Loading...
CC - Engineer Statement TH E LAND GROUP November 6, 2020 Mr. Warren Stewart, PE City of Meridian 33 E. Broadway Ave. Meridian, ID 83642 RE: Chukar Ridge Subdivision Street Centerline Elevation Certification PN 119192 Dear Mr. Stewart: As required by the City's final plat application requirements, please accept this statement certifying that all street finish centerline elevations are set a minimum of three (3)feet above the highest established normal groundwater elevation. According to the initial test pit investigations and recent construction activities,the groundwater within this project was not encountered within a depth of three (3)feet of the existing ground. Based on the above information, I certify that groundwater would be greater than three (3)feet below the designed finished street centerline elevations throughout the project. Sincerely, ��$ZONAL 0\ST 109 1 Jason Densmer, PE, Principal qT f 0 F The Land Group, Inc. ��soNDE4 11/06/2020 462 East Shore Drive, Suite 100, Eagle, Idaho 83616 208.939.4041 thelandgroupinc.com