYL FENCE WITH LATTICE TOP. W 40 W W W W W W W W W W `' .. W W W W W w 4 O S W 1 1 W W W W W W/ W % W W W W W W W W W W W W W © Z 8' CMU WALL (BY OTHERS). I W W W W /y/ � y .Y • • W W W W W W W W W W W W W J W W W W W W W N N W W W W U 5' OPEN VISION WROUGHT IRON FENCE. W W W W W W N W W W W 1. W W S I W W W W W W �, W W •. W W ,y ` • /W W I W W W W W W W W W W W W OW W V) ,{• W / \ �, W W W W V • W ` I W W W W W W W W W W W W W W W z W W W W O I /I• M I W W W W W S 1 I W W W W W W W W W W W "�.NL W O / •/�� W W W W W W W `` /W / f W W W W W W W W W W �W�^'W M f•• WWWWWW W W W W W W W W W W W W / f V W, I' y( f• • •` /l, W W W W W W W� �Y �W I• N ' ,A NKER OR 5 • / © W W W W W W W W W W W W W I' l: � � V � W O W W W W y y �'�•D O W W W W W W W W W W W W W W W W W W W js 5 W W W W W W W W N N W W W W W 9 W s •, S W W W W W W W W W W / 2 I�, � O (n s/ BLOCK 9 W W W W / \ A O W W W W W W W W • i W 5 I ® W W W W W W V A W W W W W W W W W 1 W W W W ,y •f \ S ® O N 1 W W W W W W W W W W •. •. W W Y W � I f I` / I W W W W W W W W W W •. •. W W Y � CyA •r \ V (7 f S © f W W W W W W W W W W W W W W W W W W fi • / � W W W y/� f f • 9 1. W s • \ \ \ •f (n W W W W W W W W W W W W W W W W W W W • W I• W W W W W W W W W W W • •• \ S ® W W W W W W W W W W W W /• / W W W W W •. •. W •Y W W W W W W W W W W W W S�. /W •f .� W W W W W W •. •. W W W W W W W W W W W W W W 3 /w \ ~ /W \ •• W W W W W W W W W W W W W W W W W W W W W W W / • . f(y 'y 9 \P W \,• n _ /� /•2 A� I OW W W W W W W '�' W W W W W W W W W W W W W W W `` (�,` c/ M I' O •Y W W W W W W W W W W W W W W W W W W W W W / f' ® V /• ` _A4 I S`S _All 1 •I 3 ,II ..�w W W W W W W W W W W W W W W W W W W W W W S VV %• W W W W W W W W W W W W V ® �• ,'R, _S ��OF/RE S Al A.' 40 W W JJ�W �1�•-W✓✓ W W W W W W W W W W W W W W W W W W W W W W II'• _S "I I., I •/ M I W W W W W W W W W W W W W W W W . •. W W W W W W W W W ,y O /� �'J W � p I •I S 2 •W _S 9 s 5 W W W W W W W W W W I W W W W W W W W W W W W W W W W W W W W W W W = W W W W W W W W W W W W W .y W W W W W W W W W W W W W W W W W W W W W ,y .y W W W W W W W f ` I W '' "1' /I } f• I �, ♦I ' /A W W W W W W W W W W W W ,y ,y ,y W W W W W W W f V � W � W f� V`W/• ,/, I W W W W W W W W W W W W .y W W W W W W � I •. / © � � --/ W W W W W •W •W •' W W W •W• W W W W W W W W W W W W W W W W W W W W W \ / © W W W W W W W W W W zW W W W W W W W W W W W W W W W W W 1•' I' ® •. •. W W W W W W W •. •. W W J I W W W W W W W W W W W W W W W W W W W • /W �/ Q W •. •. W W W W W W W •. •. W W W N W W W W W /y Y •. •. W W W W W W W •. •. W W 0 W W W W W W W W W W W •y V W 2 ® W W W W W gLOCK 12 W W W W W W W W W W W W W W W W •y W V W W W W W W W W W W W W W W W W W W W 5 QW W W W W W W . •. W W W W W W W W W W W W W W W C 6 W W W W W W W W W W W W W W W W v S V © W W W W W W W W W W W W W C W W W W W W W W W W W W W W W W • 1 / V f• . .� v '1 W W W W W W W W W W W W W W W W W W W W W W W W W W • y W I •/W f S 4 ^ W W W W W3 W W W W W W •Y W W W W W W W W W W W W W W W/ V • '• /W ` Gj ••f W W W W W W W W W W W W I W W W W W W W W W W W W W W W W W W W W l W O ` l X W W W W W W W W W W W W W W W W W W W W W W W W W W W W W N W t 5 W W W W W W W W W W W 1 W N W W W W W W W W W W W W W W W W N W ,•y •� W W W W W W W W .Y W W W W W W W W W W W W W W W W W W W W W W W / .• ,y W ••/ • •/ C \ ••f O W W W . W W W W W W W W W W W W W W W V O •Y W W W W W W W W W W W W W W W W I �• W •f' 1 5 W W W W W W W W W W W W W W W /•Y \ 11 � 1 W W W W W W W W W W •Y V •/ JO x W W I � W W W •. •. W W W W /• •. f 4 W W W W •. •. W W W / W W W •. •. W W W W • • � /j. N WWWWWWW LANDSCAPE PLAN 1 • W W W W W W W W �, � •. /W f I W W W W W W W •W I `�'• ® W ' 0 50 100 150 S W ® W W W W W x Plan Scale: 1" = 50' W W W W KEY NOTES (TYPICAL) �5 W W W ' 0 W W W W W W I 1. INSTALL 3' DIAMETER SHOVEL CUT TREE RING, WITH BARE EARTH SURFACE AT ALL O W W W W TREES WITHIN TURF AREAS. W W W f W V W W W W W W W W •Y / :� W W W W .. 2. 40' CLEAR VISION TRIANGLE. NO TREES SHALL BE PLANTED WITHIN A CLEAR VISION O3 W W W W I TRIANGLE. THE MAXIMUM HEIGHT OF ANY VEGETATIVE GROUND COVER AT MATURITY W W \ �, / I •Y W W �. .. .. WITHIN THE CLEAR VISION TRIANGLE SHALL BE 3' FROM THE ADJACENT STREET GRADE. 3. TREES PLANTED IN PARK STRIPS TO BE CENTERED IN STRIP. ry •F W I •' � W W W W W W W d •l W / f' / � f W W W W W W W Uj � •• 4. 6' HEIGHT SOLID VINYL FENCE. COLOR TAN. SEE DETAIL PPL3.0-2. p W W •/ I �` .. BLOCK 11 W W .. z 5. 5' HEIGHT CLEAR VISION WROUGHT IRON FENCE. SEE DETAIL PPL3.0-5. Q ' � f © 1 V•. '/W O // � W W W W W W W W W } I O Q sf © 6. 6' HEIGHT SOLID VINYL FENCE WITH LATTICE TOP. COLOR TAN. SEE DETAIL PPL3.0-3. W V W W W W W W W W W W N f' W I• W W W W W W W W W W Gj •Y W W W W W W W W W s w 7. LARGE TOT LOT STRUCTURE, SEE DETAIL PPL5.0-7. LL V 8. SMALL TOT LOT STRUCTURE, SEE DETAIL PPL5.0-8. 0} W ® W W •. W W W W W W W W } f © W W 'I W '• O W . W W W W W W W W .. .. .. N 9. REGIONAL PATHWAY, 10—FOOT WIDE. SEE CIVIL PLANS. W % W W W W W W W W W W z PRESCOTT RIDGE SUBDIVISION `�' •Y I W "� .�W W W W W W W W W W W 10. SCHEMATIC POCKET PARK/DOG PARK. FINAL DESIGN TO BE ESTABLISHED WITH FINAL z o . W WWWW W W W W W W W WWWWWWW � W � W PLAT SUBMITTAL. Q W ' f f •y •y Y�-ov. O W W W W W W W W W W 4 o MERIDIAN I D A H O o U ' f W WI 5 •Y W W W W W W W W W W W W W W .. W .. W .. W .. I 11• PSCHEMATIC LAT SUBMITTAL.LCLUBHOUSE AND POOL. FINAL DESIGN TO BE ESTABLISHED WITH FINAL LANDSCAPE PLAN U a a W ® f W 12. SCHEMATIC R-15 LAYOUT. FINAL DESIGN TO BE APPROVED THROUGH SEPARATE �������•q�ii 0 I N OO I 3 t �W I W f SUBMITTAL. ��, Sv ,���i L.L a W I '.l W 3 �, r• 13. FUTURE DEVELOPMENT. ��•� �•• AYE, O �•� S BLOCK 10 W * S 6,rr•� 5 14. CHINDEN BLVD. IMPROVEMENTS BY OTHERS. - - F2• O • z a `• 15. 8' CMU WALL BY OTHERS. SEE REFERENE DETAIL PPL3.0-4. n ` W 9 I a La16s%% : ~ � E N G I N E E R I N G O W O 20 16. R-15 TOWNHOME OUTDOOR COMMUNITY GATHERING AREA/MEW. ' `� �•• 11/19/2 ••� �•' �� • Q 9233 WEST STATE STREET 3 17. R-15 TOWNHOME OUTDOOR AMENITY AREA. SCHEMATIC AMENTIES INCLUDES OUTDOOR ••. l9 tiP �• BOISE,IDAHO 83714 E I W W I • � W • W 3 S AMENITY SPACE: PAVILION/BBQS/SEATING/FIRE PIT. FINAL DESIGN TO BE ESTABLISHED ����'1I,fl 0�.4,,���, PHONE ngll 639 6939 W W W W W W W W I °� '�, �, AS A PART OF THE FINAL PLAT.ww kmengllp.com z } Z f 2 18. ARBOR. SEE REFERENCE DETAIL PPL3.0-6. DATE: 8/26/2020 li 't F a ; M M M 4 M M M—W. SMOKEJUMPER ST. M M M M M M M M M M I M M I M PROJECT: 18-140 19. MAILBOX CLUSTER. SHEET NO. J MATCH LINE - SEE SHEET PPL3.0 w PPI-4.0Or- I 4 � IW )fl a x /a 119 0 s 8 5 4 Alp _ I r I 9 BLOCK 12 I I 66 6 3 wK W �� I �t 1 � W _ 3 � I W I w 1 w LARGE TOT LOT (TYPICAL) SMALL TOT LOT (TYPICAL) NTS NTS W I W W W I 3 W W MATCH LINE - SEE SHEET PPL6.0 W � 12 r' r� W Q 3 W 12 6 68 69 0 15 WrIWyW fYc W r" r Y Y Y Y Y Y Y Y Y Y Y Y > W 4 9 6 W ' W 15 v w w W W W W 15 W 5 > Y W .r«A�°.y W Iex�° W• f .y ••f •. Q11 W U 3 65 W 0 yIx W • W W •Y �O 7' f t W (n Y/ © W f W W 17 y W W W ® W W y f f z 3 W r W 4 13 W W W Y Y W Y © ® W 18 W 4 IW W W •Y •Y •Y W � � ,y Q ® W t • I W v v W v W W f © 64 63 62 © 60 ©9 f� W W .y y W W W W f •• °• .y ° •b •° . 4O ® W •W W W s 5 � 3 r W W Cam}—s s s s @—S N. HI GHFI RE LOOP $_S- M M 3 W W W W p 3 2 2 W. LOST RAPIDS ST. W Q q• , S $ $ S S S S $ $ $ S ?1 O9 W W O 66 i• W W W W W I• 9 W N Q 68 • •Y •Y •Y •Y W W W f f•}' N � W y W W W W •Y •Y W •Y •Y• �' W W W IW Qo f f •Y •Y •Y •Y •Y W •Y •Y •Y •Y W f O W W W W W W W W W •Y •Y •Y •Y •Y 1 W f > t J Q� y p 4 °• I Q •Y W •Y •Y W-OCIA O W W 1 G •Y •Y •Y •Y •Y W •Y ••Y •Y •Y •Y °•Y •Y W '' s W f °•3 O f• W W W W W y W W W V •Y •Y •Y •Y •Y W •Y •Y W •Y •Y •Y • •Y W W BLOCK 14 W z N © O w W •Y •Y •Y w w w W •Y •Y •Y •Y• w W •Y •Y •Y w •Y •Y W © U z f •Y •Y •Y W W W W •Y •Y I f• w W n O O N d' f W y W •Y •Y •Y •Y •Y •Y •Y W `Y 3 Y $ U ' ' � � .v .v .v .v .v .v .v .v .v .v W � W N U j © = W W f f W W w w 1ram�,' w v v 18 I z f' N Co �%W W W W S f• •Y •L W W y ' (n O W Q © v W v W W v W 5 O ® © 49 � W f U) �' 1 ' .•f.. / �W s W 48 / f f s 9 ® W n M M M W. WILDFIRE DR._M M� f �" 3 W . , •f•• 1 — — — — — — — — 45 w -w-w- w w w w MATCH LINE - SEE SHEET PPL4.0 ��� W� f �Q s W. WILDFIRE ST. f W W 4 W W W 6 LANDSCAPE PLAN � 0 50 100 150 ` W W �� MATCH LINE - SEE SHEET PPL4.0 11 W Plan/Profile Scale: 1" = 50' ` 4f Q' PLANT SCHEDULE KEY NOTES (TYPICAL) ® 2 DECIDUOUSTREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS CITY 1. INSTALL 3' DIAMETER SHOVEL CUT TREE RING, WITH BARE EARTH SURFACE AT ALL , TREES WITHIN TURF AREAS. o ACER X FREEMANII 'JEFFSRED' 2"CAL. 50'X30' CLASS II 67 2. 40' CLEAR VISION TRIANGLE. NO TREES SHALL BE PLANTED WITHIN A CLEAR VISION ATUMN BLAZE MAPLE TRIANGLE. THE MAXIMUM HEIGHT OF ANY VEGETATIVE GROUND COVER AT MATURITY m WITHIN THE CLEAR VISION TRIANGLE SHALL BE 3' FROM THE ADJACENT STREET GRADE. x a N m 0 FRAXINUS AMERICANA'AUTUMN PURPLE' 2"CAL.B&B 45'X45' CLASS II 77 3. TREES PLANTED IN PARK STRIPS TO BE CENTERED IN STRIP. AUTUMN PURPLE ASH 0 4. 6' HEIGHT SOLID VINYL FENCE. COLOR TAN. SEE DETAIL PPL3.0-2. z r 3 FRAXINUS PEN NSYLVAN ICA'PATMORE' 2"CAL.B&B 40'X20' CLASS II 23 5. 5' HEIGHT CLEAR VISION WROUGHT IRON FENCE. SEE DETAIL PPL3.0-5. O o 'PATMORE'ASH 6. 6' HEIGHT SOLID VINYL FENCE WITH LATTICE TOP. COLOR TAN. SEE DETAIL PPL3.0-3. GLEDITSIATRIACANTHOS'SKYLINE' 2"CAL. 35'X30' CLASS II 77 7, LARGE TOT LOT STRUCTURE, SEE DETAIL PPL5.0-7. z SKYLINE HONEY LOCUST w 8. SMALL TOT LOT STRUCTURE, SEE DETAIL PPL5.0-8. N EVERGREEN TREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS CITY g, REGIONAL PATHWAY, 10—FOOT WIDE. SEE CIVIL PLANS. (/) PRESCOTT RIDGE SUBDIVISION z 10. SCHEMATIC POCKET PARK/DOG PARK. FINAL DESIGN TO BE ESTABLISHED WITH FINAL o a PICEA PUNGENS 6 8 B&B 60 X30 EVERGREEN 22 MERIDIAN, I DA H O COLORADO SPRUCE PLAT SUBMITTAL. O a 11. SCHEMATIC CLUBHOUSE AND POOL. FINAL DESIGN TO BE ESTABLISHED WITH FINAL LANDSCAPE PLAN U 1 or- PINUS FLEXILIS'VANDERWOLF'S PYRAMID' 6'-8' B&B 25'X15' EVERGREEN 30 PLAT SUBMITTAL. g VANDERWOLF'S PYRAMID PINE 12. SCHEMATIC R-15 LAYOUT. FINAL DESIGN TO BE APPROVED THROUGH SEPARATE ,,��������q�����, O S SUBMITTAL. ���� T60FID z 13. FUTURE DEVELOPMENT. r•�SSA Y6,,r:• '•� a SOD/SEED BOTANICAL/COMMON NAME CONT CITY � �P••••••••�•!YO���� v 14. CHINDEN BLVD. IMPROVEMENTS BY OTHERS. TURF SOD RHIZOMATOUS SOD 490,557 SF r i • ' a W RHIZOMATOUS TALL FESCUE n 15. 8' CMU WALL BY OTHERS. SEE REFERENE DETAIL PPL3.0-4. • LA165%% •: ENGINEERING E 16. R-15 TOWNHOME OUTDOOR COMMUNITY GATHERING AREA MEW. �40 •••11/19/2 •• �, �•' 9233 WEST STATE STREET OTHER SYMBOLS DESCRIPTION / Q ,���1 •••••••• P�,�� BOISE,IDAHO 83714 z 17. R-15 TOWNHOME OUTDOOR AMENITY AREA. SCHEMATIC AMENTIES INCLUDES OUTDOOR ������I,D;;'4������, PHONE(208)639-6939 —x x— 6' SOLID VINYL FENCE. AMENITY SPACE: PAVILION/BBQS/SEATING/FIRE PIT. FINAL DESIGN TO BE ESTABLISHED kmengllp.com z AS A PART OF THE FINAL PLAT. u 6' SOLID VINYL FENCE WITH LATTICE TOP. DATE: 8/26/2020 a 18. ARBOR. SEE REFERENCE DETAIL PPL3.0-6. PROJECT: 18-140 8' CMU WALL (BY OTHERS). 19. MAILBOX CLUSTER. J 5' OPEN VISION WROUGHT IRON FENCE. SHEET NO. W PPLS. Or- PLANT SCHEDULE W. CHINDEN BLVD. (HWY 20/26) DECIDUOUSTREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS — as�— P EP EP EP EP EP P EP EP EP EP EP P EP EP EP EP EP fP 2 ACER X FREEMANII'JEFFSRED' 2"CAL. 50'X30' CLASS II EP EP EP EP EP EP EP EP EP EP EP EP EP EP EP EI ATUMN BLAZE MAPLE FRAXINUS AMERICANA•AUTUMN PURPLE' 2"CAL. B&B 45•X45• CLASS II AUTUMN PURPLE ASH 14 s FRAXINUS PEN NSYLVANICA'PATMORE• 2"CAL. B&B 40•X20• CLASS II 3 s •PATMORE•ASH W GLEDITSIATRIACANTHOS'SKYLINE• 2"CAL. 35'X30' CLASS II 1 I Q SKYLINE HONEY LOCUST O ' U EVERGREEN TREES BOTANICAL/COMMON NAME SIZE MATURE HXW CLASS H — PICEA PUNGENS 6'-8'B&B 60•X30• EVERGREEN zu ,A COLORADO SPRUCE I W ' W PINUS FLEXI LIS'VAN DERWOLF'S PYRAMID' 6'-8'B&B 25'X15' EVERGREEN 3 VANDERWOLF'S PYRAMID PINE 15 1 W SOD/SEED BOTANICAL/COMMON NAME CONT 3 W TURF SOD RHIZOMATOUS SOD I W RHIZOMATOUS TALL FESCUE I OTHER SYMBOLS DESCRIPTION � \ J 1. W —X x— 6' SOLID VINYL FENCE. 3 6' SOLID VINYL FENCE WITH LATTICE TOP. I, W 8' CMU WALL (BY OTHERS). 3 . 0 0 5' OPEN VISION WROUGHT IRON FENCE. \ W KEY NOTES (TYPICAL) � I 3 I �• 1. INSTALL 3' DIAMETER SHOVEL CUT TREE RING, WITH BARE EARTH SURFACE AT ALL i TREES WITHIN TURF AREAS. 2. 40' CLEAR VISION TRIANGLE. NO TREES SHALL BE PLANTED WITHIN A CLEAR VISION TRIANGLE. THE MAXIMUM HEIGHT OF ANY VEGETATIVE GROUND COVER AT MATURITY WITHIN THE CLEAR VISION TRIANGLE SHALL BE 3' FROM THE ADJACENT STREET GRADE. I FUTURE C C7 I 3. TREES PLANTED IN PARK STRIPS TO BE CENTERED IN STRIP. 3 4. 6' HEIGHT SOLID VINYL FENCE. COLOR TAN. SEE DETAIL PPL3.0-2. BLOCK 8 I I W I W 5. 5' HEIGHT CLEAR VISION WROUGHT IRON FENCE. SEE DETAIL PPL3.0-5. I I WI _ 6. 6' HEIGHT SOLID VINYL FENCE WITH LATTICE TOP. COLOR TAN. SEE DETAIL PPL3.0-3. 13 �. 7. LARGE TOT LOT STRUCTURE, SEE DETAIL PPL5.0-7. W I W 8. SMALL TOT LOT STRUCTURE, SEE DETAIL PPL5.0-8. 3 1 9. REGIONAL PATHWAY, 10—FOOT WIDE. SEE CIVIL PLANS. W W 10. SCHEMATIC POCKET PARK/DOG PARK. FINAL DESIGN TO BE ESTABLISHED WITH FINAL W I W PLAT SUBMITTAL. I I 3 W Jr W 11. SCHEMATIC CLUBHOUSE AND POOL. FINAL DESIGN TO BE ESTABLISHED WITH FINAL PLAT SUBMITTAL. W 12. SCHEMATIC R-15 LAYOUT. FINAL DESIGN TO BE APPROVED THROUGH SEPARATE 3 I SUBMITTAL. 13. FUTURE DEVELOPMENT. I 14. CHINDEN BLVD. IMPROVEMENTS BY OTHERS. 15. 8' CMU WALL BY OTHERS. SEE REFERENE DETAIL PPL3.0-4. W I I I 16. R-15 TOWNHOME OUTDOOR COMMUNITY GATHERING AREA/MEW. I I W 3 i W 17. R-15 TOWNHOME OUTDOOR AMENITY AREA. SCHEMATIC AMENTIES INCLUDES OUTDOOR AMENITY SPACE: PAVILION/BBQS/SEATING/FIRE PIT. FINAL DESIGN TO BE ESTABLISHED AS A PART OF THE FINAL PLAT. 3 I 18. ARBOR. SEE REFERENCE DETAIL PPL3.0-6. I W 1 19. MAILBOX CLUSTER. I W I W 3 I I I I Q / / I '• I d O / IM V — N M U I ' W 0 O w I z l7 O 0 o I I- N O N I W 15 I �N } I I W I— N IJ PRESCOTT RIDGE SUBDIVISION z MERIDIAN, IDAHO 0 W LANDSCAPE PLAN U U N I OF ID LL a I • kn d ' 15 MATCH LINE - SEE SHEET PPL5.0 15 .�' •• LA 16s;, •:� , z LANDSCAPE PLAN �� •. 11119�2( • 2 '• •' � ENGINEERING • • 9233 WEST STATE STREET '�� L •••••••• Q¢��� BOISE,IDAHO 83714 z 0 50 100 150 �1,%1 D„'4,�•���� PHONE(208)639-6939 Plan Scale: 1" = 50' kmengllp.com z o DATE: 8/26/2020 a PROJECT: 18-140 SHEET NO. J W a W. CHINDEN BLVD. (HWY 20/26) VICINITY MAP : 1"=1,000' PRESCOTT PRELIMINARY PLATSHOWINGEP (-EP EP r' EP EP EP EP EP EP d3 d3 d3 d3 m WLL L�l W j m W.CHINDEN BLVD. A PARCEL OF LAND SITUATED IN A PORTION OF THE NORTHEAST W _ _ 1/4 OF THE NORTHWEST 1/4 OF SECTION 28, TOWNSHIP 4 NORTH, ' . IN RANGE 1 WEST BOISE MERIDIAN ADA COUNTY IDAHO I LEGEND PRELIMINARY PLAT DATA I I I O u � RUT RUT SITE DATA - - \ I I U BOUNDARY LINE PROPOSED ZONING R-8,R-15,C-G w PRESCOTT COMPREHENSIVE PLAN DESIGNATION MEDIUM DENSITY RESIDENTIAL (MDR) \ I SUBDIVISION Q ADJACENT PROPERTY LINE \ \ C Co TOTAL R-8 AREA 99.41 ACRES ` \ I G PRE-PLAT LOT LINE RESIDENTIAL BUILDABLE LOT AREA 43.61 ACRES BOUNDARY z RESIDENTIAL COMMON AREA 10.87 ACRES e e e PROPOSED TO POTENTIALLY DEVELOP ROW 16.93 ACRES I AS ZERO LOT LINE LOTS. THESE LOTS SCHOOL PARCEL 28.00 ACRES 3.07 UNITS/ACRE SWILL BE UBMITTAL.DETERMINED UPON FINAL PLATGROSS DENSITY NET DENSITY 6.90 UNITS/ACRE - - _ _ _ I OPEN SPACE LOT AREAS SECTION LINE TOTAL R-15 AREA 8.95 ACRES ROW 1.00 ACRES I I 80 I BLOCK # LOT # LOT AREA (SF) QUALIFIED OPEN SPACE (SF) QUALIFIED OPEN RESIDENTIAL BUILDABLE LOT AREA 4.59 ACRES I BLOCK 8 C SPACE (ACRES) R/W R/W C-G RUT RIGHT OF WAY LINE RESIDENTIAL COMMON AREA 3.37 ACRES 12,543 I ( EP EP EXISTING EDGE OF PAVEMENT LINE GROSS DENSITY .80 UNITS/ACRE I 1 1 9,648 INCLUDES 100% OF MCDERMOTT 0.29 NET DENSITY 13.46 UNITS/ACRE I � � COLLECTOR FROMLANDSCAPE BUFFER R-4 ADJACENT PROPERTY ZONE LOT NUMBER TOTAL COMMERCIAL LOT AREA (C-G) 18.18 ACRES I - - - - 1 8 2,672 0 0.00 9 TOTAL SITE AREA 126.53 ACRES RUT I 1 19 2,230 2,230 0.05 BLOCK 12 BLOCK NUMBER I 1 30 4,400 4,290 0.10 OVERALL LOT DATA I I: 2 1 25,218 24,036 0.55 SURVEY CONTROL NOTES TOTAL LOTS 418 I I W. RAMBLIN ST.I 2 9 2,040 0 0.00 SINGLE FAMILY DETACHED RESIDENTIAL LOTS 215 SINGLE FAMILY ATTACHED RESIDENTIAL LOTS 102 2 27 1,020 0 0.00 1. ALL SURVEY DATA IS BASED ON THE NAD83 STATE PLANE TOWNHOMES LOTS 38 I / / / I M/21 / 3 1 20,125 20,125 0.46 COORDINATE SYSTEM (IDAHO WEST 1103) AND VERTICAL MULTIFAMILY LOTS 14 (NAVD88) DATUM. COMMERCIAL LOTS 1 / / I 80 81 75 74 3 13 2,040 0 0.00 COMMON LOTS 41 I I 10,124 CONTACT INFORMATION SHARED DRIVEWAY LOTS 6 SCHOOL LOTS 1 79 4 1 8,068 INCLUDES 100% OF MCDERMOTT 0.23 DEVELOPER/OWNER ENGINEER/SURVEYOR MINIMUM PROPERTY SIZE 4000 SQ. FT. I Q� 78 66 77 76 73 COLLECTOR LANDSCAPE BUFFER AVERAGE SINGLE FAMILY PROPERTY SIZE 6028 SQ. FT. I Y 5 1 1,020 0 0.00 PROVIDENCE PROPERTIES KM ENGINEERING AVERAGE TOWNHOME PROPERTY SIZE 2302 SQ. FT. RUT 701 S. ALLEN ST. #104 9233 WEST STATE STREET 5 15 1,038 0 0.00 I I O MERIDIAN, ID 83642 BOISE, IDAHO 83714 PEREGRINE PHONE: (208) 639-6939 QUALIFIED OPEN SPACE AND DENSITIES (RESIDENTIAL) RUT HEIGHTS I I 6 1 1,020 0 0.00 CONTACT: MATT DERR, P.E. ACREAGE OF QUALIFIED OPEN SPACE 12.43 ACRES cn EMAIL: mderr@kmengllp.com PERCENTAGE OF QUALIFIED OPEN SPACE 11.83% SUBDIVISION I I I 1 72 6 6 1,020 0 0.00 I. GROSS DENSITY 2.99 UNITS/ACRE _I MATCH LINE -SEE SHEET PP2.3 6 12 33,450 33,450 0.77 I z 67 6 18 3, 47 0 0.77 68 69 70 NET DENSITY 7.49 UNITS/ACRE - - 71MATCH LINE -SEE SHEET PP2.2 \ � � 6 23 1,020 0 0.00 11 ) 65 7 1 1,025 0 0.00 - - 12 13 27` 2g 29 30 31 '• 32 33 34 35 43 56 3,567 36 37 3g 41 42 f O O O O O O 58 7 15 2,324 INCLUDES 100% 0.08 I � 3940 , � 64 63 62 61 60 59 O OF N. RUSTIC ••• SS OAK WAY LANDSCAPE BUFFER 10 N. HIGHFIRE LOOP 8 1 1,020 0 0.00 8 4 7,735 7,735 0.18 14 26 W. LOST RAPIDS ST. 57 54 8 12 2,324 2,324 0.05 54 - - 25 55 56 57 58 59 60 S3 8 17 627 0 0.00 gO 24 61 62 63 - 64 65 66 67 '. • 8 27 31,011 22,840 0.52 Z 23 68 29 28 27 26 25 24 23 S2 4,206 22 8 43 3,293 INCLUDES 100% 0.10 ' O BLOCK 8 R-15 51 I OF N. RUSTIC O 15 I` WEST ADA OAK WAY LANDSCAPE BUFFER O m 21 47 +`+` `� 16 BLOCK 14 22 50 I SCHOOL 9,058 20 PARCEL 8 44 6,696 0.21 Z 44 INCLUDES 100% OF N. RUSTIC 18R-8 OAK WAY LANDSCAPE BUFFER 48 I 17 46 I 14 17 48 8 47 36,367 24,966 0.57 / O W. WILDFIRE DR. 45 / I � W. WILDFIRE ST. 47 D = D 8 68 20,268 0 0.00 206,267 - - / _ _ 2 9 1 198,094 INCLUDES LOAD OF N. RUSTIC 4.74 I O O3 O4 O O O7 1 12 17 US ZI z OAK WAY LANDSCAPE BUFFER r*+ m 9 25 842 0 0.00 6 O 11 16 ' 44 m� cn 9 29 6,483 6,483 0.15 m I / ` I 10 15 > M N 21,444 ` I Z % ,/ O Q 43 O 2 = 10 1 17,141 INCLUDES 100% OF N. RUSTIC 0.49 7 5 p 40 j, 9 14 Z �� m OAK WAY LANDSCAPE BUFFER BLOCK 1 O O v O /, 42 1 1 7 22,262 22,262 0.51 Y u 9 / !` 13 N� N 3,567 BLOCK 8• - 3- rcy.` :% 1 N 41 W 12 1 2,185 0.08 O7 O'. INCLUDES LOAD OF N. RUSTIC O9 10 Z �/� / 12 OAK WAY LANDSCAPE BUFFER O F / 6 O z 40 11 I BLOCK 13 O 12 10 2,336 0 0.005 8 12 7Q Q' Cy�`�` SF '+ '.� �+ 1 . 13 > O 38 - "•`•`-!�ti FS`y`.'.y ! 5I 11 39 12 22 2,040 0 0.00 14 O F'. 4 12 33 22,254 22,254 0.51 O 15 16 17 1g O 10 38 12 47 2,240 2,240 0.05 �T 19 2p 21 22 _ RUT 25 26 s / KKR DR• 37 `ryF�• ,2 03 O 9 O 12 57 2,076 0 0.00 O W. F�RE(1 O 23 24 25 z W.'IPN BLOCK 9 . /' �AA� GLc O 37 3,616 NE pR. 26 27 36 707. / 1 y O4 O Og 12 65 3,616 INCLUDES LOAD OF N. RUSTIC 0.08 O 2 O 28 29 30 24 35 ". / r giys �.. O 36 I OAK WAY LANDSCAPE BUFFER 34 % 9GL j 12 66 43557 0 0 BLOCK 3 O O 32 33 O 7 O 2,677 W. STURGILL PEAK ST. 6 O7 I 31 / W, 12 79 3150 INCLUDES 100% OF N. RUSTIC w OW O O 10 W' F�RELINE C I 23 . 29. . 30 / 13 24 FARE(/NE pR - 34 OAK WAY LANDSCAPE BUFFER O T, ,• O 13 1 42,469 42,469 0.97 U �`- 11 12 4% 25 - ,.:• :. 18,739 17 26 Z O 22 21 O O7 O ± ` 22 28 O / 12 21 O 27 BLOCK 12 14 1 14,258 0.43 20 Q 18 / 28 29 INCLUDES LOAD OF N. RUSTIC u; 19 W O O 16 20 30 OAK WAY LANDSCAPE BUFFER O Q O 31 a 33".'.". 14 17 2,092 0 0.00 O O Q O 1 21 Z 27 32 I'` BLOCK 4 0 16 15 0 1 I 14 22 1,956 0 0.00 va- 14 N BLOCK 2 a 19 3 }! 10 19 I 15 6 1,179 1179 1 O W. PARACHUTE DR. 10 11 26 % ; ; 20 :v O �P O _ + 10,681 z O 13 O Q 15 �� - - 9,661 O 5 Z 14 15 16 17 18 Z �! INCLUDES LAND OF N. RUSTIC 0.25 _ OAK WAY LANDSCAPE BUFFER 7 O O 19 25 24 23 22 21 14 / O QL� O9 18 NORTH OF BLOCK 12 LOTS 70 82 1 O O O O O O O BLOCK 5 20 O / I 8' PLANTERS STRIP (SEE STREET TREE 0 0.00 U a CALCS) 10 > 17 I 12.43 N W. PARACHUTE DR. 13 / w-� Q I TOTAL OPEN SPACE u O N 0.nj ,'� O 11 0 0 120 240 360 I 11 7 18. 12 J" 5 LL R-4 PRESCOTT RIDGE SUBDIVISION z O O O I 19 O O 12 16 Nor9 „ui �. O O Plan Scale: 1" = 120' O 8 O 10 11 BLOCK 6 13 C N ( N 16 17 � 4 N MERIDIAN, IDAHO H O 12 ui l w o N 20 J 11 / O 13 BLOCK 11 ` z 15 I COVER SHEET ui W " N 13 W ■ Q LL Z Z J O S�pNAL fN G RUT 33 32 31 30 29 28 = I� = 25 24 �• 14 o��S \ST F- 22 Og O �� O w 15 6 23 z z I Lu W. SMOKEJUMPER ST. 13 I J�11/20/20 0 d > Q � Q Y q I Q 10 I '�,9 rF OF �QP�� 9233 WEST STATE STREET Z O l BOISE,IDAHO 83714 a O 20 3 4 s 6 ' p BLOCK 7 v Z O O - 1 2 3 4 5 I BLOCK 12 12 TyEW S• Q PHONE(208)639-6939 kmengllp.com z O O O O O O O7 8 O9 10 11 12 13 14 1s � 1 O O O O O O 8 9 - - - - - - - - _ z _ _ _ Z O O Digitally signed by DATE: 8/26/2020 L _ _ - - - - - - - _ - - - - 11 - - - - - PROJECT: 18 140 _ _ _ _ _ -- - - - Matthew S. Derr, PE J s R-8 - Date: 2020.11.20 SHEET NO. w R-4 09:18:43 -07'00' P P 1.0 a I � ® a a W W 93� ` W 4 W w W W y 40, , yWyW 111+ d 40 w 1 y W W 25, 70, W W 40 I I WW o 40+� 3� 11 N 10 26' 14, �^ O T�� O 8 G 11 N � � W W WWWW 5 12 N 4p 1 W O 40 10' ^ 13 cv " 4Q W 2Q', 40' N BLOCK 1 23' R/20' 40' 39 1 14 15 40 w W K/w O �lv 4p'4 ti R 40 �29' "� w0' W4—A R/w40, 3, 5, 19 4p' 4p41 R/w�_ R/w 32 W ^ 21 ^ " 40 �62' 48 R w R/w 40' 22 4p, 4' Riw ^ 23 ^ " 35 W f Y W W W W W 2�' R W= W 24 w 111' 9' R w /W 4p+ O 26 g, w w ��. �. � 3,i. �. �. �. � � \R/ R/w 40' O ^ 27 " 1 g' �3 _ /w R/w_ O " 96•� > R 8 45' /w 40' 28 5' 4p w R/w _R/W 4Q' 29 0 30 24 N 107' 6' N O o 50' R/w W. Fl RELINE R/ =R ^ 1 3 y y y N 3 D / 4Q, O R. _R/W 40, p '1� R/W '� �b 28' R/W R/W R/W y y y 4 p' R W k y 104' 14' O N 5p R/W /w 4Q R/w R 40 ' W w 117' BLOCK 3 O cv 40, R/w K/w 11 12 0 1 o O 45' 14' o /w R/ o0 N A W. STURGILL PEAK ST. y iv O 2 0 1 O8 cv 6' 21' 3 o 23 12' y 44, O cv 14'�� 35 R/w y 28' 35' ^ R/w 10 "� 4Q W w M/a a M,'� 14' "o W W W W 7 16 24, N 11 cv W 6 40'w R, oN 32� 18' 12 ^ 47.00 W 40,W R/w �\� 117 1 O7' y y y 4p o 4Q' R/w y y y y I N W W > Q W W W W W 5p J� W 39 R/W W W W W W W W 1 y o 6 3 y 4p, y o^ O 40 y y y� 22 l7 2 Lo a W ro� 22 ,� 20' N Oj cv 21> W W W W W W W W W 21 2O' 3 W W ^ W W W W W W W W w ? W W W W W W W W O N 20 � " 0' 20, r/ 3 ^ O N w ✓ ✓ ✓ w w :�8+w a0 1 12' 19 40, 50, "krn v r� O N 1 w W w w Z 3y w w w y O N " ^ O N + y y y 'k + W BLOCK 4 W W W W W O 13 115 10' O3 cv BLOCK 2 1 12' o y 17 " ~i 9 40, 1 p' y y y W U) O OTi W W W W O ^ O O W W W W W W W W W W W `nr �1 4' 16 " 30' 3 ro 21 0 ^ 1 1 112' R/w 60 I N/ R/W49 /W 46' R/W 46 10 15 ^ 14 40 4p, 10 WWWWWW WyWyWWWWWW F W W �W 3 /W A ps O O 3 3p, W W W W W W W W W W W W 1 112' /W � � . ^ 2p' �. y �. �. .� y y .� y �. �. � 1 4O o W. PARACHUTE DR. R/w= X 0 50' W W W W W W W W W W W W N. W W `n R/w k W W 10 50' 50' 51' W o o f l'1 11 _ co 20 � 1 N 112 M/�, M/a /a M/a M/H R/w 60 6 _ .� o ��r�46' 50' 50' 14' 36' M/a 50 M _R/W 45, lye 12 a 6' _M/ kiw 6' 13 W 52, y w w W W W o O Lo o W 7IC > M/a 9 M/a_ 14' M/ 45 112' a 1 3' M/ _ 14' a�M 6Q 15 O6 17 18 W W 112' ^^/a �M,a W o uj co O 4' ,)A 1 W y �. y �. . � O o O 57 M/a_ �� M/a 5= 19 N 0' y y rn O M/a W W w W W oo O 00Y tea' 8 BLOCK 5 �. , M/a 3p/a 20' 2' 108' W �N �� g2+ M/a�M/a 48 50 51 �16 W W 47.00' O 10 Nr\ \� 1 �_M/a M/a M aM/a117' M/a I W 30' 27_� —1 12' — — 47 10, — 50' — 50' S0' 50' — 50' — 58 — — — — `v 6 56 /a_ o — 91' 0 co 10' 51, M/a �M/a W 50' �� 60' 23' M/a 2 7 �A/a M/a-� M/a nM,/a M/a M/ M is 150 50 60 z LAYOUT PLAN �o �Y 112' � N W W W W W W W W W W W I J 11 °' 7 y y y y W O O W W W W W W W W W W W 0 50 100 150 8 00 112 N' Plan Scale: 1" = 50' o O o 11 W W W W W W W W W W 13 14 FW W W W W W W W W W J J J y W y y y y I� 12 Lu Q 1 12'Lu BLOCK 6 1 112' 64' 50' 50' 60' 50' W W W W W W W W W W N 12 50, 60' Z O W W y y W O 13 O 47.00' 1 12' z PROPOSED TO POTENTIALLY O L `� W W W W W W W W W W DEVELOP AS ZERO LOT LINE Z� T � y y y � � W y y y y � 14 � O coo 1 LOTS. THESE LOTS WILL BE U 'n O DETERMINED UPON FINAL PLAT N I 6' 6 10> SUBMITTAL. V 1 O7 W W W W W W W W W W W �� W 109' 15 W W W R' W W 6 64' 50' 50' 60' 50' W W W W W 'W W W W W ' ' P R E S COTT RIDGE SUBDIVISION z R/ry 99' R/W R/W 97' R/W R W rc/W R/W R/ R/W R/W R/ R/W w �/W w R/W 1 50 wR/W w R/W R WQ R/W 6Q R/W 1 MERIDIAN, IDAHO O O o U 0 0 N 1 LAYOUT PLAN o �M/)+ M a nn/a M/a M/a M/N M/ M/a 16' O —R/w R W R/w /W R/W R/W R/W R/W R/W R/w R/ LL I 68' 60' 60 68 57 4�14' 65' 70' 60' 70' 70' 66' I SS�pNAI FNc O 4' a �6' �'yF W 1 � O 3 3 11 4 z z o s 11/20/20 o I N O O O 4 N 5 0 6\ 2 N 3 N N N �q/ P� E N G I N E E R I N G O O o1 0) c i 1 o O O 4O 5O ,9 F OF �� �� 9233 WEST STATE STREET z O N O r) lTyEW S.';) �' or- BOISE,IDAHO83714 a PHONE(208)639-6939 W a kmengllp.com z 47.00 DATE: 8/26/2020 C PROJECT: 18140 C a 68' 60' 60' — —68 60' 1W1' 47' 10' 70' 70' 60' 70' 31' J SHEET NO. Lu —39 — 66' P P 2.O a MATCH LINE - SEE SHEET PP2.2 ................ W W W W W W W Z1� 39 W W W W W W W / W w W Ww3 8W`ti1 WWw1 0WW' WWW WWW WWW WW�W^,WWWW WWW�W ^WWWWWWW WWWWW�W �WWWWWWWw WWWWW�W �WWWWWWWw WWyWWWW o�WWWWWWwB LWWyWWWWO yyWWWWWC KWWWWWW 9yyWWWWWWW WWWWWWW yyWWWWWWW WWWWWWW yyWWWWWWW WWWWWWW �WWWWWWWw WWWWWWW �WWWWWWWw WyWWWWW WWWWWWWw yWWWWW WWWWWWWw,WWWWW WWWWWWW WWWWWW �W ,OWWP J,77O Co 27 �� 6' 0' 96 47 0 d / \�W \� , M/a MI3 -\ 6 14' �b 46' g0 q2 w a6' �It ,�' 3 if- '6 8 10 ti \'a M1a `'O' O W W W W W W W W W W W W W W W W W W W W / W W 41 W 90, 'pj// O , W W W ry V 6' 11 W 0 , 1 v) 14 O o ' e W ' 700 77, O K W W W W W W W W W W W W W W W W W W W W W W�\� CO � W 13 � \ O 22W , y y y y y y y y y y y y .O0. \\ 7 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 1 104' 77 / J W W W W W W W W W W W W W W W W W W W W W 7, g 4� p O I 1 j7 N 180 Q 1 10 W W W W W W W W W W W W W W W W W W ,�7 6' 14' 20 }11 O 7S�' y . . . .y O O O \� 6' z 35 O � I 11u 1 10' ^ R 3 77, R/w 1 o 19 0 Q Q qpO 21' O O / 77, O \ N 1 50' a 1 50' 50' 43' 32 �00 rO 15 Lo h� BLOCK 10 \� �\'d M 113' �W f 1 W W W W W W W W W W 7 V110' 7, 7 A W 25 00 O rn rn O 20 14 0 . ui Lo 7 \:Q� �4 61 v Y� O �O (i 77 W W 113' W 45' 50' 50' 43' 12' K/w R/W KIW R/W 4�W 14' W w W v W O 17 O � 1 R/w 2O - i� / � w 7 7 w w w O I\ 1 W. PARACHUTE DR. O Oa �\ �p Q \ W y / y 11 � x OLu Z �/a M/a Mia M/a M/ MA 91 M/a m8, 1 W W3' \ W �O 7 LL 113' 50 60 54' 18 ��� 20' 13, ,�� �\ W 7 J 10' 91, 24' OA 4r O 77 n 3 Ln 1 15 16 `V 17 12 77� th 77 Q 120' G o 20 - A// 11 / 13 47.00' 1 Lo Lo 3 15r y y y y y y y y " 47.00' 112 �j (D 15 113' W W 176' 49' 50' 43' W W W W W W W W W W W W 50, 60 54' � W W k, W W W W W W W W W W W 1 �o y 3 y 17 50' 60' 50' y 1 ^v- \ 112'N 1 12' a N 1 12' N N 1 26 25 24 2 W W A - - W 3-oo oY 1 12' �� 1 O O O O O 14 o 0 1 z,� 22 6' 6> 9 0 \ OLoO 3 w 1 10 �i� 6 NA �N ��2 107 ��' 107' 4y� A W 90' 1 12' tR50' R/W 60' R/W R/w4' R/yy. W W Ryw 23 R/W w �� O W 55 ' ' , \� 97' �'�� / , R/�N M/21 M/N M/21 M/21 M/a M/?J 60 M/21 M/ao' M/2J 60 M/H 3m/� �a 24' 92 1 0 14' 84 14, \� 13 0 W. SMOKEJUMPER ST. o 30' z W. SMOKEJUMPER ST. �, O VW-i W R/W /W R/W R/W R/W R/w R W R/W R/W R/W R/w �I� PROPOSED TO POTENTIALLY 1 70 70' 70' 60' 60' 60' 55' �� R/ R/W R/W R/W R/W R/W R/w R/W R/W R/W R/W R/w�r' DEVELOP AS ZERO LOT LINE 58 70 60 70' 60' 70' 60' 21' 4d O. 10 112' LOTS. THESE LOTS WILL BE U Nq) u 7' p o I DETERMINED UPON FINAL PLAT �' I SUBMITTAL. a 3 N 1 < s o 9 0 o W Q W BLOCKI2 � o PRESCOTT RIDGE SUBDIVISION z 1O O r7 10 r7 11 r2 12 r%� 13 r%) 14 N 15 1y O O3 O4 N O N O N 7 0 MERIDIAN, IDAHO O LAYOUT PLAN U N o N 0 O O 25' 111' 1 W � � W � 1 ¢ z O S�pNAL E LL 70, W 50.00' W 5 _31 70' _ _ 70 _ 70 _ _ 60 _ 60' _ 60' 60' 20' 50' 20' 70' _ 70' jL 2$ — — _ 60' 29_ 20' 2 3' r- Q O 3 5' z 21' 65' 19 4 o — � 37, N — — — _ 58' 45' 20' \� J, 11/20/20 Pao ENGINEERING �,9 F OF �� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 Z LAYOUT PLAN PHONE 208 639 6939 z kmengllp.com z DATE: 8/26/2020if C g 0 50 100 150 PROJECT: 18-140 c d Plan Scale: 1" = 50' SHEET NO. J 0 W a U - 7" y y y y y y y y y y W y y y y y y 4 g y y y y y y y y y y 23, M A C HNC I N - SEE S' E ET'P P 3 155' y y 105' y y y y y y y y y 23' 20' 20' 23' y 23' 20' 20' 23' y y y y y y y y y y y y W y y y y y y y y y y y y y y y y y y y y y y y y - BLOCK 8 � y y y y y y y y y y y y y 23 20 23' y y y y y y y y 67° 67' 67' O y0 y y y y y y y y y y y y y y y y y y y 1 1 5' I 11 y y y y y y y y y y y y y y y SO.00' y y , ' 135' 50' 40 40' 40 40' 50 54 137' y 0 0 y y y y y y y y y y y y 23 20 20 23' y y 1 y 12 O y y y y y y y O O O O y O O y y y y y 0 O O O O y 0 O 0 00 00 y y y Q y OLO y O F > y 5 6 29 30 31 y 32� y O o � >� y y W LO y y y y y y y y 28 O O O y O 33 34 y y ,-- y y Q y 35 36� o o O o 0 43 64 O O O o 60 0 59 0 58 y y y y y y y y y y y y y 0 y o 63 0 62 0 61 `n in in 25 112' y y W y y y y y y y y y y y O 37 38 y y y O y y y y y y y y y y 18' 20' 23' 14' 6' y O y y � ,, y y y y y p[ mod. 39 40 41 42 0 55 0 21' g y y y y y y y 24'/2' 17' 20' 2O' Z y y ��•1 vt� /, y y y y y y y 23' 19' 16' 8' 21' y y z \`1 6 �� 38 40 40' 40' 40' 50' 2p' > , / h 14 y y y y y y y 23' 20' 23 4' 14' y y � c1'� M/a M/a �4,3' 1 12' a o y y y y y y a`L y 23 20 20' 23 14' 9' //23' "0 o y y y u 20' 20' 23' 2' 24 � 0 54 0 �h 97' 1' 0 1' 2 1p� 14, / o W. LOST RAPIDS ST. o 14 _ 00 26 _ y y y 1 1 231 , / // O 00 N O y y 4 y 20 20,�4, 2 3 LV BLOCK 8 2 I 12p 4' ^� y y y O O O O O y y y y y y 4 M/a M/a M/a /a�M a M/ M/a 18' 96 o 0 0 o O i^ , <,, 53 0 �I� N 25 N y y y 0 0 0 o y y y �� 28' 40 40 40' 40 40 26 18' 24' r, O 5 8' 96' y y 54 55 56 57 y y L �n y y yyy 3 O N 24 N o y 58 59 60 y o o y a0 y i�F �� y y \ 1 12' O 116 y y O y 0 0 0 y m y 0 47 I 0 y > > > y 61 62 y 0 y y y 0 52 0 0 96' y y 23 20 20 23' y 63 y y y r i y 29 0 28 0 27 -ID 26 -(D.) 25 _0 24 cO 23 o y 3� N 23 N 68 y y y y y y y y 23' 20 23 y y 64 65 66 67 y y oo O 0 O o \ \ \ 96' y y y y y y y y y y y y y y 23' 20' 23' y y y y d' 1 1 2' 47.00' I\ 22 �\ y y y y y W y y y y y y y y y y y 1 1 6' O N N y y y y y y y y y y y y y y y y y y y y 23' 20' 20' 23' 0 51 0 J 0) 15 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y 3 a 96' 1' y y y y y y y y y y y y y y y y y y y y y y y y y y y y 41' 40' 40' 40' 40' 40' 42' y \ \ 0 z Y N N y y y y y y y y y y y y y y y y y y y y y y y y y y y 22 (� 1 12 I _ ' y , y y y y y y y y y y y y y y y Zly yO 16 0 30 50 0 O O 116 `n 96 0 y 37 38' 37' 37' y y y y y y y y y 47 y y y y y 2O Q 31n 0 N T y y y y y y y y y y ^� y y � y 25' BLOCK 14 y of m �� z 96' y y 38' y y y y y y 44 y 100' 112' y y y y y y y y y y y y y I o N 19 N y °° 53 °° 52 a0 51 °0 50 a, y y y y y y y y O 0 18 19 20 21 0 o O 0 y y °° ao ao 00 00 y 49 y 3 y y y y y <v� y 15 y 49 119' 16 96' a Q. N 18 y y y `b 48 ;� y y y 108 17 y 92' d y y A y y y y y 112 ib 7' 0 6, y 17 N�' 9' 37' 38' 37' 18' 19' 48 0 m/ � M�a M/a M/a M/a m/a M/a38 y 46 y y y�� y y ,� `� No+ , 3 81 w y y y 14 w 40 R w0 R w 8 M%38 � y y / / 14> 112' 0 O � W. WILDFIRE DR. 1 45 y y y 20' y y y y y y I 5' �1i y o y o 24' 10' oN y y y 47 y y oN 25' 36. o 113, / W. WILDFIRE ST. 112 �M/ay y M a M/a nn/N MAJ M/ M/a M/A M/21 t1 y y N M�� y y y y y 50' 50' 50' 50' 45' 65 Mi ��\ y y y 13 �r� M/a M�a 7 M/a 14' 0 46 0 y y y y y 32 142 112' y y y 107' � A y y y y y y y 1 3' � ` y y y y y y y '��V y O MVO y y y y I /y y y y y y y y BLOCK 9 8 y3 y y y o O 112' 17 , LO y y y 0 0 0 0 O 0 0 ��Q/'� 12 y y y y 6 M� 0 45 0 7 1 1 1' � O y y y y y y y y y 1 O y / ��, �Vy� y y y y y y y y y y y y y y y p y y �\ \�.I• y y y y 0 O 1 1 2' 1� y y y y y y y y y O 44 0 y y QCO y y y y y y I 1 1 y y y y y y y y y y 50' 50' 50' 50' 50' / y y y y y y y y y y y y �3; y � y y y y y � I1 1 2' y y y y y y y y y y y y y y y y y y y y y y y y y y y y y ^� y y 72' �`r �� y y y y y y y3�' 0 15 0� 112' 4' \ y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y \� y y y y O 1O y y y y y y y �Y 0 43 0 y y y y y y y y y y y y y y y y y y y y y y y A y W�\� y � � y y y y y w 1 1 1' z1 1 0' y y y y y y y y y y y y y y y y y y y y y y y S y y y , �� y y y y y y y 47.00'—� y y y y y y y y y y y y y y y y y y y y y y y y y y y P \ y ^ 72 O y y y y y y y y y y y y y y y y y y y y y y y y y y y 4�`� 112' I O A Y 00 40 0 y y y y y y y y y y y y y y y y y y y y y y y y y y �\� r 0 14 0 Y U y y y y y y y y y y y y y y y y �V y y '� y y y y y y y y 3 0 it'1 Q I ca / _\-J� �\ y y 7 \ \� y y y y y y y y 1 1 1' Y L m y y y y y y y y y y y y y y y y y y y y y y y y y y �l z � y y y y y y y y y 1 1 0' y y y y y y y y y y y y y y y y y y y y y y y y y \� \ y y p Vw y y y y y y y y y 3 , 1 '— � 7 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y O �\ Q� y y y y y y y BLOCK 13 y y y y y y y 13 0 1 12 111' 7 >> 00, �\ y y y y y W y y y y 30 41 0 �_� ., 1111111111111 1111111111111 1111111111111 1111111111111 1111111111111 111111111/ 111111111/ 111111111/ 111111111/ 111111111/ �y y y y y J y y y y y y y y y y y y y 7, C\L y y y y y y y y y y y y y y y y y y y y -'a y � O � y y y y y y W y y y y MATCH LINE - SEE SHEET PP2. 1 y y y y y y W y y y y y y y �� � y (���` ' V -D y y y y y y y y y y y O Y j y 7J �� y y y y y y y y y y y 12 0 112 � 3- y y y y y W y y y y y y 00, y 7' y y y y y y y y y y y y O y y �O 1 1 1' W 40 0 y y y y y y y y y y y LAYOUT PLAN , W y y y y y y y y y y y y y y y y y y y y y z �J, C y y y y w y y y y w w y w O � z ?�.. O 50 100 150 , y y y y y yyy//////✓✓✓ �V y O ��\ y y y y y y y y y y y y Y0 39 0 Nory y y y y y �\ y ' y y y y y y y y y y y y 1 1 1' Q II 1 y y y y ,/ V y O y y y y y y y y y y y 3 Plan/Profile Scale: 1 = 50 �. 1 \ Ln y y y � � O y y y y y y y y . y y y Q' z > y .�`\ 0 3 1 1 2 y y y y y y y y O y 0 38 J/ y �O O � 7' y O 10' 78' y y y y y y y 2p' �£ , 14 6 �� 40' y y N 0 112' y cv >>, 50' O � O 0 O 37 0 111' ,GL 14 � y O N 0 15 36 \R 112 z s /w 4g Lo O O� R O O 14' �' �11 /W 4pR/w Ln O �� 35 PROPOSED TO POTENTIALLY 23 DEVELOP AS ZERO LOT LINE / LOTS. THESE LOTS WILL BE U W �R/w 112' DETERMINED UPON FINAL PLAT 24 8' 28 R/w W 1 LDF1 RE OR. o R/W 8=R/WK�� o SUBMITTAL. M y �� 12' R/w b 34 Ap, 40, Riw �, o 10' 40' R,, y` y y y 124y y y y PRESCOTT RIDGE SUBDIVISION z 4p MERIDIAN IDAHO 25 R w _b 5p, /w_ y y y y y y y y y y I Sp' R/W R/W� ly y y y y y y y y y y LAYOUT PLAN U N 26 50' y y y y y y y y y y '-1 27 N 10, y y y y y y y y y y y O 6�1, 28 N y y y y y y y y y y lJJ 29 <v y y y y BLOCK 12 y y y S�pNAL F 0 y y y 33 y y y y � y y y y y y y y y y y1199 z O 4p' 32 y y y y y y y y y y d 4p, f y y y y y y y y y y y J1�11/20/20 'h 0, y y y y y y y y y y E G I E E R I G 50' �ql F OF \O��� 9233 WEST STATE B0 SE,IDAHO 83 14STREET y y y y y y y y y y T yE W S. O Q PHONE(208)639-6939 a 50' y y y y y y y y �I� �p kmengllp.com z z y y y y y y y y _91 y y y y y y y DATE: 8/26/2020 S Qy y y y y y y 0 PROJECT: 18 -140 y/ SHEET NO. W .�� Sp' PP2.2 � 1 1 1 1 om 1 1 Q uj Z 1 1 ``' _ Z J 1 1 J EP EP EP EP EP EP EP EP EP EP W. CHINDEN BLVD. (HWY 20/26) EP EP EP EP EP EP r 1 T 1 EP EP EP ^Fp i d3 d� 3� d —d3 d3 d3 d3 d3 d3 1 rn W a 1 Q I w a rn I Q w rn 1 m d 1 w m ui W a m ui 1 w W 1 a w 866 104 Q m M W ' 60' o W 7' I \ 12 W W/1 Z 000 Z Jco Lo Lo �I I � I I I I I I \ I I \ \ o I I \ I 12' I I I BLOCK 8 I 00 I I I I I I I I I I I I Im rl' � 8 � 724' � I I I I I 454' 1Trl- 1 MATCH LINE — SEE SHEET PP2.4 MAJ MAJ MAJ M/a M/b me/j M/ nb/N /a m/a W 72' 6'/ 89' 89' 67' 72' y y W W � 80 r- r- 81 74 o OA W W W 72 89' O W E` E) E) PROPOSED TO POTENTIALLY y 89 0 72 DEVELOP AS ZERO LOT LINE LOTS. THESE LOTS WILL BE U DETERMINED UPON FINAL PLAT a I W 78 66 77 00 76 00 � 73 i SUBMITTAL. N y rn = c~n V Y ;`� W PRESCOTT RIDGE SUBDIVISION z a , Q 72' 89' 88, r i MERIDIAN, IDAHO O 72' z U 1:13120, M LAYOUT PLAN 3 co N z 00 O 20' co S\pNAL EN a W N �S G� 0 72 r7'I R tiF�� O 115' 67' 67' 67' 62' Lo m 4 z g W W 1 lcm 11/20/20 � ENGINEERING \ W 67 68 69 70 EWF \ � 9233 60 SE,ST STATE ET DAHO 83 14 O O O 06 PHONE(208)639-6939 Q . . . . S. daa �. � � � �. �. �. �. � � � �. �. �. .� � � , Z, � kmengllp.com z — W DATE: 020 ifMATCH LINE - SEE SHEET P P 2.2 W 1 15' 67' 67' 135' PROJECT: 8/21821140 SHEET NO. s W a 1,616' e e e e o e o e o e o e o 0 0 0 0 0 0 1 ui 1 Y 1 Y ° 1 ° 1 y 1 Y ° 1 ° 1 1 Y 1 ° ° 1 1 Y 1 Y 1 y 1 Y ° 1 ° IM 1 N la o a W 1 = ° BLOCK 12 ° IW IW 1 W Iz IJ 1 c� 0 Q 1 � 1 ' 1 Y ° 1 1 y 1 Y ° ° 1 1 1 Y ° 1 ° 1 1 R/W R/W 74 71 67' 145' 55' 40' 40' 40' 40' 40' 40' 40' 40' 20; 40' 40' 40' 40' 40' 40' 40' 4EM 0' 40' 40' 40' 40' 40' 69' O. 1 ME ME MMM1MMMMM mmmmmmmmm MATCH LINE — SEE SHEET P132.3 1 u 1 z PROPOSED TO POTENTIALLY O DEVELOP AS ZERO LOT LINE LOTS. THESE LOTS WILL BE U V DETERMINED UPON FINAL PLAT Z) a 1 N a 1 PRESCOTT RIDGE SUBDIVISION z 0 MERIDIAN, IDAHO O Y LAYOUT PLAN 1 O o S�pNAL fN LL 1 Ln Q� O �� O o 1 z g 1 Y 11/20/20 E N G I N E E R I N G a �,9 qTF OF �QP C�Q` 9233 WEST STATE STREET L BOISE,IDAHO 83714 l L TyEW S. Q PHONE(208)639-6939 7 kmengllp.com z LAYOUT PLAN DATE: 8/2 18-140 g PROJECT: 18-140 c a a 0 50 100 150 SHEET NO. J s W Plan Scale: 1" =50' P P 2.4 a w w y y y y S / y y W W y y e y r y y 7 y y y / y d d y y W y y y y y S y y y O 10 / yyy 8 11 ' y y O 12 W W S y0y y y y y I 1 y y BLOCK 1 W 15 y y y O M — M MGM 17 y y y / W w y y 19 y y l 1 y sue\ � M_ 's 21 �' S\\ 7247,, SSMSSSw ' M_M 27 y y w w � y y y y y y r. •.r s s S_S y y O y y y y y 2 S — _M 29 y y S y y y y y y O W FI y y y y y y s_ RELI E DR., N S• "S y y y y y y y y y y y y O •_ S _M • y y y y/ W 3 n y y y y y 4 S_S wW W W W W y y y y w O S_S _ M_ y y � yyyyy O Zti ss M41 � y � — W. STURGILL PEAK ST. y yy y O Sys M�f S__ y y S_S S •S .1• N y y y y y y y y w w y y y y y y y y y y 11 S S_S y y y y 1 y y y y y y y 12 y w 7 y y y y y y y y y y y Q y y y y y BLOCK 3 y W y H y y y y y y O y y y y y y y 22 y y O S y y y y y 22 21 S' .S O y y y y y y y y N y y s y y y y y 20 y y } Z y y y y y 13 W O y y y y y y • y w w y S y y y y y y 18 S O y y y y y y y y y y w w y y y y y 177 y U) g w y y y 1" y y y y y y y 1G ' y y y y y y 1 y y y y 21 V � 's y y y y y y 15 y y y y y y y y y W w Cl- y y I M M M M M M M y � _ J• y y y y y y y y y y s — W. PARACHUTE DR. y M Oy y BLOCK 4 s s s s s s s s© — M r s_s _ M_M 1 11 BLOCK 2 20 1 M N y y y 12 y sus M_ • • s s y a MGM 13 a d � y y � y S •. _M 14 y y O � y _S� _ _M O 15 16 17 y M y y y S_S I_ �M :r W 19 ' y y 1 uj 2 3 4 5 6 7 BLOCK 5 ' '> �M _s _M � s w y y 6 I y X X O N _S M_M ' N w y O X X X X X X y _S y y y w w y X M_M 1 S y y y y y y y W W w w O 10 w w S_ M M• . i. M M M M y y s � ' _• S �M M M 3 S S S S S S S S S S ' CONCEPTUAL ENGINEERING PLAN O M s "1 _ ' �" 1' 'S W x �� 0 50 100 150 y y y y y y y y y y y S 3 Plan Scale: 1" = 50' y y y y y y y y y y LEGEND x 11 O y y y y y y y y y y y PROPOSED IMPROVEMENTS EXISTING FEATURES O y y y y y y y y y y 3 O 10 y y y y y y y y y y y 1 V BOUNDARY LINE s s s SEWER LINE s s s SANITARY SEWER LINE 3 O 11 y y y y y y y y y 13 14 x OFFSITE BOUNDARY LINE w w WATER LINE w w WATER LINE y y y y y y y y y y Q PROPOSED LOT LINE S SEWER MANHOLE G G G GAS LINE 12 y y y y y y y y O w y y BLOCK 6 y y y y y y ' PROPOSED TO POTENTIALLY 2645 PROPOSED CONTOUR —OP—OP— OVERHEAD POWER LINE y y y y y y y y y y y DEVELOP AS ZERO LOT LINE " N of S � y y W y y y y y W y LOTS. THESE LOTS WILL BE Gi Gi GRAVITY IRRIGATION LINE N 3 y y y y 12 y y y y DETERMINED UPON FINAL O PLAT SUBMITTAL. O SEWER MANHOLE I y y y y y y y y y y 0 Wv FOUND 1/2 INCH REBAR WATER VALVE x 13 I y y y y y y y y y y y w w y y y y w w w y FOUND 5/8 INCH REBAR ® WATER METER 3 r y y y y y y y y y y z SPIKE � FIRE HYDRANT x 33 32 31 30 29 y y y y y y y y y y 28 27 y y y y y y y y y y POWER POLE V14 l y y y y y y y y y y v N m POWER BOX x ,, I •L •L y y y y y y y y ' d EP EP EDGE OF PAVEMENT y y y y y y y y y y y y y y y y y W y Or EG EG EDGE OF GRAVEL y y y 15 y y y y y y 6 y y y y y y y y y y y y y y y y y y y y y PRESCOTT RIDGE SUBDIVISION z 0 x M r•• •M M .s U1 ; e e 'r p s. r i . r O PRELIMINARY ENGINEERING NOTES M M M M M M M M M M M M M M M M M M M M M M MERIDIAN, IDAHO 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS — — — — — — — — — U WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER x 5 s s s s s s s s s s s s s s s s s s s s s u s s ENGINEERING PLAN w3 r, o MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) r s 1 O M f s' r �—• r. t �s e e 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY J S�pNAL f LL WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. x FF O Z 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED Lu 3 2 Z DURING FINAL DESIGN. y r v Q z 19 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE x y z i w 11/20/20 WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN O1 O O3 O O 6 Lu 0 3 1 O O O O s�qT Pao E N G I N E E R I N G REQUIREMENTS. N �ql F OF �� 9233 WEST STATE STREET TyEw S Q BOISE,IDAHO83714 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL y Z PHONE(208)639 6939 Z DESIGN. x EXISTING f CONNECT TO EXISTING BLOCK 7 NE(20kmeng 1p.com z 77 )7 SANITARY y 3 .1 y WATER MAIN 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE SEWER N DATE: 8/26/2020 if STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE INV:25XX.XX y Digitally signed by Matthew IRRIGATION. e S. Derr, PE PROJECT: 18 140 SHEET NO. J 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINED Date:2020.1 1.20 09:27:48 W DURING FINAL DESIGN. _ _ -07 00 P P 3.0 MATCH LINE - SEE SHEET PP3.2 LEGEND \ w w w w y y y y s I y y y y BOUNDARY LINE y y y y OFFSITE BOUNDARY LINE y y y y y y y y y y y y y y y y y y y y y y y y PROPOSED LOT LINE 1 \ y y y y y y y y y y y y PROPOSED TO POTENTIALLY DEVELOP AS ZERO LOT LINE y y y y y e y y y y y y y y y y LOTS. THESE LOTS WILL BE DETERMINED UPON FINAL , PLAT SUBMITTAL. N ? O BLOCK 8 y y 5 y y y y y y y y y y y y y y , O FOUND 1/2 INCH REBAR FOUND 5/8 INCH REBAR t Z r � ,✓/ y y y y y y y y y y y y y � ' 27 N y /s• W` r y y y y y y y y y y y y y y ® SPIKE v� / M/M y y y y y y y y y y y y y t y y y y y y y y y y y y y y y y 26 �^ y M� / 37 y y y y y y y y y y y y y y y y y �, '• C PROPOSED IMPROVEMENTS 5 s y y y y y y y y y y y y y y y y y ,' lye S S S SEWER LINE ' y N \ s N\ //S ? M W W WATER LINE BLOCK 2 ti / M DP`/ n`A1K s / P , �S SEWER MANHOLE // S� r , 2645 PROPOSED CONTOUR P� • . /s j y y y y y y y y y � y y y y y y /• VO t y y y y y y y y y y y y y y y t �/`-. t / � s � 35 y y y y y y y y y y y y y y y y y .\-1 y/ •y y y ' M •' s,. 5/ t" y y y y y y y y y y y y y y y y y r / •t''/ y y EXISTING FEATURES / � 34 y y y y y y y y y y y y y y y y y �W t" �• V L y/ y y s s s SANITARY SEWER LINE W W WATER LINE S r . c c c GAS LINE / y y y y y 31 y y y y y y y y y y y y y y y y y y y y y y/, `` r / / / •� —op—op— OVERHEAD POWER LINE • y y y y y y y y y y y y y y y y y y y y y y y y y y 1 /. y y y 29 y y 30 y y y y y y y y y y y y y y y y y y y y y y / •1 %/ GI Gl GRAVITY IRRIGATION LINE y y y y y y y y y y y y y y y y y y yL y y y y y y / •'t W / t' y `� / / y' •/ 13 / , OS SEWER MANHOLE y y y J• y y y y y y y y y y y y y y y y y y y y y y y r �'• i• y wV WATER VALVE X•• / y y y y y y y y y y y y y y y y y y y y y y y y y y �/" //y//y t' / t y M J• y y y y y y y y y y y y y y y y y y y y y y y �// y y r w w w w w w w w w w w w w y y y y y y y y t r W /w / WATER METER • / t E 1 / y y y y y y y y y y y y y y y y y y / � •� FIRE HYDRANT POWER 1 y y y y y y y y y y y y y y y y y 1' ( `✓ POWER BOX E � , m IBLOCK 9 16 y y y y y y y y y y y y y y / ' � :t •/ � 20 EP EP EDGE OF PAVEMENT EG EG 27 y y y y y y y y y y y y y .fi ty •/y /�// EDGE OF GRAVEL z w y y y y y y y y y y y y ✓� / y / r. PRELIMINARY ENGINEERING NOTES ' ! y y y y y y y y y y y y y y/ W •f r •t " y y y y y y y y y y y y y y y/ s e y '/y / \s 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS e t \ WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER Cr 19 y y y y y y y y y y y y y y y y y / / �•� 10 \ `L MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY O � � � y y y y y y y y y / '` � � \ • � WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. 8 ' p y y y y y y y y y y y y y y y y y// / :'y / 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED DURING FINAL DESIGN. / 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN 4 `Y', /y � 7 t REQUIREMENTS. 1 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL W 25 DESIGN. 1 W BLOCK 10 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE y O 5 � / y y STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE t. / N N I IRRIGATION. y y y y / .,ty/ O / 1� \• y y W 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINED tuj y y y / y / O y y y DURING FINAL DESIGN. r) � y y � ry•/y /' y y y y � O M 1 siLs s W• PARACHUTE DR. W s S /Y S S S-� M t t 't ,t z J• J• y 'I O y y y 5Ir- y ` / r. / �'J y y y LL - 10 0 J ' y/S •/ y y y y y y y r y / / �G/ 5 y y y y y y y N r z V t• ' t t. BLOCK 11 1 � � y/ 15 16 17 � 1 t y /•S r• ly O / � y y y y y y y y y y ir s 11 / r 13 y y y y y y y y y y y y y y y y y y y Co � 15 y y y y y y y y y y y y < r 3 y y y y y y y J• y y y y � y 3 y y y y y y y y y y y 1 t y l 3 •y I co y 1 r •. 21 •r � 10 yl • t � t / y � s w � S y ' 26 25 24 3 O1 O2 O3 O 5 6 14 y O O y ' O z � r• (n 22 � Og y I � y• I y � S y 5 y y y y y y y y y y s t M M M m MIN •r M M M M M M--� M M M M M M M M M M N M M M M M M M M M M M M 13 W. SMOKEJUMPER ST. — — — — — — — — W. SMOKEJUMPER ST. z s s s s s s s s s S s s s s s s� s s s s s s O r, 'r t s t .. t, ,r. r• m y : 3 10 U a Ln N r j• a y ' s I- y 3 Q w PRESCOTT RIDGE SUBDIVISION z o O O 10 11 12 13 14 30 15 Q 3 1� O O O O O 7 5 MERIDIAN, IDAHO ° ENGINEERING PLAN U w U y N O y � I a I: r R Nc/y`�' ~ Z � y y w - z Amok z w — 11/20/20 �' � ENGINEERING OF �QP�� 9233 WEST STATE STREET lTF1EW S•�� BOISE,IDAHO 83714 z PHONE(208)639-6939 CONCEPTUAL ENGINEERING PLAN kmengllp.com z DATE: 8/26/2020 C g 0 50 100 150 PROJECT: 18-140 c d Plan Scale: 1" =50- SHEET NO. J 0 W a _ w• y y y y y y y y y y y y y y y y y y y y y y y y y 3 `� yyyyyyyy y y y y y y y y y y y y y y MATCH LINE — SEE SHEET PP3.3 y y '• y y y y y y y y y y y y y y y y y 11 y, y y y y y y y y y y y y y y y y y y 65 y•r. y y y y y y y y y y y y y 12 s y y y y 27 y y y 29 30 31 y 32 33 35 y y y Q 3 y 13 y y y y y y y y y y y y 43 56 'yr y y y y y y y y .,y y y 36 37 38 y Y y y y y y y y y y y y y y f N O 3 64 63 62 61 60 59 58 •y y y y y y y y y r y • y y y 39 40 41 42 y I U Iw O O O O O O y '• y y y y y y y y ° b y ° y y y ~ I b Ln y y y t°. r y y y y y y y y M M O •� y y y y y y y s. y ° ° y I , y y y y y y y r p JA 57 54 3 y W. LOST RAPIDS ST. w w O ,� 14 26 5 y w y ' • 5 — — — — — — h y y + q y $ $ S S S S $ $ $ S \ ?J $ O e t r 25 �' y 54 55 56 57 y 58 59 y y y • • � y y I 3 a 53 ( O O O 60 O i y y y y I I N •r, y 3 r '.3 24 r y 63 y y l I 3 I y O � � y y 64 65 66 67 y Iy .. 52 O y y y y I I 29 28 27 O O O � r • 23 68 y • y y y y y y y y y y I 26 25 24 23 y S•}� (n y y y y y ' . � � r• . 22 .`• y y y y y y y y y y y y y y y � Iy � . y y y y y y y y y y y y y y y y y y y y y I I y I y 51 15 y y y y y y y y y y y y y y y y y y y y y y y y y y I 5 ly Cn • } y y y y y y y y y y y y y y y y y y y y y y y y y y l 3 y y t N Z L r y y y y y y y y y y y y y y y y y y y y y y y y yl I yl 22 y y y y y y y y y y y y y y I r" y l y N 8 N r O � U m 44 y y y y y y y y y r z r• O y y y y y y y y y y 'W 'y y � 5 I 19 y y 53 52 51 50 y y 49 y y yyyyyyyy y w a r y ! f �.• y y � y/ y 17Am 14 r r�/ / r• .. r a• 17 W � �i •d M M M M M M M M M t s l OJ)\ M —$ — — —W. WILDFIRE DR. — — \ 45 y // / w w w w w r y y y 47 � r s s s S s s s s s sS \ y y y/ — W. WILDFIRE ST.— — r y y y y y y y.y •y S y / / � S S S $ $ 5 y y y y y �•• s y /y y/ BLOCK I4 � 1 r ! y y y y y \ y y• y y y y y y y y y 46 r r \A' "'/ r y y y y y y \S '% y y y y y y y \ y y y y 17 r• � � y y y y y y y y y O O \ y � y y y y e Oy y y y y y y y y y y y y y y y y y y y y y y QI y y y y y y y y y y �/. � / I r•• 3 y y y y y O N y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y /y I / r y y y y y y 15 F—�cr_ r 10 y y y y y y y z y y r y y y y y y y O / J / CO � '' BLOCK 12 �..� Vy y y BLOCK 9 y y y y y y y O m �C O U7 y y y y y y y y y y y y y y y y y y y y y y y/ `_ � •/y O } y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y/ ,�' •,y � O• � y y y y y y y y y r y y y y y y y y y y y y y y y y y y y y y IIIIIII� IIIIIIIIII. .. IIIIIIIIIIIIIIIIIF IIIIIIIIIII, IIIIIIIIIII, 1111111111111 1111111111111 1111111111111 1111111111111 1111111111111 �y yIII - y y y y . . . . . . . . . j/ •�/ r• •� / L41 \? � y y - - O y y y y y y y y y y y y y y y y y /y r O � •�/ O 1 'r y y y y y y y y y "r — y y y y y y y y y y y y /S � r � O r y y y y y y y y y y MATCH LINE SEE SHEET PP3. 1 y y y y y y y y y y y y /•O y r O y y y y y y y y y y y 12 y y y y y y y y y y r / Oy// I � y y y y y y y y y y y O J. 40 y y y y y y y y ��• O y 6 y y y y y y y y y y y y r $ O CONCEPTUAL ENGINEERING PLAN y y y y y y y O O I O, Oy y y y y y y y y y y y / Y / / Q 0 50 100 150 y y y y y y y y °/'•O y y y y y y y y y y �, w y y y y y y/• O // y y y y y y y y y y BLOCK 13 z y y y y y y y y y y y y y y y y y y 11 J Plan/Profile Scale: 1 = 50 //' / � � O O O O LEGEND , y y y y 5 y y y y y y y y y y y U + 39 y y y y O y/ y y y y y y y y y y y y Q 1• •�/ V) `G 1 BOUNDARY LINE y/ 4 O y y y y y y y y y y O 10 OFFSITE BOUNDARY LINE r 38 • /y f" � y O y y y y y y y PROPOSED LOT LINE O O �//� � y 3 / y y y y y •r PROPOSED TO POTENTIALLY �' y y y DEVELOP AS ZERO LOT LINE LOTS. THESE LOTS WILL BE \ 3 DETERMINED UPON FINAL PLAT SUBMITTAL. /?i ���\ y \ 4 , cy \ / s O FOUND 1 2 INCH REBAR / o O FOUND 5/8 INCH REBAR , , s.T ,� O' � �P � \ .. s '• O O r 36 ® SPIKE PROPOSED IMPROVEMENTS s ��P z r s 0o s s s SEWER LINE y O'er , \ M r 7 35 w w WATER LINE v M V OS SEWER MANHOLE LOTS 9-18,20-29,BLOCK 1,LOTS 27-37,39-51,53-61,63-69, A y \ S=��OF�RE �M / 2645 BLOCK 12,AND LOTS 2-16,18-21,23-29,BLOCK 14 ARE 24 'W ' s=R. PROPOSED CONTOUR PROPOSED TO POTENTIALLY DEVELOP AS ZERO LOT LINE �� W LOTS.THESE LOTS WILL BE DETERMINED UPON FINAL PLAT �� ��w ' S M P R ESCOTT RIDGE SUBDIVISION EXISTING FEATURES SUBMITTAL. O�;wr r s_ s e z $ $ $ SANITARY SEWER LINE PRELIMINARY ENGINEERING NOTES 25 _ _r R:�,. r. $_ -/ y y y yyyyyyyyyyy y S5 MERIDIAN IDAHO N _—R ! V, y�r .Jc "•yy •}y y y :y r ;y p °y y J' r w w WATER LINE 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS y y y y y y y y y y ENGINEERING PLAN v WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER 26 y y y y y y y y y y o c c c GAS LINE MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) 27 p y y y y y y y y y y y O 20 y y y y y y y y y y 0 op—op— OVERHEAD POWER LINE 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY 29 �pNAL E y y y y y y y y y y y WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. y y y y y y y y y y ASS G'j ci ci GRAVITY IRRIGATION LINE 30 y y y y y y y y y y F yFF Z 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED w O SEWER MANHOLE DURING FINAL DESIGN. 31 y y y y y 33 y y y y Z y y y y y y y y y y y z w wv 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE 32 y y y y y y y y y y 19 WATER VALVE 11/20/20 WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN y y y y y y y y y y y tp �� E N G I N E E R I N G ti ® WATER METER REQUIREMENTS. w �,9 F OF �� �� 9233 WEST STATE STREET a FIRE HYDRANT 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL y y y y y y y y y y lTyEW S. 0�' BOISE,IDAHO83714 PHONE(208)639-6939 Z DESIGN. kmengllp.com z y y y y y y y y POWER POLE 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE y y y y y y y a ® POWER BOX STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE y y y y y y y DATE: 8/26/2020 IRRIGATION. PROJECT: 18-140 a EP EP EDGE OF PAVEMENT y y y y SHEET NO. J 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINED y LJ..I Ec Ec EDGE OF GRAVEL DURING FINAL DESIGN. PP3.2 � W. CHIND IN BLVD. (HWY 20/26) —EP EP EP EP ��—EP EP EP EP EP EP EP EP EP EP d3 d3 d3� d3— P EP EP EP EP EP E ca 1 m W a A 1 W I Z 1 W I W m 1 � 1 W W J = 1ILr A1 m - - - W T a T TTT IC T 3 y TTTTTTTT T T T T T T aj T — — — — — — — — — — — IRR W cWn Fq � Fq G W 1• ��q Z = I � LEGEND ( BOUNDARY LINE I I: OFFSITE BOUNDARY LINE iI PROPOSED LOT LINE PROPOSED TO POTENTIAL DEVELOP AS ZERO LOT LI E LOTS. THESE LOTS WILL B 3 I DETERMINED UPON FINAL PLAT SUBMITTAL. ( O FOUND 1/2 INCH REBAR 3 I FOUND 5/8 INCH REBAR I ® SPIKE { PROPOSED IMPROVEMENTS s s s SEWER LINE —w—w— WATER LINE gp I QS SEWER MANHOLE I' 2645 PROPOSED CONTOUR BLOCK 8 G I J' EXISTING FEATURES s 3 ) s s s SANITARY SEWER LINE I' w w WATER LINE i G G G GAS LINE 3 I -op—op— OVERHEAD POWER LINE { GI GI GRAVITY IRRIGATION LINE I 3 I — — — — — _ O SEWER MANHOLE wv>11 WATER VALVE 3 { ® WATER METER ( I I FIRE HYDRANT { POWER POLE m POWER BOX EP EP EDGE OF PAVEMENT 13 EG EG EDGE OF GRAVEL PRELIMINARY ENGINEERING NOTES 3 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER M/a MA J / nn/ m/a MA J nn/a nn/a M /a /a m/a MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) �I 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY 3 WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. I I { s J J 80 81 75 74 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED DURING FINAL DESIGN. I 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE W WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN REQUIREMENTS. 79 N W 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL 3 W DESIGN. 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE 78 66 77 76 73 STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE 3 �I IRRIGATION. Y �I 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINE DURING FINAL DESIGN. I o u z WI I �, F- O w w z U N I . 5z s s s s 72 � a o N O �i PRESCOTT RIDGE SUBDIVISION z MERIDIAN, IDAHO U 3 67 68 69 70 71 ENGINEERING PLAN O O MATCH LINE — SEE SHEET PP3.2 M MME IME ME _ r S�pNAL F z QF° F� O z w 0� �� ENGINEERING �q�q F OF �QP�� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 PHONE(208)639-6939 kmengllp.com z DATE: 8/26/2020if C d PROJECT: 18-140 c 0 SHEET NO. W PP3.3 oc 47' RIGHT-OF-WAY 47' RIGHT-OF-WAY 2' 2' 2' 3' 5' SIDEWALK 16.5' TBC-CL 16.5' CL-TBC 5' SIDEWALK 5' SIDEWALK 16.5' TBC-CL 16.5' CL-TBC 10' SIDEWAL 3:1 MAX. SLOPE TO 3O MAX. EXISTING SLOPE TO EXISTING 2% 2% 2% 2% /\\ \/\/ \\%\/\\/ 1' LANDING, \\r \\\\\\\\ \ \\ \\ \\\\\\\\\\\\\\\\\\\\\\\\\\\ \ \\\\ \\ \\ \ \\\\ \\\\\�\\ 1' LANDING, TYP. TYP. /\// / / / / / / / // / /�� /i�/i� \//\//\//, 3" ROLLED CURB ASPHALT PAVEMENT 3" ROLLED CURB \// AND GUTTER, TYP. ASPHA/i�LT PAVEMENT 3/4"-MINUS CRUSHED AGGREGATE BASE AND GUTTER, TYP. 3/4"-MINUS CRUSHED AGGREGATE BASE 6" MINUS PIT-RUN SUBBASE 6" MINUS PIT-RUN SUBBASE TYPICAL LOCAL STREET SECTION LOCAL STREET SECTION (W. CHAINSAW ST./W. WILDFIRE DR.) SCALE: NTS SCALE: NTS 50' RIGHT-OF-WAY P/L P/L 3:1 MAX. 5' SIDEWALK 8' PLANTERS 18' TBC-CL 18' CL-TBC 8' PLANTER 10' SIDEWALK 25' SLOPE TO 3:1 MAX. EXISTING SLOPE TO 2%. 2%. EXISTING 2% 2% \ /\\�\\\\�\\\\\\ 1' LANDING, \ \\ \\ \\ \\\\\\\\\\\\\\\\\\\\\\\\\\\ \ \\\\ \\ \\ \\ \ \\\\\\\\\�\ \ / \ ATYP. 6" VERTICAL CURB ASPHALT PAVEMENT ASPHALT PAVEMENT AND GUTTER, TYP. "3 4 -MINUS CRUSHED AGGREGATE BASE / 3/4"-MINUS CRUSHED AGGREGATE BASE 6" MINUS PIT-RUN SUBBASE 6" MINUS PIT-RUN SUBBASE TYPICAL COLLECTOR STREET SECTION (N. RUSTIC OAK WAY) TYPICAL PRIVATE DRIVE SECTION SCALE: NTS SCALE: NTS 50' RIGHT-OF-WAY 0.5' 18' CL-TBC 8' PLANTER 5' SIDEWALK 3:1 MAX. SLOPE TO 2%• EXISTING EXISTING ASPHALT PAVEMENT \ /\\/�\ 1LANDING, 6" VERTICAL CURB ASPHALT PAVEMENT AND GUTTER, TYP. 3/4"-MINUS CRUSHED AGGREGATE BASE 6" MINUS PIT-RUN SUBBASE TYPICAL COLLECTOR STREET HALF SECTION (N. MCDERMOTT RD.) SCALE: NTS SSMH #A-2 (48-INC ) STA:1 29.84 OFF:0.00 SSMH A-1 (48-INCH) RIM:2 3.60 SSMH -4 (48-INCH) STA:O 50.00 OFF:0.00 STA:4+ 5.17 OFF:0.00 2530 RIM:2522.42 SUMP: 516.93 2530 SUMP:2517.51 SUMP-2 15.35 S 3MH #A-5 (48 INCH) INV OUT: 517.51 8" PVC INV 0 T:2516.93 8" PVC INV IN: 515.45 8" PVC S A:5+94.38 OFF .09R SSM #A-3 (48-IN H) INV IN: 515.45 8" PVC R M:2525.14 STA:1+83.84 OFF:0.0 RIM: 523.94 EXISTI G GROUND INV OU :2515.35 8" PVC S MOUT:2517. SUM :2516.61 I V OUT:2517.09 " PVC 2525 VINV I :2516.71 8" P C - - - - - _ _ _ 2525 2520 2520 0 of 8 PVC © 0.60 1.3 B%_ 29 of 8 PVC Cs� 0.40% 1 0 0{ 8 PVC 2 515 �5 _of 8' PVC @ 0.40% 2 515 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2512 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2512 O c N Lo 00 r O O O O 00 O 0) It r 0 O 00 N O) O N (o 0o O) O V) M N N p M 't 4 't 4 Lo ui (O t6 Lo N N N N to N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 z d SEWER ALIGNMENT A (STA 0+00 TO 6+50) O PROFILE SCALE a HORIZ: 1 " = 50' U N VERT: 1 " = 5' DC 0 a PRESCOTT RIDGE SUBDIVISION z O MERIDIAN, IDAHO O ENGINEERING DETAILS U O SS�pNAL E LL RF �tiF � Z Q O 19 4 z w 11/20/20 ENGINEERING OF �QP�� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 PHONE(208)639-6939 kmengllp.com z DATE: 8/26/2020 C d PROJECT: 18-140 c 0 SHEET NO. W PP .4 SSMH #13-1 48-INCH) SSMH #13-2 (48-I CH) STA:3+05.76 7:0.00 STA 6+37.41 OFF:0.00 RIM:2525.66 RIM: 526.36 SSMH #A-4 (4 -INCH) SUMP:2514.22 SU P:2512.56 2530 STA:4+75.17 OFF:0.00 2540 2540 SUMP:2515.35 INV OUT:2514. 2 8" PVC INV IN:2512.90 8" F>VC INV IN:2515.45 " PVC INV IN:2512.66 12" PVC SSMH #E-15 ( 8-INCH) INV IN:2515.45 " PVC EXISTINC GROUND INV OUT:2512.56 1 " PVC STA:21+32.64 C FF:0.00 RIM:2532.84 SS H #K-1 (48-I CH) INV OUT:2515.3 8" PVC - - - - - - - - - - - - - SUMP:2523.42 INV IN:2523.52 3" PVC ST H #K-4 48-1 C - - - - - - - - - - - - - - - - - 2525 - - -.- - - - - - - - - 2525 2535 INV IN:2523.52 " PVC00 RIM 2533.18 2535 INV IN:2523.52 " PVC EXISTING ROUND INV OUT:2526.91 8 PVC INV OUT:2523.4 8" PVC - - - - - - 2520 2520 2530 2530 2 515 255 of 8 2515 2525 4o f 8 PVC 9 2525 330 f 8 PVC ® 0. 0% 335' of 12" PVC ® 0.22 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 105' of 8" PVC 0 0.4 % EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2520 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 t t It It r� c0 00 0 0 0 c0 0 0 0o o �_ _ n N r� rD � � � � m N N N N _ co N 00 op 00 0000 0 r7 M 0�0 00 rn N N 0 L L 0 Ln vi 0 L6 0 ' u7 c0 c0 60 c0 c0 c6 I� N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N � � N M N rN N M N M N M N n N M r7 u7 LO V) 0 0 � M M � M r7 r7 d M � M � to N N N N N N N N � N LO N LO N � N 0 0 0 0 LO � n d) � N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 SEWER ALIGNMENT B (STA 0+00 TO 8+00) SEWER ALIGNMENT K (STA 0+00 TO 4+50) PROFILE SCALE PROFILE SCALE HORIZ: 1 " = 50' HORIZ: 1 " = 50' VERT: 1 " = 5' VERT: 1 " = 5' SSMH #B 3 (48-INCH) SSMH #B- (48-INCH) STA:9+70.63 OFF:0.00 STA:13+15 30 OFF:0.00 RIM:2 RIM:2527.5 SSMH #E-17 (48-INCH) 2513. SUMP:2514 26 SSMH #B-5 (48-INC ) 2530 INV IN:2513,50 12" PVC INV IN:251 .36 12" PVC STA:1 +79.58 OFF:0.00 2530 SSMH L-1 (4 -INCH) STA:25+20.69 OFF:0.00 # RIM:2532.70 INV OUT: 513.40 12" PV INV EXISTING GR UND SUMP: 516.17 2535 STA:0+50.00 0 F:O.00R SUMP:2525.19 2535 INV OUT:2514.26 12" PVC INV 0 T:2516.17 8" PVC INV IN:2525.2 8" PVC SUMP:2527.59 INV IN:2525.2 8" PVC - - - - - - - INV OUT:2527.5 8' PVC - - - - - - - - INV OUT:2525.19 8" PVC 2525 2525 EXISTING GROUND 2530 2530 1 2520 2520 55 of 8 PVC 1 489; 2525 I 2525 2515 265 of 8 P C @ 0.60% 2515 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 345' of 12" PVC @0.22% 2520 IF FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 335 of 12" PVC @ 0.22% 00 0) r- to r- 0) 04 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT ,Nh V) ro rM rN to n n M 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 N N N N N N N N N N N M r 0) (O 0 Cn 00 Cn 0 Cn M � (O In (O 00 N (O (O N rn 0 N M 00 0 0) rn � 0 0 0+00 0+50 1+00 1+50 2+00 2+50 3+00 r n n 00 n 00 C6 n n n N n N cq N N I� N IN N IN N IN N � ^ � cq � ^ � � LIDN N N N N � N N LO N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NINLO N N N N N N N N N N N N N N N N N SEWER ALIGNMENT L (STA 0+00 TO 2+50) 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SEWER ALIGNMENT B (STA 8+00 TO 16+50) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH #C-1 (4 -INCH) STA:0+50.00 OFF:0.00 RIM:2523.62 SUMP:2516.81 SSMH # -5 (48-INCH) 2530 INV OUT:2516.8 8" PVC 2TA-6 GO 2530 S MH #C-3 (48-INCH) RIM:2524 31 SSMH # -2 (48-INCH) STA:9+13.9 OFF:0.00 STA:1+2 .75 OFF:0.00 S A:2+42.95 OFF:0.00 SUMP:25 3.98 RIM:252 .57 RI :2523.62 INV IN:2 14.08 8" PVC S MP52515 83 SUMP:2516.27 S MP:2515.69 INV IN:2 14.08 8" PVC INV IN:2 16.37 8" PVC IN IN:2515.79 8" PVC INV OUT: 513.98 8" PVC INV OUT:25 5.83 8" PVC 2525 INV OUT: 516.27 8" PVC IN OUT:2515.69 PVC EXISTING GR UND 2525 z o 2520 2520 O U a N -12 0 of 8 PVC 0.407. 2 515 38 of-8 PVC 8 PVC ® 0.6 % 0 7 of 8" PVC @ 0.60% I 2515 PRESCOTT RIDGE SUBDIVISION z MERIDIAN, IDAHO U EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT ENGINEERING PROFILES 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2 S� AL E LL ON N (r (or � (o � o u °o 0 ao � ao 00 00 (.0 (.0 n I- (.00 Il n 00FO NC2 00 r Adlilk 'It Ki ro Kir7 Ki rj K pj Kirj Kir7 Kirj Kr LO N N N N N N CA N N ro Z N N N N N N N N N N N N N N N N N N N N N N N N N N N N �S FO f O Q w N L N � N N � N � N N 0 N 0 N 0 N � N � N N N L N L N L N 0 N 0 N 0 N N N N N N N N N N N N N N N N N N N N N 1199 z w 11/20/20 E N G I N E E R I N G -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 � TF OF \l) 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 z PHONE(208)639-6939 SEWER ALIGNMENT C (STA 0+00 TO 10+00) kmengllp.com z PROFILE SCALE DATE: 8/26/2020 if 2i HORIZ: 1 " = 50' PROJECT: 18-140 VERT: 1 " = 5' SHEET NO. J 0 W a 2535 2535 ir- S MH #D-4 (48 INCH) S A:1 1+44.91 OF :0.00 SSMH #D-1 48-INCH) SSMH D-2 (48-INCH SS H #D-3 (48-I CH) S A:7+44.91 OFF 0.00 R M:2529.89 STA:0+57.00 I DFF:0.01 R STA:1+ 7.26 OFF:0.00 ST :3+90.33 OFF:O 00 R M:2529.53 S MP:2514.44 RIM:2527.52 RIM:25 7.48 RI :2528.22 S MP:2512.75 SUMP:2512.5 SUMP:2 511.58 SU P:2511.01 INV IN:2512.85 8' PVC INV IN:2514.54 8' PVC 2530 INV IN:2512.6 8" PVC INV IN: 511.68 12" PV �INVIN:2511.35 8" PVC EXISTING GROUND INV OUT:2512.75 8" PVC INV OUT:2514.44 8" PVC 2530 _ _ _ _ _ _ INV U : 1 V - - - - - - - - - - - - - - - - - - - - - - - - INV OU :251 1.58 12" VC IN OUT:251 1.01 12" PVC - - _• - - - - - - - - - - � V - - - - - -•- - - - - - - - - - - - - -- - - - 2525 2525 2520 2520 2515 3 0 of 8 PVC 0.4 ° 2515 400 of 8 P 120 o 8 PVC Q 0.4 % 4 355 0 8 PVC @ 0.4 21 of 12" PVC 0.22% 4 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 5' of 8" PVC 0.40% FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2510 r- O) � � M M co co O N 00 O) co M M I� M M co O O N co co O O M co 00 00 O) O O O O 0) 00 co I� 00 co r+) N c0 I� 00 O cV co O O M LO r 00 O O 00 00 O I- cfl r- 00 I� 00 N 00 00 00 00 0) O) 0) O) O) 0) O O O 0) 0) 0) 0) 0) O) O) I� n r 00 00 00 0i 0) 0i Oi O Oi O O O 0i Oi O 0i 0) 0i 0i N N N N N N N N N N N N N N N N N N M �`) M N N N N N N N N N N N N N N N N N N N N N N N N N M LO M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 SEWER ALIGNMENT D (STA 0+00 TO 14+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' S MH #D-7 (48 INCH) S A:18+69.59 OF :0.00 RIM:2 30.96 SSMH D-8 (48-INCH SUM2535ssmii 21.59 21.40 STA:19 27.08 OFF:0.00 2535 STA:15 24.91 OFF:0.00 SSMH D-9 48-INCH I V IN:2521.40 8" PVC SUMP: 521.78 # ( ) RIM:252 .35 IN OUT:2521.40 8" PVC INV IN: 521.88 8" PVC ST :22+91.52 OFF 0.00 SUMP:2 16.06 RI :2530.66 INV IN: 516.16 8" PVC EXISTING GROUND INV OU :2521.78 8" P C S MP:2523.99 INV IN:2516.16 8" PVC - - - - - - - - - IN OUT:2523.99 " PVC 2530 INV OU :2516.06 8" PVC - - - - - - - - - - - - - - - - - - - - - - - - 2530 1� r 2525 2525 365 of 2 PVC ® 0.587- I 2520 2520 345 of 8 P C .52 ° 5' of 8" PVC 0.47% 380 of 8 PVC ® 0.4 % EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 00 00 O co t O 0 O co 0O co 00 00 rn O) 7 N N r7 N n N O O) 00 cD O) 6 0) 6 0) 6 00 00 0) 'i O O O p O O O 6 O 6 - 7 O O O O O O N N N N N N N N N N M LO n M M Ih � ) 17 p) to M M M M M M N') M ) M to N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 SEWER ALIGNMENT D (STA 14+00 TO 28+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' 2535 2535 2540 2540 STA:13+91.44 FF:0.00 SSMH #M-1 (48-INCH) RIM:2529.58 STA:3+08.43 OFF:0.00 SSMH #E-15 (48-INCH) SUMP:2519.93 vRM:2530.44 STA:21+32.6 OFF:0.00 INV IN:2520.03 " PVC MP:2521.5 RIM:2532.84 EXISTIN GROUND OUT:2521.58 8" PVC SUMP:SMH #N-3 (48 INCH) NV N25 35 8" PVC INV IN:2520.03 " PVC2530 INV OUT:2519.9 8" PVC _ _ _ _ _ _ - - - - 2530 2535 SSMHtN-2 (48-INCH TA:3+17.60 OF :325.49R INV IN:2523.5 8" PVC 2535 SSMH N-1 4 -INCH RIM:286 UMP:2523.94 INV OUT: 23.5 8 PVC # ( ) INV OUT:2523 42 8' PVC STA:??? OFF:?? ??? SUMP4.73 I V IN:2524.04 " PVC �iP z EXISTING GR UND ORIM:2530.64 INV IN24.83 8" PVC I V OUT:2523.94 8" PVCSUMP:2525.59 INV O2524.73 8" P C - - - - d - - - INV OUT:2525.5 8" PVC _ m 2525 2525 2530 - - - - - - - - - - - - - 2530 U a N u a o a 26 of 8 PVC ® 0.60% PRESCOTT RIDGE SUBDIVISION z 2520 2520 2525 125 of 8 PVC 0.60 ° 2525-v UlfMERIDIAN, IDAHO 0 0 Fvc ® 0.40 105 of 8 VC ® 0.40% I U ENGINEERING PROFILES EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT O 2 2515 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 2520 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 ON SL EN z Quo v F� O wED 00 r- 11) O N N N O O 00 O O� � 000 N 00 C) 00 0)�z O i O 0i m 6 O O O O O O O O O 0O O N N N N N N N N 04 M to M 1`0 M M � M n n 1`1 1`0 O 1 9 9 LO 20 1cm N N N N N N cq � � N CA 2O N N N N N N N NN NN N (V N N N N N N N ENGINEERING � OF �QP�� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 PHONE(208)639 6939 kmengllp.com z DATc_ / 020 d SEWER ALIGNMENT M (STA 0+00 TO 4+00) SEWER ALIGNMENT N (STA 0+00 TO 5+50) PROEECT: 8�21821140 G PROFILE SCALE J " = PROFILE SCALE VERT: 1 " = 5' HORIZ: 1 " 50' SHEET NP P3.G w HORIZ: 1 50' a VERT: 1 - 5 V 2535 2535 STA:1 +81.98 OFF:0.00 STA:12+62. 2 OFF:0.00 S MH #E-10 (48 INCH) SSMH #E- (48-INCH) SSMH #E-7 (48-INC ) RIM:2 +81. ST :12+62 S A:13+91.44 OF :0.00 SSMH #E-3 (48-INCH) SSMH #E 4 (48-INCH) SSMH #E-5 (48-INC ) STA:9+63.5 OFF:0.00 STA:1 +81.63 OFF:O. 0 R M:2529.58 SSMH #B-4 (4 -INCH) SMH #E-2 (48 INCH) STA:5+60.04 OFF:0.00 STA:7+9 .67 OFF:0.00 STA:9 05.90 OFF:0.0 R SUMP 2518.90 SUMP:2519 32 S MP:2519.93 STA:13+15.30 FF:0.00 SSMH #E-1 (4 -INCH) TA:3+96.51 OFF:0.00 RIM:2529.1 RIM:2 29.58 INV I :2519.00 8" P INV IN:251 .42 8" PVC RIM:2527.58 STA:2+99.74 OFF:0.00 IM:2527.45 RIM:2528.13 RIM:2528.34 RIM:2528. 0 SUMP:2517. 2 SUMP 2518.40 I IN:2520.03 8' PVC �INV OUT-95' 789 8" PVC INV I :2519.00 8" P INV OUT:2519.32 8" PVC I IN:2520.03 8' PVC SUMP:2515. UMP:2516.94 SUMP:2517. 97 INV IN:251 .92 8" PVC INV I :2518.50 8" PV INV 0 T:2518.90 8" VC SUMP:2514.26 RIM:2526.18 UMP:2515.22 INV IN:2516. 1 8" PVC EX STING GROUND INV IN:25 7.04 8" PVC INV I :2517.59 8" P C I OUT:2519.93 " PVC 2530 INV IN:2514.36 12" PVC SUMP:2514.90 INV IN:2514.59 " PVC INV IN:2515.00 12 PVC 114V OUT:2515.22 12" PVC 12 FVc INV OUT:2514.2 12" PVC INV OUT:2514.9 12" PVC INV OUT:251 .68 12" PVC - - - - - - - - - 2525 - - _ _ / 2525 1/ 1 2520 0of 8 PVc 0.40 2520 10 of 8 PVC @ 0.40% 0 1 f 8 PVC 0. 0 120 f 8 PVC ® 0 40% 115 of 8 FTC @ 0.407. I 235 of 8 PVC ® .40% 2515 22% 95' of 12" PVC © 0.22% 165' of 12" PVC (9 0.22% 60' f 8" PVC 0. 0% 2515 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 O 0o O � O N O) � O LO N 0) N 00 r- c0 It O 00 N (0 (0 00 c0 c0 N N 00 O r7 0) V) c0 0) N c0 00 O 00 I� c0 c0 0 Lq 00 O c0 '6 O N 00 O r'7 0) N n 0o oj O N c0 0o 0o 00 r c0 U I, r c0 6 LO c0 n ^ n 00 op o0 r 00 6 07 Dj 07 07 06 07 07 N Oi Di Oj ai Cn Di Cn Di Di 0) Cn O Oi Di Oj Di Oi N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N LO 0+25 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 SEWER ALIGNMENT E (STA 0+25 TO 15+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' 2540 2540 SSMH #E-15 (48-IN H) STA:2 +32.64 OFF:0.00 SS H #E-19 (48 INCH) SSMH #E-13 ( 8-INCH) RIM:2 532.84 SSMH # -16 (48-INCH) SSMH #E 17 (48-INCH) SSM #E-18 (48-I CH) S A:29+18.93 OF :0.00 STA:19+00.10 FF:0.00 SSMH E-14 (48-INCH) SUMP:2523.42 STA:23+ 2.17 OFF:0.00 STA:25+2 .69 OFF:0.00 ST :27+63.67 OFF: .00 RIM:2 33.64 RIM:2532.02 RIM:2532 70 RIM:253 .56 SUMP:2 28.94 STA:20 25.52 OFF:0.00 INV I :2523.52 8" P C RIM:2533.35 SSMH #E 12 (48-INCH) SUMP:2522.26 RIM:253 .72 INV I :2523.52 8" P C SUMP:25 4.50 SUMP:25 5.19 SUMP:252 3.26 INV OUT:2528.94 8' PVC 2535 SSMH E-11 8-INCH STA:17+7 .22 OFF:0.00 INV IN:2522.36 8" PVC SUMP:2 22.86 INV I :2523.52 8" P C EXISTING GROUND INV IN:2 24.60 8" PVC INV IN:25 5.29 8" PVC IN IN:2526.36 8" PVC 2535 STA:16+00.30 FF:0.00 RIM:2530. 7 INV IN: 522.96 8 PVC INV UT:2523.42 8" PVC INV OUT: 524.50 8" PVC RIM:2529.90 SUMP :25 1.64 INV OU :2522.86 8" PV INV OUT: 525.19 8" PVC SUMP:2520.87 INV IN-2' 1.74 8" PVC i� ��• _ _ - - - -'- - - - - - - - - -- - - - - - - INV IN:2520.97 8" PVC INV OUT: 521.64 8" PVC INV OUT:2520.8 8" PVC �. �.�� 2530 - - - - 2530 155 0 S Pvc ® 1.66q° 2525 P C ® 0.407- 245 of 8 PV © 0.40% 4 2525 of 10 240 of 8 PVC ® 0.41 125 6 PVC ® 0.40`0 of 8 PVC ® 0.42% 1 0 of 8 PVC 0.40% 1 0 of 8 PVC 0.40% EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 210 of PVC 0.40 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 c0 00 O r- c0 0) rM N 00 c0 O O 00 rM 00 N M 0) n 0) rn 0 N O O O O 00 N O 00 00 00 O N n N 0 O 00 0) N Ln Ln O O n c0 O O 6 O 00 N O I� n 00 0) O N N r7 N 0 c0 0) r7 0 LO c0 r- O O O O O O O O O O O O O O N N r7 M N N N N N N N N r7 r7 r7 r7 r7 r7 M rM N N N N N N N N N N M M M M r7 r7 r7 Ki Ki r7 r7 r7 N N N N N N M N r7 0 M r7 r7 r7 M r7 r7 �`) r7 r7 r7 r7 rM �`) r7 r7 r7 r7 r7 rM r7 rM n r7 r7 r7 M rM r7 LO LO LO 0 0 0 LO 0 � V) d) d) d) d L0 d) � r7 r7 � r7 r7 d) r7 d) r7 d) r7 0 r7 0 r7 u r7 0 r7 � r7 0 r7 r7 d d) r7 � r7 0 r7 � r7 N N N N N N N N N N N N N N N N N N N N N In N 0 N to N Ln N d) N d) N d) N d) N 0 N Ln N Ln N LO N Ln N CN N N N N N N N N N N N N N N N N N N N N N N N N N N 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 SEWER ALIGNMENT E (STA 15+00 TO 29+50) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH #E-3 (4 -INCH) SSMH #Q-1 (48-I CH) STA:5+60.04 OFF:0.00 STA 1+87.42 OFF:O. OR RIM:2528.13 RIM: 528.24 SSMH G-4 (48-INCH) SUMP:2515.68 SU IV P:2516.08 STA:64 46.99 OFF:0.00 2530 INV IN:2516.01 " PVC INV OUT:2516.08 1 " PVC 2530 2535 RIM:2530.04 2535 VIKR/ 1KI-I-) 7 R\lr- SSMH #P-1 (48-INC ) INV OUT:2515.6 12" PVC _ INV IN: 518.95 8" PVC - - - - - - - INV IN: 518.95 8" PVC STA:1 29.51 OFF:0.00 INV OUT: 518.85 8" PVC RIM:25 0.50 SUMP: 523.83 INV 0 T:2523.83 8" PVC EXISTING GROUND 2530 _ _ _ - - - - - - 2530 2525 1 2525 / EXISTING GRO ND z O d 2525 2525 2520 2520 U a N au o 0 135' of 12" PVC @ 0. 2% PRESCOTT RIDGE SUBDIVISION z 2520 2520 2515 2515 N MERIDIAN, IDAHO U ENGINEERING PROFILES a EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 0 2515 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 2510 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 sc j1AAL R NcyF LL Amok ao N N N N N N N M 19 4 � O s O r7 It (0 N r- 04 - r7 (0 Lc) O 00 V)O O Z O O " O Op 00 00 Na0r O N N N ZZI2OI2O pN L LO N L LO NN N N N N N N z J T � E N G I N E E R I N G � OF 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 0+00 0+50 1+00 1+50 2+00 0+00 0+50 1+00 1+50 2+00 2+50 PHONE(208)639-6939 kmengllp.com z DAT : 020 J SEWER ALIGNMENT P (STA 0+00 TO 2+00) SEWER ALIGNMENT Q (STA 0+00 TO 2+50) PROJECT: 8�21821140 PROFILE SCALE PROFILE SCALE J HORIZ: 1 " = 50' HORIZ: 1 " = 50' SHEET NO. w P P 3.7 VERT: 1 " = 5' VERT: 1 " = 5' 2535 2535 STA:1 +44.91 OFF:O. 0 SSMH F-4 (48-INCH) RIM:2 29.89 SSMH F-3 (48-INCH) STA:3+ 5.54 OFF:0.00 SUMP 2514.44 S MH #F-2 (48 INCH) RIM:252 .04 STA:2+ 5.32 OFF:0.00 INV I :2514.54 8" PVC SSMH #F-1 (4 -INCH) S A:1+44.46 OFF .00 RIM:252 7.65 SUMP:2 17.99 INV I :2514.54 8" PVC STA:0+50.00 OFF:0.00 R M:2526.99 SUMP:2 18.69 EXISTIN GROUND INV IN: 518.09 8" PVC INV 0 T:2514.44 8" VC 2530 RIM:2526.45 INV OU :2517.99 8" PV _ _ 2530 2540 SSM 1 #I-2 (48-IN H) 2540 INV OUT:2519.7 8" PVC INV UT:2 INV OUT:2519.12 8" PVC 9.22 8 PVC INV OU :2518.69 8" PV - _ - - - - - SSMH I-1 (48-INCH) RIM: 531.93 STA:O+ 0.00 OFF:0.00 SUMP:2525.86 SS H #H-5 (48-I CH) - - - - RIM:2531.90 INV IN:2525.96 8" FVC ST :10+24.79 OFF:0.00 - - _ - - - - - SUMP:2526.18 INV OUT:2525.86 8" PVC RIM:25 2.77 - - - - - - - - - INV OUT:2 26.18 8" PVC SSMH #1-3 ( 8-INCH) SUMP:25 4.43 2525 2525 2535 STA:1+55.06 FF:0.00 IN IN:2524.53 8" PVC 2535 SUMP:2525.49 INV UT:2524.43 8" PVC INV IN:2525.5 8" PVC INV OUT:2525. 9 8" PVC- EXISTING G OUND 2520 1 a r, 2520 2530 2530 07 0 of 8 PVC 0.407. 150 of 8 VC @ 0.407. 1 0 2515 2515 2525 1 °f s PVC o 2525 70' of 8" PVC Q 0.4 % L35' of 8" PVC ® 0.6 % EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2520 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 N O Inul I� O O M N 0) M 00 N N (0 O O O 0) O O I- n N 0 00 r (0 6 (0 (6 (0 (6 r, O 00 00 06 00 '6 0) 6 O Q N O Cn N Cn N N N N N N N N N N N N N N N N N N N N N N N N N N N N K) r7 r7 r7 r7 Ln P7 Ln r7 L M L M 0 M N N N (V N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 SEWER ALIGNMENT F (STA 0+00 TO 5+50) SEWER ALIGNMENT I (STA 0+00 TO 3+50) PROFILE SCALE PROFILE SCALE HORIZ: 1 " = 50' HORIZ: 1 " = 50' VERT: 1 " = 5' VERT: 1 " = 5' SS H #G-6 (48-I CH) SSMH #G 5 (48-INCH) SSMH #G-1 (48 INCH) ST :11+89.37 OFF:0.00 TA:1+47.01 OFF:0.00 STA:9+17. 1 OFF:0.00 RI :l 1+89. SSMH #G-7 (48-INC ) IM:2528.61 RIM:2529. 1 UMP:2516.51 SMH #G-4 (48 INCH) SUMP:252 .03 SU P:2523.53 STA:1 +54•RIM�5302.� 2535 TA:6+46.99 OFF:0.00 INV IN:252 .13 8" PVC IN IN:2523.64 8" PVC 2535 STA:15+24.91 FF:0.00 SSMH G-3 (48-INCHRIM 84 INV IN:252 .13 8" PVC \. I V OUT:2516.51 8" PVC STA:4+ 7.53 OFF:0.00 UMP:2518.85 / � � � INV OU :2524.63 8" PVC RIM:2529.35 SSMH #G-2 48-INCH) I qV IN:2518.95 " PVC INV OUT:2 20.03 8" PVC SUMP:2516.06 STA:2+08.08 OFF:0.00 RIM:25 9.89 INV IN:2516.16 " PVC RIM:2528.96 SUMP: 517.87 I V IN:2518.95 " PVC PVC SUMP:2516.9 INV IN: 517.97 8" PVC I V OUT:2518.85 8" PVC INV IN:2516.16 2530 INV OUT:2516.0 8" PVC VIKIV Q1 IT-9r�l r Or) A" PVr' INV IN:2517. 0 8" PVC INV OU :2517.87 8" PVC - 2530 _ - - - - - - - EX STING GROUND 2525 1 2525 165 f 8 PVC © 0. 0 0 270 of 8 PVC @ 1.2 5% 2520 I 2520 20 ® 0.40% of 8 PVC ° 220 0 8 PVC 0.4 % 95 of 8 P C @ 0.3610 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 L60' of 8" PVC @ .46% FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 N O L O M O r` N r7 It O0) It It 0) It r` M O 0) LOrl) rM �O O . - O0) V) � 00 00 OO OO to N O 0 0 00 00 n ) 0 0) r� 00 cq N N c6 ai O ai0) 06 N r 'i N NN N NN N CA 000 O n N 7 N N N N N N M M M rM N N 00N NN N N V) MM M M M M M rM rONM0 � 0 0 0 ` LO LO N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 SEWER ALIGNMENT G (STA 0+00 TO 14+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH #H- (48-INCH) SSMH #H 4 (48-INCH) SSMH #H-6 (48 INCH) SSMH #G-5 (4 -INCH) STA:5+11. 2 OFF:0.00 STA:7+68. 1 OFF:0.00 SSMH # -5 (48-INCH) TA:12+69.94 OFF:0.00 STA:9+17.21 OFF:0.00 RIM:2531.5 RIM:2534. 9 STA:10 24.79 OFF:0.00 RIM:2 33.25 SSMH #H-7 (48-INC ) RIM:2529.71 SUMP:2522 18 SUMP:252 .30 RIM:253 .77 STA:1 +55.45 OFF:O. 0 2535 SUMP:2520.03 SS H #H-1 (48-I CH) SSMH #H-2 (48-INCH) INV IN:252 .28 8" PVC INV IN:25 3.40 8" PVC SUMP:2 24.43 I V IN:2526 25su� .2 2 PVC RIM:2533. 8 2535 STA:10+ 6.50 OFF:379.8 R PVC RIM 2530.10 RIM:2531. 0 - - _ _ _ IN OUT:2526.15 PVC INV OU :2526.83 8" P C INV IN:2520.13 SUNP:2520.68 SUMP:2521. 6 _ INV IN:2 24.53 8" PVC INV OUT:2520.0 8" PVC INV IN:2520.78 8" PVC INV I :2521.96 8" P IC _ - - - - - - - - - - - - - - -• _ _ _ _ INV OU 2524.43 8" PV INV OUT:2520.68 8' PVC INV 0 T:2521.86 8" P/C - - - - - - - -'- - � - - - EXISTING GROUND 2530 2530 z o PVC © 0.68 O 85 of X 2525 245 of 8 P C@ 0.66% U N 2525 255 of 8 PVC ® 0.407- 55 of 8 PVC 0 f 8 PVC 0 0% 0 270 of 8 PVC (� 040% PRESCOTT RIDGE SUBDIVISION z 2520 140 ° 8 PVc ® � �% 2520 MERIDIAN, IDAHO O ENGINEERING PROFILES U EXISTI 4G GROUND CENTERLINE OF SEWER PIPE ALIGNMENT LL O 2515 FFINI H GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 SS\ANAL F �y RF FAdilik <, z Q p w L0 N r- L N N r) O I- O 0) N O N O N rn rn a0 N r- (0 Lc) r7 r7 O 0) r- O c0 to 00 O O O N c0 O z Z Ln N N r O N 7 r7 r` c0 r7 rn r` c0 r rn r7 1 9 4 ai 0) °j O Q O O O Q C5 O N N N nj r7 r7 r7 r7 r7 r7 r7 r7 N N N M M M M r7 z N N 10 M r) M V) r� i PO M r7 r) V) i � n n r vi r n r7 V) N V) N 11) N V) N 11) N n n n r� n n vi rM 0 N Ln N L0 r7 0 r) � r7 0 r7 LQ r7 d) r) V) r0 Ln r7 0 r7 Ln r7 � r7 � r7 r7 � r7 r7 r7 r7 r7 r7 r7 r7 r7 M M n r7 d N LO N N N L N L N L N V) N c N d N 0 N N N N N N L N LO N 0 N ZZI2O/2O o N N N N N N N N N N N N N N N N N N N N N N N N N PZ` E N G I N E E R I N G v N � N � N � N � N � N � N � N � N � N � N � N � � F OF �� �� 9233 WEST STATE STREET lTF1EW S•�� BOISE,IDAHO 83714 0+25 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 PHONE(208)639 6939 kmengllp.com z DATE: 8/26/2020if C SEWER ALIGNMENT H (STA 0+00 TO 14+00) PROJECT: 18-140 c PROFILE SCALE J HORIZ: 1 " = 50' SHEET NO. W P P3 VERT: 1 " = 5' .8 2535 2535 SSMH #S-1 ( 8-INCH) STA:3+ 0.33 OFF:0.00 SSMH #J-1 (4 -INCH) STA:0+55.00 FF:0.00 RIM:252 3.22 STA:0+50.00 OFF:0.00 RIM:2530.85 RIM:2529.15 SUMP:2 511.01 SUMP:2510.75 INV IN: 511.35 8" PVC SUMP:2524.18 INV IN:2510.7 12" PVC INV IN: 511.11 12" PV 2535 INV OUT:2524. ( 18 8" PVC 3SMH #J-3 (48 INCH) SSMH # -8 (48-INCH) 2535 2530 INV OU :2511.01 12" P C 2530 S :0+92.19 OFF:0.00 IM:2530.36 RIM:252 .89 n� RI :2530.75 UMP:2523.10 SUMP-2 18.90 SL MP:2523.83 NV IN:2523.20 " PVC INV IN:2 19.00 8" PVC - - oil- - - - IN IN:2523.93 8" PVC EXISTING GROUND NV OUT:2523.1 8" PVC INV IN:2 19.00 8" PVC IN OUT:2523.83 " PVC INV OU 2518.90 8" PVIEXISTING GROUND 2530 - - - - - - - - - -- - - - - - - - - - - - 2530 2525 2525 2525 2525 2520 2520 155 f 8 PVC ® 0. 0% ff4Oof8" PVC@0.6 % 0 V 2520 2520 2515 2515 I EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT O EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 120' of 12" PVC @ 0.2 % FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2510 00 LO O N cN 0N r-N N N N N N N0 N O 0) N N N N N ro i O O O O O OO O V � u U) M LO M ro 0 to 0 to M c O O N N N N N cd LO N LO N LO N U) N V N L LO Ln N N N N � Ln L Ln LO N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 SEWER ALIGNMENT J (STA 0+00 TO 4+50) SEWER ALIGNMENT S (STA 0+00 TO 2+50) PROFILE SCALE PROFILE SCALE HORIZ: 1 " = 50' HORIZ: 1 " = 50' VERT: 1 " = 5' VERT: 1 " = 5' SSMH #13 2 (48-INCH) SSMH #D-2 (48-INC ) STA:6+37 41 OFF:0.00 SSMH #T-1 (48-INCH) STA:1+77.26 OFF:0.00 SSMH #C-5 (4 -INCH) RIM:2526. 6 STA:1+77.0 OFF:-242.41 L RIM:2527. 8 2530 STA:6+21.15 OFF:0.00 SUMP:2512.56 RIM:2526.8 8 SUMP:2511. SUMP:2512 26 2530 SUMP:2513.98 INV IN:25 2.90 8" PVC INV IN:251 .36 12" PVC 1 8" PVC INV IN:2514.08 " PVC INV IN:25 2.66 12" PVC INV OUT:25 2.26 12" PVC INV I :251INV OUT 251 12.02.0 12" PVC INV IN:2514.08 " PVC E ISTING GROUND INV OUT: 512.56 12" PV _ INV OUT:2513.9 8" PVC - - - -' - - 2525 - - - - 2525 2520 2520 2515 2515 2 0 of'8 PVC 0.407. 5' of 12" PVC@0.2 % 2 0' of 12" PVC @ 0.24% B EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 c0 00 I� 0 0 0 c0 M N 00 c0 0 0 to I� N O) N N O 0 0 M �(') c0 rM � 't 't O � � t0 t0 CO (D c4 '6 c4 O) M M n � � M 0 0 cD c0 cD I� n r- N N N LO N N N N N N N N N N N N N LO N N N N N N N N N N N LO N LO N N C N N N 04 N N LO N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 SEWER ALIGNMENT T (STA 0+00 TO 2+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH # -7 (48-INCH) STA:18 69.59 OFF:0.00 2540 RIM:2530.96 2540 INV IN: 521.50 8" PVC SSMH #U-1 (48 INCH) INV IN: 521.40 8" PVC S A:0+91.25 OFF 0.00 INV OUT: 521.40 8" PVC R M:2531.19 S MP:2523.96 I V IN:2524.06 8' PVC 2535 I V OUT:2523.96 8" PVC 2535 SSMH U- 48-INCH STA:1+63.1 OFF:0.00 EX STING GROUND RIM:2531.1 SUMP:2524. 0 z INV OUT:25 4.50 8" PVC O 2530 2530 X N u a o a 2525 2525 PRESCOTT RIDGE SUBDIVISION z O MERIDIAN, IDAHO U 70' of 8" PVC ® .60% ENGINEERING PROFILES 4 of 8" PVC 6.21 o EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT O FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 2520 sS�ONAL FLL Nc, s N N N(D Lo ro Lo V) LO U-) LO U-) LO Lo lcm LO 0 �� O z Z N N N (V N N N N N N ZZI to p E N G I N E E R I N G OF 9233 WEST STATE STREET 0+00 0+50 1+00 1+50 2+00 2+50 lTF1EW S.• BOISE,IDAHO 83714 PHONE(208)639-6939 kmengllp.com z if SEWER ALIGNMENT U (STA 0+00 TO 2+50) DATE: 8/26/2020 G d PROJECT: 18-140 PROFILE SCALE J HORIZ: 1 " = 50' SHEET NO. W VERT: 1 " = 5' P P3.9 a w w y y y y S / y y W W y y e y r y y 7 y y y / y d d y y W y y y y y S y y y O 10 / yyy 8 11 ' y y O 12 W W S y0y y y y y I 1 y y BLOCK 1 W 15 y y y O M — M MGM 17 y y y / W w y y 19 y y l 1 y sue\ � M_ 's 21 �' S\\ 7247,, SSMSSSw ' M_M 27 y y w w � y y y y y y r. •.r s s S_S y y O y y y y y 2 S — _M 29 y y S y y y y y y O W FI y y y y y y s_ RELI E DR., N S• "S y y y y y y y y y y y y O •_ S _M • y y y y/ W 3 n y y y y y 4 S_S wW W W W W y y y y w O S_S _ M_ y y � yyyyy O Zti ss M41 � y � — W. STURGILL PEAK ST. y yy y O Sys M�f S__ y y S_S S •S .1• N y y y y y y y y w w y y y y y y y y y y 11 S S_S y y y y 1 y y y y y y y 12 y w 7 y y y y y y y y y y y Q y y y y y BLOCK 3 y W y H y y y y y y O y y y y y y y 22 y y O S y y y y y 22 21 S' .S O y y y y y y y y N y y s y y y y y 20 y y } Z y y y y y 13 W O y y y y y y • y w w y S y y y y y y 18 S O y y y y y y y y y y w w y y y y y 177 y U) g w y y y 1" y y y y y y y 1G ' y y y y y y 1 y y y y 21 V � 's y y y y y y 15 y y y y y y y y y W w Cl- y y I M M M M M M M y � _ J• y y y y y y y y y y s — W. PARACHUTE DR. y M Oy y BLOCK 4 s s s s s s s s© — M r s_s _ M_M 1 11 BLOCK 2 20 1 M N y y y 12 y sus M_ • • s s y a MGM 13 a d � y y � y S •. _M 14 y y O � y _S� _ _M O 15 16 17 y M y y y S_S I_ �M :r W 19 ' y y 1 uj 2 3 4 5 6 7 BLOCK 5 ' '> �M _s _M � s w y y 6 I y X X O N _S M_M ' N w y O X X X X X X y _S y y y w w y X M_M 1 S y y y y y y y W W w w O 10 w w S_ M M• . i. M M M M y y s � ' _• S �M M M 3 S S S S S S S S S S ' CONCEPTUAL ENGINEERING PLAN O M s "1 _ ' �" 1' 'S W x �� 0 50 100 150 y y y y y y y y y y y S 3 Plan Scale: 1" = 50' y y y y y y y y y y LEGEND x 11 O y y y y y y y y y y y PROPOSED IMPROVEMENTS EXISTING FEATURES O y y y y y y y y y y 3 O 10 y y y y y y y y y y y 1 V BOUNDARY LINE s s s SEWER LINE s s s SANITARY SEWER LINE 3 O 11 y y y y y y y y y 13 14 x OFFSITE BOUNDARY LINE w w WATER LINE w w WATER LINE y y y y y y y y y y Q PROPOSED LOT LINE S SEWER MANHOLE G G G GAS LINE 12 y y y y y y y y O w y y BLOCK 6 y y y y y y ' PROPOSED TO POTENTIALLY 2645 PROPOSED CONTOUR —OP—OP— OVERHEAD POWER LINE y y y y y y y y y y y DEVELOP AS ZERO LOT LINE " N of S � y y W y y y y y W y LOTS. THESE LOTS WILL BE Gi Gi GRAVITY IRRIGATION LINE N 3 y y y y 12 y y y y DETERMINED UPON FINAL O PLAT SUBMITTAL. O SEWER MANHOLE I y y y y y y y y y y 0 Wv FOUND 1/2 INCH REBAR WATER VALVE x 13 I y y y y y y y y y y y w w y y y y w w w y FOUND 5/8 INCH REBAR ® WATER METER 3 r y y y y y y y y y y z SPIKE � FIRE HYDRANT x 33 32 31 30 29 y y y y y y y y y y 28 27 y y y y y y y y y y POWER POLE V14 l y y y y y y y y y y v N m POWER BOX x ,, I •L •L y y y y y y y y ' d EP EP EDGE OF PAVEMENT y y y y y y y y y y y y y y y y y W y Or EG EG EDGE OF GRAVEL y y y 15 y y y y y y 6 y y y y y y y y y y y y y y y y y y y y y PRESCOTT RIDGE SUBDIVISION z 0 x M r•• •M M .s U1 ; e e 'r p s. r i . r O PRELIMINARY ENGINEERING NOTES M M M M M M M M M M M M M M M M M M M M M M MERIDIAN, IDAHO 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS — — — — — — — — — U WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER x 5 s s s s s s s s s s s s s s s s s s s s s u s s ENGINEERING PLAN w3 r, o MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) r s 1 O M f s' r �—• r. t �s e e 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY J S�pNAL f LL WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. x FF O Z 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED Lu 3 2 Z DURING FINAL DESIGN. y r v Q z 19 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE x y z i w 11/20/20 WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN O1 O O3 O O 6 Lu 0 3 1 O O O O s�qT Pao E N G I N E E R I N G REQUIREMENTS. N �ql F OF �� 9233 WEST STATE STREET TyEw S Q BOISE,IDAHO83714 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL y Z PHONE(208)639 6939 Z DESIGN. x EXISTING f CONNECT TO EXISTING BLOCK 7 NE(20kmeng 1p.com z 77 )7 SANITARY y 3 .1 y WATER MAIN 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE SEWER N DATE: 8/26/2020 if STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE INV:25XX.XX y Digitally signed by Matthew IRRIGATION. e S. Derr, PE PROJECT: 18 140 SHEET NO. J 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINED Date:2020.1 1.20 09:27:48 W DURING FINAL DESIGN. _ _ -07 00 P P 3.0 MATCH LINE - SEE SHEET PP3.2 LEGEND \ w w w w y y y y s I y y y y BOUNDARY LINE y y y y OFFSITE BOUNDARY LINE y y y y y y y y y y y y y y y y y y y y y y y y PROPOSED LOT LINE 1 \ y y y y y y y y y y y y PROPOSED TO POTENTIALLY DEVELOP AS ZERO LOT LINE y y y y y e y y y y y y y y y y LOTS. THESE LOTS WILL BE DETERMINED UPON FINAL , PLAT SUBMITTAL. N ? O BLOCK 8 y y 5 y y y y y y y y y y y y y y , O FOUND 1/2 INCH REBAR FOUND 5/8 INCH REBAR t Z r � ,✓/ y y y y y y y y y y y y y � ' 27 N y /s• W` r y y y y y y y y y y y y y y ® SPIKE v� / M/M y y y y y y y y y y y y y t y y y y y y y y y y y y y y y y 26 �^ y M� / 37 y y y y y y y y y y y y y y y y y �, '• C PROPOSED IMPROVEMENTS 5 s y y y y y y y y y y y y y y y y y ,' lye S S S SEWER LINE ' y N \ s N\ //S ? M W W WATER LINE BLOCK 2 ti / M DP`/ n`A1K s / P , �S SEWER MANHOLE // S� r , 2645 PROPOSED CONTOUR P� • . /s j y y y y y y y y y � y y y y y y /• VO t y y y y y y y y y y y y y y y t �/`-. t / � s � 35 y y y y y y y y y y y y y y y y y .\-1 y/ •y y y ' M •' s,. 5/ t" y y y y y y y y y y y y y y y y y r / •t''/ y y EXISTING FEATURES / � 34 y y y y y y y y y y y y y y y y y �W t" �• V L y/ y y s s s SANITARY SEWER LINE W W WATER LINE S r . c c c GAS LINE / y y y y y 31 y y y y y y y y y y y y y y y y y y y y y y/, `` r / / / •� —op—op— OVERHEAD POWER LINE • y y y y y y y y y y y y y y y y y y y y y y y y y y 1 /. y y y 29 y y 30 y y y y y y y y y y y y y y y y y y y y y y / •1 %/ GI Gl GRAVITY IRRIGATION LINE y y y y y y y y y y y y y y y y y y yL y y y y y y / •'t W / t' y `� / / y' •/ 13 / , OS SEWER MANHOLE y y y J• y y y y y y y y y y y y y y y y y y y y y y y r �'• i• y wV WATER VALVE X•• / y y y y y y y y y y y y y y y y y y y y y y y y y y �/" //y//y t' / t y M J• y y y y y y y y y y y y y y y y y y y y y y y �// y y r w w w w w w w w w w w w w y y y y y y y y t r W /w / WATER METER • / t E 1 / y y y y y y y y y y y y y y y y y y / � •� FIRE HYDRANT POWER 1 y y y y y y y y y y y y y y y y y 1' ( `✓ POWER BOX E � , m IBLOCK 9 16 y y y y y y y y y y y y y y / ' � :t •/ � 20 EP EP EDGE OF PAVEMENT EG EG 27 y y y y y y y y y y y y y .fi ty •/y /�// EDGE OF GRAVEL z w y y y y y y y y y y y y ✓� / y / r. PRELIMINARY ENGINEERING NOTES ' ! y y y y y y y y y y y y y y/ W •f r •t " y y y y y y y y y y y y y y y/ s e y '/y / \s 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS e t \ WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER Cr 19 y y y y y y y y y y y y y y y y y / / �•� 10 \ `L MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY O � � � y y y y y y y y y / '` � � \ • � WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. 8 ' p y y y y y y y y y y y y y y y y y// / :'y / 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED DURING FINAL DESIGN. / 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN 4 `Y', /y � 7 t REQUIREMENTS. 1 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL W 25 DESIGN. 1 W BLOCK 10 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE y O 5 � / y y STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE t. / N N I IRRIGATION. y y y y / .,ty/ O / 1� \• y y W 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINED tuj y y y / y / O y y y DURING FINAL DESIGN. r) � y y � ry•/y /' y y y y � O M 1 siLs s W• PARACHUTE DR. W s S /Y S S S-� M t t 't ,t z J• J• y 'I O y y y 5Ir- y ` / r. / �'J y y y LL - 10 0 J ' y/S •/ y y y y y y y r y / / �G/ 5 y y y y y y y N r z V t• ' t t. BLOCK 11 1 � � y/ 15 16 17 � 1 t y /•S r• ly O / � y y y y y y y y y y ir s 11 / r 13 y y y y y y y y y y y y y y y y y y y Co � 15 y y y y y y y y y y y y < r 3 y y y y y y y J• y y y y � y 3 y y y y y y y y y y y 1 t y l 3 •y I co y 1 r •. 21 •r � 10 yl • t � t / y � s w � S y ' 26 25 24 3 O1 O2 O3 O 5 6 14 y O O y ' O z � r• (n 22 � Og y I � y• I y � S y 5 y y y y y y y y y y s t M M M m MIN •r M M M M M M--� M M M M M M M M M M N M M M M M M M M M M M M 13 W. SMOKEJUMPER ST. — — — — — — — — W. SMOKEJUMPER ST. z s s s s s s s s s S s s s s s s� s s s s s s O r, 'r t s t .. t, ,r. r• m y : 3 10 U a Ln N r j• a y ' s I- y 3 Q w PRESCOTT RIDGE SUBDIVISION z o O O 10 11 12 13 14 30 15 Q 3 1� O O O O O 7 5 MERIDIAN, IDAHO ° ENGINEERING PLAN U w U y N O y � I a I: r R Nc/y`�' ~ Z � y y w - z Amok z w — 11/20/20 �' � ENGINEERING OF �QP�� 9233 WEST STATE STREET lTF1EW S•�� BOISE,IDAHO 83714 z PHONE(208)639-6939 CONCEPTUAL ENGINEERING PLAN kmengllp.com z DATE: 8/26/2020 C g 0 50 100 150 PROJECT: 18-140 c d Plan Scale: 1" =50- SHEET NO. J 0 W a _ w• y y y y y y y y y y y y y y y y y y y y y y y y y 3 `� yyyyyyyy y y y y y y y y y y y y y y MATCH LINE — SEE SHEET PP3.3 y y '• y y y y y y y y y y y y y y y y y 11 y, y y y y y y y y y y y y y y y y y y 65 y•r. y y y y y y y y y y y y y 12 s y y y y 27 y y y 29 30 31 y 32 33 35 y y y Q 3 y 13 y y y y y y y y y y y y 43 56 'yr y y y y y y y y .,y y y 36 37 38 y Y y y y y y y y y y y y y y f N O 3 64 63 62 61 60 59 58 •y y y y y y y y y r y • y y y 39 40 41 42 y I U Iw O O O O O O y '• y y y y y y y y ° b y ° y y y ~ I b Ln y y y t°. r y y y y y y y y M M O •� y y y y y y y s. y ° ° y I , y y y y y y y r p JA 57 54 3 y W. LOST RAPIDS ST. w w O ,� 14 26 5 y w y ' • 5 — — — — — — h y y + q y $ $ S S S S $ $ $ S \ ?J $ O e t r 25 �' y 54 55 56 57 y 58 59 y y y • • � y y I 3 a 53 ( O O O 60 O i y y y y I I N •r, y 3 r '.3 24 r y 63 y y l I 3 I y O � � y y 64 65 66 67 y Iy .. 52 O y y y y I I 29 28 27 O O O � r • 23 68 y • y y y y y y y y y y I 26 25 24 23 y S•}� (n y y y y y ' . � � r• . 22 .`• y y y y y y y y y y y y y y y � Iy � . y y y y y y y y y y y y y y y y y y y y y I I y I y 51 15 y y y y y y y y y y y y y y y y y y y y y y y y y y I 5 ly Cn • } y y y y y y y y y y y y y y y y y y y y y y y y y y l 3 y y t N Z L r y y y y y y y y y y y y y y y y y y y y y y y y yl I yl 22 y y y y y y y y y y y y y y I r" y l y N 8 N r O � U m 44 y y y y y y y y y r z r• O y y y y y y y y y y 'W 'y y � 5 I 19 y y 53 52 51 50 y y 49 y y yyyyyyyy y w a r y ! f �.• y y � y/ y 17Am 14 r r�/ / r• .. r a• 17 W � �i •d M M M M M M M M M t s l OJ)\ M —$ — — —W. WILDFIRE DR. — — \ 45 y // / w w w w w r y y y 47 � r s s s S s s s s s sS \ y y y/ — W. WILDFIRE ST.— — r y y y y y y y.y •y S y / / � S S S $ $ 5 y y y y y �•• s y /y y/ BLOCK I4 � 1 r ! y y y y y \ y y• y y y y y y y y y 46 r r \A' "'/ r y y y y y y \S '% y y y y y y y \ y y y y 17 r• � � y y y y y y y y y O O \ y � y y y y e Oy y y y y y y y y y y y y y y y y y y y y y y QI y y y y y y y y y y �/. � / I r•• 3 y y y y y O N y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y /y I / r y y y y y y 15 F—�cr_ r 10 y y y y y y y z y y r y y y y y y y O / J / CO � '' BLOCK 12 �..� Vy y y BLOCK 9 y y y y y y y O m �C O U7 y y y y y y y y y y y y y y y y y y y y y y y/ `_ � •/y O } y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y/ ,�' •,y � O• � y y y y y y y y y r y y y y y y y y y y y y y y y y y y y y y IIIIIII� IIIIIIIIII. .. IIIIIIIIIIIIIIIIIF IIIIIIIIIII, IIIIIIIIIII, 1111111111111 1111111111111 1111111111111 1111111111111 1111111111111 �y yIII - y y y y . . . . . . . . . j/ •�/ r• •� / L41 \? � y y - - O y y y y y y y y y y y y y y y y y /y r O � •�/ O 1 'r y y y y y y y y y "r — y y y y y y y y y y y y /S � r � O r y y y y y y y y y y MATCH LINE SEE SHEET PP3. 1 y y y y y y y y y y y y /•O y r O y y y y y y y y y y y 12 y y y y y y y y y y r / Oy// I � y y y y y y y y y y y O J. 40 y y y y y y y y ��• O y 6 y y y y y y y y y y y y r $ O CONCEPTUAL ENGINEERING PLAN y y y y y y y O O I O, Oy y y y y y y y y y y y / Y / / Q 0 50 100 150 y y y y y y y y °/'•O y y y y y y y y y y �, w y y y y y y/• O // y y y y y y y y y y BLOCK 13 z y y y y y y y y y y y y y y y y y y 11 J Plan/Profile Scale: 1 = 50 //' / � � O O O O LEGEND , y y y y 5 y y y y y y y y y y y U + 39 y y y y O y/ y y y y y y y y y y y y Q 1• •�/ V) `G 1 BOUNDARY LINE y/ 4 O y y y y y y y y y y O 10 OFFSITE BOUNDARY LINE r 38 • /y f" � y O y y y y y y y PROPOSED LOT LINE O O �//� � y 3 / y y y y y •r PROPOSED TO POTENTIALLY �' y y y DEVELOP AS ZERO LOT LINE LOTS. THESE LOTS WILL BE \ 3 DETERMINED UPON FINAL PLAT SUBMITTAL. /?i ���\ y \ 4 , cy \ / s O FOUND 1 2 INCH REBAR / o O FOUND 5/8 INCH REBAR , , s.T ,� O' � �P � \ .. s '• O O r 36 ® SPIKE PROPOSED IMPROVEMENTS s ��P z r s 0o s s s SEWER LINE y O'er , \ M r 7 35 w w WATER LINE v M V OS SEWER MANHOLE LOTS 9-18,20-29,BLOCK 1,LOTS 27-37,39-51,53-61,63-69, A y \ S=��OF�RE �M / 2645 BLOCK 12,AND LOTS 2-16,18-21,23-29,BLOCK 14 ARE 24 'W ' s=R. PROPOSED CONTOUR PROPOSED TO POTENTIALLY DEVELOP AS ZERO LOT LINE �� W LOTS.THESE LOTS WILL BE DETERMINED UPON FINAL PLAT �� ��w ' S M P R ESCOTT RIDGE SUBDIVISION EXISTING FEATURES SUBMITTAL. O�;wr r s_ s e z $ $ $ SANITARY SEWER LINE PRELIMINARY ENGINEERING NOTES 25 _ _r R:�,. r. $_ -/ y y y yyyyyyyyyyy y S5 MERIDIAN IDAHO N _—R ! V, y�r .Jc "•yy •}y y y :y r ;y p °y y J' r w w WATER LINE 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS y y y y y y y y y y ENGINEERING PLAN v WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER 26 y y y y y y y y y y o c c c GAS LINE MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) 27 p y y y y y y y y y y y O 20 y y y y y y y y y y 0 op—op— OVERHEAD POWER LINE 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY 29 �pNAL E y y y y y y y y y y y WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. y y y y y y y y y y ASS G'j ci ci GRAVITY IRRIGATION LINE 30 y y y y y y y y y y F yFF Z 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED w O SEWER MANHOLE DURING FINAL DESIGN. 31 y y y y y 33 y y y y Z y y y y y y y y y y y z w wv 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE 32 y y y y y y y y y y 19 WATER VALVE 11/20/20 WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN y y y y y y y y y y y tp �� E N G I N E E R I N G ti ® WATER METER REQUIREMENTS. w �,9 F OF �� �� 9233 WEST STATE STREET a FIRE HYDRANT 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL y y y y y y y y y y lTyEW S. 0�' BOISE,IDAHO83714 PHONE(208)639-6939 Z DESIGN. kmengllp.com z y y y y y y y y POWER POLE 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE y y y y y y y a ® POWER BOX STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE y y y y y y y DATE: 8/26/2020 IRRIGATION. PROJECT: 18-140 a EP EP EDGE OF PAVEMENT y y y y SHEET NO. J 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINED y LJ..I Ec Ec EDGE OF GRAVEL DURING FINAL DESIGN. PP3.2 � W. CHIND IN BLVD. (HWY 20/26) —EP EP EP EP ��—EP EP EP EP EP EP EP EP EP EP d3 d3 d3� d3— P EP EP EP EP EP E ca 1 m W a A 1 W I Z 1 W I W m 1 � 1 W W J = 1ILr A1 m - - - W T a T TTT IC T 3 y TTTTTTTT T T T T T T aj T — — — — — — — — — — — IRR W cWn Fq � Fq G W 1• ��q Z = I � LEGEND ( BOUNDARY LINE I I: OFFSITE BOUNDARY LINE iI PROPOSED LOT LINE PROPOSED TO POTENTIAL DEVELOP AS ZERO LOT LI E LOTS. THESE LOTS WILL B 3 I DETERMINED UPON FINAL PLAT SUBMITTAL. ( O FOUND 1/2 INCH REBAR 3 I FOUND 5/8 INCH REBAR I ® SPIKE { PROPOSED IMPROVEMENTS s s s SEWER LINE —w—w— WATER LINE gp I QS SEWER MANHOLE I' 2645 PROPOSED CONTOUR BLOCK 8 G I J' EXISTING FEATURES s 3 ) s s s SANITARY SEWER LINE I' w w WATER LINE i G G G GAS LINE 3 I -op—op— OVERHEAD POWER LINE { GI GI GRAVITY IRRIGATION LINE I 3 I — — — — — _ O SEWER MANHOLE wv>11 WATER VALVE 3 { ® WATER METER ( I I FIRE HYDRANT { POWER POLE m POWER BOX EP EP EDGE OF PAVEMENT 13 EG EG EDGE OF GRAVEL PRELIMINARY ENGINEERING NOTES 3 1. DOMESTIC WATER SERVICE WILL BE PROVIDED BY CITY OF MERIDIAN. 8" WATER MAINS WILL BE LOOPED THROUGHOUT THE SUBDIVISION CONNECTING TO THE EXISTING WATER M/a MA J / nn/ m/a MA J nn/a nn/a M /a /a m/a MAINS IN N. TRIDENT AVE. AND W. CHINDEN BLVD. (HWY 20/26) �I 2. SANITARY SEWER SERVICE WILL BE PROVIDED BY THE CITY OF MERIDIAN. THE PROPERTY 3 WILL BE SERVED BY THE CONNECTION AT N. TRIDENT AVE. I I { s J J 80 81 75 74 3. WATER AND SEWER LINE SIZES AND LOCATIONS ARE PRELIMINARY AND WILL BE REFINED DURING FINAL DESIGN. I 4. ALL DOMESTIC WATER MAINS AND SANITARY SEWER WILL BE INSTALLED IN ACCORDANCE W WITH THE IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY AND CITY OF MERIDIAN REQUIREMENTS. 79 N W 5. PRESSURE AND GRAVITY IRRIGATION IMPROVEMENTS SHALL BE DETERMINED DURING FINAL 3 W DESIGN. 6. CONSTRUCTION OF THE FOLLOWING IMPROVEMENTS WILL BE IN COMPLIANCE WITH THE 78 66 77 76 73 STANDARD MERIDIAN CONSTRUCTION NOTES: WATER; DRAINAGE; SEWER; AND PRESSURE 3 �I IRRIGATION. Y �I 7. CITY OF MERIDIAN SANITARY SEWER AND WATER EASEMENT LOCATIONS TO BE DETERMINE DURING FINAL DESIGN. I o u z WI I �, F- O w w z U N I . 5z s s s s 72 � a o N O �i PRESCOTT RIDGE SUBDIVISION z MERIDIAN, IDAHO U 3 67 68 69 70 71 ENGINEERING PLAN O O MATCH LINE — SEE SHEET PP3.2 M MME IME ME _ r S�pNAL F z QF° F� O z w 0� �� ENGINEERING �q�q F OF �QP�� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 PHONE(208)639-6939 kmengllp.com z DATE: 8/26/2020if C d PROJECT: 18-140 c 0 SHEET NO. W PP3.3 oc 47' RIGHT-OF-WAY 47' RIGHT-OF-WAY 2' 2' 2' 3' 5' SIDEWALK 16.5' TBC-CL 16.5' CL-TBC 5' SIDEWALK 5' SIDEWALK 16.5' TBC-CL 16.5' CL-TBC 10' SIDEWAL 3:1 MAX. SLOPE TO 3O MAX. EXISTING SLOPE TO EXISTING 2% 2% 2% 2% /\\ \/\/ \\%\/\\/ 1' LANDING, \\r \\\\\\\\ \ \\ \\ \\\\\\\\\\\\\\\\\\\\\\\\\\\ \ \\\\ \\ \\ \ \\\\ \\\\\�\\ 1' LANDING, TYP. TYP. /\// / / / / / / / // / /�� /i�/i� \//\//\//, 3" ROLLED CURB ASPHALT PAVEMENT 3" ROLLED CURB \// AND GUTTER, TYP. ASPHA/i�LT PAVEMENT 3/4"-MINUS CRUSHED AGGREGATE BASE AND GUTTER, TYP. 3/4"-MINUS CRUSHED AGGREGATE BASE 6" MINUS PIT-RUN SUBBASE 6" MINUS PIT-RUN SUBBASE TYPICAL LOCAL STREET SECTION LOCAL STREET SECTION (W. CHAINSAW ST./W. WILDFIRE DR.) SCALE: NTS SCALE: NTS 50' RIGHT-OF-WAY P/L P/L 3:1 MAX. 5' SIDEWALK 8' PLANTERS 18' TBC-CL 18' CL-TBC 8' PLANTER 10' SIDEWALK 25' SLOPE TO 3:1 MAX. EXISTING SLOPE TO 2%. 2%. EXISTING 2% 2% \ /\\�\\\\�\\\\\\ 1' LANDING, \ \\ \\ \\ \\\\\\\\\\\\\\\\\\\\\\\\\\\ \ \\\\ \\ \\ \\ \ \\\\\\\\\�\ \ / \ ATYP. 6" VERTICAL CURB ASPHALT PAVEMENT ASPHALT PAVEMENT AND GUTTER, TYP. "3 4 -MINUS CRUSHED AGGREGATE BASE / 3/4"-MINUS CRUSHED AGGREGATE BASE 6" MINUS PIT-RUN SUBBASE 6" MINUS PIT-RUN SUBBASE TYPICAL COLLECTOR STREET SECTION (N. RUSTIC OAK WAY) TYPICAL PRIVATE DRIVE SECTION SCALE: NTS SCALE: NTS 50' RIGHT-OF-WAY 0.5' 18' CL-TBC 8' PLANTER 5' SIDEWALK 3:1 MAX. SLOPE TO 2%• EXISTING EXISTING ASPHALT PAVEMENT \ /\\/�\ 1LANDING, 6" VERTICAL CURB ASPHALT PAVEMENT AND GUTTER, TYP. 3/4"-MINUS CRUSHED AGGREGATE BASE 6" MINUS PIT-RUN SUBBASE TYPICAL COLLECTOR STREET HALF SECTION (N. MCDERMOTT RD.) SCALE: NTS SSMH #A-2 (48-INC ) STA:1 29.84 OFF:0.00 SSMH A-1 (48-INCH) RIM:2 3.60 SSMH -4 (48-INCH) STA:O 50.00 OFF:0.00 STA:4+ 5.17 OFF:0.00 2530 RIM:2522.42 SUMP: 516.93 2530 SUMP:2517.51 SUMP-2 15.35 S 3MH #A-5 (48 INCH) INV OUT: 517.51 8" PVC INV 0 T:2516.93 8" PVC INV IN: 515.45 8" PVC S A:5+94.38 OFF .09R SSM #A-3 (48-IN H) INV IN: 515.45 8" PVC R M:2525.14 STA:1+83.84 OFF:0.0 RIM: 523.94 EXISTI G GROUND INV OU :2515.35 8" PVC S MOUT:2517. SUM :2516.61 I V OUT:2517.09 " PVC 2525 VINV I :2516.71 8" P C - - - - - _ _ _ 2525 2520 2520 0 of 8 PVC © 0.60 1.3 B%_ 29 of 8 PVC Cs� 0.40% 1 0 0{ 8 PVC 2 515 �5 _of 8' PVC @ 0.40% 2 515 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2512 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2512 O c N Lo 00 r O O O O 00 O 0) It r 0 O 00 N O) O N (o 0o O) O V) M N N p M 't 4 't 4 Lo ui (O t6 Lo N N N N to N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 z d SEWER ALIGNMENT A (STA 0+00 TO 6+50) O PROFILE SCALE a HORIZ: 1 " = 50' U N VERT: 1 " = 5' DC 0 a PRESCOTT RIDGE SUBDIVISION z O MERIDIAN, IDAHO O ENGINEERING DETAILS U O SS�pNAL E LL RF �tiF � Z Q O 19 4 z w 11/20/20 ENGINEERING OF �QP�� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 PHONE(208)639-6939 kmengllp.com z DATE: 8/26/2020 C d PROJECT: 18-140 c 0 SHEET NO. W PP .4 SSMH #13-1 48-INCH) SSMH #13-2 (48-I CH) STA:3+05.76 7:0.00 STA 6+37.41 OFF:0.00 RIM:2525.66 RIM: 526.36 SSMH #A-4 (4 -INCH) SUMP:2514.22 SU P:2512.56 2530 STA:4+75.17 OFF:0.00 2540 2540 SUMP:2515.35 INV OUT:2514. 2 8" PVC INV IN:2512.90 8" F>VC INV IN:2515.45 " PVC INV IN:2512.66 12" PVC SSMH #E-15 ( 8-INCH) INV IN:2515.45 " PVC EXISTINC GROUND INV OUT:2512.56 1 " PVC STA:21+32.64 C FF:0.00 RIM:2532.84 SS H #K-1 (48-I CH) INV OUT:2515.3 8" PVC - - - - - - - - - - - - - SUMP:2523.42 INV IN:2523.52 3" PVC ST H #K-4 48-1 C - - - - - - - - - - - - - - - - - 2525 - - -.- - - - - - - - - 2525 2535 INV IN:2523.52 " PVC00 RIM 2533.18 2535 INV IN:2523.52 " PVC EXISTING ROUND INV OUT:2526.91 8 PVC INV OUT:2523.4 8" PVC - - - - - - 2520 2520 2530 2530 2 515 255 of 8 2515 2525 4o f 8 PVC 9 2525 330 f 8 PVC ® 0. 0% 335' of 12" PVC ® 0.22 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 105' of 8" PVC 0 0.4 % EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2520 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 t t It It r� c0 00 0 0 0 c0 0 0 0o o �_ _ n N r� rD � � � � m N N N N _ co N 00 op 00 0000 0 r7 M 0�0 00 rn N N 0 L L 0 Ln vi 0 L6 0 ' u7 c0 c0 60 c0 c0 c6 I� N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N � � N M N rN N M N M N M N n N M r7 u7 LO V) 0 0 � M M � M r7 r7 d M � M � to N N N N N N N N � N LO N LO N � N 0 0 0 0 LO � n d) � N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 SEWER ALIGNMENT B (STA 0+00 TO 8+00) SEWER ALIGNMENT K (STA 0+00 TO 4+50) PROFILE SCALE PROFILE SCALE HORIZ: 1 " = 50' HORIZ: 1 " = 50' VERT: 1 " = 5' VERT: 1 " = 5' SSMH #B 3 (48-INCH) SSMH #B- (48-INCH) STA:9+70.63 OFF:0.00 STA:13+15 30 OFF:0.00 RIM:2 RIM:2527.5 SSMH #E-17 (48-INCH) 2513. SUMP:2514 26 SSMH #B-5 (48-INC ) 2530 INV IN:2513,50 12" PVC INV IN:251 .36 12" PVC STA:1 +79.58 OFF:0.00 2530 SSMH L-1 (4 -INCH) STA:25+20.69 OFF:0.00 # RIM:2532.70 INV OUT: 513.40 12" PV INV EXISTING GR UND SUMP: 516.17 2535 STA:0+50.00 0 F:O.00R SUMP:2525.19 2535 INV OUT:2514.26 12" PVC INV 0 T:2516.17 8" PVC INV IN:2525.2 8" PVC SUMP:2527.59 INV IN:2525.2 8" PVC - - - - - - - INV OUT:2527.5 8' PVC - - - - - - - - INV OUT:2525.19 8" PVC 2525 2525 EXISTING GROUND 2530 2530 1 2520 2520 55 of 8 PVC 1 489; 2525 I 2525 2515 265 of 8 P C @ 0.60% 2515 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 345' of 12" PVC @0.22% 2520 IF FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 335 of 12" PVC @ 0.22% 00 0) r- to r- 0) 04 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT ,Nh V) ro rM rN to n n M 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 N N N N N N N N N N N M r 0) (O 0 Cn 00 Cn 0 Cn M � (O In (O 00 N (O (O N rn 0 N M 00 0 0) rn � 0 0 0+00 0+50 1+00 1+50 2+00 2+50 3+00 r n n 00 n 00 C6 n n n N n N cq N N I� N IN N IN N IN N � ^ � cq � ^ � � LIDN N N N N � N N LO N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N NINLO N N N N N N N N N N N N N N N N N SEWER ALIGNMENT L (STA 0+00 TO 2+50) 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SEWER ALIGNMENT B (STA 8+00 TO 16+50) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH #C-1 (4 -INCH) STA:0+50.00 OFF:0.00 RIM:2523.62 SUMP:2516.81 SSMH # -5 (48-INCH) 2530 INV OUT:2516.8 8" PVC 2TA-6 GO 2530 S MH #C-3 (48-INCH) RIM:2524 31 SSMH # -2 (48-INCH) STA:9+13.9 OFF:0.00 STA:1+2 .75 OFF:0.00 S A:2+42.95 OFF:0.00 SUMP:25 3.98 RIM:252 .57 RI :2523.62 INV IN:2 14.08 8" PVC S MP52515 83 SUMP:2516.27 S MP:2515.69 INV IN:2 14.08 8" PVC INV IN:2 16.37 8" PVC IN IN:2515.79 8" PVC INV OUT: 513.98 8" PVC INV OUT:25 5.83 8" PVC 2525 INV OUT: 516.27 8" PVC IN OUT:2515.69 PVC EXISTING GR UND 2525 z o 2520 2520 O U a N -12 0 of 8 PVC 0.407. 2 515 38 of-8 PVC 8 PVC ® 0.6 % 0 7 of 8" PVC @ 0.60% I 2515 PRESCOTT RIDGE SUBDIVISION z MERIDIAN, IDAHO U EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT ENGINEERING PROFILES 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2 S� AL E LL ON N (r (or � (o � o u °o 0 ao � ao 00 00 (.0 (.0 n I- (.00 Il n 00FO NC2 00 r Adlilk 'It Ki ro Kir7 Ki rj K pj Kirj Kir7 Kirj Kr LO N N N N N N CA N N ro Z N N N N N N N N N N N N N N N N N N N N N N N N N N N N �S FO f O Q w N L N � N N � N � N N 0 N 0 N 0 N � N � N N N L N L N L N 0 N 0 N 0 N N N N N N N N N N N N N N N N N N N N N 1199 z w 11/20/20 E N G I N E E R I N G -0+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 � TF OF \l) 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 z PHONE(208)639-6939 SEWER ALIGNMENT C (STA 0+00 TO 10+00) kmengllp.com z PROFILE SCALE DATE: 8/26/2020 if 2i HORIZ: 1 " = 50' PROJECT: 18-140 VERT: 1 " = 5' SHEET NO. J 0 W a 2535 2535 ir- S MH #D-4 (48 INCH) S A:1 1+44.91 OF :0.00 SSMH #D-1 48-INCH) SSMH D-2 (48-INCH SS H #D-3 (48-I CH) S A:7+44.91 OFF 0.00 R M:2529.89 STA:0+57.00 I DFF:0.01 R STA:1+ 7.26 OFF:0.00 ST :3+90.33 OFF:O 00 R M:2529.53 S MP:2514.44 RIM:2527.52 RIM:25 7.48 RI :2528.22 S MP:2512.75 SUMP:2512.5 SUMP:2 511.58 SU P:2511.01 INV IN:2512.85 8' PVC INV IN:2514.54 8' PVC 2530 INV IN:2512.6 8" PVC INV IN: 511.68 12" PV �INVIN:2511.35 8" PVC EXISTING GROUND INV OUT:2512.75 8" PVC INV OUT:2514.44 8" PVC 2530 _ _ _ _ _ _ INV U : 1 V - - - - - - - - - - - - - - - - - - - - - - - - INV OU :251 1.58 12" VC IN OUT:251 1.01 12" PVC - - _• - - - - - - - - - - � V - - - - - -•- - - - - - - - - - - - - -- - - - 2525 2525 2520 2520 2515 3 0 of 8 PVC 0.4 ° 2515 400 of 8 P 120 o 8 PVC Q 0.4 % 4 355 0 8 PVC @ 0.4 21 of 12" PVC 0.22% 4 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 5' of 8" PVC 0.40% FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2510 r- O) � � M M co co O N 00 O) co M M I� M M co O O N co co O O M co 00 00 O) O O O O 0) 00 co I� 00 co r+) N c0 I� 00 O cV co O O M LO r 00 O O 00 00 O I- cfl r- 00 I� 00 N 00 00 00 00 0) O) 0) O) O) 0) O O O 0) 0) 0) 0) 0) O) O) I� n r 00 00 00 0i 0) 0i Oi O Oi O O O 0i Oi O 0i 0) 0i 0i N N N N N N N N N N N N N N N N N N M �`) M N N N N N N N N N N N N N N N N N N N N N N N N N M LO M N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 SEWER ALIGNMENT D (STA 0+00 TO 14+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' S MH #D-7 (48 INCH) S A:18+69.59 OF :0.00 RIM:2 30.96 SSMH D-8 (48-INCH SUM2535ssmii 21.59 21.40 STA:19 27.08 OFF:0.00 2535 STA:15 24.91 OFF:0.00 SSMH D-9 48-INCH I V IN:2521.40 8" PVC SUMP: 521.78 # ( ) RIM:252 .35 IN OUT:2521.40 8" PVC INV IN: 521.88 8" PVC ST :22+91.52 OFF 0.00 SUMP:2 16.06 RI :2530.66 INV IN: 516.16 8" PVC EXISTING GROUND INV OU :2521.78 8" P C S MP:2523.99 INV IN:2516.16 8" PVC - - - - - - - - - IN OUT:2523.99 " PVC 2530 INV OU :2516.06 8" PVC - - - - - - - - - - - - - - - - - - - - - - - - 2530 1� r 2525 2525 365 of 2 PVC ® 0.587- I 2520 2520 345 of 8 P C .52 ° 5' of 8" PVC 0.47% 380 of 8 PVC ® 0.4 % EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 00 00 O co t O 0 O co 0O co 00 00 rn O) 7 N N r7 N n N O O) 00 cD O) 6 0) 6 0) 6 00 00 0) 'i O O O p O O O 6 O 6 - 7 O O O O O O N N N N N N N N N N M LO n M M Ih � ) 17 p) to M M M M M M N') M ) M to N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 SEWER ALIGNMENT D (STA 14+00 TO 28+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' 2535 2535 2540 2540 STA:13+91.44 FF:0.00 SSMH #M-1 (48-INCH) RIM:2529.58 STA:3+08.43 OFF:0.00 SSMH #E-15 (48-INCH) SUMP:2519.93 vRM:2530.44 STA:21+32.6 OFF:0.00 INV IN:2520.03 " PVC MP:2521.5 RIM:2532.84 EXISTIN GROUND OUT:2521.58 8" PVC SUMP:SMH #N-3 (48 INCH) NV N25 35 8" PVC INV IN:2520.03 " PVC2530 INV OUT:2519.9 8" PVC _ _ _ _ _ _ - - - - 2530 2535 SSMHtN-2 (48-INCH TA:3+17.60 OF :325.49R INV IN:2523.5 8" PVC 2535 SSMH N-1 4 -INCH RIM:286 UMP:2523.94 INV OUT: 23.5 8 PVC # ( ) INV OUT:2523 42 8' PVC STA:??? OFF:?? ??? SUMP4.73 I V IN:2524.04 " PVC �iP z EXISTING GR UND ORIM:2530.64 INV IN24.83 8" PVC I V OUT:2523.94 8" PVCSUMP:2525.59 INV O2524.73 8" P C - - - - d - - - INV OUT:2525.5 8" PVC _ m 2525 2525 2530 - - - - - - - - - - - - - 2530 U a N u a o a 26 of 8 PVC ® 0.60% PRESCOTT RIDGE SUBDIVISION z 2520 2520 2525 125 of 8 PVC 0.60 ° 2525-v UlfMERIDIAN, IDAHO 0 0 Fvc ® 0.40 105 of 8 VC ® 0.40% I U ENGINEERING PROFILES EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT O 2 2515 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 2520 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 ON SL EN z Quo v F� O wED 00 r- 11) O N N N O O 00 O O� � 000 N 00 C) 00 0)�z O i O 0i m 6 O O O O O O O O O 0O O N N N N N N N N 04 M to M 1`0 M M � M n n 1`1 1`0 O 1 9 9 LO 20 1cm N N N N N N cq � � N CA 2O N N N N N N N NN NN N (V N N N N N N N ENGINEERING � OF �QP�� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 PHONE(208)639 6939 kmengllp.com z DATc_ / 020 d SEWER ALIGNMENT M (STA 0+00 TO 4+00) SEWER ALIGNMENT N (STA 0+00 TO 5+50) PROEECT: 8�21821140 G PROFILE SCALE J " = PROFILE SCALE VERT: 1 " = 5' HORIZ: 1 " 50' SHEET NP P3.G w HORIZ: 1 50' a VERT: 1 - 5 V 2535 2535 STA:1 +81.98 OFF:0.00 STA:12+62. 2 OFF:0.00 S MH #E-10 (48 INCH) SSMH #E- (48-INCH) SSMH #E-7 (48-INC ) RIM:2 +81. ST :12+62 S A:13+91.44 OF :0.00 SSMH #E-3 (48-INCH) SSMH #E 4 (48-INCH) SSMH #E-5 (48-INC ) STA:9+63.5 OFF:0.00 STA:1 +81.63 OFF:O. 0 R M:2529.58 SSMH #B-4 (4 -INCH) SMH #E-2 (48 INCH) STA:5+60.04 OFF:0.00 STA:7+9 .67 OFF:0.00 STA:9 05.90 OFF:0.0 R SUMP 2518.90 SUMP:2519 32 S MP:2519.93 STA:13+15.30 FF:0.00 SSMH #E-1 (4 -INCH) TA:3+96.51 OFF:0.00 RIM:2529.1 RIM:2 29.58 INV I :2519.00 8" P INV IN:251 .42 8" PVC RIM:2527.58 STA:2+99.74 OFF:0.00 IM:2527.45 RIM:2528.13 RIM:2528.34 RIM:2528. 0 SUMP:2517. 2 SUMP 2518.40 I IN:2520.03 8' PVC �INV OUT-95' 789 8" PVC INV I :2519.00 8" P INV OUT:2519.32 8" PVC I IN:2520.03 8' PVC SUMP:2515. UMP:2516.94 SUMP:2517. 97 INV IN:251 .92 8" PVC INV I :2518.50 8" PV INV 0 T:2518.90 8" VC SUMP:2514.26 RIM:2526.18 UMP:2515.22 INV IN:2516. 1 8" PVC EX STING GROUND INV IN:25 7.04 8" PVC INV I :2517.59 8" P C I OUT:2519.93 " PVC 2530 INV IN:2514.36 12" PVC SUMP:2514.90 INV IN:2514.59 " PVC INV IN:2515.00 12 PVC 114V OUT:2515.22 12" PVC 12 FVc INV OUT:2514.2 12" PVC INV OUT:2514.9 12" PVC INV OUT:251 .68 12" PVC - - - - - - - - - 2525 - - _ _ / 2525 1/ 1 2520 0of 8 PVc 0.40 2520 10 of 8 PVC @ 0.40% 0 1 f 8 PVC 0. 0 120 f 8 PVC ® 0 40% 115 of 8 FTC @ 0.407. I 235 of 8 PVC ® .40% 2515 22% 95' of 12" PVC © 0.22% 165' of 12" PVC (9 0.22% 60' f 8" PVC 0. 0% 2515 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 O 0o O � O N O) � O LO N 0) N 00 r- c0 It O 00 N (0 (0 00 c0 c0 N N 00 O r7 0) V) c0 0) N c0 00 O 00 I� c0 c0 0 Lq 00 O c0 '6 O N 00 O r'7 0) N n 0o oj O N c0 0o 0o 00 r c0 U I, r c0 6 LO c0 n ^ n 00 op o0 r 00 6 07 Dj 07 07 06 07 07 N Oi Di Oj ai Cn Di Cn Di Di 0) Cn O Oi Di Oj Di Oi N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N LO 0+25 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 SEWER ALIGNMENT E (STA 0+25 TO 15+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' 2540 2540 SSMH #E-15 (48-IN H) STA:2 +32.64 OFF:0.00 SS H #E-19 (48 INCH) SSMH #E-13 ( 8-INCH) RIM:2 532.84 SSMH # -16 (48-INCH) SSMH #E 17 (48-INCH) SSM #E-18 (48-I CH) S A:29+18.93 OF :0.00 STA:19+00.10 FF:0.00 SSMH E-14 (48-INCH) SUMP:2523.42 STA:23+ 2.17 OFF:0.00 STA:25+2 .69 OFF:0.00 ST :27+63.67 OFF: .00 RIM:2 33.64 RIM:2532.02 RIM:2532 70 RIM:253 .56 SUMP:2 28.94 STA:20 25.52 OFF:0.00 INV I :2523.52 8" P C RIM:2533.35 SSMH #E 12 (48-INCH) SUMP:2522.26 RIM:253 .72 INV I :2523.52 8" P C SUMP:25 4.50 SUMP:25 5.19 SUMP:252 3.26 INV OUT:2528.94 8' PVC 2535 SSMH E-11 8-INCH STA:17+7 .22 OFF:0.00 INV IN:2522.36 8" PVC SUMP:2 22.86 INV I :2523.52 8" P C EXISTING GROUND INV IN:2 24.60 8" PVC INV IN:25 5.29 8" PVC IN IN:2526.36 8" PVC 2535 STA:16+00.30 FF:0.00 RIM:2530. 7 INV IN: 522.96 8 PVC INV UT:2523.42 8" PVC INV OUT: 524.50 8" PVC RIM:2529.90 SUMP :25 1.64 INV OU :2522.86 8" PV INV OUT: 525.19 8" PVC SUMP:2520.87 INV IN-2' 1.74 8" PVC i� ��• _ _ - - - -'- - - - - - - - - -- - - - - - - INV IN:2520.97 8" PVC INV OUT: 521.64 8" PVC INV OUT:2520.8 8" PVC �. �.�� 2530 - - - - 2530 155 0 S Pvc ® 1.66q° 2525 P C ® 0.407- 245 of 8 PV © 0.40% 4 2525 of 10 240 of 8 PVC ® 0.41 125 6 PVC ® 0.40`0 of 8 PVC ® 0.42% 1 0 of 8 PVC 0.40% 1 0 of 8 PVC 0.40% EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 210 of PVC 0.40 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 c0 00 O r- c0 0) rM N 00 c0 O O 00 rM 00 N M 0) n 0) rn 0 N O O O O 00 N O 00 00 00 O N n N 0 O 00 0) N Ln Ln O O n c0 O O 6 O 00 N O I� n 00 0) O N N r7 N 0 c0 0) r7 0 LO c0 r- O O O O O O O O O O O O O O N N r7 M N N N N N N N N r7 r7 r7 r7 r7 r7 M rM N N N N N N N N N N M M M M r7 r7 r7 Ki Ki r7 r7 r7 N N N N N N M N r7 0 M r7 r7 r7 M r7 r7 �`) r7 r7 r7 r7 rM �`) r7 r7 r7 r7 r7 rM r7 rM n r7 r7 r7 M rM r7 LO LO LO 0 0 0 LO 0 � V) d) d) d) d L0 d) � r7 r7 � r7 r7 d) r7 d) r7 d) r7 0 r7 0 r7 u r7 0 r7 � r7 0 r7 r7 d d) r7 � r7 0 r7 � r7 N N N N N N N N N N N N N N N N N N N N N In N 0 N to N Ln N d) N d) N d) N d) N 0 N Ln N Ln N LO N Ln N CN N N N N N N N N N N N N N N N N N N N N N N N N N N 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 SEWER ALIGNMENT E (STA 15+00 TO 29+50) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH #E-3 (4 -INCH) SSMH #Q-1 (48-I CH) STA:5+60.04 OFF:0.00 STA 1+87.42 OFF:O. OR RIM:2528.13 RIM: 528.24 SSMH G-4 (48-INCH) SUMP:2515.68 SU IV P:2516.08 STA:64 46.99 OFF:0.00 2530 INV IN:2516.01 " PVC INV OUT:2516.08 1 " PVC 2530 2535 RIM:2530.04 2535 VIKR/ 1KI-I-) 7 R\lr- SSMH #P-1 (48-INC ) INV OUT:2515.6 12" PVC _ INV IN: 518.95 8" PVC - - - - - - - INV IN: 518.95 8" PVC STA:1 29.51 OFF:0.00 INV OUT: 518.85 8" PVC RIM:25 0.50 SUMP: 523.83 INV 0 T:2523.83 8" PVC EXISTING GROUND 2530 _ _ _ - - - - - - 2530 2525 1 2525 / EXISTING GRO ND z O d 2525 2525 2520 2520 U a N au o 0 135' of 12" PVC @ 0. 2% PRESCOTT RIDGE SUBDIVISION z 2520 2520 2515 2515 N MERIDIAN, IDAHO U ENGINEERING PROFILES a EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 0 2515 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 2510 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 sc j1AAL R NcyF LL Amok ao N N N N N N N M 19 4 � O s O r7 It (0 N r- 04 - r7 (0 Lc) O 00 V)O O Z O O " O Op 00 00 Na0r O N N N ZZI2OI2O pN L LO N L LO NN N N N N N N z J T � E N G I N E E R I N G � OF 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 0+00 0+50 1+00 1+50 2+00 0+00 0+50 1+00 1+50 2+00 2+50 PHONE(208)639-6939 kmengllp.com z DAT : 020 J SEWER ALIGNMENT P (STA 0+00 TO 2+00) SEWER ALIGNMENT Q (STA 0+00 TO 2+50) PROJECT: 8�21821140 PROFILE SCALE PROFILE SCALE J HORIZ: 1 " = 50' HORIZ: 1 " = 50' SHEET NO. w P P 3.7 VERT: 1 " = 5' VERT: 1 " = 5' 2535 2535 STA:1 +44.91 OFF:O. 0 SSMH F-4 (48-INCH) RIM:2 29.89 SSMH F-3 (48-INCH) STA:3+ 5.54 OFF:0.00 SUMP 2514.44 S MH #F-2 (48 INCH) RIM:252 .04 STA:2+ 5.32 OFF:0.00 INV I :2514.54 8" PVC SSMH #F-1 (4 -INCH) S A:1+44.46 OFF .00 RIM:252 7.65 SUMP:2 17.99 INV I :2514.54 8" PVC STA:0+50.00 OFF:0.00 R M:2526.99 SUMP:2 18.69 EXISTIN GROUND INV IN: 518.09 8" PVC INV 0 T:2514.44 8" VC 2530 RIM:2526.45 INV OU :2517.99 8" PV _ _ 2530 2540 SSM 1 #I-2 (48-IN H) 2540 INV OUT:2519.7 8" PVC INV UT:2 INV OUT:2519.12 8" PVC 9.22 8 PVC INV OU :2518.69 8" PV - _ - - - - - SSMH I-1 (48-INCH) RIM: 531.93 STA:O+ 0.00 OFF:0.00 SUMP:2525.86 SS H #H-5 (48-I CH) - - - - RIM:2531.90 INV IN:2525.96 8" FVC ST :10+24.79 OFF:0.00 - - _ - - - - - SUMP:2526.18 INV OUT:2525.86 8" PVC RIM:25 2.77 - - - - - - - - - INV OUT:2 26.18 8" PVC SSMH #1-3 ( 8-INCH) SUMP:25 4.43 2525 2525 2535 STA:1+55.06 FF:0.00 IN IN:2524.53 8" PVC 2535 SUMP:2525.49 INV UT:2524.43 8" PVC INV IN:2525.5 8" PVC INV OUT:2525. 9 8" PVC- EXISTING G OUND 2520 1 a r, 2520 2530 2530 07 0 of 8 PVC 0.407. 150 of 8 VC @ 0.407. 1 0 2515 2515 2525 1 °f s PVC o 2525 70' of 8" PVC Q 0.4 % L35' of 8" PVC ® 0.6 % EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2520 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 N O Inul I� O O M N 0) M 00 N N (0 O O O 0) O O I- n N 0 00 r (0 6 (0 (6 (0 (6 r, O 00 00 06 00 '6 0) 6 O Q N O Cn N Cn N N N N N N N N N N N N N N N N N N N N N N N N N N N N K) r7 r7 r7 r7 Ln P7 Ln r7 L M L M 0 M N N N (V N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 SEWER ALIGNMENT F (STA 0+00 TO 5+50) SEWER ALIGNMENT I (STA 0+00 TO 3+50) PROFILE SCALE PROFILE SCALE HORIZ: 1 " = 50' HORIZ: 1 " = 50' VERT: 1 " = 5' VERT: 1 " = 5' SS H #G-6 (48-I CH) SSMH #G 5 (48-INCH) SSMH #G-1 (48 INCH) ST :11+89.37 OFF:0.00 TA:1+47.01 OFF:0.00 STA:9+17. 1 OFF:0.00 RI :l 1+89. SSMH #G-7 (48-INC ) IM:2528.61 RIM:2529. 1 UMP:2516.51 SMH #G-4 (48 INCH) SUMP:252 .03 SU P:2523.53 STA:1 +54•RIM�5302.� 2535 TA:6+46.99 OFF:0.00 INV IN:252 .13 8" PVC IN IN:2523.64 8" PVC 2535 STA:15+24.91 FF:0.00 SSMH G-3 (48-INCHRIM 84 INV IN:252 .13 8" PVC \. I V OUT:2516.51 8" PVC STA:4+ 7.53 OFF:0.00 UMP:2518.85 / � � � INV OU :2524.63 8" PVC RIM:2529.35 SSMH #G-2 48-INCH) I qV IN:2518.95 " PVC INV OUT:2 20.03 8" PVC SUMP:2516.06 STA:2+08.08 OFF:0.00 RIM:25 9.89 INV IN:2516.16 " PVC RIM:2528.96 SUMP: 517.87 I V IN:2518.95 " PVC PVC SUMP:2516.9 INV IN: 517.97 8" PVC I V OUT:2518.85 8" PVC INV IN:2516.16 2530 INV OUT:2516.0 8" PVC VIKIV Q1 IT-9r�l r Or) A" PVr' INV IN:2517. 0 8" PVC INV OU :2517.87 8" PVC - 2530 _ - - - - - - - EX STING GROUND 2525 1 2525 165 f 8 PVC © 0. 0 0 270 of 8 PVC @ 1.2 5% 2520 I 2520 20 ® 0.40% of 8 PVC ° 220 0 8 PVC 0.4 % 95 of 8 P C @ 0.3610 EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 L60' of 8" PVC @ .46% FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 N O L O M O r` N r7 It O0) It It 0) It r` M O 0) LOrl) rM �O O . - O0) V) � 00 00 OO OO to N O 0 0 00 00 n ) 0 0) r� 00 cq N N c6 ai O ai0) 06 N r 'i N NN N NN N CA 000 O n N 7 N N N N N N M M M rM N N 00N NN N N V) MM M M M M M rM rONM0 � 0 0 0 ` LO LO N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 SEWER ALIGNMENT G (STA 0+00 TO 14+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH #H- (48-INCH) SSMH #H 4 (48-INCH) SSMH #H-6 (48 INCH) SSMH #G-5 (4 -INCH) STA:5+11. 2 OFF:0.00 STA:7+68. 1 OFF:0.00 SSMH # -5 (48-INCH) TA:12+69.94 OFF:0.00 STA:9+17.21 OFF:0.00 RIM:2531.5 RIM:2534. 9 STA:10 24.79 OFF:0.00 RIM:2 33.25 SSMH #H-7 (48-INC ) RIM:2529.71 SUMP:2522 18 SUMP:252 .30 RIM:253 .77 STA:1 +55.45 OFF:O. 0 2535 SUMP:2520.03 SS H #H-1 (48-I CH) SSMH #H-2 (48-INCH) INV IN:252 .28 8" PVC INV IN:25 3.40 8" PVC SUMP:2 24.43 I V IN:2526 25su� .2 2 PVC RIM:2533. 8 2535 STA:10+ 6.50 OFF:379.8 R PVC RIM 2530.10 RIM:2531. 0 - - _ _ _ IN OUT:2526.15 PVC INV OU :2526.83 8" P C INV IN:2520.13 SUNP:2520.68 SUMP:2521. 6 _ INV IN:2 24.53 8" PVC INV OUT:2520.0 8" PVC INV IN:2520.78 8" PVC INV I :2521.96 8" P IC _ - - - - - - - - - - - - - - -• _ _ _ _ INV OU 2524.43 8" PV INV OUT:2520.68 8' PVC INV 0 T:2521.86 8" P/C - - - - - - - -'- - � - - - EXISTING GROUND 2530 2530 z o PVC © 0.68 O 85 of X 2525 245 of 8 P C@ 0.66% U N 2525 255 of 8 PVC ® 0.407- 55 of 8 PVC 0 f 8 PVC 0 0% 0 270 of 8 PVC (� 040% PRESCOTT RIDGE SUBDIVISION z 2520 140 ° 8 PVc ® � �% 2520 MERIDIAN, IDAHO O ENGINEERING PROFILES U EXISTI 4G GROUND CENTERLINE OF SEWER PIPE ALIGNMENT LL O 2515 FFINI H GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 SS\ANAL F �y RF FAdilik <, z Q p w L0 N r- L N N r) O I- O 0) N O N O N rn rn a0 N r- (0 Lc) r7 r7 O 0) r- O c0 to 00 O O O N c0 O z Z Ln N N r O N 7 r7 r` c0 r7 rn r` c0 r rn r7 1 9 4 ai 0) °j O Q O O O Q C5 O N N N nj r7 r7 r7 r7 r7 r7 r7 r7 N N N M M M M r7 z N N 10 M r) M V) r� i PO M r7 r) V) i � n n r vi r n r7 V) N V) N 11) N V) N 11) N n n n r� n n vi rM 0 N Ln N L0 r7 0 r) � r7 0 r7 LQ r7 d) r) V) r0 Ln r7 0 r7 Ln r7 � r7 � r7 r7 � r7 r7 r7 r7 r7 r7 r7 r7 r7 M M n r7 d N LO N N N L N L N L N V) N c N d N 0 N N N N N N L N LO N 0 N ZZI2O/2O o N N N N N N N N N N N N N N N N N N N N N N N N N PZ` E N G I N E E R I N G v N � N � N � N � N � N � N � N � N � N � N � N � � F OF �� �� 9233 WEST STATE STREET lTF1EW S•�� BOISE,IDAHO 83714 0+25 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 PHONE(208)639 6939 kmengllp.com z DATE: 8/26/2020if C SEWER ALIGNMENT H (STA 0+00 TO 14+00) PROJECT: 18-140 c PROFILE SCALE J HORIZ: 1 " = 50' SHEET NO. W P P3 VERT: 1 " = 5' .8 2535 2535 SSMH #S-1 ( 8-INCH) STA:3+ 0.33 OFF:0.00 SSMH #J-1 (4 -INCH) STA:0+55.00 FF:0.00 RIM:252 3.22 STA:0+50.00 OFF:0.00 RIM:2530.85 RIM:2529.15 SUMP:2 511.01 SUMP:2510.75 INV IN: 511.35 8" PVC SUMP:2524.18 INV IN:2510.7 12" PVC INV IN: 511.11 12" PV 2535 INV OUT:2524. ( 18 8" PVC 3SMH #J-3 (48 INCH) SSMH # -8 (48-INCH) 2535 2530 INV OU :2511.01 12" P C 2530 S :0+92.19 OFF:0.00 IM:2530.36 RIM:252 .89 n� RI :2530.75 UMP:2523.10 SUMP-2 18.90 SL MP:2523.83 NV IN:2523.20 " PVC INV IN:2 19.00 8" PVC - - oil- - - - IN IN:2523.93 8" PVC EXISTING GROUND NV OUT:2523.1 8" PVC INV IN:2 19.00 8" PVC IN OUT:2523.83 " PVC INV OU 2518.90 8" PVIEXISTING GROUND 2530 - - - - - - - - - -- - - - - - - - - - - - 2530 2525 2525 2525 2525 2520 2520 155 f 8 PVC ® 0. 0% ff4Oof8" PVC@0.6 % 0 V 2520 2520 2515 2515 I EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT O EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2515 120' of 12" PVC @ 0.2 % FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 2510 00 LO O N cN 0N r-N N N N N N N0 N O 0) N N N N N ro i O O O O O OO O V � u U) M LO M ro 0 to 0 to M c O O N N N N N cd LO N LO N LO N U) N V N L LO Ln N N N N � Ln L Ln LO N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 SEWER ALIGNMENT J (STA 0+00 TO 4+50) SEWER ALIGNMENT S (STA 0+00 TO 2+50) PROFILE SCALE PROFILE SCALE HORIZ: 1 " = 50' HORIZ: 1 " = 50' VERT: 1 " = 5' VERT: 1 " = 5' SSMH #13 2 (48-INCH) SSMH #D-2 (48-INC ) STA:6+37 41 OFF:0.00 SSMH #T-1 (48-INCH) STA:1+77.26 OFF:0.00 SSMH #C-5 (4 -INCH) RIM:2526. 6 STA:1+77.0 OFF:-242.41 L RIM:2527. 8 2530 STA:6+21.15 OFF:0.00 SUMP:2512.56 RIM:2526.8 8 SUMP:2511. SUMP:2512 26 2530 SUMP:2513.98 INV IN:25 2.90 8" PVC INV IN:251 .36 12" PVC 1 8" PVC INV IN:2514.08 " PVC INV IN:25 2.66 12" PVC INV OUT:25 2.26 12" PVC INV I :251INV OUT 251 12.02.0 12" PVC INV IN:2514.08 " PVC E ISTING GROUND INV OUT: 512.56 12" PV _ INV OUT:2513.9 8" PVC - - - -' - - 2525 - - - - 2525 2520 2520 2515 2515 2 0 of'8 PVC 0.407. 5' of 12" PVC@0.2 % 2 0' of 12" PVC @ 0.24% B EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 FFINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2510 c0 00 I� 0 0 0 c0 M N 00 c0 0 0 to I� N O) N N O 0 0 M �(') c0 rM � 't 't O � � t0 t0 CO (D c4 '6 c4 O) M M n � � M 0 0 cD c0 cD I� n r- N N N LO N N N N N N N N N N N N N LO N N N N N N N N N N N LO N LO N N C N N N 04 N N LO N N N N N N N N N N N N N N N N N N N N N N N N N N N N 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 SEWER ALIGNMENT T (STA 0+00 TO 2+00) PROFILE SCALE HORIZ: 1 " = 50' VERT: 1 " = 5' SSMH # -7 (48-INCH) STA:18 69.59 OFF:0.00 2540 RIM:2530.96 2540 INV IN: 521.50 8" PVC SSMH #U-1 (48 INCH) INV IN: 521.40 8" PVC S A:0+91.25 OFF 0.00 INV OUT: 521.40 8" PVC R M:2531.19 S MP:2523.96 I V IN:2524.06 8' PVC 2535 I V OUT:2523.96 8" PVC 2535 SSMH U- 48-INCH STA:1+63.1 OFF:0.00 EX STING GROUND RIM:2531.1 SUMP:2524. 0 z INV OUT:25 4.50 8" PVC O 2530 2530 X N u a o a 2525 2525 PRESCOTT RIDGE SUBDIVISION z O MERIDIAN, IDAHO U 70' of 8" PVC ® .60% ENGINEERING PROFILES 4 of 8" PVC 6.21 o EXISTING GROUND CENTERLINE OF SEWER PIPE ALIGNMENT O FINISH GROUND CENTERLINE OF SEWER PIPE ALIGNMENT 2520 2520 sS�ONAL FLL Nc, s N N N(D Lo ro Lo V) LO U-) LO U-) LO Lo lcm LO 0 �� O z Z N N N (V N N N N N N ZZI to p E N G I N E E R I N G OF 9233 WEST STATE STREET 0+00 0+50 1+00 1+50 2+00 2+50 lTF1EW S.• BOISE,IDAHO 83714 PHONE(208)639-6939 kmengllp.com z if SEWER ALIGNMENT U (STA 0+00 TO 2+50) DATE: 8/26/2020 G d PROJECT: 18-140 PROFILE SCALE J HORIZ: 1 " = 50' SHEET NO. W VERT: 1 " = 5' P P3.9 a W. CHINDEN BLVD. (HWY 20/26) VICINITY MAP : 1"=1,000' PRESCOTT PRELIMINARY PLATSHOWINGEP (-EP EP r' EP EP EP EP EP EP d3 d3 d3 d3 m WLL L�l W j m W.CHINDEN BLVD. A PARCEL OF LAND SITUATED IN A PORTION OF THE NORTHEAST W _ _ 1/4 OF THE NORTHWEST 1/4 OF SECTION 28, TOWNSHIP 4 NORTH, ' . IN RANGE 1 WEST BOISE MERIDIAN ADA COUNTY IDAHO I LEGEND PRELIMINARY PLAT DATA I I I O u � RUT RUT SITE DATA - - \ I I U BOUNDARY LINE PROPOSED ZONING R-8,R-15,C-G w PRESCOTT COMPREHENSIVE PLAN DESIGNATION MEDIUM DENSITY RESIDENTIAL (MDR) \ I SUBDIVISION Q ADJACENT PROPERTY LINE \ \ C Co TOTAL R-8 AREA 99.41 ACRES ` \ I G PRE-PLAT LOT LINE RESIDENTIAL BUILDABLE LOT AREA 43.61 ACRES BOUNDARY z RESIDENTIAL COMMON AREA 10.87 ACRES e e e PROPOSED TO POTENTIALLY DEVELOP ROW 16.93 ACRES I AS ZERO LOT LINE LOTS. THESE LOTS SCHOOL PARCEL 28.00 ACRES 3.07 UNITS/ACRE SWILL BE UBMITTAL.DETERMINED UPON FINAL PLATGROSS DENSITY NET DENSITY 6.90 UNITS/ACRE - - _ _ _ I OPEN SPACE LOT AREAS SECTION LINE TOTAL R-15 AREA 8.95 ACRES ROW 1.00 ACRES I I 80 I BLOCK # LOT # LOT AREA (SF) QUALIFIED OPEN SPACE (SF) QUALIFIED OPEN RESIDENTIAL BUILDABLE LOT AREA 4.59 ACRES I BLOCK 8 C SPACE (ACRES) R/W R/W C-G RUT RIGHT OF WAY LINE RESIDENTIAL COMMON AREA 3.37 ACRES 12,543 I ( EP EP EXISTING EDGE OF PAVEMENT LINE GROSS DENSITY .80 UNITS/ACRE I 1 1 9,648 INCLUDES 100% OF MCDERMOTT 0.29 NET DENSITY 13.46 UNITS/ACRE I � � COLLECTOR FROMLANDSCAPE BUFFER R-4 ADJACENT PROPERTY ZONE LOT NUMBER TOTAL COMMERCIAL LOT AREA (C-G) 18.18 ACRES I - - - - 1 8 2,672 0 0.00 9 TOTAL SITE AREA 126.53 ACRES RUT I 1 19 2,230 2,230 0.05 BLOCK 12 BLOCK NUMBER I 1 30 4,400 4,290 0.10 OVERALL LOT DATA I I: 2 1 25,218 24,036 0.55 SURVEY CONTROL NOTES TOTAL LOTS 418 I I W. RAMBLIN ST.I 2 9 2,040 0 0.00 SINGLE FAMILY DETACHED RESIDENTIAL LOTS 215 SINGLE FAMILY ATTACHED RESIDENTIAL LOTS 102 2 27 1,020 0 0.00 1. ALL SURVEY DATA IS BASED ON THE NAD83 STATE PLANE TOWNHOMES LOTS 38 I / / / I M/21 / 3 1 20,125 20,125 0.46 COORDINATE SYSTEM (IDAHO WEST 1103) AND VERTICAL MULTIFAMILY LOTS 14 (NAVD88) DATUM. COMMERCIAL LOTS 1 / / I 80 81 75 74 3 13 2,040 0 0.00 COMMON LOTS 41 I I 10,124 CONTACT INFORMATION SHARED DRIVEWAY LOTS 6 SCHOOL LOTS 1 79 4 1 8,068 INCLUDES 100% OF MCDERMOTT 0.23 DEVELOPER/OWNER ENGINEER/SURVEYOR MINIMUM PROPERTY SIZE 4000 SQ. FT. I Q� 78 66 77 76 73 COLLECTOR LANDSCAPE BUFFER AVERAGE SINGLE FAMILY PROPERTY SIZE 6028 SQ. FT. I Y 5 1 1,020 0 0.00 PROVIDENCE PROPERTIES KM ENGINEERING AVERAGE TOWNHOME PROPERTY SIZE 2302 SQ. FT. RUT 701 S. ALLEN ST. #104 9233 WEST STATE STREET 5 15 1,038 0 0.00 I I O MERIDIAN, ID 83642 BOISE, IDAHO 83714 PEREGRINE PHONE: (208) 639-6939 QUALIFIED OPEN SPACE AND DENSITIES (RESIDENTIAL) RUT HEIGHTS I I 6 1 1,020 0 0.00 CONTACT: MATT DERR, P.E. ACREAGE OF QUALIFIED OPEN SPACE 12.43 ACRES cn EMAIL: mderr@kmengllp.com PERCENTAGE OF QUALIFIED OPEN SPACE 11.83% SUBDIVISION I I I 1 72 6 6 1,020 0 0.00 I. GROSS DENSITY 2.99 UNITS/ACRE _I MATCH LINE -SEE SHEET PP2.3 6 12 33,450 33,450 0.77 I z 67 6 18 3, 47 0 0.77 68 69 70 NET DENSITY 7.49 UNITS/ACRE - - 71MATCH LINE -SEE SHEET PP2.2 \ � � 6 23 1,020 0 0.00 11 ) 65 7 1 1,025 0 0.00 - - 12 13 27` 2g 29 30 31 '• 32 33 34 35 43 56 3,567 36 37 3g 41 42 f O O O O O O 58 7 15 2,324 INCLUDES 100% 0.08 I � 3940 , � 64 63 62 61 60 59 O OF N. RUSTIC ••• SS OAK WAY LANDSCAPE BUFFER 10 N. HIGHFIRE LOOP 8 1 1,020 0 0.00 8 4 7,735 7,735 0.18 14 26 W. LOST RAPIDS ST. 57 54 8 12 2,324 2,324 0.05 54 - - 25 55 56 57 58 59 60 S3 8 17 627 0 0.00 gO 24 61 62 63 - 64 65 66 67 '. • 8 27 31,011 22,840 0.52 Z 23 68 29 28 27 26 25 24 23 S2 4,206 22 8 43 3,293 INCLUDES 100% 0.10 ' O BLOCK 8 R-15 51 I OF N. RUSTIC O 15 I` WEST ADA OAK WAY LANDSCAPE BUFFER O m 21 47 +`+` `� 16 BLOCK 14 22 50 I SCHOOL 9,058 20 PARCEL 8 44 6,696 0.21 Z 44 INCLUDES 100% OF N. RUSTIC 18R-8 OAK WAY LANDSCAPE BUFFER 48 I 17 46 I 14 17 48 8 47 36,367 24,966 0.57 / O W. WILDFIRE DR. 45 / I � W. WILDFIRE ST. 47 D = D 8 68 20,268 0 0.00 206,267 - - / _ _ 2 9 1 198,094 INCLUDES LOAD OF N. RUSTIC 4.74 I O O3 O4 O O O7 1 12 17 US ZI z OAK WAY LANDSCAPE BUFFER r*+ m 9 25 842 0 0.00 6 O 11 16 ' 44 m� cn 9 29 6,483 6,483 0.15 m I / ` I 10 15 > M N 21,444 ` I Z % ,/ O Q 43 O 2 = 10 1 17,141 INCLUDES 100% OF N. RUSTIC 0.49 7 5 p 40 j, 9 14 Z �� m OAK WAY LANDSCAPE BUFFER BLOCK 1 O O v O /, 42 1 1 7 22,262 22,262 0.51 Y u 9 / !` 13 N� N 3,567 BLOCK 8• - 3- rcy.` :% 1 N 41 W 12 1 2,185 0.08 O7 O'. INCLUDES LOAD OF N. RUSTIC O9 10 Z �/� / 12 OAK WAY LANDSCAPE BUFFER O F / 6 O z 40 11 I BLOCK 13 O 12 10 2,336 0 0.005 8 12 7Q Q' Cy�`�` SF '+ '.� �+ 1 . 13 > O 38 - "•`•`-!�ti FS`y`.'.y ! 5I 11 39 12 22 2,040 0 0.00 14 O F'. 4 12 33 22,254 22,254 0.51 O 15 16 17 1g O 10 38 12 47 2,240 2,240 0.05 �T 19 2p 21 22 _ RUT 25 26 s / KKR DR• 37 `ryF�• ,2 03 O 9 O 12 57 2,076 0 0.00 O W. F�RE(1 O 23 24 25 z W.'IPN BLOCK 9 . /' �AA� GLc O 37 3,616 NE pR. 26 27 36 707. / 1 y O4 O Og 12 65 3,616 INCLUDES LOAD OF N. RUSTIC 0.08 O 2 O 28 29 30 24 35 ". / r giys �.. O 36 I OAK WAY LANDSCAPE BUFFER 34 % 9GL j 12 66 43557 0 0 BLOCK 3 O O 32 33 O 7 O 2,677 W. STURGILL PEAK ST. 6 O7 I 31 / W, 12 79 3150 INCLUDES 100% OF N. RUSTIC w OW O O 10 W' F�RELINE C I 23 . 29. . 30 / 13 24 FARE(/NE pR - 34 OAK WAY LANDSCAPE BUFFER O T, ,• O 13 1 42,469 42,469 0.97 U �`- 11 12 4% 25 - ,.:• :. 18,739 17 26 Z O 22 21 O O7 O ± ` 22 28 O / 12 21 O 27 BLOCK 12 14 1 14,258 0.43 20 Q 18 / 28 29 INCLUDES LOAD OF N. RUSTIC u; 19 W O O 16 20 30 OAK WAY LANDSCAPE BUFFER O Q O 31 a 33".'.". 14 17 2,092 0 0.00 O O Q O 1 21 Z 27 32 I'` BLOCK 4 0 16 15 0 1 I 14 22 1,956 0 0.00 va- 14 N BLOCK 2 a 19 3 }! 10 19 I 15 6 1,179 1179 1 O W. PARACHUTE DR. 10 11 26 % ; ; 20 :v O �P O _ + 10,681 z O 13 O Q 15 �� - - 9,661 O 5 Z 14 15 16 17 18 Z �! INCLUDES LAND OF N. RUSTIC 0.25 _ OAK WAY LANDSCAPE BUFFER 7 O O 19 25 24 23 22 21 14 / O QL� O9 18 NORTH OF BLOCK 12 LOTS 70 82 1 O O O O O O O BLOCK 5 20 O / I 8' PLANTERS STRIP (SEE STREET TREE 0 0.00 U a CALCS) 10 > 17 I 12.43 N W. PARACHUTE DR. 13 / w-� Q I TOTAL OPEN SPACE u O N 0.nj ,'� O 11 0 0 120 240 360 I 11 7 18. 12 J" 5 LL R-4 PRESCOTT RIDGE SUBDIVISION z O O O I 19 O O 12 16 Nor9 „ui �. O O Plan Scale: 1" = 120' O 8 O 10 11 BLOCK 6 13 C N ( N 16 17 � 4 N MERIDIAN, IDAHO H O 12 ui l w o N 20 J 11 / O 13 BLOCK 11 ` z 15 I COVER SHEET ui W " N 13 W ■ Q LL Z Z J O S�pNAL fN G RUT 33 32 31 30 29 28 = I� = 25 24 �• 14 o��S \ST F- 22 Og O �� O w 15 6 23 z z I Lu W. SMOKEJUMPER ST. 13 I J�11/20/20 0 d > Q � Q Y q I Q 10 I '�,9 rF OF �QP�� 9233 WEST STATE STREET Z O l BOISE,IDAHO 83714 a O 20 3 4 s 6 ' p BLOCK 7 v Z O O - 1 2 3 4 5 I BLOCK 12 12 TyEW S• Q PHONE(208)639-6939 kmengllp.com z O O O O O O O7 8 O9 10 11 12 13 14 1s � 1 O O O O O O 8 9 - - - - - - - - _ z _ _ _ Z O O Digitally signed by DATE: 8/26/2020 L _ _ - - - - - - - _ - - - - 11 - - - - - PROJECT: 18 140 _ _ _ _ _ -- - - - Matthew S. Derr, PE J s R-8 - Date: 2020.11.20 SHEET NO. w R-4 09:18:43 -07'00' P P 1.0 a I � ® a a W W 93� ` W 4 W w W W y 40, , yWyW 111+ d 40 w 1 y W W 25, 70, W W 40 I I WW o 40+� 3� 11 N 10 26' 14, �^ O T�� O 8 G 11 N � � W W WWWW 5 12 N 4p 1 W O 40 10' ^ 13 cv " 4Q W 2Q', 40' N BLOCK 1 23' R/20' 40' 39 1 14 15 40 w W K/w O �lv 4p'4 ti R 40 �29' "� w0' W4—A R/w40, 3, 5, 19 4p' 4p41 R/w�_ R/w 32 W ^ 21 ^ " 40 �62' 48 R w R/w 40' 22 4p, 4' Riw ^ 23 ^ " 35 W f Y W W W W W 2�' R W= W 24 w 111' 9' R w /W 4p+ O 26 g, w w ��. �. � 3,i. �. �. �. � � \R/ R/w 40' O ^ 27 " 1 g' �3 _ /w R/w_ O " 96•� > R 8 45' /w 40' 28 5' 4p w R/w _R/W 4Q' 29 0 30 24 N 107' 6' N O o 50' R/w W. Fl RELINE R/ =R ^ 1 3 y y y N 3 D / 4Q, O R. _R/W 40, p '1� R/W '� �b 28' R/W R/W R/W y y y 4 p' R W k y 104' 14' O N 5p R/W /w 4Q R/w R 40 ' W w 117' BLOCK 3 O cv 40, R/w K/w 11 12 0 1 o O 45' 14' o /w R/ o0 N A W. STURGILL PEAK ST. y iv O 2 0 1 O8 cv 6' 21' 3 o 23 12' y 44, O cv 14'�� 35 R/w y 28' 35' ^ R/w 10 "� 4Q W w M/a a M,'� 14' "o W W W W 7 16 24, N 11 cv W 6 40'w R, oN 32� 18' 12 ^ 47.00 W 40,W R/w �\� 117 1 O7' y y y 4p o 4Q' R/w y y y y I N W W > Q W W W W W 5p J� W 39 R/W W W W W W W W 1 y o 6 3 y 4p, y o^ O 40 y y y� 22 l7 2 Lo a W ro� 22 ,� 20' N Oj cv 21> W W W W W W W W W 21 2O' 3 W W ^ W W W W W W W W w ? W W W W W W W W O N 20 � " 0' 20, r/ 3 ^ O N w ✓ ✓ ✓ w w :�8+w a0 1 12' 19 40, 50, "krn v r� O N 1 w W w w Z 3y w w w y O N " ^ O N + y y y 'k + W BLOCK 4 W W W W W O 13 115 10' O3 cv BLOCK 2 1 12' o y 17 " ~i 9 40, 1 p' y y y W U) O OTi W W W W O ^ O O W W W W W W W W W W W `nr �1 4' 16 " 30' 3 ro 21 0 ^ 1 1 112' R/w 60 I N/ R/W49 /W 46' R/W 46 10 15 ^ 14 40 4p, 10 WWWWWW WyWyWWWWWW F W W �W 3 /W A ps O O 3 3p, W W W W W W W W W W W W 1 112' /W � � . ^ 2p' �. y �. �. .� y y .� y �. �. � 1 4O o W. PARACHUTE DR. R/w= X 0 50' W W W W W W W W W W W W N. W W `n R/w k W W 10 50' 50' 51' W o o f l'1 11 _ co 20 � 1 N 112 M/�, M/a /a M/a M/H R/w 60 6 _ .� o ��r�46' 50' 50' 14' 36' M/a 50 M _R/W 45, lye 12 a 6' _M/ kiw 6' 13 W 52, y w w W W W o O Lo o W 7IC > M/a 9 M/a_ 14' M/ 45 112' a 1 3' M/ _ 14' a�M 6Q 15 O6 17 18 W W 112' ^^/a �M,a W o uj co O 4' ,)A 1 W y �. y �. . � O o O 57 M/a_ �� M/a 5= 19 N 0' y y rn O M/a W W w W W oo O 00Y tea' 8 BLOCK 5 �. , M/a 3p/a 20' 2' 108' W �N �� g2+ M/a�M/a 48 50 51 �16 W W 47.00' O 10 Nr\ \� 1 �_M/a M/a M aM/a117' M/a I W 30' 27_� —1 12' — — 47 10, — 50' — 50' S0' 50' — 50' — 58 — — — — `v 6 56 /a_ o — 91' 0 co 10' 51, M/a �M/a W 50' �� 60' 23' M/a 2 7 �A/a M/a-� M/a nM,/a M/a M/ M is 150 50 60 z LAYOUT PLAN �o �Y 112' � N W W W W W W W W W W W I J 11 °' 7 y y y y W O O W W W W W W W W W W W 0 50 100 150 8 00 112 N' Plan Scale: 1" = 50' o O o 11 W W W W W W W W W W 13 14 FW W W W W W W W W W J J J y W y y y y I� 12 Lu Q 1 12'Lu BLOCK 6 1 112' 64' 50' 50' 60' 50' W W W W W W W W W W N 12 50, 60' Z O W W y y W O 13 O 47.00' 1 12' z PROPOSED TO POTENTIALLY O L `� W W W W W W W W W W DEVELOP AS ZERO LOT LINE Z� T � y y y � � W y y y y � 14 � O coo 1 LOTS. THESE LOTS WILL BE U 'n O DETERMINED UPON FINAL PLAT N I 6' 6 10> SUBMITTAL. V 1 O7 W W W W W W W W W W W �� W 109' 15 W W W R' W W 6 64' 50' 50' 60' 50' W W W W W 'W W W W W ' ' P R E S COTT RIDGE SUBDIVISION z R/ry 99' R/W R/W 97' R/W R W rc/W R/W R/ R/W R/W R/ R/W w �/W w R/W 1 50 wR/W w R/W R WQ R/W 6Q R/W 1 MERIDIAN, IDAHO O O o U 0 0 N 1 LAYOUT PLAN o �M/)+ M a nn/a M/a M/a M/N M/ M/a 16' O —R/w R W R/w /W R/W R/W R/W R/W R/W R/w R/ LL I 68' 60' 60 68 57 4�14' 65' 70' 60' 70' 70' 66' I SS�pNAI FNc O 4' a �6' �'yF W 1 � O 3 3 11 4 z z o s 11/20/20 o I N O O O 4 N 5 0 6\ 2 N 3 N N N �q/ P� E N G I N E E R I N G O O o1 0) c i 1 o O O 4O 5O ,9 F OF �� �� 9233 WEST STATE STREET z O N O r) lTyEW S.';) �' or- BOISE,IDAHO83714 a PHONE(208)639-6939 W a kmengllp.com z 47.00 DATE: 8/26/2020 C PROJECT: 18140 C a 68' 60' 60' — —68 60' 1W1' 47' 10' 70' 70' 60' 70' 31' J SHEET NO. Lu —39 — 66' P P 2.O a MATCH LINE - SEE SHEET PP2.2 ................ W W W W W W W Z1� 39 W W W W W W W / W w W Ww3 8W`ti1 WWw1 0WW' WWW WWW WWW WW�W^,WWWW WWW�W ^WWWWWWW WWWWW�W �WWWWWWWw WWWWW�W �WWWWWWWw WWyWWWW o�WWWWWWwB LWWyWWWWO yyWWWWWC KWWWWWW 9yyWWWWWWW WWWWWWW yyWWWWWWW WWWWWWW yyWWWWWWW WWWWWWW �WWWWWWWw WWWWWWW �WWWWWWWw WyWWWWW WWWWWWWw yWWWWW WWWWWWWw,WWWWW WWWWWWW WWWWWW �W ,OWWP J,77O Co 27 �� 6' 0' 96 47 0 d / \�W \� , M/a MI3 -\ 6 14' �b 46' g0 q2 w a6' �It ,�' 3 if- '6 8 10 ti \'a M1a `'O' O W W W W W W W W W W W W W W W W W W W W / W W 41 W 90, 'pj// O , W W W ry V 6' 11 W 0 , 1 v) 14 O o ' e W ' 700 77, O K W W W W W W W W W W W W W W W W W W W W W W�\� CO � W 13 � \ O 22W , y y y y y y y y y y y y .O0. \\ 7 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 1 104' 77 / J W W W W W W W W W W W W W W W W W W W W W 7, g 4� p O I 1 j7 N 180 Q 1 10 W W W W W W W W W W W W W W W W W W ,�7 6' 14' 20 }11 O 7S�' y . . . .y O O O \� 6' z 35 O � I 11u 1 10' ^ R 3 77, R/w 1 o 19 0 Q Q qpO 21' O O / 77, O \ N 1 50' a 1 50' 50' 43' 32 �00 rO 15 Lo h� BLOCK 10 \� �\'d M 113' �W f 1 W W W W W W W W W W 7 V110' 7, 7 A W 25 00 O rn rn O 20 14 0 . ui Lo 7 \:Q� �4 61 v Y� O �O (i 77 W W 113' W 45' 50' 50' 43' 12' K/w R/W KIW R/W 4�W 14' W w W v W O 17 O � 1 R/w 2O - i� / � w 7 7 w w w O I\ 1 W. PARACHUTE DR. O Oa �\ �p Q \ W y / y 11 � x OLu Z �/a M/a Mia M/a M/ MA 91 M/a m8, 1 W W3' \ W �O 7 LL 113' 50 60 54' 18 ��� 20' 13, ,�� �\ W 7 J 10' 91, 24' OA 4r O 77 n 3 Ln 1 15 16 `V 17 12 77� th 77 Q 120' G o 20 - A// 11 / 13 47.00' 1 Lo Lo 3 15r y y y y y y y y " 47.00' 112 �j (D 15 113' W W 176' 49' 50' 43' W W W W W W W W W W W W 50, 60 54' � W W k, W W W W W W W W W W W 1 �o y 3 y 17 50' 60' 50' y 1 ^v- \ 112'N 1 12' a N 1 12' N N 1 26 25 24 2 W W A - - W 3-oo oY 1 12' �� 1 O O O O O 14 o 0 1 z,� 22 6' 6> 9 0 \ OLoO 3 w 1 10 �i� 6 NA �N ��2 107 ��' 107' 4y� A W 90' 1 12' tR50' R/W 60' R/W R/w4' R/yy. W W Ryw 23 R/W w �� O W 55 ' ' , \� 97' �'�� / , R/�N M/21 M/N M/21 M/21 M/a M/?J 60 M/21 M/ao' M/2J 60 M/H 3m/� �a 24' 92 1 0 14' 84 14, \� 13 0 W. SMOKEJUMPER ST. o 30' z W. SMOKEJUMPER ST. �, O VW-i W R/W /W R/W R/W R/W R/w R W R/W R/W R/W R/w �I� PROPOSED TO POTENTIALLY 1 70 70' 70' 60' 60' 60' 55' �� R/ R/W R/W R/W R/W R/W R/w R/W R/W R/W R/W R/w�r' DEVELOP AS ZERO LOT LINE 58 70 60 70' 60' 70' 60' 21' 4d O. 10 112' LOTS. THESE LOTS WILL BE U Nq) u 7' p o I DETERMINED UPON FINAL PLAT �' I SUBMITTAL. a 3 N 1 < s o 9 0 o W Q W BLOCKI2 � o PRESCOTT RIDGE SUBDIVISION z 1O O r7 10 r7 11 r2 12 r%� 13 r%) 14 N 15 1y O O3 O4 N O N O N 7 0 MERIDIAN, IDAHO O LAYOUT PLAN U N o N 0 O O 25' 111' 1 W � � W � 1 ¢ z O S�pNAL E LL 70, W 50.00' W 5 _31 70' _ _ 70 _ 70 _ _ 60 _ 60' _ 60' 60' 20' 50' 20' 70' _ 70' jL 2$ — — _ 60' 29_ 20' 2 3' r- Q O 3 5' z 21' 65' 19 4 o — � 37, N — — — _ 58' 45' 20' \� J, 11/20/20 Pao ENGINEERING �,9 F OF �� 9233 WEST STATE STREET lTF1EW S• BOISE,IDAHO 83714 Z LAYOUT PLAN PHONE 208 639 6939 z kmengllp.com z DATE: 8/26/2020if C g 0 50 100 150 PROJECT: 18-140 c d Plan Scale: 1" = 50' SHEET NO. J 0 W a U - 7" y y y y y y y y y y W y y y y y y 4 g y y y y y y y y y y 23, M A C HNC I N - SEE S' E ET'P P 3 155' y y 105' y y y y y y y y y 23' 20' 20' 23' y 23' 20' 20' 23' y y y y y y y y y y y y W y y y y y y y y y y y y y y y y y y y y y y y y - BLOCK 8 � y y y y y y y y y y y y y 23 20 23' y y y y y y y y 67° 67' 67' O y0 y y y y y y y y y y y y y y y y y y y 1 1 5' I 11 y y y y y y y y y y y y y y y SO.00' y y , ' 135' 50' 40 40' 40 40' 50 54 137' y 0 0 y y y y y y y y y y y y 23 20 20 23' y y 1 y 12 O y y y y y y y O O O O y O O y y y y y 0 O O O O y 0 O 0 00 00 y y y Q y OLO y O F > y 5 6 29 30 31 y 32� y O o � >� y y W LO y y y y y y y y 28 O O O y O 33 34 y y ,-- y y Q y 35 36� o o O o 0 43 64 O O O o 60 0 59 0 58 y y y y y y y y y y y y y 0 y o 63 0 62 0 61 `n in in 25 112' y y W y y y y y y y y y y y O 37 38 y y y O y y y y y y y y y y 18' 20' 23' 14' 6' y O y y � ,, y y y y y p[ mod. 39 40 41 42 0 55 0 21' g y y y y y y y 24'/2' 17' 20' 2O' Z y y ��•1 vt� /, y y y y y y y 23' 19' 16' 8' 21' y y z \`1 6 �� 38 40 40' 40' 40' 50' 2p' > , / h 14 y y y y y y y 23' 20' 23 4' 14' y y � c1'� M/a M/a �4,3' 1 12' a o y y y y y y a`L y 23 20 20' 23 14' 9' //23' "0 o y y y u 20' 20' 23' 2' 24 � 0 54 0 �h 97' 1' 0 1' 2 1p� 14, / o W. LOST RAPIDS ST. o 14 _ 00 26 _ y y y 1 1 231 , / // O 00 N O y y 4 y 20 20,�4, 2 3 LV BLOCK 8 2 I 12p 4' ^� y y y O O O O O y y y y y y 4 M/a M/a M/a /a�M a M/ M/a 18' 96 o 0 0 o O i^ , <,, 53 0 �I� N 25 N y y y 0 0 0 o y y y �� 28' 40 40 40' 40 40 26 18' 24' r, O 5 8' 96' y y 54 55 56 57 y y L �n y y yyy 3 O N 24 N o y 58 59 60 y o o y a0 y i�F �� y y \ 1 12' O 116 y y O y 0 0 0 y m y 0 47 I 0 y > > > y 61 62 y 0 y y y 0 52 0 0 96' y y 23 20 20 23' y 63 y y y r i y 29 0 28 0 27 -ID 26 -(D.) 25 _0 24 cO 23 o y 3� N 23 N 68 y y y y y y y y 23' 20 23 y y 64 65 66 67 y y oo O 0 O o \ \ \ 96' y y y y y y y y y y y y y y 23' 20' 23' y y y y d' 1 1 2' 47.00' I\ 22 �\ y y y y y W y y y y y y y y y y y 1 1 6' O N N y y y y y y y y y y y y y y y y y y y y 23' 20' 20' 23' 0 51 0 J 0) 15 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y 3 a 96' 1' y y y y y y y y y y y y y y y y y y y y y y y y y y y y 41' 40' 40' 40' 40' 40' 42' y \ \ 0 z Y N N y y y y y y y y y y y y y y y y y y y y y y y y y y y 22 (� 1 12 I _ ' y , y y y y y y y y y y y y y y y Zly yO 16 0 30 50 0 O O 116 `n 96 0 y 37 38' 37' 37' y y y y y y y y y 47 y y y y y 2O Q 31n 0 N T y y y y y y y y y y ^� y y � y 25' BLOCK 14 y of m �� z 96' y y 38' y y y y y y 44 y 100' 112' y y y y y y y y y y y y y I o N 19 N y °° 53 °° 52 a0 51 °0 50 a, y y y y y y y y O 0 18 19 20 21 0 o O 0 y y °° ao ao 00 00 y 49 y 3 y y y y y <v� y 15 y 49 119' 16 96' a Q. N 18 y y y `b 48 ;� y y y 108 17 y 92' d y y A y y y y y 112 ib 7' 0 6, y 17 N�' 9' 37' 38' 37' 18' 19' 48 0 m/ � M�a M/a M/a M/a m/a M/a38 y 46 y y y�� y y ,� `� No+ , 3 81 w y y y 14 w 40 R w0 R w 8 M%38 � y y / / 14> 112' 0 O � W. WILDFIRE DR. 1 45 y y y 20' y y y y y y I 5' �1i y o y o 24' 10' oN y y y 47 y y oN 25' 36. o 113, / W. WILDFIRE ST. 112 �M/ay y M a M/a nn/N MAJ M/ M/a M/A M/21 t1 y y N M�� y y y y y 50' 50' 50' 50' 45' 65 Mi ��\ y y y 13 �r� M/a M�a 7 M/a 14' 0 46 0 y y y y y 32 142 112' y y y 107' � A y y y y y y y 1 3' � ` y y y y y y y '��V y O MVO y y y y I /y y y y y y y y BLOCK 9 8 y3 y y y o O 112' 17 , LO y y y 0 0 0 0 O 0 0 ��Q/'� 12 y y y y 6 M� 0 45 0 7 1 1 1' � O y y y y y y y y y 1 O y / ��, �Vy� y y y y y y y y y y y y y y y p y y �\ \�.I• y y y y 0 O 1 1 2' 1� y y y y y y y y y O 44 0 y y QCO y y y y y y I 1 1 y y y y y y y y y y 50' 50' 50' 50' 50' / y y y y y y y y y y y y �3; y � y y y y y � I1 1 2' y y y y y y y y y y y y y y y y y y y y y y y y y y y y y ^� y y 72' �`r �� y y y y y y y3�' 0 15 0� 112' 4' \ y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y \� y y y y O 1O y y y y y y y �Y 0 43 0 y y y y y y y y y y y y y y y y y y y y y y y A y W�\� y � � y y y y y w 1 1 1' z1 1 0' y y y y y y y y y y y y y y y y y y y y y y y S y y y , �� y y y y y y y 47.00'—� y y y y y y y y y y y y y y y y y y y y y y y y y y y P \ y ^ 72 O y y y y y y y y y y y y y y y y y y y y y y y y y y y 4�`� 112' I O A Y 00 40 0 y y y y y y y y y y y y y y y y y y y y y y y y y y �\� r 0 14 0 Y U y y y y y y y y y y y y y y y y �V y y '� y y y y y y y y 3 0 it'1 Q I ca / _\-J� �\ y y 7 \ \� y y y y y y y y 1 1 1' Y L m y y y y y y y y y y y y y y y y y y y y y y y y y y �l z � y y y y y y y y y 1 1 0' y y y y y y y y y y y y y y y y y y y y y y y y y \� \ y y p Vw y y y y y y y y y 3 , 1 '— � 7 y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y y O �\ Q� y y y y y y y BLOCK 13 y y y y y y y 13 0 1 12 111' 7 >> 00, �\ y y y y y W y y y y 30 41 0 �_� ., 1111111111111 1111111111111 1111111111111 1111111111111 1111111111111 111111111/ 111111111/ 111111111/ 111111111/ 111111111/ �y y y y y J y y y y y y y y y y y y y 7, C\L y y y y y y y y y y y y y y y y y y y y -'a y � O � y y y y y y W y y y y MATCH LINE - SEE SHEET PP2. 1 y y y y y y W y y y y y y y �� � y (���` ' V -D y y y y y y y y y y y O Y j y 7J �� y y y y y y y y y y y 12 0 112 � 3- y y y y y W y y y y y y 00, y 7' y y y y y y y y y y y y O y y �O 1 1 1' W 40 0 y y y y y y y y y y y LAYOUT PLAN , W y y y y y y y y y y y y y y y y y y y y y z �J, C y y y y w y y y y w w y w O � z ?�.. O 50 100 150 , y y y y y yyy//////✓✓✓ �V y O ��\ y y y y y y y y y y y y Y0 39 0 Nory y y y y y �\ y ' y y y y y y y y y y y y 1 1 1' Q II 1 y y y y ,/ V y O y y y y y y y y y y y 3 Plan/Profile Scale: 1 = 50 �. 1 \ Ln y y y � � O y y y y y y y y . y y y Q' z > y .�`\ 0 3 1 1 2 y y y y y y y y O y 0 38 J/ y �O O � 7' y O 10' 78' y y y y y y y 2p' �£ , 14 6 �� 40' y y N 0 112' y cv >>, 50' O � O 0 O 37 0 111' ,GL 14 � y O N 0 15 36 \R 112 z s /w 4g Lo O O� R O O 14' �' �11 /W 4pR/w Ln O �� 35 PROPOSED TO POTENTIALLY 23 DEVELOP AS ZERO LOT LINE / LOTS. THESE LOTS WILL BE U W �R/w 112' DETERMINED UPON FINAL PLAT 24 8' 28 R/w W 1 LDF1 RE OR. o R/W 8=R/WK�� o SUBMITTAL. M y �� 12' R/w b 34 Ap, 40, Riw �, o 10' 40' R,, y` y y y 124y y y y PRESCOTT RIDGE SUBDIVISION z 4p MERIDIAN IDAHO 25 R w _b 5p, /w_ y y y y y y y y y y I Sp' R/W R/W� ly y y y y y y y y y y LAYOUT PLAN U N 26 50' y y y y y y y y y y '-1 27 N 10, y y y y y y y y y y y O 6�1, 28 N y y y y y y y y y y lJJ 29 <v y y y y BLOCK 12 y y y S�pNAL F 0 y y y 33 y y y y � y y y y y y y y y y y1199 z O 4p' 32 y y y y y y y y y y d 4p, f y y y y y y y y y y y J1�11/20/20 'h 0, y y y y y y y y y y E G I E E R I G 50' �ql F OF \O��� 9233 WEST STATE B0 SE,IDAHO 83 14STREET y y y y y y y y y y T yE W S. O Q PHONE(208)639-6939 a 50' y y y y y y y y �I� �p kmengllp.com z z y y y y y y y y _91 y y y y y y y DATE: 8/26/2020 S Qy y y y y y y 0 PROJECT: 18 -140 y/ SHEET NO. W .�� Sp' PP2.2 � 1 1 1 1 om 1 1 Q uj Z 1 1 ``' _ Z J 1 1 J EP EP EP EP EP EP EP EP EP EP W. CHINDEN BLVD. (HWY 20/26) EP EP EP EP EP EP r 1 T 1 EP EP EP ^Fp i d3 d� 3� d —d3 d3 d3 d3 d3 d3 1 rn W a 1 Q I w a rn I Q w rn 1 m d 1 w m ui W a m ui 1 w W 1 a w 866 104 Q m M W ' 60' o W 7' I \ 12 W W/1 Z 000 Z Jco Lo Lo �I I � I I I I I I \ I I \ \ o I I \ I 12' I I I BLOCK 8 I 00 I I I I I I I I I I I I Im rl' � 8 � 724' � I I I I I 454' 1Trl- 1 MATCH LINE — SEE SHEET PP2.4 MAJ MAJ MAJ M/a M/b me/j M/ nb/N /a m/a W 72' 6'/ 89' 89' 67' 72' y y W W � 80 r- r- 81 74 o OA W W W 72 89' O W E` E) E) PROPOSED TO POTENTIALLY y 89 0 72 DEVELOP AS ZERO LOT LINE LOTS. THESE LOTS WILL BE U DETERMINED UPON FINAL PLAT a I W 78 66 77 00 76 00 � 73 i SUBMITTAL. N y rn = c~n V Y ;`� W PRESCOTT RIDGE SUBDIVISION z a , Q 72' 89' 88, r i MERIDIAN, IDAHO O 72' z U 1:13120, M LAYOUT PLAN 3 co N z 00 O 20' co S\pNAL EN a W N �S G� 0 72 r7'I R tiF�� O 115' 67' 67' 67' 62' Lo m 4 z g W W 1 lcm 11/20/20 � ENGINEERING \ W 67 68 69 70 EWF \ � 9233 60 SE,ST STATE ET DAHO 83 14 O O O 06 PHONE(208)639-6939 Q . . . . S. daa �. � � � �. �. �. �. � � � �. �. �. .� � � , Z, � kmengllp.com z — W DATE: 020 ifMATCH LINE - SEE SHEET P P 2.2 W 1 15' 67' 67' 135' PROJECT: 8/21821140 SHEET NO. s W a 1,616' e e e e o e o e o e o e o 0 0 0 0 0 0 1 ui 1 Y 1 Y ° 1 ° 1 y 1 Y ° 1 ° 1 1 Y 1 ° ° 1 1 Y 1 Y 1 y 1 Y ° 1 ° IM 1 N la o a W 1 = ° BLOCK 12 ° IW IW 1 W Iz IJ 1 c� 0 Q 1 � 1 ' 1 Y ° 1 1 y 1 Y ° ° 1 1 1 Y ° 1 ° 1 1 R/W R/W 74 71 67' 145' 55' 40' 40' 40' 40' 40' 40' 40' 40' 20; 40' 40' 40' 40' 40' 40' 40' 4EM 0' 40' 40' 40' 40' 40' 69' O. 1 ME ME MMM1MMMMM mmmmmmmmm MATCH LINE — SEE SHEET P132.3 1 u 1 z PROPOSED TO POTENTIALLY O DEVELOP AS ZERO LOT LINE LOTS. THESE LOTS WILL BE U V DETERMINED UPON FINAL PLAT Z) a 1 N a 1 PRESCOTT RIDGE SUBDIVISION z 0 MERIDIAN, IDAHO O Y LAYOUT PLAN 1 O o S�pNAL fN LL 1 Ln Q� O �� O o 1 z g 1 Y 11/20/20 E N G I N E E R I N G a �,9 qTF OF �QP C�Q` 9233 WEST STATE STREET L BOISE,IDAHO 83714 l L TyEW S. Q PHONE(208)639-6939 7 kmengllp.com z LAYOUT PLAN DATE: 8/2 18-140 g PROJECT: 18-140 c a a 0 50 100 150 SHEET NO. J s W Plan Scale: 1" =50' P P 2.4 a - - - - - - - - - - - - WEST CHINDEN BLVD. SITE INFORMATION: PARCEL I: 15 ACRES M3,370 SF) OURRENTZONING: RI PATHWAY CONNECTION FRONTAGE NOISE ABATEMENT - - - PROPoseozoNmc: cc TO CHINDEN ROAD BERM AND WALL -�r -ROW BOUNDARY PROPERTY LINE SHADED AWACENT ZONING: Rur(EAST,WEST,SOLFM)I Mrs C-G(NORTH) __ ,�— __ __ .OUTDOOR aulLolNcs: MOR ®� AREA OF 3 STORIES-60,�00 SF 8'HIGH HOSaTTAL(W BEDS) — — — — `� 'f x.X x,z a>s RESPITECMUWALL - ~� ® 3a I 3sTDRr-1B1.UW SF \ ° -9 I RETAIL-5,000 SF \ \A — I F5bpcK { I RESTAURANT-5,0095E \\ I NTRY I 1 PARKING REQUIRED: MOB\ (511.000 SF) 3W SPACES HOSPITAL(11BEO+1 ISTAFF) Ia SPACES RETAIL(11500 SF) 10SPACES \\ I PHASE? I I RESTAURANT(1 Y200 SF) 25 SPACES T S 3 STORY 59 SPACES MOBlRETAIL W I PARKING PROVIO' 5 293PACE3 ® I pE \ 1 IRESTAURANT 4 AOA REQUIRED(AppAG 4,1.2): MOB(10%) 30 REQUIRED 1 - HOSPITAL(5° a REQUIRED RETAIL( SPACES) 1REQUIRED RESTAURANT(12 SPACES) 1 REQUIRED NOTAPART W o I OF PARCEL IZ MONUMENT SIGNAGE � Iw 30'DENSE - I I I a LANDSCAPE BUFFER ,� I A0A I IL I I I I � I IK AND WALKING PATH 0 1I{�{ I I I I � I I I I I I I � I I uLo OUTDOOR PLAZA SETBACK I AND GREEN SPACE i ED WALK CONTACT EVINC OK GROUP u ++tl +� ++ +• - - CONTACT'K2V 11-7OK BIKE PARKING + +° +°®+++® IN ENTRY _ PNONe 9COOKO57 ® EMAIL; KCOOK�pEVENNEVGRCUP.COM ® • a°++��� .\ENTRY._-' PHASE 1 Q _` DECORATIVE ADDRESS:20,WESTINDIAN SCHOOL ROAD w ®—�--` FSED I y SCREENING FOR PHOENIX,Az OW13 2 PATIENT PRIVACY APPLICANT•PROVIDENCE PROPERTIES J I CONTACT:PATRI214.56 K812 EXISTING PHASE 3 �, EMUCONNOR PATRICKCO j EMAIL: 701 SO KGO LLEN STREET 91OMES.COM SINGLE IL 3STORY ���J III,-J nopREss:MERIDIAAN,IDAHO 835412 STREET FAMILY a' - HOSPITAL 1 STORY f „ I CIVIL ENGINEER-NM ENGINEERING I n DERR I PHONE: i nDIADERRpKM TTEE1STORY DRESS:933 WE ASTRET eo15E,IOANo Barra I I I STAFF I I VICINITY MAP LEGEND: I Z I ENTRY I r ypl I I I M EMERGENCY FI I 1 � LOAGING I e O ..,,.�_ .�.......a PUBLIC wilmillCMU BLOCK WALL BYPASS FRONTAGE M ROAD-2E WIDE SHED OUTDOOR I _ �-I OF RESPITE --`- - _ - - - - - PATHWAY a r a CONNECTION 8'HIGH PROPERTY LINE PEDE TRIAN PATHWAY POINT CMU WALL ` T R SI E TI 31TE�QIN-OPTION iP1�ANNED SINGLE FAMILY C N E TI N DINT P N E TOWN HO E ®off,__ W �i MERIDIAN HOSPITAL \ MERIDIAN,IDAHO 01 - - - - — - — — - - — - - — - WEST CHINDEN BLVD. t - SITE INFORMATION: PARCELI, 15 ACRES 1853,3705F) 75- SHADED CURRENT ZONING RUT PATHWAY CONNECTION FRONTAGE NOISE ABATEMENT ® - OUTDOOR AREA PKPOSED20NING. C-G f'••. OF RESPITE ADJAGENTZON84G, RuT(EAST.WEST.SOUTH)1 M1 a C4(NORTH) —_ — TO CHINDEN — ROAD BERM AND WALL ROW BOUNDARY PROPERTY LINE BUILDINGS. MOB -- 3 STORIES-60,0005F - ® - a--- - -- HOSPITAL 181 BEDS) B'HIGH °6 3 STORV. 81,0005E CMU WALL • ® I °a° ® I ` '^ I I I RETAIL-5,0005E RESTAURANT-5,000 SF I - NTRY PARKING REQUIRED' MOB(",MD SF) 300 SPACES (11 HOSPITAL ♦115TAFF) 1 SPACES RETAIL HUMID ID BE)ED 84 IIDSPACIES PHASE 2 f RESTAURANT(1l200SF) 25 SPACES I I 511 SPACES 3 STORY MOBIRETRIL I� I W I PARKING PROVIDED. '785PACE5 RESTAURANT I I ADA REQUIRED(ADAAG 4.1.2) MOB In%) 3D REQUIRED 1 I HOSPITAL(2%) 4 REQUIRED RETAIL(1125 SPACES) 1 REOUI RED t I I I RESTAURANT SPACES) IREGUIRED I Lu 1 I Jo tO ° ILU MONUMENT I I I I I— SIGNAGE MOB Retail/Restaurant shown 30'DENSE o o 0 0 I ® �a as shifted to the east corner if LANDSCAPE BUFFER I ADA O AND WALKING PATH 0 If�I I I I I I I I I I ILLI I I I I I I I I If I I y the out-parcel is acquired. `l J I I I OU DOO PLAZA AN GREEN SP CE AREA ARCHITECT-DEVENNEY GROUP ED WALK I I F RESPITE CONTACT:KEVIN COOK BIKE PARKING---- a •°+ a+ MAIN _ IN ENTRY I I PHCHE. 802341-T2BT • ®••+®® + A B LA I EMAIL'. KCOOK@DEVENNEYGROUP.COM + ENTRY PHASE 1 DECORATIVE ADDRESS.201 WEST INDIAN SCHOOL ROAD FSED I E TRYI OR I I FHOENIX.Az 85013 I SCREENING F 2 ® I PATIENT PRIVACY APPLICANT-PROVIDENCE PROPERTIES I CONTACT'PATFUCK214�CONNOR EXISTING LU 0 PHASE 3 5 EMAIL PATRICKCO 1 EMAIL PATSOLTH LLEN STREET 0104 $COI AUtlRE55,ME SOUTH OAHO STREET pr04 SINGLE a� II 3STDNY mm MERIDIAN,IOAH083642 FAMILY III0 HOSPITAL 1 STORY 31 MI ® LIVIL ENGINEER-NM ENGINEERING IL CONTACT'_MATT DERR PHONE'. 209fi39-DS39 I - I _I EMAIL "OE8233 W 7 STATE S COM REE llullr I 1 STORY I JI ADtlRE55 5233 WE$T STATE STREET —I BOIBE,IUAHO 83719 STAFF =1 I I VICINITY MAP LEGEND: I I ENTRY � 1 M EMERGENCY J LDAUING e ffffff W Y`w PUBLIC — CMU BLOCK WALL `— ----------1 M BOPASS ROOEAGE SHADED OUTDOOR _ _ _ -MULTI-USE AREA OF RESPITE r -� _ PATHWAY LsaoaEcr s �0'HIGH PROPERTY LINE CONNECTION ° CMU WALL PEDE TRIAN PATHWAY POINT SITE 6PTION LB PLANNED SINGLE FAMILY C N EI TI NI DINT PLANNED TOWN HO E I (J�r",1 so5 a lm zm MERIDIAN HOSPITAL : CONCEPT PLAN INCLUDING THE OUT-PARCEL IN NORTHEST CORNER MERIDIAN,IDAHO