CC - Engineer Statement CJ-UIB
S• THE i GATEWAY
J U B COMPANIES h;:'1 LANG
OROUPON D INC.
J•U•B ENGINEERS, INC.
14 October 2020
Sonya Allen
Associate City Planner
City of Meridian
33 E. Broadway Avenue,Suite 102
Meridian, Idaho 83642
RE: Sky Mesa Highlands Subdivision No.1
GROUNDWATER ELEVATIONS
Dear Sonya,
A geotechnical evaluation for the project site was performed by Adrian Mascorro, PE,with subsurface
soil information summarized in his report dated September 11, 2020. According to the reports, seasonal
high groundwater can be anticipated at depths greater than 9-feet below the existing ground surface.
Based on the information provided in the geotechnical report,the roadway finished grade centerline
elevations were designed to be more than 3-feet above the anticipated groundwater elevations.
Please feel free to contact me at (208) 376-7330 if you have any questions
Sincerely,
J-U-B ENGINE Inc.
W. Scott Wonders, PE
a 250 South Beechwood Ave Suite 201,Boise,ID 83705 p 208-376-7330 w www.jub.com