Loading...
Bureau of Reclamation Irrigation Crossing Agreement Jamison Lateral ACHD Amity/Ten Mile Water Main Extension (2) RETURN TO: Contract No.20-07-11-L53 16 Bureau of Reclamation Attn:MSF 6125 230 Collins Road Boise,ID 83702 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION Arrowrock Division,Boise Project,Idaho CONSENT TO USE THIS CONSENT TO USE, hereinafter referred to as Consent, made the 17th day of November 5 2020,pursuant to the Act of Congress June 17, 1902(32 Stat. 388;43 U.S.C. §391), and acts amendatory thereof or supplementary thereto, collectively referred to as the Federal Reclamation Laws, specifically, Section 10 of the Reclamation Project Act of 1939 (53 Stat. 1196),between the UNITED STATES OF AMERICA, hereinafter called the United States, by and through the Bureau of Reclamation, Department of the Interior, hereinafter referred to as Reclamation, and CITY OF MERIEDIAN, hereinafter referred to as Consentee. WITNESSETH, THAT: WHEREAS, in connection with the Arrowrock Division,Boise Project,Idaho,the United States,pursuant to Federal Reclamation Laws, constructed, operates,and maintains certain irrigation works hereinafter referred to as the Jemison Lateral; and WHEREAS, said Jemison Lateral, is operated and maintained by the Boise Project Board of Control,hereinafter referred to as the Board,under a repayment contract with the United States; and WHEREAS,the Consentee desires the United States to give consent to construct,install, operate and maintain a sleeved 16 inch water main line under and across said Jemison Lateral; and WHEREAS,the proposed use has been reviewed and determined to be compatible with project purposes. NOW, THEREFORE, in consideration of the mutual covenants and stipulations hereinafter stated,the parties hereto do mutually agree as follows: I CONSENT AND LEGAL Subject to the terms and conditions of this Consent,the United States does hereby consent to the Consentee, or its agents,to construct, install, operate and maintain a 16 inch water main line in a 20 inch by 20 linear feet steel sleeve, a minimum of 3 feet, under and across, said Jemison Lateral. Located on Amity Road,west of the intersection of Amity Road and Ten Mile Road, in a portion of the SE1/4SE1/4 of Section 27 and the NEI/4NEI/4 of Section 34, Township 3 North,Range 1 West, of the Boise Meridian, CTU:20-07-11-1,5316,City of Meridian Page I of 9 situated in Ada County,Idaho, and shall be installed in the manner and at the location shown on the attached Exhibits A, B, C,D, and E,by this reference made a part hereof. 2. SUBJECT TO FEE OWNER APPROVAL Unless the Consentee is the underlying fee owner,this Consent is subject to Consentee securing approval of the underlying fee owner to cross or use the identified portion of Reclamation's right of way. By executing this document the Consentee acknowledges this notice and assumes all liability, if any, in this regard. 3. FEES The Consentee has provided an application to obtain this Consent in conforinance with Title 43 of the Code of Federal Regulations,Part 429 and a payment of$100.00 for the application fee and$722.00 for administrative fees is hereby acknowledged. 4. TERM The term of this Consent is to be perpetual from the date of this document, subject to the ternis and conditions herein. 5. SPECIAL STIPULATIONS Consentee agrees that the construction, installation, operation and maintenance(O&M) shall be conducted as follows: a. The Consentee shall notify the Board at least seven(7)days prior to beginning construction work. b. Consentee's structures shall be constructed, operated and maintained by the Consentee without cost to the United States or its assigns, and in such a manner as to cause no interference with the normal operation of project facilities. All construction,reconstruction and maintenance work performed by the Consentee upon the premises of the United States shall be undertaken only at times, according to plans, and in a manner satisfactory to the authorized official. C. All backfill placed in the facility or its embankments shall be placed and compacted to the satisfaction of the authorized official. The facility and appurtenant structures shall be restored by the Consentee to a condition at least as good as before the work was accomplished. d. All work must be performed during the non-iffigation season in which work commences (November I through March 15). e. This Consent is limited to construct, install, operate and maintain a 16 inch water main line in a 20 inch by 20 linear feet steel sleeve, a minimum of 3 feet, under and across, said Jemison Lateral. Located on Amity Road,west of the intersection of Amity Road and Ten Mile Road, in a portion of the SE1/4SE1/4of Section 27 and the NE1/4NE 1/4of Section 34, Township 3 North,Range I West, of the Boise Meridian, situated in Ada County,Idaho, In accordance with Idaho Code section 42-1102, et seq, additional encroachments onto the right of way by public or private roads, utilities,fences, gates,pipelines, structures, or other construction or placement of objects, need specific written permission from the United States or its CTU:20-07-1 1-L5316,City of Meridian Page 2 of 9 successor or assign. Encroachments of any kind placed in such right of way without express written permission shall be removed at the expense of the person or entity causing or permitting such encroachment upon the request of the owner of the right of way. f. Any alteration in design of the facilities to be constructed, or any alteration, modification, or reconstruction of facilities, once the original work is accepted by Reclamation,its successors or assigns, must be approved in writing prior to commencing any work on facilities in the area subject to this Consent. g. The Consentee acknowledges and agrees that this Consent is not and shall not be interpreted as, the approval or authorization of any other use,encroachment or activity upon Project facilities or land except as expressly stated herein. In addition,the Consent shall not in any way be construed as approval or consent to Consentee's construction,installation, or modification of any facilities, which would permit, allow or enable discharge of storm water run-off into the facilities or works of the United States or the Board/District. Notwithstanding anything to the contrary contained in this Consent, neither the United States nor the Board/District approves, authorizes,permits, allows, or accepts any non-agricultural stormwater discharge into any facility owned, operated, and/or maintained by the United States or the Board/District, whether it be through a pipe, conduit, culvert,canal,lateral, drain or other ditch, or surface or ground water, absent the United States'prior written permission and Board's/District's concurrence per Reclamation regulations and policy. Consentee acknowledges that the authorized works identified in this Consent does not permit nor allow any nonagricultural water discharge to enter the facility. 6. UNRESTRICTED ACCESS The United States officers, agents, and employees shall at all times have unrestricted access and ingress to,passage over, and egress from all of said lands,to make investigations of all kinds,dig test pits and drill test holes, to survey for and construct reclamation and irrigation works and other structures incident to Federal Reclamation Projects, or for any purpose whatsoever. Reclamation will make every reasonable effort to keep damages to a minimum. 7. HOLD HARMLESS The Consentee agrees to indemnify the United States for, and hold the United States and all of its representatives harmless from, all damages resulting from suits, actions, or claims of any character brought on account of any injury to any person or property arising out of any act, omission, neglect, or misconduct in the manner or method of performing any construction, care, operation, maintenance, supervision,examination, inspection, or other activities of the Consentee. 8. PROTECTION OF UNITED STATES INTERESTS The Consentee shall construct, operate, and maintain its structures in a good workmanlike manner,as determined by Reclamation,to ensure that the authorized uses are compatible with the Reclamation purposes for which the land rights were acquired, and to protect the interests of the United States. The Consentee shall insure compliance with all laws, regulations, and orders of the United States, and any other public authority affecting such works. CTU:20-07-11-L5316,City of Meridian Page 3 of 9 9. TERMINATION This Consent,a use authorization,will terminate and all rights of the Consentee hereunder will cease, and the Consentee will quietly deliver to the United States possession of the premises in like condition as when taken,reasonable wear and damage by the elements excepted: a. At the end of the term of this Consent. b. Reclamation may, at any time and at no cost or liability to the United States, terminate this Consent if Consentee fails to comply with any of the terms and conditions hereof, or upon mutual agreement of all parties. C. The United States, acting through Reclamation,Department of the Interior, reserves rights to construct, operate, and maintain public works now or hereafter authorized by the Congress without liability for termination of the use authorization or other damage to the Consentee's activities or facilities.. d. Reclamation may, at any time and at no cost or liability to the United States, terminate this Consent in the event of a natural disaster, a national emergency, a need arising from security requirements, or an immediate and overriding threat to public health and safety. e. Reclamation may, at any time and at no cost or liability to the United States, terminate this Consent,for activities other than existing authorized private exclusive recreational or residential use as defined under 43 CFR§429.2 if Reclamation determines that any of the following apply: i. The use has become incompatible with authorized project purposes,project operations,safety, and security; ii. A higher public use is identified through a public process described at 43 CFR§429.32(a)(t); or iii. Termination is necessary for operational needs of the project. f. Reclamation may, at any time and at no cost or liability to the United States, terminate this Consent if Reclamation determines that the Consentee has failed to use the use authorization for its intended purpose. Further,failure to construct within the timeframe specified in the terms of the use authorization may constitute a presumption of abandonment of the requested use and cause termination of the use authorization. 9. Reclamation may, at any time and at no cost or liability to the United States, terminate this Consent if the Consentee fails to comply with all applicable Federal, State, and local laws, regulations, ordinances, or terms and conditions of any use authorization, or to obtain any required permits or authorizations. 10. NOTICES a. Notices served under this Consent shall be in writing and may be delivered by personal delivery; via recognized delivery services such as United Parcel Services (UPS) or Federal Express (FedEx); or by deposit in the United States Mail, postage prepaid, as certified mail, return receipt requested, and addressed as follows: CTU:20-07-1 1-L5316,City of Meridian Page 4 of 9 UNITED STATES CONSENTEE BOARD Deputy Area Manager Mayor Manager Bureau of Reclamation City of Meridian Boise Project Board of Control 230 Collins Road 33 E. Broadway Ave. 2465 Overland Road Boise,ID 83702 Meridian,ID 83642 Boise,ID 83705 (208) 383-2200 (208) 376-7330 (208)344-1141 b. Any notice delivered by personal delivery shall be deemed received by the addressee upon actual delivery. Any notice delivered by certified mail or delivery service shall be deemed received by the addressed on the third business day after deposit. The addresses to which notices are to be delivered may be changed by giving notice of such change in accordance with this paragraph. This paragraph shall apply where notice is required under this Consent,and no specific requirements are set forth. Where this Consent provides for a specific notice in a different manner,the more specific requirements shall prevail. C. The parties hereby designate the Deputy Area Manager of the Snake River Area Office, Bureau of Reclamation;Manager of the Boise Project Board of Control;and the Mayor of the City of Meridian, as their respective authorized representative for this Consent. These individuals shall have authority to take any action allowed or required under this Consent, on behalf of their employer. The parties may change their designated representatives at any time by giving notice of such change in accordance with this Article. 11. INCREASED COSTS If the construction, operation, or maintenance of any or all of such structures and facilities of the United States across, over, under, or upon said right of way should be made more expensive by reason of the existence of improvements or works of Consentee thereon, such additional expense is to be estimated by the Reclamation, whose estimate is to be final and binding upon the parties hereto. Consentee will make payment thereof to the United States or any of its successors or assigns within(30)days after demand is made upon Consentee for payment of any such sums. As an alternative to payment, Consentee, at its sole cost and expense and within the time limits established by the United States, may remove or adapt its facilities constructed and operated by it on said right of way to accommodate the aforementioned structures and facilities of the United States. Consentee shall bear any costs incurred by the United States occasioned by the failure of Consentee to remove or adapt its facilities within the time limits specified. 12. REMOVAL OF STRUCTURES Upon expiration, termination, or revocation of the Consent, the Consentee shall remove all structures, equipment, or other improvements made by it from the premises at no cost to the United States. Upon failure to remove any such improvements within sixty(60)days of expiration,termination,or revocation, any remaining improvements shall, at the option of the United States,be removed or become the property of the United States. The Consentee shall pay all the expenses of the United States, or its assigns or successors, related to removal of such improvements. 13. DISCOVERY OF CULTURAL RESOURCES The Consentee shall immediately provide an oral notification to Reclamation of the discovery of any and all antiquities or other objects of archaeological, cultural, historic, or scientific interest. The Consentee shall follow up with a written report of their finding(s)to Reclamation within forty-eight(48)hours, Objects under consideration include, but are not limited to, historic or prehistoric ruins, human remains, CTU:20-07-1 I-L5316,City of Meridian Page 5 of 9 funerary objects,and artifacts discovered as a result of activities under this authorization. The Consentee shall immediately cease the activity in the area of the discovery, make a reasonable effort to protect such discovery, and wait for written approval from Reclamation before resuming the activity. Protective and mitigative measures specified by Reclamation shall be the responsibility of the Consentee. 14. HAZARDOUS MATERIALS a. The Consentee may not allow contamination or pollution of Federal lands,waters,or facilities. The Consentee has the responsibility for care,operation, and maintenance by its employees or agents and shall take reasonable precautions to prevent such contamination or pollution by third parties. Substances causing contamination or pollution shall include,but are not limited to,hazardous materials, thermal pollution,refuse, garbage,sewage effluent,industrial waste,petroleum products,mine tailings,mineral salts,misused pesticides, pesticide containers, or any other pollutants. b. The Consentee shall comply with all applicable Federal,State, and local laws an reaulations, and Reclamation policies and directives*and standards, existing or hereafter enacted or promulgated, concerning any hazardous materiall that will be used, produced, transported, stored, or disposed of, on or, in Federal lands, waters, or facilities. C. "Hazardous'material" means any substance, pollutant, or contaminant listed as hazardous under the Comprehensive Environmental Response,Compensation,and Liability Act of 1980,as amended,42 U.S.C. § 96015 g"se ., and the regulations promulgated pursuant to that Act. d. Upon discovery of any event which may or does result in contamination or pollution of Federal lands, waters, or facilities, the Consentee shall initiate any necessary emergency measures to protect health, safety, and the environment and shall report such discovery with full details of the actions taken to Reclamation. Reporting may be within a reasonable time period. A reasonable time period means: within twenty-four(24) hours of the time of discovery if it is an emergency, or by the first working day if it is a non- emergency. An emergency is any situation that requires immediate action to reduce or avoid endangering public health and safety or the environment. e. Violation of any of the provisions of this Article, as determined by Reclamation, may constitute grounds for termination of this Consent. Such violations require immediate corrective action by the Consentee and shall make the Consentee liable for the cost of full and complete remediation and/or restoration of any Federal resources or facilities that are adversely affected as a result of the violation. f. The Consentee agrees to include the provisions contained in paragraphs(a)through(e)of this Article in any subcontract or third-party contract it may enter into pursuant to this Consent. 9. Reclamation agrees to provide information necessary for the Consentee using reasonable diligence,to comply with the provisions of this Article. 15. THIRD PARTY RIGHTS This Consent is granted subject to all rights previously acquired by third parties, CTU:20-07-1 I-L5316,City of Meridian Page 6 of 9 16. SEVERABILITY Each provision of this Consent shall be interpreted in such a manner as to be valid under applicable law, but if any provision of this Consent shall be deemed or determined by competent authority to be invalid or prohibited hereunder, such provision shall be ineffective and void only to the extent of such invalidity or prohibition, but shall not be deemed ineffective or invalid as to the remainder of such provision or any other remaining provisions, or of this Consent as a whole. 17. BINDING The provisions of this Consent shall apply to, and bind, the successors and assigns of the parties hereto, but no assignment or transfer of this Consent or any part or interest therein shall be valid until approved by Reclamation. 18. OFFICIALS NOT TO BENEFIT No Member of Congress shall be admitted to any share or part of any contract or agreement made, entered into, or accepted by or on behalf of the United States, or to any benefit to arise thereupon. IN WITNESS WHEREOF,the parties hereto have executed this Consent the day and year first above written. CONSENTEE UNITED STATES OF AMERICA B By .� Brya R. ors urg Title rtu V,u Deputy Area Manager Bureau of Reclamation 230 Collins Road Boise, ID 83702-4520 This Consent has been considered and is hereby approved by the Boise Project Board of Control the day of�&6u:57 , 2020 By 'adx�&. Robert Carter, anager CTU:20-07-11-L5316,City of Meridian Page 7 of 9 ACKNOWLEDGEMENT STATE OF IDAHO ) ) ss County of Ada ) On the day of , 2020, personally appeared before me, the undersigned notary , Robert Carter , known to me to be the official of the Boise Project Board of Control who executed the within and foregoing instrument and acknowledged said instrument to be the free and voluntary act4 and deed of said Board, for the uses and purposes therein mentioned , and on oath stated that he was authorized to execute said instrument . IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written . GARD•f*•••• �y4106 • . • 6 •0 .,• Notary lic in and for the 44.•' D,�ARY , y. State of Idaho 1 _ Residing at , q _ � • ; -� lG My commission expires 3- tZ 7wzj • r PUBti � . . . �•'••.`� TES OF •�9••°• ACKNOWLEDGEMENT STATE OF IDAHO ) ) ss County of NcNrx On the � ' 1 ' '. 'day of 0VOM16Pam' , 2020 , personally appeared before me "Vk0L30Xk F • ;k rdL�,o 0 , known to me to be the official of the City of Meridian, who executed the within and foregoing instrument and acknowledged said instrument to be the free and voluntary act and deed of said City of Meridian , for the uses and purposes therein mentioned , and on oath stated that he was authorized to execute said instrument. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written . J , 1 1MY CHARLENE WAYNotary Public in and for the�OMMISSION #67390 State of �1QNOTARY PUBLIC N STATE OF IDAHO Residing at Mexr 4 C cLn COMMISSION EXPIRES 3/28/22 My commission expires �6 22 " Z ( QT i CTU: 20-07- 11 -L5316 , City of Meridian Page 8 of 9 1 ACKNOWLEDGEMENT STATE OF IDAHO ) )ss County of Ada ) On the 7-1 h day of Id lit/�/j.Q�~ , 2020, personally appeared before me Bryan R. Horsburgh , to me known to be the official of the United States of America that executed the within and foregoing instrument and acknowledged said instrument to be the free and voluntary act and deed of said United States for the uses and purposes therein mentioned, and on oath stated that she was authorized to execute said instrument. IN WITNESS WHEREOF, I have hereunto set my hand and affixed my official seal the day and year first above written. LINDA HAMMOND Notary Public in and for the PUBLIC-STATE OF IDAHO State of Idaho COMMISSION NUMBER 20181195 Residing at �t�lA.? LNOTARY Y COMMISSION EXPIRES 6-29-2024 My commission expires CTU:20-07-11-L5316,City of Meridian Page 9 of 9 Exhibit A 08 0 CITY OF MERIDIAN City of Meridian S L E G E N D APPROVED FOR CONSTRUCTION (See Standards For Specifics) UTILITY IMPROVEMENTS ...... I., D.— "INN"nN.—0 NN,'q�18) Th--I'll New Potable!OW"OtWer Main TO BE CONSTRUCTED IN CONJUNCTION WITH THE ft..(1101 INN.—N, No -d- SS NN-111.4 W I.— NNNN, New S—itary Sewer Main 2 ADA COUNTY HIGHWAY DISTRICT i��Z,1'4*4;� im%4 iC.L. of Roadway Existing Edge of Pavement or Gravel TEN MILE ROAD AND AMITY ROAD Existing Drain or Irrigation Pipe m z Existing Ditch or Flow line ACHD PROJECT NO . 308004 0 On Existing Property Line Existing Fence and Gate CITY PROJECT NO . 10987 APPROVED FOR X FOR ON Existing Utility Line With Initial �QNSTRUG[ION C4.—.P....—W., pteal—o....... .......... Existing Concrete Sidewalk ......clny 6w-..U. —V......Wy No.-Q" It" !. Pph—i. Existing Curb,Gutter,and Sidewalk 7= .,i".-NN,qPo,,N,NW'1.,.1 d,'zo.., F.-FFF= osu—ut appiuvai�, oi .y Existing and New Water Valve :,.,y -,qju No ...... T ft E isting and New Water Meter iN;.Iy.-N NN, .INN.N.—d.dVP..... P.W—Hy x do,e......, .long Uy LIN.11ky.—y No a....p,.n. z Fire Hydrant "lus,�1-11lial,No N, i.."o.."�Aiy Light Pole 10 Utility Pole With Anchor INd"16 sobnen Sign @ Existing and New Manholes 7 Existing and New Catch Basin s Deciduous And Evergreen Tree 00 ; 3; 00 Deciduous And Evergreen Bushes SHEET INDEX z 5m,1 0 VICT, FIX Existing Building VICTORY RD Pill z'm m vig, 1. TITLE SHEET m >-4 4 .2- 2. CONSTRUCTION NOTES Dig WNW Asphalt Repair 3-5. UTILITY IMPROVEMENTS > Revision Note PROJECI' Gravel Repair Concrete Repair SITE IM z Lawn Sod Repair iL) r) AMITY RD N.T.S NOTES: 1. REFER To ACHD PROJECT #308004 PLANS AND SPECIFICATIONS FOR 0 m PROPOSED ROADWAY IMPROVEMENTS AND PROJECT HORIZONTAL AND U) lu m VERTICAL CONTROL. INNNNNN 2, COORDINATE ALL WORK RELATED TO CITY OF MERIDIAN UTILITY z J IMPROVEMENTS WITH ROADWAY IMPROVEMENTS. z Uj CITY W 3. INFORMATON SHOWN ON THIS PLAN SET IS ACCURATE ONLY FOR OF MERIDIAN UTILITY IMPROVEMENTS. (:�VEPUDIAM-- z z Z 0 W 0: Public \-Iz� J Works Department ININNN IL L6 a 2 D"g.&C-W.0-UPPWI--W 3PNNCffl-AkNN`NNN LAKE HAZEL RD 0 4 — [roil] >NN 0 >- man a L =:IV 9 aj Nhrm. a a 4,r z I ken All all 111A m j INNNNN, Fall: J DATE: MAY 2020 DRAWING:SHMI.DWG Know whars below. JOB NO:2001 2 Call before you dig. SHE Exhil rdyc' Exhibit B CITY OF MERIDIAN STANDARD NOTES: GENERAL CONSTRUCTIO 1 All reduction ark shall be done in accordance wth the current version of the Idaho Standards for Public Works Construction(It the City of Mendifian Supplemental Specifications to the ISPWC(and any addendums),Meridian Design Standards, 1 MAX M? MAX thecr'equirements ofthe Ada County Highway Distinct(ACHD)anchor the requirements ofthe Idaho Transportation Department(ITD)The mom stringent of any of these standards shall be the controlling standards or speciffications, FROM EACH'END 4.5'MAX (TYP.) 2 The Contractor shall haw a copy of the latest City of Meridian Standard Specifications and Drawings on site or readily accessible at ail times during construction(available an the welasite)Failure to ham access to a current copy of the Standard Specifications on site could be grounds for a stop ark order umJI the situation is resolved. A CH E ID 'Y 4 3. The Contractor shall have plans stamped'Approved for Construction'thythe City offlendian onsite at all times 2 a 8 a sp 4. AllContractors.Subcontractors and UtilAyCordractorssmailadmind a pre-consdruction conference prionto startofwork. 5, Contractors shall notify the appropriate agency when materials am on site or inspection of the ark is required.No ark may begin on any project without Twenty Four(24)hour pror notice. WATER n*GHT HIT 6. Contractor shall notify the Public Works Inspector 48 hours imor to the required testing,The Contractor may not open or close water valves. END SEAL CARRIER*PIPEFIUSED JOINIT Ng 7 All matenal furrished on.or for the project must meet the minimum requirements of the approving agencies.At the request of the approving agency or the Design Engineer,Contractors shall furnish proof that all materials installed on this project meet the CASING PIPE specification requirements set forth in General Construction Note No 1 PLASTIC SKID 8. Work subject to approval by any govemmental agency must be approved prior to(A)backfilling trenches for pipe;(B)placing of aggregate base;C)Placing ofmirucrese,(0)cal of asphalt parving. on Z WATER MAIN CASING DETAIL 9 9. Inspection,approval and final acceptance of all water and sewer construction shall be by the Public Works Department,and,their decision shall be final.Such inspections shall not relieve the contractor from lbe responsibility of performing the ark in an T acceptable manner in accordance with the DEQ1QUPE approved construction plans. N.T.S. 10,Any deviation from the approved plans and specifications must haw the appircable agency approval in writing prior to construction 11,Prior to beginning installation of street lights,the electrical contractor shall obtain an Electrical Pernift from the Building Division of the Meridian Public Works Departirmard Any deviation in street light locations from the approved plans must be approved in NOTES:1. CASING PIPE SHALL BE INSTALLED AT THE SAME SLOPE wriffing from the City Engineer AS THE CARRIER PIPE AND THE CARRIER PIPE SHALL BE CENTERED INSIDE THE CASING PIPE. ROADWAY 2. THE ENTIRE ANNULAR SPACE BETWEEN THE CASING AND . . . . . . . . CARRIER PIPES SPACE SHALL BE FILLED IN ACCORDANCE 1. ACHD or ITD Will inspect all work within the public right-of-way,to include utility trenches above the pipe zone. WITH THE ISPWC AND CITY OF MERIDIAN SUPPLEMENTAL SPECIFICATIONS. Id-I I I I I I 2. Traffic control beyond the provided under the prime roadway contract may be respired for these utility improvements All real traft contral shall conform to the requirements of ACHO,and the Manual on Uniform Tmffic Control Divides All required raffle control shall be dandiderd incidental to the project and no separate payment will be made. 3. Men dill work occurs prior to the prime madway construction,all utility benches located within the limit of the prime roadway project that must be kept open to two way traffic and within existing paved surfaced shall be restored with Type 7'manch maunder.Trench Z restoration is considered monsidary analmll be maintained under the dome madi contact folloi the Initial installation The initial manch repair mug be accepted by ACHD and the prime contractor before maintenance responsibility is damifered to the prime conwittor All temporary search restoration shall be considered incidental to the project and no separate payment shall be made. WATER 1. Construclion of the water system shall conform to the standards in the"Idaho Rules for Public Drinking Water Systems(IOAPA 58.01.01 as all as the standards and specifications referred to in Gemerai Construction Note No.I. Z Z The horizontal separation of potable water mains and non-potable water mains(sanitary sewer,stan drain,and irrigator)shall be a minimum of ten If 0)feet.Where it is necessary for a potable water murn and non-potable water main to cross with less 4 than eighteen(18)inches of vidUcal separation,the crossing shall be committed in accordance wth Section 542 07 of the Idaho Rules for Public Dmi Water Systems(IDAPA 58.01.08)and Section 430.02 of the wastewater Rules(jDAPA 58.0116). 1 401 APPROVED FOR 00 3. The horizontal suspension of num-pitable services and potable water services or potable water mains shall be a minimum of six(6)feet.Where it is necessary for a potable water main and non-potable water main to=as with less than eighteen(18) COMTRUI inches of"Ifical separation,the crossing shall be constructed in accordance with Section 542.07 of the Idaho Rules for Public Drinking Water Systems(IDAPA 58.01.08)and Section 430.02 of the Wastewater Rull(IDAPA 58.0116). These Plans wrordalosawadona,have dean mvi—iw corplorfice war Mai City Suesnowul d sialivations.T—Joe,nor Z 0 4 Place water service lines in a two(2)inch diameter pipe wherever the service line crosses a stomn water treatment faciffily(i.e seepage beds,drainage sales). Ze vill, 5. The Contractor shall be responsible for providing confinuours water seNces to all existing water users affected by construction.If water service must be interrupted,the Contractor shall coordinate with the Public Works Inspector. wwri.pri iamixi wfpord,-,--,a ui wid-1-61,-4-1 0 with the prime commit to minimize the amount of March ark in the paved areas that must remain am.a.u:y maddr.hai ad am—.na,wase-ovaid,sa oduad dY W 6. It is the intent of this project that all new waterline vork be performed in conjunction win ACHO's roadi reconstruction project.All water line work shaM be closely coordinated ay aaff show nor as deari a,wipromal viruses apaidawily Z '42 opentodeffic Man utility construction must occur prior to the roadway ark trenches shall be repaired with Temporary Type'i surface reateratuar See RoadwayNote#3 wormed in wriong cy d*City.Any proposed revision It,mass plone sual o&suprou".j. ..do,ophande viiin In.Mardian 01Y 7, Trench warning may be required to complete construction adinsted.Contractor is required to obtain necessary permits and doormats poor to atering dawartiming 6tandadds and Spedficatiuras biduse saw nasal, drailruQui SEWER Name solithan 1. Construction ofthe sewer system shall conform to the standards in the Wastewater Rules IDAPA 58.01.16)as well as the standards and specifications referred to in General Construction Note No 1. 2 The horizontal separation of potable water mains and nor-lilthible water mains(sanitary sewer,storm cran,and rogation)shall be a minimum of ten(10)feet.Where it is necessary for a potabse water main and non-potable water main to cross with less Z than eighteen(18)inches of vertical separation,the crossing shall be constructed in accordance with Section 542.07 of the Idaho Rules for Public Drinking Water Systems(IDAPA 58.01.08)and Section 430.02 of the Wastewater Rules IDAPA 58.01.16) 1 3. The horizontal separation of non-potable services and potable water services or potable water mains shall be a minimum of six(6)feet Where 0 is necessary for a potable water main and non-potable waWr main to cross with less than eighteen(18) inches of vertical separation,the crossing shall be constructed in accordance with Section 542.07 of the Idaho Rules for Public Drinking Water Systems(IDAPA 58,01.08)and Section 430.02 of the WasterviddearRulas(DAPA 58.01.16). 4, Place sewer service lines in a six(6)inch diameter water class pipe wherever the service line crosses a storimater treatment facility(i.e.,seepage beds,drainage rates). 5 It is the intent of this project that all new sewer line work be perhommid in conjunction virth ACHD's mardway reconstruction project.All sewer line ark shall be closely coordinated with the prime contact to minimize the amount of pench work an the paved areas that must remain open to hall When utility construction must occur pror to the roaclay work trenches shall be repared wth Temporary Type P"surface restoration.See Roadway Note#3 6 Trench clarwatering maybe required to complete construction actimbers Contractor is required to obtain necessary permits and approvals Imorto sharing dewatenng. Issis Z Z W 2 W > W Z 0 2 R 16 lissis W Z W Issis DATE-,MAY 2020 ORWNG:SHOJINIG JOB NO:E012 SHEET 2 Or 5 Exhibit B 'Pxhibit C City of Mefidime APPROVED FOR CONSTRUCTION in"­1�1 ................ wiw Np.;'­' 111;1111111111�111.'1'111!��.' R8048360200 ld.,11,ME"ill", j1do,C01 39 1181 Em 34+21 Win 0m, 6 Tory A.&Dona J.Manning 46'LT 11­ np'i,"".­­11�.1. 7. _��A BED BY D aii ep PA- P/L P/L- P/ E �Ep L::— Es Li 0 Ep bil 7 3 5 9 10 12 13 31+03 Wa��&10'LT 31 00 32+00 AMITY ROAD 33+00 TT_ 0 LO _�80�eo_oo P/L P/L PA ......... ES Li z /L P/L P/L p/,————P/L PA——— L) R7811270010 [_4875� ol N 0 E S Robert M,&Linda U.Sanders 'x 16'(IPS)HOPE,AWWA C906,PE4710,DR7,WATER MAIN,ITEM 401.4.1.Al. PROVED 12"GATE VALVE,FLxMJ,ITEM 402.4.1 Al. NOTES; 1. CONSIDERED A DV WATER co THE CITY POTABLE THE NEW WATER MAIN WILL BE CONSTRUCTION MAIN FOR FUTURE CONNECTION TO 27 OLDW—OF ASSEMBLY PER MERIDIAN SD—Wl3,ITEM SP—MO4004. WATER SYSTEM. I >4 0 ffi w TI—pen. nift Mn —phanAe .I LOCATE STATION PER MERIDIAN SD—G5,M)A 401.4.1.C.l. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESSURE sh Miind,w Cdy SWIW-di,in'd apAnfwns.Th'.——I.I. > TESTING THE NEW WATER MAIN AND PROVIDING ALL WATER niftne,th.--, ol­unwf oj the mpAnSiDIRLy w dmign NON—POTABLE PIPE CROSSING,SEE WATER NOTES ON SHEET 2. REQUIRED TO COMPLETE THE TEST, BACTERIA TESTING OF anWat­v�"w iw��in—plion. in wi­ni ismiubm, THE WATER MAIN SHALL NOT BE REQUIRED. niou'b",-I.—, JV(IPS)HOPE,AWWA C906,PE4710.DR7,FLANGE ADAPTER,INCIDENTAL TO PIPE ITEM. .11.1 h"I.III,cilyn:wn'".dp w nw.- tot N.Y lo 2o 4D so 16"X12"[MiaLE IRON REDUCER,FLXFiL INCIDENTAL TO PIPE ITEM. city swii sh.1 n�"'-"uuw.op—d n*.spfwly sdd,.,w by ft Qiy.An,qf�p­d lininn..oft III— @CONCRETE THRUST BLOCK,INCIDENTAL TO PIPE ITEM. ­L DO lb�Zgwh�!.r­sno—PA--,In 11,,M---CiIY SCALE;1'=20' Smi,161m iind 5*1winnn,ww'.nAd HAMMERHEAD THRUST BLOCK,INCIDENTAL TO PIPE ITEM. Nam scorien ,CU:HORIZ. Iiii-20 VERT, =2' 27 2704 ONG GROU 0 NM TIC 2702 2702 CROWN FINIS i GRIDE z 27DO 2700 > IRRIGATION 0 IRRIGATION 2698 L 2698 F 0 Ic 2696 10T' 2696 4=—=- J ME11:v ATM ANN p NEW 00 NO 1 2694 #PROXI z IN 2694 $1 AM DRAIN I ROSSINO SEE WATER NOTES ON SHEL7 2 2692 2692 DITE MAY M0 No:DESIGN— JOB NO:2DO12 "0 SH19 3 OF 5 2690�30 ..32 13 34 35 ExhibitC — 'Pxhibit D Clty of lillsirldloo APPROVED FOR CONSTRUCTION 0 400 y1lin.U1. d-n.1 Wel.1h. ­nc­I'd.he Co.3 0._bi E'1_"� Ll 0 ftop and co'sn'ti 11, 1.7 R8048360200 F.."'.sni..a L..1 ftgvl.n­� .............11.1. Ljj 0 Tory A.&Dona J. Manning S1226336401 Re,le.inj QLPE/P 1. F4750] 0 2 a a 0 Waite,Joseph M. 0 z 0 w Lij Ld V) P"t F". V) Ld EG EG EG —EP—EP—EP_u' EP— EP Li EP U) 40�+O ANAITY ROAD . . . . . . . . . . . . . . . . . ��36+00 37 27 2 %400 36+311 20 3 AMI]y ROAD 11LUIN 0 0 EP—EP EP— EP_ ip EP 0 + ===Yf t EG T + Ln 0 d LLJ Of z LLJ z )-.I 5"��" z —RIW—— KV V� E-4 C) < E-4 S1235223201 F-2955� in Two Valley Investment Properties Inc. Z 0 u Pq <z.0 0 N 0 T E S 0 -0,3/8�THICK STEEL CASING PIPE,MW 310.4.1.A.l. 0 z 20 — NOTES: 1. THE NEW WATER MAIN WILL BE CONSIDERED A DRY WATER 16'(IPS)HOPE,AWWA C906,PE4710,DR7,WATER MAIN,IIEM 401.4.1.ALI. MAIN FOR FUTURE CONNEC11ON TO THE CITY POTABLE Pq LOCATE STATION PER MERIDIAN SD—G5,FEM 401.4.1.C.l. APPROVED FOR WATER SYSTEM. NON—POTABLE PIPE CROSSING,SEE WATER NOTES ON SHEET 2. CONSTRUCTION 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESSURE TESflNG THE NEW WATER MAIN AND PROVIDING ALL WATER 0 10 20 40 6 2(Fjk)-4"SCHEDULE 40 RIGID PLASTIC CONDUIT(IRRIGQON AND ELECTRICAL have been reviewed for wmpliance REQUIRED TO COMPLETE THE TEST. BACTERIA TESTING OF I I I i SERVICE SLEEVE)WITH 1—#12 THWN LOCATE WIRE EXTEND SLEEVE A Specifitaiions,This review does not THE WATER MAIN SHALL NOT BE REQUIRED. MINIMUM OF 6'PAST HARDSCAPE SURFACES.M 1102.4.1.E.l. nvai of the re ponaii to design z 0 hei aniIQiia��_oi�i, bona,on linanms,� QU::HOI 1Z.:1:�_20 q re I q p i VERT, *-2':::: ..... ... wkinfloaCkyrelhinath rightto n1em.1nmosiaeociesni by .. . .. ..... . ....... a n ..... ......... .. .... . . ... ... C ly staff shaH not be tonsbued as approved u asispeoli ai dressed in wrilb g by the C:ih.Aiy proposed nev sion to Vai ns 270B ... w0h. be shwsl..n 17.1t, I ... . .. .... . 2708 S andards and Sp?mfintiors befb asiidimisionE mni qp�: ........ .... .. N inne sobrien . ......... Dite Sep 25;920 EX ISTI N G GROUND 0 2706 TBC 2706 4 :L .... . .. q. ... ... rNEN TBC ...... 2704 ... .... ... .... .. ....... . . p ... ... 2704 I F F F 4 q p ..... -------- p p I p > .... ... 1 77 ...... .... ... . .. .... .. w Z 0 2702 p p ::: :::. :::i'� .. ..... . ..... . 2702 .. . ....... . . .... "y L3 0) 16 q . .... ... . ....... . . . . .. . . . 4' /21 r1r: . . . 0 q ....... 0 ...... ....... 1 4[� Gmtu I p L3 2700 JE RCP 4 . ..... 4— 2700 IL ... ..... ... .... ... .. . r 9 �. I� 1 5 w IRRIGON: ....... . .... . . . . .. . : :,:�: q:::�::: :::::: : ::::: IRRIGATION I I I I. I I+ .�9 r:::ipp M N j q .... ... ROXIMATE LOCATION N WATER ... ... . p q L 2698 :::p p 2698 z p q I . . . ........ q p ::::: ::: ......... . 4 NO FITTINGS OR CONN.CTONS SHAI L+EIE INSfAi lb�Ok THE q UNI M . ... ... ... HOPE'*A,EN MAIN: OTHFRW k NOTED:b 4 THIEr TDPI;KING-2596,48 PLANS.TI­E HOPE WAI T MAIN SHA 1:BE�INSTAI LED IN THE 2696 ... ..... .. ...... .... .. .......... ... ...... . ..... 2696 STEEL CNING Byr A G)MBINATION C F INSTAWNC A PORTION APPROAW rE LOCAn N NEW:WATER MAIN OF THE A ATER MAIN E EEPER AND I IENDING THE PIPE AT A 0+ ....... MAXIMUM 1/2 OF E MANUFACTL)RES:ALLOWED:BENDING DATE'MY 2020 :I .....­­ ':�: RAQ1V$' p i OWING:DES13i .... ........ 77—F0_LF_20-0�T&"WHICK M�ff�rwi_ .... .. JDB NO:20012 2694 ...... CENTERED N, JAM113ON LAT pi SEE DETAIL ION S 2694 35 36 37 38 39 40 — SHEET 4 OF 5 Exhibit D Exhibit E Item 20. City of Meridian 00 *0 0 A APPROVED FOR APPROVED FOR CONSTRUCTION CONSTRUCTION in Theini plivini nini.1—niine—hil—Pli.- n. .'h 1.ift IN�LPF Inifnin''in "inn" -10 id"in"�14 blirnarid,aN-P""t"n' -'eve'"'*Wi r.r.n.in-iirnei,npee'..' in.neii—aildy.danp anilm­nili­th�,winjLes in in.1, iniph.ln. 'ind "Aw 40.1$­ rin"'44.110011 0( S12263364 I -Pin-ei,inflin "Whi. ­��'1. in,— I,,,— h..�,nyneunr,weigh,iv--ii-neenin—`v"'by ...... 9 1,ft ly,,ny PMPNW flywinn,W ineini,P05 Waite,Joseph M. iiiiii—ind in me, ii, Cay.ia.n"not en,Win...PP­dvni­PW.11y ....... ..t.ininiz fW W-preii. in inn,W.W.C14 40 60 Swindino...apif.w- nni,inwo re,--...GW-. 46 LT 6 Name sobrien 43+59 ... ............ 10' 4 9 11 13 z ——PA—— P/L--::: V) PA————P/L— P/L— PA— F/L- 2 P/L Ep Lj cf) 597 _Y ROAD 43+00 44+00 47 45i 00 97 42+00 AM11 e 0 0 EP + EP EP EG 77777777, 0 P/L————P/L— P/L— PA— EP--- EP EP EF EG Ld E; z _j E-4 z S1235223201 < F29675 0 W* um,,, Two Valley Investment Properties inc� z Z A. 0 i<5 N 0 T E S 16'(IPS)HOPE,AWWA C906,PE4710,DR7,WATER MAIN.ITEM 401.4.1.Al. NOTES: 1. THE NEW WATER MAIN WILL BE CONSIDERED A DRY WATER F7F 27 BLOW—OFF ASSEMBLY PER MERIDIAN SD—W12,ITEM SP—MO4004. MAIN FOR FUTURE CONNECTION TO THE CITY POTABLE LOCATE STATION PER MERIDIAN SD—G5,ITEM 401.4-1-C.l. WATER SYSTEM. 0 16'(IPS)HOPE,AWWA C906,PE4710,DI FLANGE ADAPTER,INCIDENTAL TO PIPE ITEM. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRESSURE TESTING THE NEW WATER MAIN AND PROVIDING ALL WATER 0 10 20 40 60 16'DUCTILE IRON BUND FLANGE W/2'THREADED TAP,INCIDENTAL TO PIPE ITEM. REQUIRED TO COMPLETE THE TEST. BACTERIA TESTING OF 04 THE WATER MAIN SHALL NOT BE REQUIRED. sw:1�=20' 0.4 @ HAMMERHEAD THRUST BLOCK,INCIDENTAL TO PIPE ITEM. 0 MALE:HUM 1=20 VERT,"=2'. q 2710 2710 NEW CROMI ... 2708 . . . 1 1-1 1 1 2708 EXISTING GROUND >. lan Z Z 2706 2706 TBC z 2704 2704 F 2702 2702 WAO 0 lar ApPROVA 2700 z 2700 re 2698 DATE-,MAY 2020 MNG:MIGNAG Joe NO:20012 2696 2696 SHEET 5 OF 5 40 43 44 Exhibit E