ACHD Comments-MER20-0043 Waterwalk Hotel
1 Waterwalk Hotel/
MER20-0043/ A-2020-0092
Development Services Department
Project/File: Waterwalk Hotel/ MER20-0043/ A-2020-0092
This is an Administrative Design Review and Certificate of Zoning Compliance to
construct an extended stay hotel with 109 rooms on 5.18 acres.
Lead Agency: City of Meridian
Site address: Northwest corner of Franklin Road and Eagle Road
Staff Approval: May 1, 2020
Applicant: WWOZ Boise Meridian LLC
2121 North Webb Road
Wichita, KS 67206
Representative: GLMV Architecture, Inc.
1525 E. Douglas
Wichita, KS 67211
Staff Contact: Paige Bankhead
Phone: 387-6293
E-mail: pbankhead@achdidaho.org
A. Findings of Fact
1. Description of Application: The applicant is requesting approval of an Administrative Design
Review and Certificate of Zoning Compliance application to construct an extended stay hotel with
109 rooms on 5.18 acres. The property is zoned General Retail & Service Commercial (C-G). The
City of Meridian’s Comprehensive Plan designates this area as commercial.
2. Description of Adjacent Surrounding Area:
Direction Land Use Zoning
North Light Industrial L-I
South General Retail & Service Commercial C-G
East General Retail & Service Commercial C-G
West Light Industrial L-I
3. Site History: ACHD staff previously reviewed this site as a rezone application in October 2019.
The requirements of this staff report are consistent with those of the prior action.
4. Transit: Transit services are not available to serve this site.
5. New Center Lane Miles: The proposed development includes 0.0 centerline miles of new public
road.
Vicinity Map
2 Waterwalk Hotel/
MER20-0043/ A-2020-0092
6. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building
permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that
time. The impact fee assessment will not be released until the civil plans are approved by ACHD.
7. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
There are no roadways, bridges or intersections in the general vicinity of the project that are in the
Integrated Five Year Work Plan (IFYWP) or the District’s Capital Improvement Plan (CIP).
B. Traffic Findings for Consideration
1. Trip Generation: This development is estimated to generate 439 additional vehicle trips per day
(0 existing); 35 additional vehicle trips per hour in the PM peak hour (0 existing), based on the
Institute of Transportation Engineers Trip Generation Manual, 10th edition.
2. Condition of Area Roadways
Traffic Count is based on Vehicles per hour (VPH)
* Acceptable level of service for a five-lane principal arterial is “E” (1,780 VPH).
** ACHD does not set level of service thresholds for State Highways.
***There are no traffic counts for Olson Road.
3. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD’s most current traffic counts.
• The average daily traffic count for Eagle Road north of Franklin Road was 60,234 on
6/18/2019
• The average daily traffic count for Franklin Road west of Eagle Road was 18,842 on
12/5/2017.
• There are no traffic counts for Olson Avenue.
C. Findings for Consideration
1. City of Meridian Pathways Master Plan
The southern boundary of the site adjacent to Eagle Road is designated in the City of
Meridian’s Pathways Master Plan as a proposed pathway. The pathway is specified to be a 10-
foot wide concrete or asphalt pathway. The pathway is designed to accommodate two-way bicycle
and pedestrian traffic.
Roadway Frontage Functional
Classification
PM Peak
Hour
Traffic Count
PM Peak
Hour Level
of Service
**Eagle Road 440-feet Principal
Arterial 2,372 N/A
Franklin Road 705-feet Principal
Arterial 747 Better than
“D”
***Olson Avenue 490-feet Local N/A N/A
3 Waterwalk Hotel/
MER20-0043/ A-2020-0092
2. Eagle Road
Eagle Road is under the jurisdiction of the Idaho Transportation Department (ITD). The applicant,
the City of Meridian, and ITD should work together to determine if additional right-of-way or
improvements are necessary on Eagle Road.
Staff Comments/Recommendations: The applicant should work with ITD and the City of Meridian
to ensure they have adequate right-of-way for the proposed 3rd southbound lane on Eagle Road
and the right turn lane onto westbound Franklin Road.
3. Olson Avenue
a. Existing Conditions: Olson Avenue is improved with 2-travel lanes, vertical curb, gutter and
no sidewalk abutting the site. There is 58-feet of right-of-way for Olson Avenue (25-feet from
centerline).
b. Policy:
Commercial Roadway Policy: District Policy 7208.2.1 states that the developer is responsible
for improving all commercial street frontages adjacent to the site regardless of whether or not
access is taken to all of the adjacent streets.
Street Section and Right-of-Way Policy: District Policy 7208.5 states that right-of-way widths
for new commercial streets shall typically be 50 and 70-feet wide and that the standard street
section will vary depending on the need for a center turn lane, bike lanes, volumes, percentage
of truck traffic, and/or on-street parking.
• A 36-foot street section (back-of-curb to back-of-curb) will typically accommodate two
travel lanes and on-street parking.
• A 40-foot street section (back-of-curb to back-of-curb) will typically accommodate two
travel lanes and a center turn lane.
• A 46-foot street section (back-of-curb to back-of-curb) will typically accommodate two
travel lanes and a center turn lane and bike lanes.
Sidewalk Policy: District Policy 7208.5.6 requires a concrete sidewalks at least 5-feet wide to
be constructed on both sides of all commercial streets. If a separated sidewalk is proposed, a
parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is
required to provide increased safety and protection of pedestrians. Consult the District’s planter
width policy if trees are to be placed within the parkway strip.
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of
the dedicated right-of-way. The easement shall encompass the entire area between the right-
of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located
wholly within the public right-of-way or wholly within an easement.
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing
streets adjacent to a proposed development may be required. These improvements are to
correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or
replacement; curb and gutter construction or replacement; replacement of unused driveways
with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement
repairs; signs; traffic control devices; and other similar items.
c. Applicant’s Proposal: The applicant has proposed to construct a 5-foot wide attached
concrete sidewalk on Olson Avenue abutting the site.
d. Staff Comments/Recommendations: The applicant’s proposal meets District policy and
should be approved, as proposed. The applicant should be required to dedicate additional right-
of-way to total 2-feet behind the back edge of sidewalk. The applicant may provide a permanent
4 Waterwalk Hotel/
MER20-0043/ A-2020-0092
right-of-way easement for detached sidewalks. If street trees are desired, an 8-foot wide planter
strip is required.
Consistent with the District’s Minor Improvements policy, the applicant should be required to
replace any broken or deteriorated portions of curb, gutter and/or pavement on Olson Avenue
abutting the site.
4. Driveways - Olson Avenue
a. Existing Conditions: There are no existing driveways from the site onto Olson Avenue.
b. Policy:
Driveway Location Policy: District policy 7208.4.1 requires driveways near intersections to be
located a minimum of 75-feet (measured centerline-to-centerline) from the nearest local street
intersection, and 150-feet from the nearest collector/arterial or arterial street intersection.
Successive Driveways: District Policy 7208.4.1 states that successive driveways away from an
intersection shall have no minimum spacing requirements for access points along a local street,
but the District does encourage shared access points where appropriate.
Driveway Width Policy: District policy 7208.4.3 restricts commercial driveways to a maximum
width of 40-feet. Most commercial driveways will be constructed as curb-cut type facilities.
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7208.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet
into the site beyond the edge of pavement of the roadway.
Driveway Design Requirements: District policy 7208.4.3 states if an access point is to be gated,
the gate or keypad (whichever is closer) shall be located a minimum of 50-feet from the near edge
of the intersection and a turnaround shall be provided.
c. Applicant’s Proposal: The applicant has proposed to construct a 30-foot wide curb return type
driveway onto Olson Avenue 205-feet north of Franklin Road and a 20-foot wide curb return type
driveway onto Olson Avenue 485-feet north of Franklin Road.
d. Staff Comments/Recommendations: The applicant’s proposal meets District policy and should
be approved, as proposed.
5. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District’s Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
6. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm
drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle
at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height
restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop
signs. Landscape plans are required with the submittal of civil plans and must meet all District
requirements prior to signature of the final plat and/or approval of the civil plans.
D. Site Specific Conditions of Approval
1. Construct a 5-foot wide attached concrete sidewalk on Olson Avenue abutting the site, as proposed.
Dedicate additional right-of-way to total 2-feet behind the back edge of sidewalk. The applicant may
5 Waterwalk Hotel/
MER20-0043/ A-2020-0092
construct a detached 5-foot wide concrete sidewalk and provide a permanent right-of-way
easement. If street trees are desired, 8-foot wide planter strips are required.
2. Consistent with the District’s Minor Improvements policy, the applicant should be required to replace
any broken or deteriorated portions of pavement, curb, gutter and/or sidewalk abutting the site for
Olson Avenue.
3. Submit civil plans to ACHD Development Services for review and approval. The impact fee
assessment will not be released until the civil plans are approved by ACHD.
4. Payment of impact fees is due prior to issuance of a building permit.
5. Comply with all Standard Conditions of Approval.
E. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD
right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non-
compliant pedestrian improvements abutting the site to meet current Americans with Disabilities
Act (ADA) requirements. The applicant’s engineer should provide documentation of ADA
compliance to District Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
5. A license agreement and compliance with the District’s Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190
in the event any ACHD conduits (spare or filled) are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District’s Utility Coordinator at 387-6258 (with file numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards
and approved supplements, Construction Services procedures and all applicable ACHD Standards
unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and
certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant’s authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change in
6 Waterwalk Hotel/
MER20-0043/ A-2020-0092
the planned use of the property which is the subject of this application, shall require the applicant
to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a
waiver/variance of the requirements or other legal relief is granted by the ACHD Commission.
F. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
G. Attachments
1. Vicinity Map
2. Site Plan
3. Utility Coordinating Council
4. Development Process Checklist
5. Request for Reconsideration Guidelines OR Appeal Guidelines
7 Waterwalk Hotel/
MER20-0043/ A-2020-0092
VICINITY MAP
8 Waterwalk Hotel/
MER20-0043/ A-2020-0092
SITE PLAN
9 Waterwalk Hotel/
MER20-0043/ A-2020-0092
Ada County Utility Coordinating Council
Developer/Local Improvement District
Right of Way Improvements Guideline Request
Purpose: To develop the necessary avenue for proper notification to utilities of local highway and
road improvements, to help the utilities in budgeting and to clarify the already existing process.
1) Notification: Within five (5) working days upon notification of required right of way improvements
by Highway entities, developers shall provide written notification to the affected utility owners and
the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to,
project limits, scope of roadway improvements/project, anticipated construction dates, and any
portions critical to the right of way improvements and coordination of utilities.
2) Plan Review: The developer shall provide the highway entities and all utility owners with
preliminary project plans and schedule a plan review conference. Depending on the scale of
utility improvements, a plan review conference may not be necessary, as determined by the utility
owners. Conference notification shall also be sent to the UCC. During the review meeting the
developer shall notify utilities of the status of right of way/easement acquisition necessary for their
project. At the plan review conference each company shall have the right to appeal, adjust and/or
negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter
of review indicating the costs and time required for relocation of its facilities. Said letter of review
is to be provided within thirty calendar days after the date of the plan review conference.
3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary
plans. Utilities may request an updated plan review meeting if revisions are made in the
preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days
after receiving the revisions to review and comment thereon.
4) Final Notification: The developer will provide highway entities, utility owners and the UCC with
final notification of its intent to proceed with right of way improvements and include the anticipated
date work will commence. This notification shall indicate that the work to be performed shall be
pursuant to final approved plans by the highway entity. The developer shall schedule a
preconstruction meeting prior to right of way improvements. Utility relocation activity shall be
completed within the times established during the preconstruction meeting, unless otherwise
agreed upon.
Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com
for e-mail notification information.
10 Waterwalk Hotel/
MER20-0043/ A-2020-0092
Development Process Checklist
Items Completed to Date:
Submit a development application to a City or to Ada County
The City or the County will transmit the development applic ation to ACHD
The ACHD Planning Review Section will receive the development application to review
The Planning Review Section will do one of the following:
Send a “No Review” letter to the applicant stating that there are no site specific conditions of approval at
this time.
Write a Staff Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
Write a Commission Level report analyzing the impacts of the development on the transportation system
and evaluating the proposal for its conformance to District Policy.
Items to be completed by Applicant:
For ALL development applications, including those receiving a “No Review” letter:
• The applicant should submit one set of engineered plans directly to ACHD for review by the Development
Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements
required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.)
• The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Non-Subdivisions)
Driveway or Property Approach(s)
• Submit a “Driveway Approach Request” form to ACHD Construction (for approval by Development Services & Traffic
Services). There is a one week turnaround for this approval.
Working in the ACHD Right-of-Way
• Four business days prior to starting work have a bonded contractor submit a “Temporary Highway Use Permit
Application” to ACHD Construction – Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50’ or you
are placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
Sediment & Erosion Submittal
• At least one week prior to setting up a Pre-Construction Meeting an Erosion & Sediment Control Narrative & Plan, done
by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD
Stormwater Section.
Idaho Power Company
• Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre -Con being
scheduled.
Final Approval from Development Services is required prior to scheduling a Pre-Con.
11 Waterwalk Hotel/
MER20-0043/ A-2020-0092
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the Development Services Manager when it is alleged that the
Development Services Manager did not properly apply this section 7101.6, did not consider all of
the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily
and capriciously in the interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged
the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary
and Clerk of the District, which must be filed within ten (10) working days from the date of
the decision that is the subject of the appeal. The notice of appeal shall refer to the
decision being appealed, identify the appellant by name, address and telephone number
and state the grounds for the appeal. The grounds shall include a written summary of the
provisions of the policy relevant to the appeal and/or the facts and law relied upon and
shall include a written argument in support of the appeal. The Commission shall not
consider a notice of appeal that does not comply with the provisions of this subsection.
c. Time to Reply: The Development Services Manager shall have ten (10) working days
from the date of the filing of the notice of appeal to reply to the notice of the appeal, and
may during such time meet with the appellant to discuss the matter, and may also consider
and/or modify the decision that is being appealed. A copy of the reply and any
modifications to the decision being appealed will be provided to the appellant prior to the
Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal
will be noticed and scheduled on the Commission agenda at a regular meeting to be held
within thirty (30) days following the delivery to the appellant of the Development Services
Manager’s reply to the notice of appeal. A copy of the decision being appealed, the notice
of appeal and the reply shall be delivered to the Commission at least one (1) week prior
to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision being
appealed, as such action is adequately supported by the law and evidence presented at
the hearing.
12 Waterwalk Hotel/
MER20-0043/ A-2020-0092
Request for Reconsideration of Commission Action
1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD
staff or any other person objecting to any final action taken by the Commission may request
reconsideration of that action, provided the request is not for a reconsideration of an action
previously requested to be reconsidered, an action whose provisions have been partly and
materially carried out, or an action that has created a contractual relationship with third parties.
a. Only a Commission member who voted with the prevailing side can move for
reconsideration, but the motion may be seconded by any Commissioner and is voted on
by all Commissioners present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a
certain time.
b. The request must be in writing and delivered to the Secretary of the Highway District no
later than 11:00 a.m. 2 days prior to the Commission’s next scheduled regular meeting
following the meeting at which the action to be reconsidered was taken. Upon receipt of
the request, the Secretary shall cause the same to be placed on the agenda for that next
scheduled regular Commission meeting.
c. The request for reconsideration must be supported by written documentation setting forth
new facts and information not presented at the earlier meeting, or a changed situation that
has developed since the taking of the earlier vote, or information establishing an error of
fact or law in the earlier action. The request may also be supported by oral testimony at
the meeting.
d. If a motion to reconsider passes, the effect is the original matter is in the exact position it
occupied the moment before it was voted on originally. It will normally be returned to
ACHD staff for further review. The Commission may set the date of the m eeting at which
the matter is to be returned. The Commission shall only take action on the original matter
at a meeting where the agenda notice so provides.
e. At the meeting where the original matter is again on the agenda for Commission action,
interested persons and ACHD staff may present such written and oral testimony as the
President of the Commission determines to be appropriate, and the Commission may take
any action the majority of the Commission deems advisable.
f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover
administrative costs, as established by the Commission.