CC - Geotech I ENVIRONMENTAL ALLWEST MATERIALS OTESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY September 11, 2020 Jeff Harris Sky Mesa Development, LLC 729 South Bridgeway Place Eagle, Idaho 83616 RE: Geotechnical Evaluation Sky Mesa Highlands Subdivision South Eagle Road and East Lake Hazel Road Meridian, Idaho ALLWEST Project No. 519-505G Mr. Harris: ALLWEST has completed the authorized geotechnical evaluation for the proposed Sky Mesa Highlands Subdivision to be located on the northwest corner of Eagle and Lake Hazel Roads in Meridian, Idaho. The purpose of this evaluation was to characterize subsurface soil conditions at the site and provide geotechnical recommendations to assist planning, design, and construction of the proposed development. The attached report presents the results of our field evaluation, laboratory testing, and our recommendations. We appreciate the opportunity to be of service to Sky Mesa Development, LLC. If you have any questions or need additional information, please contact us at(208) 895-7898. Sincerely, ALLWEST g�QMAL 0��4 ENs— 253 �EOF 10 Adrian Mascorro, P.E. '�N�IASC Area Manager 255 N. Linder Rd., Suite#100, Meridian, ID 83642 Phone: 208.895.7898• Fax: 208.898.3959 Hayden, ID• Lewiston, ID•Meridian, ID.Spokane Valley,WA• Missoula, MT www.allwesftesting.com GEOTECHNICAL EVALUATION SKY MESA HIGHLANDS SUBDIVISION MERIDIAN, IDAHO ALLWEST PROJECT NO. 519-505G September 11 , 2020 Prepared for: Sky Mesa Development, LLC 729 South Bridgeway Place Eagle, Idaho Prepared By: ALLWEST 255 North Linder Road, Suite 100 Meridian, Idaho 83642 A LWE T WWW.ALLWESTTESTING.COM TABLE OF CONTENTS ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Meridian, Idaho Page 1.0 SCOPE OF SERVICES ........................................................................................2 2.0 PROJECT UNDERSTANDING.............................................................................3 3.0 FIELD EVALUATION PROCEDURES.................................................................3 4.0 SITE CONDITIONS ..............................................................................................3 4.1 General Geologic Conditions............................................................................. 3 4.2 General Soil Conditions..................................................................................... 3 5.0 EXPLORATION AND SAMPLING .......................................................................4 5.1 Subsurface Soil Conditions ...............................................................................4 5.2 Subsurface Water.............................................................................................. 5 6.0 LABORATORY TESTING ....................................................................................5 7.0 CONCLUSIONS AND RECOMMENDATIONS ....................................................6 7.1 Grading ............................................................................................................. 6 7.2 Site Preparation.................................................................................................6 7.3 Subgrade Stabilization ...................................................................................... 7 7.4 Excavation......................................................................................................... 8 7.5 Materials............................................................................................................ 8 7.6 Fill Placement and Compaction......................................................................... 9 7.7 Utility Trenches.................................................................................................. 9 7.8 Wet Weather Construction ................................................................................ 9 7.9 Cold Weather Construction ............................................................................. 10 7.10 Stormwater Disposal ..................................................................................... 10 7.11 Asphalt Pavement ......................................................................................... 11 8.0 ADDITIONAL RECOMMENDED SERVICES..................................................... 12 9.0 EVALUATION LIMITATIONS............................................................................. 12 Appendix A— Site Vicinity Map, Exploration Location Plan Appendix B —Test Pit Logs, Unified Soil Classification System Appendix C— Laboratory Test Results GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation Sky Mesa Highlands Subdivision South Eagle Road and East Lake Hazel Road Meridian, Idaho ALLWEST has completed the geotechnical evaluation for the Sky Mesa Highlands Subdivision located on the northwest corner of Eagle and Lake Hazel Roads in Meridian, Idaho. The general location of the site is shown on Figure 1 — Site Vicinity Map in Appendix A of this report. The purpose of this evaluation was to identify subsurface soil conditions at the site, and provide opinions and recommendations with respect to the proposed development, relative to earthwork, stormwater disposal, and pavement section design. This report details the results of our field evaluation and presents our recommendations to assist design and construction. 1.0 SCOPE OF SERVICES Our scope of services for the project included the following: 1) Prior to subsurface exploration, we visited the site to observe site accessibility and to pre-mark exploration locations, as required by Idaho Digline. 2) ALLWEST then notified Idaho Digline to mark underground utilities as required by Idaho state law. 3) Subcontracted a backhoe and operator to observe the excavation of 13 test pits to a maximum depth of 13 feet. 4) Visually described, classified, and logged the soils encountered within test pits in general accordance with ASTM D 2487 and ASTM D 2488, which utilizes the Unified Soil Classification System (USCS), and we logged the subsurface profiles. We obtained select soil samples encountered within the test pits. 5) Performed seepage tests in select test pits to evaluate subsurface seepage. 6) At completion of exploration, the test pits were loosely backfilled approximately level with the ground surface. 7) Performed laboratory tests on select soil samples to assess some of the soil engineering properties and characteristics. 8) Reviewed the results of the field evaluation and laboratory testing, performed engineering analyses, and provided recommendations to assist project design and construction. 9) Prepared a draft report for your review. After your review and comment, we provided this report with our field evaluation results, subsurface logs, and geotechnical-related opinions and recommendations. We provided our services for this project in general accordance with our revised geotechnical proposal 519-505P, dated November 20, 2019. GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 3 Meridian, Idaho 2.0 PROJECT UNDERSTANDING Based on review of the project's Grading Plan by J-U-B Engineers (dated August 31, 2020), we understand plans for the approximate 31-acre subdivision will consist of 75 single-family residential lots. No basements or below-ground portions of the residences will exist. The development will include associated infrastructure, asphalt- paved roadways, and stormwater disposal facilities. An existing residence and outbuildings exist on the site; the residence and adjacent outbuildings will remain as part of the development, but the outbuildings adjacent to the southern slope/hillside will be demolished prior to development. Based on review of the grading plan, cuts and fills of up to approximately 15 to 20 feet will be required for final grading. 3.0 FIELD EVALUATION PROCEDURES To complete this evaluation, we subcontracted a backhoe and operator to observe the excavation of 13 test pits using Case 580C backhoe with a 3-foot-wide bucket. We obtained soil samples for laboratory testing. The approximate locations of the test pits are shown on Figure A-2 — Exploration Location Plan in Appendix A. 4.0 SITE CONDITIONS At the time of exploration, the site was undeveloped, and the ground surface was covered with native weeds and vegetation. A residence with associated outbuildings existed in the south and east portions of the site. The site is bordered by Eagle Road to the east, residential development and Lake Hazel Road to the south, and new residential developments to the west and north. 4.1 General Geologic Conditions The geologic conditions at the site are mapped as Sandy Alluvium of Side-Stream Valleys and Gulches (north of terrace) and Gravel of Amity Terrace (terrace) on Geologic Map of the Boise Valley and Adjoining Area, Western Snake River Plain, Idaho", by Othberg and Stanford (1992). North of the terrace these soils consist of sand interbedded with silty sand and silt with minor clay and calcium carbonate, and the terrace soils consist of gravels and sands mantled with loess. The soils encountered within test pits are generally consistent with geologic mapping. 4.2 General Soil Conditions The USDA Natural Resources Conservation Service (NRCS), which represents the upper 5 feet of the soil profile, has mapped the soil on the site as Purdam silt loam (north of terrace) and Pipeline silt loam (terrace). The parent materials of the Purdam silt loam are mixed alluvium, lacustrine deposits, and/or loess consisting of silt loam, silty clay loam, cemented material, and stratified sand to loam. The parent materials of the Pipeline silt loam are silty alluvium and/or loess over sandy alluvium consisting of silt loam, silty clay loam, cemented material, and gravelly sand. The soils encountered within test pits are generally consistent with NRCS mapping. GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 4 Meridian, Idaho 5.0 EXPLORATION AND SAMPLING We observed the excavation of 13 test pits using Case 580C backhoe with a 3-foot- wide bucket at the approximate locations shown on Figure A-2 — Exploration Location Plan. We obtained Google Earth latitude and longitude coordinates of test pit locations with a hand-held cellular device. These coordinates can be found on individual test pit logs in Appendix B and should be considered accurate to the degree implied by the method use. We visually described, classified and logged soil conditions observed within test pits in general accordance with ASTM D 2487 and D 2488. We obtained select disturbed soil samples from exploration locations. At completion of exploration, test pits were loosely backfilled with excavated soils approximately level with existing ground surfaces. 5.1 Subsurface Soil Conditions The site mainly contained 3 inches of surficial roots and vegetation at the surface. Generally, the site consists of surficial sandy clays and sandy silts, overlying silts and sands with variable amounts of gravels and calcium carbonate cementation, which overly sands and gravels (with varying amounts of silt and calcium carbonate) with depth. We also observed an area (near the southeast corner of the site) with uncontrolled and unsuitable fill soils with debris. Specific soil descriptions of the on- site soils observed are provided below. Unsuitable fill soils — At the ground surface within test pit TP-13, we observed unsuitable fill soil down to greater than 13 feet below existing ground surface. Fill soil consisted of lean clayey sand with gravel and lean clay with sand and gravel, and appeared brown, medium dense/stiff, and moist. The fill soil from 4 to 13 feet contained variable chunks of hard pan/caliche throughout, asphalt debris at 9 feet, and trash/wood debris at 12'/2 feet. It appears the area within/adjacent to TP-13 may be an old farmer trash/backfill pit. Sandy lean clay, lean clay with sand, or clayey sand (CL or SC) (native) — At the ground surface within test pits TP-1 to TP-5, and underlying surficial sandy silt/silt with sand within test pits TP-6 to TP-8, we observed native sandy lean clay, lean clay with sand, or clayey sand to depths of 1'/2 to 3'/2 feet. The clayey soils appeared brown to light brown/orange, firm to stiff or medium dense, and moist. Sandy silt or silt with sand (with or without gravel) (native) — At the ground surface within test pits TP-6 to TP-12, and underlying sandy lean clay within test pits TP-1, TP-2, TP-3, and TP-6, we observed sandy silt and/or silt with sand (with or without gravel) to depths varying between 1 to 12 feet. The silty soil appeared brown to tan, medium dense to dense, moist, and contained variable weak to moderate calcium carbonate cementation throughout. GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 5 Meridian, Idaho Silty sand (with or without gravel) (native) — Underlying clayey sand/sandy clay within test pits TP-5, TP-7, and TP-8, and underlying silt with sand within test pit TP-10, we observed silty sand (with or without gravel) to depths of 6 to 13 feet (maximum test pit termination depth). The silty sand appeared tan or orange to brown, medium dense, moist, and contained weak to moderate calcium carbonate cementation. Gravel with silt and sand, silty gravel with sand, sand with silt and gravel f"dirty" gravels/sands (greater than 5% silt)] — Underlying clayey and silty soils within test pits TP-4, TP-8, TP-9, TP-11, and TP-12, we observed "dirty" gravels and sands with varying amounts of silt (greater than 5%) to test pit termination depths of up to 13 feet. The "dirty" gravel/sand soils appeared tan to orange, medium dense to dense, and moist. Within test pit TP-4, the gravel soils contained moderate to strong calcium carbonate cementation where excavation refusal was observed at 6 feet. Gravel with sand f"clean" gravels (less than 5% silt)] — Underlying sandy silt, silty sand, or silt with sand soils within test pits TP-1 to TP-3, TP-6, and TP-7, we observed "clean" gravels with sand (less than 5% silt) to test pit termination depths of up to 13 feet. Where encountered, "clean" gravels were first observed varying between 6 to 9 feet below ground. The "clean" gravel soils appeared tan to orange, medium dense, and moist. Detailed soil descriptions, depths and notes are presented on individual test pit logs in Appendix B. The descriptive soil terms used on the test pit logs in this report, can be referenced by the USCS. A copy of the USCS is included in Appendix B. Subsurface conditions may vary between exploration locations. Such changes in subsurface conditions may not be apparent until construction, and if they change significantly from those observed, then accordingly, construction timing, plans and costs may change. 5.2 Subsurface Water At the time of exploration, we did not observe groundwater to the maximum test pit excavation depths of up to 13 feet. However, based on groundwater monitoring throughout the 2020 snow melt and irrigation seasons, we observed groundwater within three of the installed piezometers, test pits TP-1, TP-2, and TP-3, at shallowest depths of 5.3, 8.6, and 11.2 feet, respectively, below existing ground surfaces. Groundwater in the area is typically influenced by local irrigation and nearby surface water sources (creeks and laterals), and may be influenced by precipitation, construction, and development of adjacent sites. Groundwater will fluctuate throughout snow melt and irrigation seasons. 6.0 LABORATORY TESTING We performed laboratory testing to supplement field classifications and to assess some of the soil engineering properties and parameters. The laboratory tests GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 6 Meridian, Idaho conducted included moisture content (ASTM D 2216), gradation (ASTM D 1140), Atterberg limits (ASTM D 4318), and California bearing ratio (CBR) (ASTM D 1883). Laboratory test results are summarized in Appendix C, and are also presented on test pit logs in Appendix B. 7.0 CONCLUSIONS AND RECOMMENDATIONS Based on our observations, testing and evaluation, in our opinion, the site may be considered suitable for the planned development. The following recommendations are presented to assist with design and construction of the proposed development, relative to earthwork, infrastructure, stormwater disposal, and asphalt pavements. These recommendations are based on our understanding of the proposed construction, the conditions observed within exploration locations, laboratory test results, and engineering analysis. If the scope of construction changes, or if conditions are encountered during construction that differ from those described herein, we should be notified so we can review our recommendations and provide revisions, if necessary. 7.1 Grading Final grading plans for this development will consist of cuts and fills of up to approximately 15 to 20 feet. Final site grading should adhere to civil design, ensuring that surface flow is directed away from development areas. 7.2 Site Preparation Prior to conducting site grading, surficial soil containing vegetation, roots and organics should be removed below proposed site grading fill areas, pavements, and any other development areas. We anticipate approximately 3 inches of site stripping will be required for majority of the site to remove vegetation and roots. However, this depth may vary and will not be fully known until construction. Existing asphalt pavements, pavement subsections, infrastructure, unsuitable fill soils, and any large tree root areas must be over-excavated their entire depth below development areas. We observed unsuitable fill soils within test pit TP-13 to excavation termination depth of 13 feet. Test pit TP-13 may be associated with an old farmer trash/backfill area that is not suitable for development. All unsuitable fill soils containing asphalt, concrete, and variable trash debris must be over-excavated its entire depth below any proposed development areas, prior to fill placement. Any over-excavated materials may only be reused within non-structural landscape areas or must be disposed of off-site. Over-excavations within proposed pavement or flatwork areas (such as roadways, parking areas, sidewalks, concrete curb and gutter, or any other concrete lanes) should extend a minimum of 1 foot beyond asphalt/concrete perimeters. GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 7 Meridian, Idaho After site stripping, any unsuitable fill over-excavations, and prior to placing site grading fills or pavement subsections, the exposed subgrades should be proof-rolled with a minimum of 5-ton vibratory roller or with a vibratory hoe-pack, to confirm subgrade stability. This will also assist in identifying any soft or loose soil zones associated with loose test pit backfill, potential groundwater, or wet/soft soils due to precipitation. If native subgrade soil is observed to significantly deflect or pump, it should be over-excavated and replaced with properly compacted fills, or stabilized as recommended in section 7.3 Subgrade Stabilization. 7.3 Subgrade Stabilization If the subgrade soils are observed to pump or deflect significantly during grading, the subgrades should be stabilized prior to fill placement. Subgrades may be stabilized using geosynthetic reinforcement in conjunction with imported granular structural fill. The required thicknesses of granular structural fill (used in conjunction with geosynthetic reinforcement) will be dependent on the construction traffic loading, which is unknown at this time. Therefore, a certain degree of trial and error may be required during construction to verify recommended stabilization section thicknesses. Geosynthetic reinforcement should consist of Tensar TX-160 or equivalent. Alternatives to Tensar TX-160 must be approved by the geotechnical engineer prior to use on site. The following recommendations are provided for subgrade stabilization using geosynthetic reinforcement. • Geosynthetic reinforcement materials should be placed on a non-disturbed subgrade with smooth surface. Loose and disturbed soil should be removed prior to placement of geosynthetic reinforcement materials. • A minimum weight 4-ounce, non-woven filter fabric should be placed on the undisturbed subgrade. The geosynthetic reinforcement should be placed directly on top of the filter fabric. The filter fabric and geosynthetic reinforcement should be unrolled in the primary direction of fill placement and should be over-lapped at least 3 feet. • The geosynthetic materials should be pulled taut to remove slack. • Construction equipment should not be operated directly on the geosynthetic materials. Fill should be placed from outside the excavation to create a pad to operate equipment on. We recommend a minimum of 12 to 18 inches of granular structural fill be placed over the geosynthetic reinforcement before operating construction equipment on the fill. Low pressure, track-mounted equipment should be used to place fill over the geosynthetic reinforcement. • Granular structural fill placed over geosynthetic reinforcement should be properly moisture-conditioned prior to placement, and once placed, statically rolled. This section is considered the "bridge" section over soft subgrades. GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 8 Meridian, Idaho • After the first "bridge" lift has been placed, the remaining fill material above the "bridge" section should be compacted to structural fill criteria in section 7.6 Fill Placement and Compaction, utilizing vibratory compaction methods. • Vibration should be discontinued if it reduces the subgrade stability. If compaction criterion is not met within the fill lift above the "bridge" section, the "bridge" section thickness is not enough, and subgrade stabilization must be attempted again with a greater "bridge" section. The geotechnical engineer or a representative of the geotechnical engineer must be on-site during subgrade stabilization to verify our recommendations are followed, and to provide additional recommendations, as needed. 7.4 Excavation Excavation of on-site soil can be accomplished with typical excavation equipment. We recommend excavations greater than 4 feet deep be sloped no steeper than 1.5H:1 V (horizontal to vertical). Alternatively, deeper excavations may be shored or braced in accordance with Occupational Safety and Health Administration (OSHA) specifications and local codes. Regarding trench wall support, the site soil is considered Type C soil according to OSHA guidelines. Ultimately, the contractor is responsible for site safety, excavation configurations and following OSHA guidelines. 7.5 Materials Stripped soils and/or soils containing vegetation or debris are only suitable for use in non-structural landscape areas. Existing on-site soils may be reused as site grading fill, provided they are stockpiled separately, they meet the criteria below, and they are compacted as required in this report. Imported granular soils should be free of organics, debris, and other deleterious material, and meet the following criteria. Import materials should be approved by ALLWEST prior to delivery to the site. Fill Type Criteria Site Grading, Maximum size <_ 6 inches; Structural Fill Retained on %-inch sieve < 30%; Liquid limit < 50% Maximum size <_ 6 inches; Granular Structural Fill, Retained on 3/4-inch sieve < 30%; Granular Subbase Passing No. 200 sieve <_ 15%; Non-plastic Alternatively, meet ISPWC section 801 6 inches Maximum size <_ 1 inch; Crushed Base Course Retained on 3/4-inch sieve < 10%; Passing No. 200 sieve < 10%; Non-plastic Alternatively, meet ISPWC section 802 (Type 1) Maximum size <_ 2 inches; Utility Trench Backfill Retained on %-inch sieve <030%; Passing No. 200 sieve <_ 10/o; Non-plastic Alternatively, meet ISPWC section 305 (Type I GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 9 Meridian, Idaho 7.6 Fill Placement and Compaction Fill should be placed in lift thicknesses which are appropriate for the compaction equipment used. Typically, 8- to 12-inch-thick loose-lifts are appropriate for typical rubber-tire and steel-drum compaction equipment. Lift thicknesses should be reduced to 4 inches for hand-operated compaction equipment. Fill should be moisture conditioned to within 2% of the optimum moisture content prior to placement to facilitate compaction. Fill should be compacted to the following percentages of the maximum dry density as determined by ASTM D 1557 (modified Proctor). Fill Area Compaction M'-�� Sub grade Proof-roll* Site Grading / Granular Structural Fill / Pavements 95 Base Course/ Subbase 95 Utility Trench Backfill 92 * Proof-roll should be observed and approved by a representative of the geotechnical engineer. 7.7 Utility Trenches Support soils for underground utilities will likely consist of sandy lean clay, clayey sand, silt with sand, sandy silt, sandy silt with gravel, or poorly-graded gravel with sand. These soils should provide adequate support for utilities, provided utility subgrades are compacted utilizing vibratory methods, such as with a large vibratory hoe-pack. If utility pipe subgrades are soft, yielding, and/or saturated at the time of construction, subgrade over-excavation and replacement with competent structural fill may be required below utilities. If support soils yield and/or are saturated at the time of construction, we should be notified to observe these soils and provide additional recommendations, as necessary. We recommend backfilling trench excavations with fill soils which meet criteria in section 7.5 Materials, as on-site fine-grained soils (clays and silts) with variable amounts of calcium carbonate cementation may be difficult to moisture-condition and compact in utility trenches. 7.8 Wet Weather Construction We recommend earthwork for this site be scheduled for the drier seasons of the year. If construction is undertaken in wet periods of the year, it will be important to slope the ground surface to provide drainage away from construction. If construction occurs during or immediately after excessive precipitation, it may be necessary to over- excavate and replace saturated subgrade soil, which might otherwise be suitable. The on-site soils are sensitive to disturbance when wet. If these soils become wet and unstable, we recommend construction traffic is minimized where these soils are exposed. Low ground-pressure (tracked) equipment should be used to minimize disturbance. Soft and disturbed subgrade areas should be over-excavated to undisturbed soil and backfilled with structural fill. GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 10 Meridian, Idaho In addition, it should be noted the on-site soils tend to have notable adhesion when wet and may be easily transported off-site by construction traffic. 7.9 Cold Weather Construction The on-site soils are frost susceptible. If site grading and construction are anticipated during cold weather, we recommend good winter construction practices be observed. Snow and ice should be removed from excavated and fill areas prior to additional earthwork or construction. Pavement and flatwork portions of the construction should not be placed on frozen ground; nor should the supporting soils be permitted to freeze during or after construction. Frozen soils must not be used as fill. If native subgrades, or suitably moisture-conditioned and compacted fill lifts, will be left exposed to freezing temperatures overnight, those areas should be protected with a minimum of 12 inches of loose soil, or covered with heated construction blankets, so construction subgrades do not freeze. Any frozen soils should be removed prior to additional fill placement or construction of any kind. Earthwork construction during cold inclement weather will require a higher level of attention and detail to achieve required earthwork construction and compaction criteria, and may lead to additional earthwork requirements and extended construction schedules. 7.10 Stormwater Disposal During our field investigation, we performed field seepage tests within test pits TP-2 and TP-6 at depths of 9 to 9'/2 feet within "clean" poorly-graded gravel with sand, where we measured field seepage rates of greater than 15 inches per hour (in/hr). Based on our field seepage testing and observations, and consistent soil properties of the "clean" poorly-graded gravel with sand soil, we recommend stormwater disposal occur within poorly-graded gravel with sand, encountered at depths between 6 to 12 feet below existing ground surfaces, within the north, northeast, and east portions of the site (test pits TP-1 to TP-3, TP-6 and TP-7). Stormwater disposal should not be disposed of within or above soils containing calcium carbonate cementation; refer to individual test pit logs in Appendix A for detailed descriptions of subsurface soils that contain calcium carbonate cementation. The following allowable design seepage rate may be utilized for stormwater disposal: Poorly-graded gravel with sand ("clean") ................................ 8 in/hr Stormwater disposal facilities should be constructed a minimum of 1 foot into poorly- graded gravel with sand. Seepage beds should be "burrito wrapped" or otherwise maintain a separation/filter fabric between native fine-grained soils and drain rock/filter sand to help prevent fine-soil migration into drainable/filtering media. ALLWEST should observe stormwater disposal facility subgrades, to establish if GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 11 Meridian, Idaho suitable receiving soil is encountered, to confirm the recommended seepage rate, and to ensure the separation/filter fabric has been properly installed. Refer to test pit logs in Appendix A for soil contact depths. The proper separation from bottom of stormwater disposal facilities and seasonal high groundwater should be maintained. We installed slotted piezometer pipes within select test pits on-site for future groundwater monitoring. ALLWEST started monitoring these on-site piezometer pipes in February of 2020, where we observed groundwater (to the maximum piezometer pipe depths) within test pits TP-11, TP-2, and TP-3. Based on the measurements obtained to-date, the shallowest groundwater depths measured were 5.3, 8.6, and 11.2 feet, below existing ground surfaces, within TP-1, TP-2, and TP-3, respectively. Groundwater should be monitored as required by governing jurisdictions in the area, to confirm seasonal high groundwater elevations at the site. 7.11 Asphalt Pavement Prior to pavement section construction, the subgrade should be prepared as recommended in section 7.2 Site Preparation. Local and collector roadways should be designed for a 20-year Equivalent Single Axle Load (ESAL) of 33,000 and 370,000, respectively, which is equivalent to a traffic index (TI) of 6 and 8, respectively. If actual traffic conditions are different than what is stated, we should be notified so that we may modify our pavement section design. Based on laboratory testing, we obtained a CBR value of 6.3 for surficial sandy lean clay soils on-site, which relates to an R-value of 15. The following flexible asphalt pavement section design is provided based on the Idaho Transportation Department (ITD) design methodology, utilizing Ada County Highway District (ACHD) substitution ratios. Based on our observations, laboratory testing, and assumptions, we recommend the following pavement sections be utilized for subdivision roadway construction for local and collector roadways. The following table presents these pavement sections. Asphalt Aggregate Granular Pavement Application Concrete Base Course Subbase inches inches inches Local Roadway 2.5 4 11 Collector Roadway 3 6 14 Base course and subbase should conform to the material recommendations as noted in this report and should be placed over a properly prepared subgrade. The subgrade, subbase, and base course surfaces should slope at no less than 2% away from the crown of the roadway to help reduce the potential for surface water infiltration into the underlying pavement subgrade. GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Geotechnical Evaluation ALLWEST Project No. 519-505G Sky Mesa Highlands Subdivision Page 12 Meridian, Idaho Asphalt concrete pavement should be compacted to minimum of 92% of the Rice density. Crack maintenance on pavements should be performed at a minimum of every 3 years, or when cracking is evident. Crack sealing will help reduce surface water infiltration into the supporting soils. 8.0 ADDITIONAL RECOMMENDED SERVICES To maintain continuity and efficiency, we recommend ALLWEST be retained to provide observations and testing throughout construction. As an independent testing laboratory, ALLWEST can document the recommendations included in this report are properly implemented, provide quality control testing, and observe earthwork for conformance to project specifications. As a minimum, we recommend the following testing and observations be provided by ALLWEST: • Observe site stripping and unsuitable fill over-excavation, and removal of any other unsuitable debris and soils. • Observe subgrade proof-rolling and approve subgrades prior to fill construction materials placement and roadway section construction. • Observe removal of disturbed soil and subgrade stabilization, if required. • Conduct compaction testing of fill for general site grading, utilities, and pavement areas. • Observe placement of/test asphalt for compaction, oil content and gradation. • Observe concrete placement, and test for slump, air entrainment, and compressive strength. • Provide special inspections as required by the IBC and the structural engineer. If we are not retained to provide the recommended construction observation and testing services, we shall not be responsible for soil engineering-related construction errors or omissions. 9.0 EVALUATION LIMITATIONS This report has been prepared to assist design and construction of the proposed Sky Mesa Highlands Subdivision in Meridian, Idaho. Our services consist of professional opinions and conclusions made in accordance with generally accepted geotechnical engineering principles and practices in our local area at the time this report was prepared. This acknowledgement is in lieu of all warranties either expressed or implied. The following plates complete this report: Appendix A— Site Vicinity Map, Exploration Location Plan Appendix B — Test Pit Logs, Unified Soil Classification System Appendix C — Laboratory Test Results GEOTECHNICAL I ENVIRONMENTAL ALLWESTMATERIALS TESTING I SPECIAL INSPECTION AN EMPLOYEE-OWNED COMPANY Appendix A A-1 — Site Vicinity Map A-2 — Exploration Location Plan ALLWEST • t L • t ■,.. v a46 At ; y big , "• _ G► 184 a ■ r �} n/ r 1 �. } k ® ,Lu �^.- • V/ a ar � LakeL,Haz I Rd v r r r - - • i .. tuna Figure A-1 Site Vicinity . . Geotechnical Evaluation Sky Mesa Highlands •• • Meridian, •, • Linder255 N. Road, Suite 100 Development, Meridian, •, • 83642 Project • • 1 Block 1 Block 1 50 1 Block 2 3 9 COMMON ■'qN 2 3 4 5 6 7 1 2 3 4 5 6 7 LOT - TP-3 N * Lq 49 • I � E. BRACES--_. TP-1 12 g 48 32 l ..OMMON LOT n H) Block 3 TP2 31 1 - M 47 1330 O 2 20 46 11 23 19 18 17 16 14 r� I 29 vi 3 24 45 15 ■ A 44 TP-4 28 4 Z25 W PP-02 _ zs ;�, — — —————————— ---- -----h-T— -- —Z� --- -----29--- — -,1 n 43 F. 6 PP-03 , 26 0 TP-5 7 `� T 42 27 26 25 e .. r Co■mr* 24 \ \ TP-a Block 31 1 41 23 9 � 1a n 40 cD(BN 22 \ 14 12 32 pock 1 , YTP-9 21 ■ * 13 TP-10 A� �,� Block 3 TP-8 33 �. 20 N N89'50'51"W �� '�s• 19 197.33' SSS�6L 18 34 17 ■ 16 TP-7 � F 15 35 M ■ N45.23'07-W TP-11 \ 36 105.37' / LS ■ 37 DIAMOND RIDGE N68O0 '�• TP-12 ESTATES SUBDIVISION a.g2, 38 W in c0 N7 0� COMMON 02 LOT • NO'1 3'0S"E O 40.00' Z N89.56'45"w TP-13 A _ N89'56'45'W 1329.5T _ 205.28' E. LAKE HAZEL ROAD N Legend w, �i/ E 0 Approximate location of test pit observed by ALLWEST. * Slotted PVC pipe installed in test pit. Figure A-2 - Exploration Location Plan Geotechnical Evaluation ALLWEST Sky Mesa Highlands Subdivision Meridian, Idaho 255 N. Linder Road, Suite 100 Client: Sky Mesa Development, LLC Meridian, Idaho 83642 Project No.: 519-505G Phone: (208) 895-7898 Fax: (208) 898-3959 Date: September 2020 Appendix B Test Pit Logs Unified Soil Classification System (USCS) ALLWEST ALLWEST DATE STARTED: 12/12/2019 TP - 1 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'58.7004"(43.549639°) = LONGITUDE(DEGREES):W-116°21'17.3052" (-116.354807°) Lu F U U � o j TOTAL DEPTH: 13' 0CL DESCRIPTION W U) NOTES Sandy lean CLAY(Native); brown to light brown,firm, moist Significant roots and vegetation observed to 3 inches. 1 BG CBR=6.3 CL 2 BG Passing No.200 sieve=66% Moisture content=31% Atterberg limits: LL=42,PL=24, PI =18 3 Sandy SILT;tan,medium dense to dense, moist,weak to moderate cementation 4 ML 5 6 Poorly-graded GRAVEL with sand;tan to orange, medium dense, moist ° 0 Q 7 0� 0 Q o� O Q o� O 9 ....wet at 9 feet o� GP O Q 1 0 Q 1 o� O 1 O o� O Q 1 Test pit terminated at 13 feet. Slotted PVC pipe installed to 13 feet. 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 2 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'58.5672"(43.549602°) = LONGITUDE(DEGREES):W-116°21'22.5936" (-116.356276°) W F U U � o j TOTAL DEPTH: 13' 0CL DESCRIPTION W U) NOTES Sandy lean CLAY(Native); brown,stiff, moist Significant roots and vegetation observed to 3 inches. 1 CL 2 Sandy SILT;tan,medium dense to dense, moist,weak to moderate cementation 3 4 ML 5 Sandy SILT with gravel;tan, medium dense, moist,weak to moderate cementation 6 7 ML 8 9 Poorly-graded GRAVEL with sand;tan to orange, medium dense, moist ° o Field seepage test performed at 9-1/2 feet. O Field seepage rate=>15 in/hr. 1 0 O o� 1 GP O O o� 1 O 0 O 1 Test pit terminated at 13 feet. Slotted PVC pipe installed to 13 feet. 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 3 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'59.802"(43.549945°) = LONGITUDE(DEGREES):W-116°21'30.258" (-116.358405°) W F U U � o j TOTAL DEPTH: 13' 0CL DESCRIPTION W U) NOTES Sandy lean CLAY(Native); brown to light brown,firm, moist Significant roots and vegetation observed to 3 inches. 1 cL 2 Sandy SILT;tan,medium dense to dense, moist,weak to moderate cementation 3 4 5 ML 6 7 8 Sandy SILT with gravel;tan, medium dense, moist,weak to moderate cementation 9 1 ML 1 1 Poorly-graded GRAVEL with sand;tan to orange, medium dense, GP moist,with calcium carbonate ° O Q 1 Test pit terminated at 13 feet. Slotted PVC pipe installed to 13 feet. 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 4 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. TEST PIT LOG LOGGER:Maxwell Thomas WEATHER:Sunny PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'56.8356"(43.549121°) = LONGITUDE(DEGREES):W-116°21'30.51" (-116.358475°) W F U U � o j TOTAL DEPTH:6' 0CL DESCRIPTION W U) NOTES Lean CLAY with sand(Native);brown,stiff, moist Significant roots and vegetation observed to 18 inches. CL 1 Passing No.200 sieve=73% BG Moisture content= 10% Poorly-graded GRAVEL with silt,sand,and cobbles;tan,medium Atterberg limits: ILL=41,PL=20, PI =21 dense to dense, moist, moderate to strong cementation ° 2 0 0 O 3 ° BG GP-GM 4 0 0 0 5 0 0 O 6 Test pit terminated at 6 feet due to excavation refusal on strong cementation. 7 8 9 1 1 1 1 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 5 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'55.6224"(43.548784°) = LONGITUDE(DEGREES):W-116°21'26.442" (-116.357345°) W F U U � o j TOTAL DEPTH: 13' 0CL DESCRIPTION W U) NOTES Clayey SAND(Native); brown to orange,medium dense, moist Significant roots and vegetation observed to 3 inches. 1 ....cobbles observed at 1-1/2 feet sc 2 BG 3 Silty SAND with gravel;tan, medium dense,moist,weak to moderate cementation 4 5 6 7 8 SM 9 .... hard pan/caliche observed at 9 to 10 feet 1 1 1 1 Test pit terminated at 13 feet. Slotted PVC pipe installed to 13 feet. 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 6 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'54.6684"(43.548519°) = LONGITUDE(DEGREES):W-116°21'19.4832" (-116.355412°) W F U U � o j TOTAL DEPTH: 12.5' 0CL DESCRIPTION W U) NOTES Sandy SILT(Native);tan,medium dense, moist Significant roots and vegetation observed to 3 inches. ML 1 cL Sandy lean CLAY;brown,firm, moist 2 Sandy SILT;tan,medium dense, moist,weak to moderate cementation ML BG Passing No.200 sieve=67% Moisture content= 13% 3 SILT with sand;tan, medium dense,moist BG 4 5 ML 6 7 8 Poorly-graded GRAVEL with sand;tan to orange, medium dense, moist ° BG 0 O g ° Field seepage test performed at 9 feet. o Field seepage rate=>15 in/hr. O 1 0 GP O o� 1 O 0 O 0 Test pit terminated at 12-1/2 feet. Slotted PVC pipe terminated at 12-1/2 feet. 1 1 —75 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION T AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 7 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'52.152"(43.54782°) = LONGITUDE(DEGREES):W-116°21'16.7004" (-116.354639°) W F U U � o j TOTAL DEPTH: 13' 0CL DESCRIPTION W U) NOTES Sandy SILT(Native);tan,medium dense, moist Significant roots and vegetation observed to 3 ML inches. 1 Sandy lean CLAY;brown,firm, moist CL 2 Silty SAND;orange to brown,medium dense, moist,weak to moderate cementation 3 4 sM 5 6 Poorly-graded GRAVEL with sand;tan to orange, medium dense, moist ° 0 O 7 0� o BG O 8 0 O o� 9 O GP O O 1 0 O 1 O o� 1 � O 0 O 1 Test pit terminated at 13 feet. Slotted PVC pipe installed to 13 feet. 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 8 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'53.07"(43.548075°) = LONGITUDE(DEGREES):W-116°21'23.0364" (-116.356399°) W F U U � o j TOTAL DEPTH: 13' 0CL DESCRIPTION W U) NOTES Sandy SILT(Native);tan,medium dense, moist,weak Significant roots and vegetation observed to 3 cementation inches. ML BG Passing No.200 sieve=69% Moisture content=5% 1 Sandy lean CLAY;brown,firm, moist BG Passing No.200 sieve=53% 2 cL Moisture content= 11% Atterberg limits: LL=41,PL=21, PI =20 Silty SAND;tan,medium dense, moist,weak to moderate cementation 3 BG Passing No.200 sieve=39% 4 Moisture content= 16% SM 5 6 Silty GRAVEL with sand;tan, medium dense,moist 0 7 ° BG Passing No.200 sieve= 13% Moisture content= 10% 8 0 9 0 GM 0 1 0 1 0 1 ° BG 1 Test pit terminated at 13 feet. ° Slotted PVC pipe installed to 13 feet. 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 9 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'53.5524"(43.548209°) = LONGITUDE(DEGREES):W-116°21'28.89" (-116.358025°) W F U U � o j TOTAL DEPTH: 12.5' 0CL DESCRIPTION W U) NOTES SILT with sand(Native);brown to tan, medium dense,moist Significant roots and vegetation observed to 3 inches. 1 ML 2 SILT with sand and gravel;brown to tan, medium dense,moist 3- ML 4 Poorly-graded SAND with silt and gravel;tan, medium dense, moist gG Passing No.200 sieve=5% Moisture content=5% 5 6 7 8 SP-SM 9 1 1 1 Test pit terminated at 12-1/2 feet. 1 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 10 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'52.7208"(43.547978°) = LONGITUDE(DEGREES):W-116°21'32.8608" (-116.359128°) OJ W F U U Lu o j TOTAL DEPTH:8.5' o- 0 DESCRIPTION W U) NOTES SILT with sand(Native);brown to tan, medium dense,moist Significant roots and vegetation observed to 3 inches. BG Passing No.200 sieve=72% Moisture content=24% 1 .....weak to moderate cementation observed at 1-1/2 feet 2 ML BG 3 4 Silty SAND with gravel;tan, medium dense,moist, moderate cementation 5 6 SM 7 ....cobbles observed at 7-1/2 feet 8 BG Passing No.200 sieve= 16% Moisture content= 10% Test pit terminated at 8-1/2 feet due to excavation refusal on large cobbles. 9 1 1 1 1 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 11 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'51.2124"(43.547559°) = LONGITUDE(DEGREES):W-116°21'24.9588" (-116.356933°) OJ W F U U Lu o j TOTAL DEPTH: 13' o- 0 DESCRIPTION W U) NOTES SILT with sand(Native);brown to tan, medium dense,moist Significant roots and vegetation observed to 3 inches. 1 2 3 ML 4 5 6 Sandy SILT with gravel and cobbles;tan, medium dense,moist 7 ML 8 Poorly-graded GRAVEL with silt,sand,and cobbles;tan,medium dense,moist 0 9 0 0 0 1 0 GP-GM 0 O 1 0 0 1 0 0 0 1 Test pit terminated at 13 feet. 1 —75 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION T AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 12 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'50.1936"(43.547276°) = LONGITUDE(DEGREES):W-116°21'20.5416" (-116.355706°) OJ W F U U Lu o j TOTAL DEPTH:7' o- 0 DESCRIPTION W U) NOTES SILT with sand(Native);brown to tan, medium dense,moist, Significant roots and vegetation observed to 3 weak cementation inches. 1 2 ML 3 4— Poorly-graded SAND with silt,gravel,and cobbles;tan,medium dense to dense, moist 5 BG SP-SM 6 7 Test pit terminated at 7 feet. 8 9 1 1 1 1 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 ALLWEST DATE STARTED: 12/12/2019 TP - 13 DATE FINISHED: 12/12/2019 EXCAVATOR: CASE 580C MERIDIAN,IDAHO OPERATOR:Steve Just EXCAVATION METHOD:3-ft wide bucket GEOTECHNICAL SECTION COMPANY:Just Dig'It Exc. LOGGER:Maxwell Thomas TEST PIT LOG WEATHER:Cloudy PROJECT:519-505G NOTES:See Figure A-2 in Appendix A for approximate test pit location. Sky Mesa Highlands Subdivision LATITUDE(DEGREES):N 43°32'48.3"(43.54675°) = LONGITUDE(DEGREES):W-116°21'16.7004" (-116.354639°) OJ W F U U Lu o j TOTAL DEPTH: 13' o- 0 DESCRIPTION W U) NOTES Clayey SAND with gravel(Fill); brown, medium dense, moist v1y, Significant roots and vegetation observed to 3 inches. 00( 00( BG 1 00( 00( 00( 00< 2 FILL 00( 00( 00( 00( 00( 4 Lean CLAY with sand and gravel(Fill); brown,stiff, moist,with calcium carbonate cementation/caliche chunk 00( 00(00( 00( 00( 00< 00( 6 00<00( BG Passing No.200 sieve=78% 00< Moisture content=27% 00< 00( 00( 8 FILL 9 Asphalt debris observed at 9 feet. 1 1 1 Trash and wood debris observed at 12-1/2 feet. 00( 1 Test pit terminated at 13 feet. 1 WATER LEVELS a WHILE EXCAVATING Y AT COMPLETION 1 AFTER EXCAVATING Sheet 1 of 1 Unified Soil Classification System MAJOR DIVISIONS SYMBOL TYPICAL NAMES Well-Graded Gravel, CLEAN GW Gravel-Sand Mixtures. GRAVELS GP Poorly-Graded Gravel, GRAVELS Gravel-Sand Mixtures. Silty Gravel, COARSE GRAVELS GM Gravel-Sand-Silt Mixtures. GRAINED WITH FINES GC Clayey Gravel, SOILS Gravel-Sand-Clay Mixtures. Well-Graded Sand, CLEAN SW Gravelly Sand. SANDS SP Poorly-Graded Sand, SANDS Gravelly Sand. Silty Sand, SANDS L SM Sand-Silt Mixtures. WITH FINES Sc Clayey Sand, Sand-Clay Mixtures. ML Inorganic Silt, SILTS AND CLAYS Silty or Clayey Fine Sand. Inorganic Clay of Low to LIQUID LIMIT CL Medium Plasticity, LESS THAN 50% Sandy or Silty Clay. FINE OL Organic Silt and Clay of Low GRAINED Plasticity. SOILS Inorganic Silt, Elastic Silt, SILTS AND CLAYS MH Micaceous Silt, Fine Sand or Silt. LIQUID LIMIT CH Inorganic Clay of High Plasticity, GREATER THAN 50% Fat Clay. OH Organic Clay of Medium to High Plasticity. Highly Organic Soils PT Peat, Muck and Other Highly Organic Soils. ALLWEST Appendix C Laboratory Test Results ALLWEST Summary of Laboratory Test Results Moisture Gradation Atterberg Limits Test Pit Depth Content Liquid Plasticity CBR Sample Classification No. (Feet) M Gravel Sand Silt/Clay Limit Index (USCS) M M M M M 1 1 -2 6.3 Sandy Lean CLAY(CL) 1 2 -2.5 31 34 66 42 18 Sandy Lean CLAY CL 4 0.5- 1 10 27 73 41 21 Lean CLAY with sand (CL) 6 2.5- 3 13 33 67 Sandy SILT ML 8 0.5- 1 5 31 69 Sandy SILT (ML) 8 1.5- 2 11 47 53 41 20 Sandy Lean CLAY CL 8 3.5 -4 16 61 39 Silty SAND SM 8 7.5- 8 10 - - 13 Silty GRAVEL with sand GM 9 4.5 - 5 5 - - 5 Poorly-graded SAND with silt&gravel SP-SM 10 0 - 0.5 24 28 72 SILT with sand ML 10 8- 8.5 10 - - 16 Silty SAND with gravel SM 13 6 -6.5 27 - - 78 Lean CLAY with sand and gravel CL Table C-1 255 N. Linder Road, Suite 100 • Meridian, Idaho 83642 • (208) 895-7895 • Fax (208) 898-3959 www.allwesttesting.com This report may not be reproduced, except in full, without the permission of ALLWEST. LIQUID AND PLASTIC LIMITS TEST REPORT 60 Dashed line indicates the approximate upper limit boundary for natural soils 50 �0 ' G 40 U C � X W N— Z_ � v F / 30 c W � ' Q i J / C d %/ O� O 20 4 U) LU J / J Q 10 0 ; c L-ML ML or OL MH or OH 0 0 10 20 30 40 50 60 70 80 90 100 110 LIQUID LIMIT MATERIAL DESCRIPTION LL PL PI %<#40 %<#200 USCS • Sandy Lean Clay 42 24 18 66% CL c■ Lean Clay with sand 41 20 21 73% CL C♦ Sandy Lean Clay 41 21 20 53% CL X m m U 7 O ` Project No. 519-505G Client: Sky Mesa Development,LLC Remarks: aD Project: Sky Mesa Highlands Subdivision c *Location: TP-1 Depth:2-2.5' ■Location: TP-4 Depth: 0.5-l' ALocation: TP-8 Depth: 1.5-2' 0 cn ALLWEST Figure C-1 Tested By: C. Downes Checked By:J.Varozza California Bearing Ratio ASTM D 1883 Project: Sky Mesa Highlands Subdivision Project No.: 519-505G Client: Sky Mesa Development, LLC Location: TP-1 @ 1'- 2' Date Tested: 12/20/19 Compaction Method: ASTM D1557 Tested By: C. Downes / J. Varozza Classification: Sandy Lean Clay (CL) 110 100 90 80 N 70 a 2 60 ii PSI @ 0.1 inch penetration= 63 0 50 iA 4A a n 40 30 20 10 0 0 0.1 0.2 0.3 0.4 0.5 Penetration(inches) CBR @ 0.1 Inch Penetration: 6.3 Maximum Dry Unit Weight (pcf): 104.5 Swell (%): 4.1 Optimum Water Content (%): 19 Dry Unit Weight Before Soak(pcf): 94.3 Remold of Max. Dry Unt Wgt(%): 90 Water Content Before Soak (%): 18.7 Water Content After Soak, Top 1 Inch (%): 36.2 Surcharge (psf): 100 Immersion Period (hrs): 96 Reviewed By: Isaac Rede Figure: C-2 ►LLWET 255 N Linder Rd,Suite 100•Meridian,ID 83642•(208)895-7898•Fax(208)898-3959 www.allwesttesting.com This report shall not be reproduced except in full without the permission of ALLW EST.