Loading...
PZ - Pre-App Meeting Notes CITY OF MERIDIAN PRE-APPLICATION MEETING NOTES Project/Subdivision Name:Conner Square Date: July 7, 2020 Applicant(s)/Contact(s): Sarah Martz City Staff:Alan, Bill, Caleb, Steve Location: 557 W. Idaho Ave&528 W. Broadway Ave Size of Property: .33 acres Comprehensive Plan FLUM Designation: North half—HDR, South half-MDR Existing Use: Single Family Existing Zoning: R-15 Proposed Use:Three 4-plexes Proposed Zoning: R-15 Surrounding Uses: Residential Street Buffer(s)and/or Land Use Buffer(s): Three feet(3')wide landscaped area required along street frontages Open Space/Amenities/Pathways: See below Access/Stub Streets:W. Broadway Street, W. Idaho Street Waterways/Floodplain/Topography/Hazards: North portion of property within 500 year floodplain. History: Additional Meeting Notes: • Staff recommends the applicant consider two buildings with central open space rather than 3. The development at 604 W. Pine Avenue (north of the property) is an example. • Multifamily is allowed in the R-15 through a conditional use. Conditional uses are required to go in front of the Planning Commission in a public meeting. • A Certificate of Zoning Compliance(CZC)and Design Review(DE) is required for multifamily developments. Please refer to UDC 11-513-1 and 11-513-8. Design must meet the standards of the Architectural Standards Manual (ASM). This is available at: httosJlmeridiancity.orp/planning/currentlarchitectural-standards • Please note UDC 11-4-3-27 requires open space and amenities for multifamily developments. These include: 0 80 sf of private useable open space per unit. This can include patios, porches, decks, etc. o Common open space requirements of 150 sf per units<500 sf, and 250 sf for units>500 sf< 1,200 sf. o One amenity will be required within this development. Please refer to UDC 11-4-3-27(D) • Setbacks are as follows: o 10 from street, 20'from street to garage. 3' interior side, 12' rear. • Water and Sewer is available from W. Broadway Avenue Note:A Traffic Impact Study(TIS)will be required by ACHD for large commercial projects and any residential development with over 100 units. To avoid unnecessary delays&expedite the hearing process, applicants are encouraged to submit the TIS to ACHD prior to submitting their application to the City. Not having ACHD comments and/or conditions on large projects may delay hearing(s)at the City. Please contact Mindy Wallace at 387- 6178 or Christy Little at 387-6144 at ACHD for information in regard to a TIS, conditions, impact fees and process. Other Agencies/Departments to Contact: ® Ada County Highway Dist. (ACHD) ❑ Nampa Meridian Irrigation Dist. (NMID) ❑ Public Works Department ❑ Idaho Transportation Dept. (ITD) ❑ Settler's Irrigation District ❑ Building Department ❑ Republic Services ® Police Department ❑ Parks Department, Jay ❑ Central District Health Department ® Fire Department ❑ Other: Application(s) Required: ® Administrative Design Review ® Certificate of Zoning Compliance ® Conditional Use Notes: 1)Applicants are required to hold a neighborhood meeting in accord with UDC 11-5A-5C prior to submittal of an application requiring a public hearing(except for a vacation or short plat);and 2)All applicants for permits requiring a public hearing shall post the site with a public hearing notice in accord with UDC 11-5A-5D.3(except for UDC text amendments, Comp Plan text amendments, and vacations). The information provided during this meeting is based on current UDC requirements and the Comprehensive Plan.Any subsequent changes to the UDC and/or Comp Plan may affect your submittal and/or application. This pre-application meeting shall be valid for four(4)months.