Loading...
PZ - Landscape Plan ORIGINAL SURVEY ON FILE AT CK ENGINEERING o0p0000o0000000000 Z OF 1 °000 O LANDSCAPE LEGEND ti II ° i PRELIMINARY NOT FOR (�O PLANTS TO BE INSTALLED o I 1 (DO „�} CONSTRUCTION I a 1 �o���jQ1��1pw1�J���, TOB m' OOOGG "O�p800000��O OO > � I 6 I I 3& EXISTIN6 PLANTS TO BE REMOVED10 r I B I I 5 S m I Z VISIONTRAN6LE ° r 71Z _ ------------------- GUT EDGE AS DETAILED - rill Q GB 5 MA 3 Z ° o N o of _ _ _ _ 1 LANDSCAPE BERM .o N Q M ++++ + +,++ TOB 3 START TOB I TOB 7 ' TOB TOB — — �TO — — T0� — — — = T q TOE — — —T — ] - IFf+++ t+ ++ 2 I I , I I I I Toe I -oB I 1 7 I 5B I Z END 7 co + + + + I I I I I I I __ OL E_ C awn 3 o w + + + Ep ' ' I PROPERTY LINE (VERIFY) a 0 o o 'I L a E � � Co 1"1 N 0M W (10 AP q t o ❑ ❑ ❑ ❑ TAN VINYL PRIVACY FENCE a0 U Y u * I I I I I o m N � � oo o " � � a W + I, co 0 + + +"' + +�� I I C I I 23 I 25 26 27 I 28 I 2g I HEI6HT AS NOTED IN GALLOUT LE6END O1 0 ` v o o + + + +_ I 1 I I I I I . I W __ _ o m.m ° N m a 4 + + �i I I I I I O I O I I O I O ( ) W W .sL ma 9 °JoN z ` I +++ + +1 O PP 1 e l 6 /� M Z ++ IO QUANTITY U J W La = J 3 0- CCOo D o cc III+ + + I I I I I I I I I w + o JB { PLANT IDENTIFICATION KEY w $ I + + + + MP I I I I I I I 1 2 � + O * + + + + I I I I I I EAQ TG L + + I + + + Z I I I I 3 W_G 1+ Z + + + + + + TURF OVER APPROVED TOPSOIL w w API I I I I I I of PROVIDE SEED AT ALL DRAINAGE o + of +++++++++++ SWALES AND SOD AT ALL OTHER ++++ I +p +++ 3 I I I I I I I I I I I SB �� +++++++++++ LOCATIONS + + + + + + + 2 1 I I I I I I I + z n t + + m + + + + + �+ + + I I 2 I I 2 I I 2 2 THREE INCH DEPTH OF 2" MINUS z N +++I+ f I TG TG TG TG I I I I START Z , __ k 11A , AG START BARK MULCH OVER APPROVED N m + + I+ I+ + I TG O I TOPSO I L III + MP I + + + + + + + - o + + + + + + +Aga + + + + + + + � + + + + + + + + + + + ` t+ �+ + + + + + + + + + + J+ + + + + ++} + + 1 + + + , AGHD SEED MIX. SEE NOTES ON a o t++++ I++++++ AP 3 -+- �r �_ _ _ + + + 1 + + � + + + L+y+ + +y1 }+ SHEET L1.6 FOR SPECIES AND o K I +I I + + EA 5 NOTES + + + + + + END Z o I + + + �� + ti ,a IW = +++'+ I+++1++++ II 2 ,' RIVA CAPRI STREET g I sB I w 5 w O o 12in. 2 2 - - - AG �� + + + + + + + 2 I - +++,+ '+ +++ + $ END 3 TG TG TG 2 LANDSCAPE REQUIREMENTS �� Q TG TG * + + + 5 WF rr--+� ��i +_ +_ w Io + + + +,_+ CB + + + + + + + + + + + + + + + + �� �+ -r }{ �� _� � + +_ COMMON OPEN SPACE ~ + I+ + + •"M' I cJB + + + + + + 4 -4 + + + + + + + _ _f + + + + + + +1 , + + + + r+ + + + + + + + + + + + + + + + �� + �- +-r r -+_ W `1 + + + +�_�+ 5 + + + + + + + + + + + + + + + + + + + + + + �_ _,+ + + + + + + + + + + + + + +++ +I+++ ++ +' S MP M - + + + + I TOTAL SITE AREA= 216,4g3 SF (4.q7 ACRES) Copyright C�2020 Z Q m I+ + + + + + + +� WF 3 I `Z END I I , , 1 I 2I,64q SF (I0%) OPEN SPACE REQU I RED. All right any means Reproduction or use Ipermin any form rm n J I + + + + rJ I I I 8 I I I I I I 26,74q SF (12.36gb) OF QUALIFIED OPEN SPACE PROVIDED. erection Land design,Inc.is unlawful and subject to 0 N ;m i+ + I+ + + + + + GB o III + +I + + + + QC 1 criminal prosecution. w J Z m +++I+ +I+ +++�. + MP I I I I I I I I I START 2 I TREE PER 8,000 SQUARE FEET, AND SEED OR SOD. Lu rr i+It++ + I ++++ + 1 3 I I I I I I I I I I I = 26,74q SF INTERIOR OPEN SPACE / 8,000 o ++++ ++ ++++++ 22 WF I I I I I I I I I I I = 3 TREES REQUIRED; 3 PROVIDED a I I I I I I I I I I o o +++�+ I+� + + + I I I I I I I I I I I PARKWAY STRIPS = q62 LINEAL FEET F + + + + + QG I 5 I I I I TREE PER 35 LINEAR FEET= 27 TREES REQUIRED; Y +++++ + +;-)+ I+++ �` QC 2 I I I I I I I I I I I I I 27 TREES PROVIDED. Z N iII+ + + + + + + + + w + + + + + + + 0 + + + + + +(• + 5 M�' + + + 6 PATHWAY TREES = 156 LINEAL FEET a jll+++ + r+ + +�+++++ ` SS ++� ++ GA I I I I TREE PER 100 LINEAR FEET= I TREE REQUIRED; Z 3 + + +1 + + + + 6 + +1`, + 5 I I I I I I I I I I - 2 ITREEPROVIDED ° I + + +` + + + + RH + + + + RH I I I I 1 w MS + + + + + + 6 + + + 5 I I , , I I I I I I I I 710 5 + + ,+ + + + + + 1 1 1 1 1 1 1 1 + + + + + + WF + 5B 5 I WHEN MORE THAN 50 TREES ARE REQUIRED, 5 TREE SPECIES ARE + +1_� + + + ; + + + + + + + + SS I I I I I , I REQUIRED. 8 SPECIES ARE PROVIDED. O w PA + + + + + _� + + + + + + + + + 3 0 w 3 + + + + + + + + + + + + + O I I 5 O 3 WF '1 3 3 — Q W I + + + + + + + + + + + + + '•�+ MA 2 13 I I I g I 3 3 3 GOMMON LOT AMENITY LIST: GB + �+ + + + + + + + + + + +1L4 + I 3 GB I 3 I SB I GB / I SB SB / GB I 2 GAZEBO WITH BENCHES. r n o EA + + + \�I1�// + PP +++ ++++1=+++++ +++ 6 ++� ' 3 END — GB 3 — EA — 3 EA 3 3 3 3 8 SB 3 3 (STARTS �// _ U Lu 6 +* + + I + + + ++ + +� CA 5 + + + + „ EA — _ — _ Lu Z GB SB 1O GB WF Z _ SB EA *LINEAR FEET OF PARKWAY DOES NOT INCLUDE VISION TRIAN6LES. + a I + + + + + + + +_+ + ,- + + + + _ - _ -.-- _Q__ - =� � o - — STREET BUFFER - BLACK CAT ROAD — \ _, + 1 + + + + + + ,4 + + + + + + + +��� + + Requirements: LINEAR FEET TREES READ TREES PROVIDED & m + 0 ++ R+ + + + + + + + + +1 i + + + + + + + +��� + + + + + +1 f + + + + + + + + + + + + + + + + + + + + + +�+ + + 5 + + + + t + + + + + + l i+ a eo I�j , + I+ + + + + + + + + + + + + + + + + + + + + + + w' + + + + + + '+ + + + + 'R 4'` + + + F,+ �� a+ + + ,R 5 + + + + _F+ + + + + + 25 BUFFER 240 L.F. 7 ( m Q F 1 ■� + CIO _+-+�-+_ aT �+ 5 -7--':;:1- + 1 �� + + + + + + + + + + + + + L + + + + + + + + + + + + + ,4 + + + + + + 5 + + + + + + + + I TREE / 55 LF. (25' BUFFER) W + + PH Oo rod + + + + t0 +�+ 5 -floe + + B + + + + ��The� + . Tt . � e 1 1 LINEAR FEET OF BUFFER DOES NOT INCLUDE VISION TRIANGLES. �� - 5 ---- - ------- ---- --- ---- ------ 7 ---801 - — + — — — 801 To + + +--+ + + + + + + + �+ �- + + + + + + C J --ej6- 1+ 5 + +-e,r +� �+ + ++ SS ++++++ �1+++ +++++a 1 + +++ ++ +++++++++++e01++++ +++ ++7++++ + + ++ ++++B++++++++ ++� ++ + ++ ++�+ + +° ++++++,+ + + + ++ +±++ +++++++ {71++++ I - ♦♦♦ - _ I eol 3 0l _ _ _ ao1 _ s of _ --- -- - _ -----� _- __-__ _T_ __ _ 1--__ STREET BUFFER - MCMILLAN ROAD = w Q . � _ —801 55 1 5 8U1 1 80 801 801 TO OP OP — OP — 8 3 WF MS 3 -OP 0� 3 OP �P OP 3 I erg_ TOB RH roe -roe To QG 3 TOB Mr' 3 T B TOB PA TOB pG TOE PP — --0P- Re uirements: LINEAR FEET TREES RE02 TREES PROVIDED w Q n _ TEL- MP TEL TOR I -T B -TOB _ q L1 TEL TEL GB O PP TEL AP TELL TEL MP TEL L MS TEL TEL TEL PA TEL AP TEL TEL 25' BUFFER 600 L.F. 17 7 w W W W d3 I TREE / 35 LF. (25' BUFFER) Q � -.. -„ w w w w w TOB TOB _ - W. MCMILLAN ROAD W W `" '" `" '"o roe I To6 roe - TOB TOE roe Toe To6 TOR LINEAR FEET OF BUFFER DOES NOT INCLUDE VISION TRIANGLES. U U N I -TUB- TOB TOR TOB TOB TOB— F — ° ' MITIGATION REQUIREMENTS Z (D d3 d3 d3 d3 d3 d3 d3 d3 d3 __ iQu __ T.QP_ __�P�_ __ IOe _ _ TOR _ 748� _ _ TOE �TOB TOB TOB TOB d3 d3 d3 __ __ _ __ __ __ __ __ TOB -_ - TOB __ _ILR _� �0$ __ TOB_ __ TOB� -:,ry aol eol aol aol aol aol aol - -- *SEE SHEET L1.5 FOR MIT16ATION NOTES. Q 0 -- aol aol a01 801 eol aol eoi 901 e01 ROT eol - _ - - - - - z - - - - - — — — — — — — — — — — FENCING REQUIREMENTS Q -o eol 11 TAN VINYL PRIVACY FENCE 1,3g6 L.F. W Q m I zo ow E CALLOUT LEGEND = C T DAPHNE SQUARE LANDSCAPE PLAN w O VISION TRIANGLE. � N 30 O 30 60 q0 Q 0 a SCALE: I"- 30'-O" 6'-0" TAN VINYL FENCE, SEE DETAIL 1&1.0. - LANDSCAPE P E NOTES:E : 3 2' TALL BERM AT 3:I SLOPE SC O S O aT I. CONTRACTOR SHALL REPORT TO LANDSCAPE ARGHITEGT ALL CONDITIONS WHIGH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, O SHADE STRUCTURE WITH BENCHES. o PRIOR TO BE6INNIN6 WORK. O TREE(S) TO BE REMOVED. Q 2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARGHITEGT'S PRIOR WRITTEN APPROVAL. ALTERNATE MATERIALS OF SIMILAR O D PLANT SCHEDULE SIZE AND GHARAGTER MAY BE CONSIDERED IF SPECIFIED PLANT MATERIALS CAN NOT BE OBTAINED. 6 AGHD STORMWATER BASIN. SEE CIVIL SHEETS. 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. 4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARGHITEGT PRIOR TO CONSTRUCTION START-UP. O EXISTING WATERWAY TO BE REMOVED. 0_ QTY. KEY BOTANICAL NAME COMMON NAME SIZE NOTES CLASS 5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. -0 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN O AGHD 10' STORMWATER EASEMENT DECIDUOUS SHADE TREES A SOUND AND HEALTHY CONDITION. Ir W�UJ 7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND GALL OUT SYMBOL NUMBERS. ; o o a 3 o W LO 12 AG Acer platonoides 'Crimson King' Crimson King Maple 2" GAL. 45' X 35'W 11 o y ui .2 ti 0 7 AP Acer platanoides 'Deborah' Deborah Norway Maple 2" GAL. 50' X 50'W I I 8. ALL PLANTIN6 BEDS SHALL BE COVERED WITH A MINIMUM OF 3 DEPTH OF 2 MINUS BARK MULCH, COLOR PER OWNER. SUBMIT SAMPLE FOR APPROVAL. ` o w a k o- , 0 22 TG Tilia cordata 'Grozam' Corinthian Linden 2" GAL. 40'H X 15'W q. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BE6INNIN6 AT THE DATE OF ACCEPTANCE BY THE OWNER. REPLACE ALL �go= \ 2 W U.Z 11 P PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPEGIES AT NO COST TO THE OWNER. " o z o�X 0 0 Cv 7 QG Quercus coccinea Scarlet Oak 2" GAL. 60' X 50'W III / � o Z Y�t 10. FINISH 6RADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE DRAINA6E IN ACCORDANCE WITH THE SITE cc m a o Q o m 0 GRADING PLAN. t� N o a g 2 C E CONIFEROUS TREES 11. AMEND EXISTIN6 APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 SQUARE FEET. ROTO-TILL OR6ANIGQqz MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. cQi' II PA Picea obies Norway Spruce ii HT. 50' X 25'W 12. FERTILIZE ALL TREES AND SHRUBS WITH 'A&RIFORM' PLANTING TABLETS. QUANTITY PER MANUFAGTURER'S RECOMMENDATIONS. 10 PP Picea un ens '6lauca' Golorado Blue Spruce 6-7' HT. 60'H X 20'W 15. ALL PLANTIN6 BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12" DEPTH OF TOPSOIL. SPREAD, GOMPACT, REVISIONS ORNAMENTAL FLOWERING TREES AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/2" BELOW ADJACENT No. Date Description U SURFACES OF TURF SOD AREAS, AND " BELOW ADJACENT SURFACES OF TURF SEED AREAS. J C 10 MP Molus 'Prairiefire' Prairiefire Grabapple 2" GAL. 20' X 20'W 1 14. REUSE EXISTIN6 TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND ^ 10 MS Molus 'Spring Snow' Spring Snow Grabapple 2" GAL. 20' X 20'W I CONDITION OF TOPSOIL AS A 6ROWIN6 MEDIUM. PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL LL >_ TESTS. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, GLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROGKS, GRASS OR SHRUBS/PERENNIALS/ORNAMENTAL GRASSES OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, GONTRAGTOR IS RESPONSIBLE TO EITHER: � 34 GA Galamagrostis x acutiflora 'Karl Foerster' Foerster's Feather Reed Grass #I 5'H X 2'W PROJECT NO.: 37 GB Gornus albo 'Bailholo' Ivory Halo Dogwood #5 5' X 5'W A) PROVIDE APPROVED IMPORTED TOPSOIL, ORIr 30 EA Euonymus alatus 'Gompoctus' Dwarf Burning Bush #5 8' X 8'W B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARGHITEGT. 20095 B 33 MA Mohonio oquifolium 'Gompacta' Compact Oregon Grape #5 5' X 4IN 15. IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF DRAWN BY: 24 PH Rudbeckia hirto Black-Eyed Susan #I 3' X 2'W SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INGHES IN ANY DIMENSION, AND OTHER TC 25 SS Salvia x sylvestrfs 'Mainacht' May Night Salvia #I 1.5'X 1.5'W EXTRANEOUS OR TOXIC, MATTER HARMFUL TO PLANT GROWTH. 50 SB 5piraea x bumalda '6oldflame' 6oldflame Spirea #5 4' X 4'W A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL GHARAGTERISTIGS TO THOSE FOUND ON THE PROJEGT SITE. CHECKED BY: 47 WF Weigela florido 'Dark Horse' Dark Horse Weigela #2 3'H X 3'W OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OGGURS AT A DEPTH OF NOT LESS THAN 4 INGHES. JB B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND 6ENERAL TEXTURE BY A REGO&NIZED COMMERCIAL OR � 6OVERNMENT A6ENGY AND COPIES OF THE TESTING A6ENGY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S DATE: J rn REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION. ACIDITY/ALKALINITY RAN6E - PH. 5.5 10/07/2020 o TO 7.6. w CC-4 16. IMMEDIATELY GLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. Ir 17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL A.G.H.D. STORM DRAIN PIPE, STRUCTURES, OR FACILITIES. Ir 0 15. SEEPAGE BEDS AND OTHER STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURIN6 THE GONSTRUGTION AND SHEET NUMBER A N INSTALLATION OF THE LANDSCAPE IRR16ATION SYSTEM. M. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARGHITEGT IMMEDIATELY.N L1.0 U O L 0- I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ORIGINAL SKRVEY ON FILE A- CK ENGIN-C2ING oo�� ZE OF�IDooOoo ' 96" ON CENTER Z TURF AREA PREPARATION NOTES. EXTRUDED POST GAP WHEN PRESENT: BUD ° (STANDARD OPTION) 91" MAXIMUM SPAN POINT (A MINOR ROOT FLARE/GOLLAR (SWELLING AT PRELIMINARY I. LIMIT TURF SUBGRADE PREPARATION TO AREAS TO BE PLANTED. N GROOK IN THE TRUNK NOT FOR U w SOIL LINE WHERE STEM TISSUE 2. NEWLY GRADED SUBGRADES: LOOSEN SUBGRADE TO A MINIMUM DEPTH OF 4 INGHES. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, RUBBISH, AND JUST ABOVE THE TRANSITIONS INTO ROOT TISSUE) TO C O N S T R U C T I O N OTHER EXTRANEOUS MATTER AND LEGALLY DISPOSE OF THEM OFF OWNER'S PROPERTY. SIN SOIL LINE) TO BE rn BE AT SOIL LINE. °o��j���o A. SPREAD PLANTING SOIL TO A DEPTH OF q INGHES IN TURF AREAS AND 18 INGHES AT SHRUB BED AREAS BUT NOT LESS THAN REQUIRED TO MEET FINISH GRADES AFTER LIGHT APPROXIMATELY I Y2" y °oo �O°o ROLLING AND NATURAL SETTLEMENT. DO NOT SPREAD IF PLANTING SOIL OR SUBGRADE IS FROZEN MUDDY OR EXGE551VELY NET. HOLD TOP AND BOTTOM ABOVE THE SOIL ROOT PROBE +�V' r� -,y PDRE�VG I >�G WIND 000 o�S C7 000P o 3. SPREAD PLANTING SOIL OVER LOOSENED SUBGRADE. RAILS IN PLAGE WITH af,� " -7/8" U-GHANNEL LINE `4a b„s r o 4. REDUCE ELEVATION OF PLANTING SOIL TO ALLOW FOR SOIL THIGKNESS OF SOD. LOCK RING. ` a.� ,+ Z ��r 5. UNGHAN6ED 5UB6RADE5: IF TURF IS TO BE PLANTED IN AREAS UNALTERED OR UNDISTURBED BY EXGAVATIN6, GRADING, OR SURFAGE-SOIL STRIPPING OPERATIONS, PREPARE SURFACE Z REMOVE TOUNGE ON ONE 12 SOIL LINE J' ° SOIL AS FOLLOWS: SIDE OF PANEL TO SIT a` 4" 5" CONCRETE MOWSTRIP - � �b,_t�; � , A. REMOVE EXISTING GRASS, VEGETATION AND TURF. DO NOT MIX INTO SURFAGE SOIL. N ti .a P REMOVE DEAD/DAMAGED BRANCHES w FLUSH AGAINST POST � AND PRUNE TO INTERNATIONAL M 6. APPLY SOIL AMENDMENTS DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. �h � E GONGRETE FOOTING �� _�_ o N M A. REMOVE STONES LARGER THAN I INCH IN ANY DIMENSION AND STICKS, ROOTS, TRASH, AND OTHER EXTRANEOUS MATTER. 7/8" x 6" TOUNGE AND iv SOCIETY OF ARBORICULTURE o o Q B. LEGALLY DISPOSE OF WASTE MATERIAL, INGLUDIN6 GRASS, VEGETATION, AND TURF, OFF OWNER'S PROPERTY. GROOVE PICKET ^I I �o , - �4t", STANDARDS; IMPROPERLY PRUNED ' T N �' SCORE JOINT AT EACH -- o c� -7. FINISH 6RADING: GRADE PLANTING AREAS TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE UNIFORMLY FINE TEXTURE. GRADE TO WITHIN PLUS OR MINUS 1/2 INCH OF FINISH CO �' / 42 TREES (AS DETERMINED BY THE m - N o POST t riy G o o L E �o N N 30 w ELEVATION. ROLL AND RAKE, REMOVE RIDGES, AND FILL DEPRESSIONS TO MEET FINISH GRADES. LIMIT FINISH GRADING TO AREAS THAT CAN BE PLANTED IN THE IMMEDIATE FUTURE. I-I/2" x 5-I/2" RAIL ' _ LANDSCAPE ARGHITEGT) SHALL BE s - �' _ z � `� r a`) Q a' E a' 3 cco C7a w 8. MOISTEN PREPARED AREA BEFORE PLANTING IF SOIL IS DRY. WATER THOROUGHLY AND ALLOW SURFAGE TO DRY BEFORE PLANTING. DO NOT CREATE MUDDY SOIL. FENCE POST SET POST HIGHEST ROOT SHALL �o,,,; �a d REMOVED AND REPLACED. DO NOT " m o❑ o N z q. DO NOT SOW IMMEDIATELY FOLLOWIN6 RAIN OR WHEN GROUND IS TOO DRY. TEMPERATURE SHALL BE BETWEEN 55 F AND q5 F FOR A 24 HOUR PERIOD. WIND SHALL BE LESS THAN 5 BE 2" MAXIMUM 'ti' � REMOVE MAIN LEADER!! Y 0 L PRIOR TO INSTALLATION y r ��^�� ri1 a 0 o Z. a ao N `o v o MPH. 12" WIDE CONCRETE OF MOWSTRIP BELOW SOIL LINE. w _ r o z = 10. TURF SEED SHALL BE SOWN AT A RATE PER SEED SUPPLIER RECOMMENDATIONS. MOWSTRIP UTILIZE SOIL/ROOT ?I - T RUBBER GINGH TIE L ,a o co L Z PLAN VIEW r* � Jwc�� � 3 � L co PROBE AROUND' n � o . . . . . . 3 LL a co c, w TRUNK (APPROX 1"-2" �' ' `�� ,'1. s% 2"x 2" WOOD STAKE (LENGTH AS _ o IL""•!a �� ° SIN 5" SQUARE VINYL FENCE AWAY FROM TRUNK) a�' � �r*' "1 "°`{ REQUIRED)-DO NOT PENETRATE TOPSOIL NOTES POST TO LOCATE HIGHEST %3`°�1' ,,� ROOTBALL. SEE NOTE 1. SET STAKES L - I` ROOTS. tea'. ) "�p � PARALLEL TO PREVAILING WIND. I. TOPSOIL REQUIREMENTS: A5TM D 5268, PH RANGE OF 5.5 TO -f, FOUR PERCENT OR6ANIG MATERIAL MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT GROWTH. I -III- SET FINISH GRADE AS I I I I SPECIFIED 4.��, � I���°�;�l�o�,���� REMOVE TREE WRAP TRUNK o 2. TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY PROTECTION, AFTER INSTALLATION FREE OF SUBSOIL, GLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, OR6ANIG MATTER LARGER THAN 2 INGHES IN ANY DIMENSION, AND OTHER I I I 1 CONCRETE FOOTING AS � '� , s a EXTRANEOUS OR TOXIC, MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS REQUIREMENT. I I I i N - - REMOVE BURLAP, v �,,,%" ��=«� GONSTRUGT 2" EARTH BERM AT EDGE 3. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A REGOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE I -III -I SPECIFIED TWINE AND WIRE �ljPr�j�q�"�Q> `° I I I I h �g�h��., %'s' OF ROOTBALL, FILL TREE RING W/ o TESTING AGENGYS FINDIN65 AND RECOMMENDATIONS SHALL BE FURNISHED TO THE ARGHITEGT5 REPRESENTATIVE BY THE GONTRACTOR. ALL TOPSOIL SHALL BE AMENDED TO I I -III -- BASKET FROM TOP � ,A , ' ��� / I 6 AGGREGATE BASEu.r- v ��'�� MULCH, AS SPECIFIED. ACHIEVE SPECIFIED PH AND OR6ANIG REQUIREMENTS. RE-TEST TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE PLACED L 1_i J =11I- p ;�s rim %,�„� m OF ROOTBALL, zw �,� lrb � ° WHILE IN A FROZEN OR MUDDY CONDITION. NOTES. =11I-1 = GOMPAGTED SUB-GRADE REMOVE ALL NAILS, . o�' o 0 , 1 3" THICK MULCH LAYER KEEP MULCH 4. PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SGHEDULED. PLACE TOPSOIL DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO -1 TIES, AND PLASTIC Z �" c" w o Q 3 AWAY FROM TRUNK. BRING SURFAGE TO PROPOSED FINISH GRADE, AS REQUIRED. 1. SCORE JOINTS o 10 O.G. OR AT EACH POST. -III III FROM ROOTBALL. IF Qf J N 5. COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: 2. INSTALLATION TO BE COMPLETED IN - SYNTHETIC BURLAP IS o 19 FINISH GRADE g K A. LAWN AREAS: q INGHES MINIMUM OR AS NEGE55ARY TO ACHIEVE EVEN GRADES WITH SURROUNDING LAWN AREAS. ACCORDANCE WITH MANUFACTURER'5 31" 3-' UTILIZED TO WRAP w ° B. PLANTER BEDS: 18 INGHES MINIMUM SPECIFICATIONS. 5" 2 THE ��/��/��/� �/�/�/ / /�/ ����� COMMERCIAL SLOW RELEASE 6. FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. FINISH SHALL BOEBALL, I LLJ T Q ��jj��jj��jj j ���j�� �A/��A / �j/�A� FERTILIZER TABLETS w GRADE OF TOPSOIL SHALL BE 2" BELOW FINISH GRADE OF PAVEMENTS AREAS FOR SOD AND I" FOR SEED. �� VINYL FENCE PANEL COMPLETELY �\ V� 7 SIDES OF HOLE ROUGH 4 UNEVEN. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. REMOVED. ONLY =III �� 10 8. ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE 5TOGKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROGK SCALE: I/2 I'-O" BIODEGRADABLE III \ III BAGKFILL WITH APPROVED TOPSOIL MATERIALS SHALL BE STOGKPILED OR TEMPORARILY PLAGED IN PROPOSED LANDSGAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED WITH ROCK BURLAP SHALL BE w MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO LANDSGAPE ARGHITEGT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. LEFT ON THE BOTTOM AND SOIL AMENDMENTS AS z 3110 SPECIFIED EPTH OF MULCH AT OF THE ROOTBALL. IIII 11 1 III . BAGKFILL IN 6" LIFTS, F PLANTER BEDS WIDTH WIDTH WIDTH WIDTH WIDTH WATER EACH LAYER, TAMP Copyright C�2020 Z WEED ABATEMENT NOTES■ OF BALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/ TOP OF ROOTBALL LIGHTLY AS REQUIRED, BAGKFILL All rights reserved. Reproduction or use any form o or by any means without written permission of 0 ■ , Breckon Land Design,Inc.is unlawful and subject to 0 5' MIN. I TREE RING DO NOT OVER GOMPAGT!! criminal prosecution. w J I. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDR0 EEDING. w 2. GONTRAGTOR SHALL SPRAY ALL EXPOSED WEEDS WITH @ROUND-UP,& (GONTAGT HERBIGIOE) OR APPROVED EQUAL. - _ SET ROOTBALL ON NATIVE, 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. -III = UNDISTURBED SOIL 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE ^ =III of NOTES: o WATERING FOR THREE TO FIVE (3-5) DAYS. I11 IIII 1111 APPROVED TOPSOIL AND SOIL I. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO a 5. APPLY SEGOND APPLICATION OF @ROUND-UP-& TO ALL EXPOSED WEEDS. APPLY IN STRICT GONFORMANGE WITH MANUFACTURERS SPEGIFIGATIONS AND INSTRUCTIONS. DO AMENDMENTS AS SPEGIFIED INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. FINISH GRADE, GUT EDGE WARRANTY PERIOD OR I YEAR AFTER SUBSTANTIAL COMPLETION WHIGH EVER IS GREATER. ALL STAKING o 6. IF ANY EVIDENGE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLIGATIONS, GONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. PER PLANS SHALL BE REMOVED AT THE END OF THE WARRANTY PERIOD. 7. AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE. 2. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE PLANTER BED CUT EDGE LANDSCAPE ARGHITEGT BEFORE PROCEEDING. o 2 3. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARGHITEGT AND OWNER PRIOR TO INSTALLATION OF IRRIGATION NOTES: (TYPICAL AT TREES IN TURF AREAS) NOT To SCALE PLANT MATERIAL. z10 I..I 4. WRAP RUBBER GINGH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE O EIGHT TYING METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 1. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC, UNDERGROUND SPRINKLER SYSTEM WHIGH INSURES GOMPLETE GOVERA6E AND PROPERLY ZONED FOR REQUIRED WATER 5. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. o USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS AND DECODERS. 6. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSGAPE ARGHITEGT 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO-ZONES. KEEP GROUND LINE SAME AS NURSERY LINE IMMEDIATELY. co 10 CONIFEROUS TREE PLANTING - Q 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HE16HT OF 4 INGHES AT LAWN AREAS AND 18 AT PLANTER BEDS. s 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS GROUND COVERS OR SHRUB MASSIN65 SHALL HAVE A POP-UP REMOVE ANY PLASTIC, BURLAP, NAILS, OR > 0 SPRAY SYSTEM. OTHER MATERIALS FROM THE ROOTBALL 5 NOT TO SGAL E o 5. GONNEGT NEW IRRIGATION IMPROVEMENTS TO THE EXISTING ELEGTRONIG WATER DISTRIBUTION/ TIMING CONTROLLER. ENSURE THE FOLLOWING. WHIGH MAY LIMIT ROOT GROWTH - o. AT LEAST ONE PROGRAM AND DECODER FOR EACH HYDROZONE Q w I SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF GONSTRUGT 2" EARTH BERM TO FORM A M 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES. WATER RETENTION BASIN, FILL BERM WITH w = G -7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD GOVERA6E WITH TRIANGULAR 5PAGIN6. MULCH, AS SPEGIFIED 7 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFAGES (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). L O W q. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC, VALVE ZONES. APPROVE Q.G.V. LOCATIONS WITH OWNER'S REPRESENTATIVE. MULCH, PER PLANS, 3" DEPTH OVER ENTIRE WHEN PRESENT: BUD co Q BED. DO NOT COVER GROWN5 OF PLANTS POINT (A MINOR ROOT FLARE/COLLAR (SWELLING AT Q Q CROOK IN THE TRUNK TREE MITIGATION■ IIIII IIIII PROVIDE DEWITT PRO 5 WEED BARRIER JUST ABOVE THE SOIL LINE WHERE STEM TISSUE ,`' FABRIC OR APPROVED EQUAL TRANSITIONS INTO ROOT TISSUE) TO -1I II I II I I I I II I II I I=I BE AT SOIL LINE. W J Q W �1r SOIL LINE) TO BE PER THE MEETING WITH THE MERIDIAN CITY ARBORI5T, MATT PERKINS, THE APPROXIMATELY I Y2" PREVAILING WIND � Q IIII ABOVE THE SOIL ROOT PROBE DIRECTION 1..� � EXISTING TREES TO BE REMOVED FROM THE SITE, WHIGH REQUIRE MITIGATION, � - LINE o ARE AS FOLLOWS: IIIII IIIII III I F, Q o ONE (1) FRUIT TREE AT Cl" GALIPER = BAGKFILL WITH APPROVED TOPSOIL AND SOIL LINE 2 WIDTH OF REMOVE DEAD/DAMAGED BRANCHES F ONE (I) PINE TREE AT 24" GALIPER 6" ROOTBALL 6'> SOIL AMENDMENTS, AS SPECIFIED. BAGKFILL iv Z U o ONE (1) PINE TREE AT 15" GALIPER IN 6" LIFTS, WATER EACH LAYER, DO NOT AND PRUNE TO INTERNATIONAL r n � ONE (I) PINE TREE AT Cl" GALIPER TAMP OR OVER COMPACT. STANDARDS;OS; IMPROPERLY U PRUNED O < C/ ONE (I) PINE TREE AT II" GALIPER NOTE: _ (� Q o CONSTRUCT 6" MOUND OF TOPSOIL s � TREES (AS DETERMINED BY THE � Q o TOTAL GALIPER INGHES REQUIRED I. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. - LANDSCAPE ARGHITEGT) SHALL BE FOR MITIGATION = 68 GALIPER INGHES 2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURERS RECOMMENDATIONS TO ALL HIGHEST ROOT SHALL REMOVED AND REPLACED. DO NOT W 7 a) GROUNOGOVER BEDS. BE O MAXIMUM REMOVE MAIN LEADER!! L EXISTING TREES TO BE REMOVED FROM THE SITE, WHIGH DO NOT REQUIRE BELOW SOIL LINE. SHRUB PLANTING UTILIZE 501L/ROOT RUBBER CINCH TIE z O MITIGATION: ^ N " " " " O W ° `{J PROBE AROUND 10 NOT TO SCALE TRUNK (APPROX 1 -2 2x 2 WOOD STAKE (LENGTH AS A E � ONE PINE TREE AT IS GALIPER (UNHEALTHY SPECIMEN). I` AWAY FROM TRUNK) REQUIRED)-DO NOT PENETRATE � THE METHOD FOR MITIGATION WILL BE TO PLANT 34 TREES (AT 2" GALIPER) IN TO LOCATE HIGHEST ROOTBALL. SEE NOTE I. SET STAKES THE ARTERIAL ROAD LANDSGAPE BUFFER, AND IN THE MAIN COMMON LOT IN THE ROOTS. c° PARALLEL TO PREVAILING WIND. v SOUTHWEST CORNER OF THE PROJECT. 34 TREES AT 2" GALIPER EACH, EQUALS Z 0 af REMOVE TREE WRAP TRUNK 68 GALIPER, WHIGH MEETS THE MITIGATION REQUIREMENTS. o Q a 'A' 'A' w v PROTECTION, AFTER INSTALLATION J p CON5TRUGT 2" EARTH BERM AT EDGE ? w OF ROOTBALL, FILL TREE RING W/ A = LENGTH, AS SPEGIFIED N MULCH, AS SPEGIFIED. OR PER PLANT SCHEDULE 0 m 9 P 00 3" THICK MULCH LAYER, KEEP MULCH D B = 85% OF X REMOVE BURLAP, O 3" AWAY FROM TRUNK. TWINE, AND WIRE FINISH GRADE + BASKET FROM TOP GOMMERGIAL SLOW RELEASE C a /�/�/� �/ A /�/� FERTILIZER TABLETS OF ROOTBALL, - �A/��/��/ /��/ REMOVE ALL NAILS, w //��/��/ /��� �/ � �/��/�/��/��/ rn FINISH GRADE PER PLANS �W�W PLAN VIEW FROM ROOTBALL. IF -III �j SIDES OF HOLE ROUGH 4 UNEVEN a o o° c► TIES, AND PLASTIC �/ �/� y n EDGINGCr) , PER PLANS AND DETAILS �/ - = = ` "�L wilmaka9� o UTILIZED 1TO WRAP IS BAGKFILL WITH APPROVED TOPSOIL \\ Z W a 6ROUNDGOVER PLANTING PER PLANTING -III -III-III -III AND SOIL AMENDMENTS AS �� -0 0 W z G z THE ROOTBALL, IT M y Z �.ni PLAN SHALL BE SPECIFIED. BAGKFILL IN WATER EACH LAYER 6 LIFTS, �I� m§ Q a c m w COMPLETELY WIDTH WIDTH WIDTH WIDTH WIDTH , TAMP o�� MULCH, PER PLANS, 3" DEPTH OVER REMOVED. ONLY OF BALL OF BALL OF BALL OF BALL OF BALL LIGHTLY AS REQUIRED, BAGKFILL �Q c o W C ENTIRE BED. DO NOT COVER GROWN5 OF BIODEGRADABLE SOIL EVEN W/ TOP OF ROOTBALL, ? W - PLANTS 5' MIN. DIA. DO NOT OVER GOMPAGT!! BURLAP SHALL BE TREE RING LEFT ON THE BOTTOM REVISIONS ��/��/�/��/��/��/�/��/� /��/� SPLIT ALL ROOT BOUND ROOTS WITH 3 SET ROOTBALL ON NATIVE Q -III III //A//A//�A//�A//�A//�A//�A//�A//�A//�A�A/A EQUAL SPAGED VERTIGAL GUTS. OF THE ROOTBALL. UNDISTURBED SOIL No. Date Description v ;IIIIIIII i��i��i��i��i���i����ii NOTES: to 11 �1 I1 11 111 11 11 11 1 TILL SOIL TO A DEPTH OF 12 , BAGKFILL 0- III III III IIII III III IIIII IIIII III„ WITH APPROVED TOPSOIL AND SOIL I. THE STAKING OF TREES IS TO BE THE CONTRACTORS OPTION; HOWEVER, THE CONTRACTOR IS AMENDMENTS, AS SPECIFIED. RESPONSIBLE TO INSURE THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN 5TRA16HT ` 4 IIIIIIIIIII III- III FOR ONE YEAR AFTER SUBSTANTIAL COMPLETION. ALL STAKING SHALL BE REMOVED AT THE END OF THE r DEWITT PRO 5 WEED BARRIER FABRIC WARRANTY PERIOD. PROJECT NO.: SECTION OR APPROVED EQUAL 2. IN THE EVENT OF A QUESTION OR LACK OF GLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY Ir 20095 THE LANDSCAPE ARGHITEGT BEFORE PROCEEDIN6. B SUBGRADE 5. LANDSCAPE GONTRAGTOR IS TO NOTIFY THE LANDSGAPE ARGHITEGT AND OWNER PRIOR TO INSTALLATION DRAWN BY: NOTES: OF PLANT MATERIAL. TIC Z 4. WATER TREE TWIGE WITHIN THE FIRST 24 HOURS. c I. ALL 6ROUNDGOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR 5. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-O" IN WIDTH, PROVIDE TREE ROOT CHECKED BY: C PATTERN. BARRIER (DEEPROOT #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND G 2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S REGOMMENDATIONS TO ALL EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL GONFORM TO ALL A6ENGY APPROVAL JB _ 6ROUN000VER BEDS. REQUIREMENTS, GONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. DATE: J PERENNIAL & GROUNDCOVER DECIDUOUS TREE PLANTING ,0�07�202o Lu 0 Ir 4 N°- 7G SGAI-E 6 (TYPICAL FOR TREES X CALIPER OR LESS) N°- 7G SGAI-E PLANTING SHEET NUMBER L1.5 I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 ORIGINAL SKRVCY ON FILE A- CK CKGIN-C2ING o°°o Z,�OF o1D°OOOo 00000 0� �gST Z RnO°Oo PRELIMINARY STORMWATER POND REVEGETATION REQUIREMENTS NOT FOR w CONSTRUCTION a GENERAL OVERVIEW SEEDING o °OOo 1VDSCA� oo° o THESE REQUIREMENTS OUTLINE THE RECOMMENDED GUIDELINES FOR REVEGETATION OF THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXECUTION FOR SEEDING. °OOOa00000000p0° > SIDE-SLOPES, BANKS, AND BOTTOMS (EXGLUDIN6 SAND INVERT AREAS) OF NEW z STORMWATER MANAGEMENT PONDS THROUGHOUT THE JURISDICTION OF ADA COUNTY RECOMMENDED SEED MIX FOR USE IN UPLAND AREAS WITH WELL-DRAINED SOILS. PERCENT OF o HIGHWAY DISTRICT (AGHD). THE RECOMMENDATIONS AND REQUIREMENTS DESCRIBED HERE POUNDS PER LIVE PURE LIVE w ARE IN ACCORDANCE WITH THE ADA GOUNTY H16HWAY DISTRICT STORMWATER Lu MANAGEMENT BASIN REVE6ETATION 6UIDANGE MANUAL" (OCTOBER 201-7) IN APPENDIX D. GOMMON NAME BOTANIGAL NAME SEED PER AGRE SEED IN MIX o a) o M THE FIVE MAIN GOALS FOR THE REVE6ETATION OF NEW PONDS ARE AESTHETICS, NOXIOUS ° _ ° 0 z WEED AND INVASIVE SPECIES MANAGEMENT, FIRE HAZARD REDUCTION, WATER QUALITY AND BLUEBUNGH WHEATGRA55 Pseudoroegneria spicato 3.7 20 '" 2 - 11 EROSION CONTROL. REFER TO SECTIONS OF THE MANUAL AS NOTED IN THESE IDAHO FESCUE Festuca idahoensis O.q 15 Y ° = a u ° m o REQUIREMENTS. " ° n z INDIAN RIGEGRA55 Achnatherum h menoides 2.8 15 E.N C0 ° a m y a) Q� E � .E GENERAL EARTHWORK NEEDLE-AND-THREAD Hesperostipa comato 0.2 I m C us � � ; p L PRAIRIE JUNE61RASS Koeleria mocrontho 0.1 10 w U3.2 r � a 2 00 N ° " ° ALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION. ALL _ -° N Q ° ° -0. a �; z FINISHED GRADES SHALL BE SMOOTH AND ROUNDED TO ENSURE A NATURAL TRANSITION THIGK5PIKE WHEAT6RASS Elymus lanceolatus 2.5 15 w c��� 3 0 cCOo o BETWEEN NEW AND EXISTING GRADES. REFER TO GRADING AND DRAINAGE PLANS FOR SAND DROPSEED 5porobolu5 cryptondrus 0.0-7 14 3 " a co W ADDITIONAL REQUIREMENTS. IF NATURAL TOPSOIL OGGUR5 AT VARYIN6 DEPTHS ON THE SANDBER6 BLUEGRASS Foci secunda 0_2 10 • - • • PROJECT SITE. THE TOPSOIL SHOULD BE EXGAVATED AND 5TOGKPILED AT DESIGNATED TOTAL 10.4-1 100 N L STORAGE AREAS PRIOR TO THE PROPOSED GRADING OPERATIONS. 0 FIBER MULCH MATERIAL ; SITE ASSESSMENT GROW NUTRIBASE FROM QUATTRO ENVIRONMENTAL, A COMPOSTED POULTRY BASED MULCH , GONTRAGTOR SHALL ASSESS THE EXISTING SOIL GONDITION5 TO IDENTIFY ANY MATERIAL FREE OF GROWTH OR GERMINATION INHIBITING INGREDIENTS. APPLY AT THE BARRIERS TO A 5000E55FUL ESTABLISHMENT OF THE DESIRED SPECIES DUE TO CONDITIONS RATE OF 2000 LBS. PER AGRE. AT THE SITE. REFER TO ASMPRGM SECTION 3.3 FOR VISUAL AND FIELD ASSESSMENT SOIL ORGANIC SOIL AMENDMENT GHARAGTERISTIGS. IF VISUAL ASSESSMENT OF SOIL INDICATES ANY UNUSUAL SOIL GROW NUTRIB005T FROM QUATTRO ENVIRONMENTAL (OR APPROVED EQUAL) APPLIED AT 5 GONDITION5, THE GONTRAGTOR SHALL HAVE THREE (3) SOIL TESTS PERFORMED BY A GALLONS PER AGRE. ° a QUALIFIED SOIL ANALYSIS LABORATORY. THESE RESULTS WILL DIRECT THE PREPARATION OF THE SOIL FOR THE REVE6ETATION ACTIVITIES. TAGKIFIER GONTRACTOR SHALL ALSO ASSESS THE EXISTING HYDROLOGICAL CONDITIONS IF ANY MULCH TAGKIFIER SOIL STABILIZER - EGOL06Y CONTROLS M-BINDER. TAGKIFIER APPLIED 0 K AND THE PROPOSED TOP06RAPHY OF THE PROPOSED POND. REFER TO ASMPRGM 5EGTION AT THE RATE OF 80 LBS. PER AGRE. ° 3.4 AND 3.5 FOR ADDITIONAL INFORMATION AND GONDITION5. GRANITE SEED ' z 16Ql WEST 2100 NORTH P.O. BOX 117 SITE PREPARATION LEHI, UTAH 54045 o I-800-768-4433 TOPSOIL REQUIREMENTS AND PREPARATION (OR APPROVED EQUAL) w z w DRILL SEEDING Copyright C�2020 REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED DRILL SEEDING IS RECOMMENDED IN THE UPLAND AREAS WITH SLOPES LESS THAN 3:1. All rights reserved. Reproduction or use in any form 0 TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. TOPSOIL REQUIREMENTS: A5TM D 5268, PH SEED DEPOSITION SHOULD BE CALIBRATED TO A DEPTH OF 0.25 TO 0.5 INCH. FULL SIZE OR or by any means without written permission of 2 RANGE OF 5.5 TO -1, FOUR PERCENT OR6ANIG MATERIAL MINIMUM, FREE OF STONES 1/2 INGH COMPACT RANGELAND DRILLS ARE RECOMMENDED. DEPENDING ON SIZE, DRILLS GAN BE Brockon Land design,Inc.is unlawful and subject to 0 J criminal prosecution. w OR LARGER IN ANY DIMENSION, AND OTHER EXTRANEOUS MATERIALS HARMFUL TO PLANT PULLED BY TRACTOR OR ALL-TERRAIN VEHICLE. DRILL SEEDING SHOULD FOLLOW GROWTH. CONTOURS IN TOP06RAPHY TO MINIMIZE EROSION POTENTIAL. GONTRAGTOR15 OPTION TO a TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DRILL SEED OR HYDR05EED UPLAND AREAS. o DISTURBED. TOPSOIL SHALL BE FERTILE, FRIABLE, NATURAL LOAM, SURFAGE SOIL, o REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE HYDROSEEDIN6 z OF ROOTS, STUMPS, OR6ANIG MATTER LARGER THAN 2 INGHES IN ANY DIMENSION, AND MIX SPEGIFIED SEED AND OR6ANIG SOIL AMENDMENT IN WATER PER MANUFAGTURER'S OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE RECOMMENDATIONS. APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS. w SCREENED TO ACHIEVE THIS REQUIREMENT. DO NOT HYDROSEED AREA IN EXGESS OF THAT WHIGH GAN BE MULGHED ON SAME DAY. GONTRAGTOR SHALL HAVE (3) TOPSOIL SAMPLES TESTS PERFORMED BY A QUALIFIED a SOIL ANALYSIS LABORATORY. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR AGIDITY, KEEP OFF ROADS, WALKS, STRUGTURES AND AREAS NOT TO BE SEEDED. GLEAN UP THESE FERTILITY AND GENERAL TEXTURE BY A QUALIFIED SOIL ANALYSIS LABORATORY AND AREAS. o COPIES OF THE TESTING AGENGY'5 FINDIN65 AND RECOMMENDATIONS SHALL BE FURNISHED AFTER HYDROSEEDIN6 IN UPLAND AREAS, TRACK IN SEED USING A CLEATED GRAWLER WITH W TO THE LANDSCAPE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL 10 TRACK MARKS PERPENDICULAR TO THE SLOPE. AFTER TRACKED, MULGH SLOPE WITH 2O00 H SHALL BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC REQUIREMENTS. RE-TEST O TOPSOIL PRIOR TO FINAL COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO LBS. PER AGRE OF FERTILE-FIBER MULCH MATERIAL AND 80 LBS. PER AGRE OF TAGKIFIER. TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION. AFTER HYDROSEEDIN6 IN WETLAND AREAS, DO NOT TRACK IN SEED USING A CLEATED Q PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THIGKNESS AS 5GHEDULED. GRAWLER. AFTER SEEDING, MULCH AREA WITH 2O00 LBS. PER AGRE OF FERTILE-FIBER ' ^ PLACE TOPSOIL DURING DRY WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED MULCH MATERIAL AND 80 LBS. PER AGRE OF TAGKIFIER. v J ° TO BRING SURFAGE TO PROPOSED FINISH GRADE, AS REQUIRED Q �} ^ SEEDING TIME V `J J w GOMPAGTED TOPSOIL THIGKNESS AT THE FOLLOWING AREAS: THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND MID > O (n J o GRASSES AND FORB5: 6 INCHES MINIMUM OGTOBER. IF SEEDING IS APPLIED TOO EARLY OR TOO LATE AND PROPER GERMINATION IS Q o NOT REALIZED PRIOR TO FALL DORMANGY THEN RESEEDING SHALL BE APPLIED IN EARLY FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFAGE WITH LOOSE, UNIFORMLY FINE SPRING, AS SOON AS SOIL IS WORKABLE (NOT MUDDY) BETWEEN MARCH AND MID MAY. THIS Q TEXTURE. REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. G PLANTING TIME PROVIDES THE OPTIMUM WEATHER CONDITIONS FOR SEED GERMINATION AND TOPSOIL STOCKPILE LOCATIONS TO BE GOVERED COORDINATE WITH EROSION AND SEEDLING SURVIVAL RATE. SEEDING AFTER NOVEMBER 20, 'DORMANT SEEDING' INSURES O SEDIMENT CONTROL PLAN. THAT THE SEED DOES NOT GERMINATE PRIOR TO FREEZING WINTER TEMPERATURES AND QQ ALL GRAVEL, SUBBASE, AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SEED SHOULD BE IN PLACE FOR THE EARLY SPRING RAINS. SHALL ONLY BE STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR TEMPORARILY PLACED IN PROPOSED LANDSCAPE TEMPORARY SUPPLEMENTAL IRRIGATION 00 AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED WITH ROCK THE GONTRAGTOR SHALL PROVIDE SUPPLEMENTAL IRRIGATION IN SITUATIONS WHERE 0 MATERIALS. GONTRAGTOR SHALL SUBMIT A DETAILED STOGKPILE PLAN TO LAN05GAPE IMMEDIATE VEGETATION ESTABLISHMENT IS DESIRED, SUGH AS HIGHLY VISIBLE SITES OR ARCHITECT AND OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. EROSION PRONE AREAS OR WHERE IT MAY BE NEGESSARY FOR SEEDLING ESTABLISHMENT. o SEEDED AREAS SHOULD BE IRRIGATED USING OVERHEAD SPRAY OR ROTOR IN-GROUND C"t < O TOPSOIL DISTRIBUTION SPRINKLER IRRIGATION SYSTEM. IT IS RECOMMENDED THAT, IF USED, THE IRRIGATION BE U ., CONTINUED FOR AT LEAST TWO (2) SEASONS. SEE IRRIGATION PLANS. Z o ONCE THE GENERAL EARTHWORK IS COMPLETE AND ROUGH GRADING HAS BEEN 0 ACCOMPLISHED, THE TOPSOIL SHOULD BE REDISTRIBUTED OVER THE AREA TO MINIMUM GENERAL MAINTENANCE AND MONITORING Q r n DEPTHS AS SPEGIFIED. WHERE NEEDED, SLOPES SHOULD BE 6RADED WITH SERRATION TO v THE GONTRAGTOR SHALL MAINTAIN THE SITE FOLLOWING REVE&ETATION FOR THE Q o HOLD TOPSOIL ADEQUATELY. TOPSOIL SHOULD BE SPREAD AND LIGHTLY COMPACTED UTILIZING A SMALL CLEATED TRACTOR MOVING PERPENDICULAR TO THE CONTOURS OR PERIOD OF TWO (2) YEARS. THIS INGLUDES REMOVAL OF VOLUNTEER TREES AND SHRUBS, Q � O ANOTHER METHOD WITH EQUAL GAPABILITY. IT IS OUR RECOMMENDATION THAT ANY LITTER CONTROL, WEED CONTROL AND MOWING OF TALL GRASSES AT THE DISCRETION OF - NEGESSARY MEGHANIGAL MEANS OF EROSION CONTROL BE IN PLACE PRIOR TO BEGINNING AGHD STAFF. MOWING SHOULD ONLY BE PERFORMED WHERE FORBS, SHRUBS AND TREES w SITE DISTURBANCE. ARE NOT PLANTED. O � ONCE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVEGETATION SEEDING SHALL SITES SHALL BE VISITED EVERY TWO (2) WEEKS FOR MONITORING AND ASSESSING THE FOLLOW IMMEDIATELY. IN ORDER TO ELIMINATE SURFAGE GRU5TIN6 AND TO FAGILITATE OUJ BETTER ROOT PENETRATION, THE SURFAGE SHOULD BE SGARIFIED PRIOR TO SEEDING. SEEDING SUGGESS. VISUAL ASSESSMENT BY TRAINED PERSONNEL SHOULD OGGUR SEVERAL E TIMES OVER THE THE NEXT TWO (2) GROWING SEASONS FOLLOWING THE REVE&ETATION COMPOST ADDITION TO THE TOPSOIL PROJEGT. VISUAL ASSESSMENTS SHALL INGLUDE ESTIMATIONS OF VE6ATATIVE COVER AND ESTABLISHMENT, VEGETATION SPEGIES COMPOSITION, SOIL CONDITIONS AND HYDROLOC71GAL v GOMP05T ADDITION RATES WILL BE DEPENDENT ON THE QUALITIES OF THE GOMP05T AND CONDITIONS. VISUAL ASSESSMENT WILL IDENTIFY PROBLEM AREAS WHERE REVE&ETATION THE QUALITIES OF THE TOPSOIL. COMPOST APPLICATION RATES SHALL BE DETERMINED BY AND SITE PREPARATION EFFORTS WILL BE REQUIRED. SITES SHOULD BE MONITORED FOR Q GON5ULTATION WITH A QUALIFIED RECLAMATION SPECIALIST, A6RIGULTURAL PROFESSIONAL PRESENCE OF NOXIOUS WEEDS AND INVASIVE SPEGIES. REAPPLY HERBICIDE AS NEEDED OR A REPRESENTATIVE OF THE COMPOST PRODUGER. CONTRACTOR SHALL HAVE ONE (1) FOLLOWING MANUFAGTURER'5 GUIDELINES AND MAINTENANCE PERSONNEL EXPERTISE. OTHER SAMPLE OF THE COMPOST TESTED BY A QUALIFIED SOIL ANALYSIS LABORATORY. P05T-MONITIORIN6 METHODS ARE DESCRIBED IN ASMPRGM 5EGTION 8 AND SHOULD BE FOLLOWED. IF APPLYING COMPOST, LOOSEN SURFAGE SOIL TO A DEPTH OF AT LEAST 6 INCHES. RESEEDING EFFORTS SHALL FOLLOW THE SPECIFIED SEED MIXES FOR THE PROJECT PROVIDE WEED ABATEMENT PROCEDURE. APPLY SOIL AMENDMENTS AGGORDIN6 TO ALONG WITH RECOMMENDATIONS FROM ASMPRGM SECTION 6. PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOM06ENEOUS MIXTURE OF FINE TEXTURE. APPLY SOIL AMENDMENTS DIREGTLY TO SURFAGE SOIL BEFORE LOOSENING. REFER TO ASMPRGM SECTIONS 4.1.2 AND 4.1.5 FOR ADDITIONAL INFORMATION. a o o°� c yWLU o PROBLEMATIC SOIL CONDITIONS �\ uyi m Q o F SITE INVESTIGATION AND TOPSOIL ANALYSIS MAY INDICATE THE NEED FOR � " y Z 0 W?1 REMEDIATION OF PROBLEMATIC SOIL CONDITIONS SUCH AS COMPACTION OR NUTRIENT COF/ I im m a o a o m ° EXCESSES OR DEFIGIENGIES. SEE ASMPRGM SECTION 4.2 FOR ADDITIONAL REQUIREMENTS. WEED ABATEMENT REVISIONS Q ALL AREAS TO BE PLANTED OR SEEDED SHALL HAVE WEED ABATEMENT OPERATIONS No. Date Description v PERFORMED ON THEM PRIOR TO PLANTING OR SEEDING. J o CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH ROUND-UP (GONTAGT HERBICIDE) OR r1 APPROVED EQUAL. DO NOT WATER FOR AT LEAST SEVEN 0) DAYS. REMOVE EXPOSED LL WEEDS FROM THE SITE. GONTRAGTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT GONGLUSION OF THIS WATERING PERIOD, a) DISGONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. APPLY SECOND APPLIGATION OF PROJECT NO.: B C) ROUND-UP TO ALL EXPOSED WEEDS. APPLY IN STRIGT GONFORMANGE WITH 2O095 MANUFAGTURER'5 SPECIFICATIONS AND IN5TRUGTION5. DO NOT WATER FOR AT LEAST DRAWN BY: SEVEN 0) DAYS. REMOVE WEEDS FROM THE SITE. IF ANY EVIDENCE OF WEED GERMINATION TC EXISTS AFTER TWO (2) APPLIGATION5, GONTRAGTOR SHALL BE DIRECTED TO PERFORM A CHECKED BY: THIRD APPLIGATION. AT THE TIME OF PLANTING AND SEEDING, ALL PLANTING AREAS SHALL JB BE WEED FREE. J DATE: 0 10/07/2020 w Ir o0 SHEET NUMBER A L1.6 I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16