09 - Landscape PlanE. STATE AVEN. LOCUST GROVE RDLot
41
7
SS
13
MR
14
BG
2
PO
12
HS
7
RF
4
PV
20
HS
9
SS
19
HS
4
PV
13
MR
11
RF
8
SS
10
RF
1
PO
3
RF
5
MR
30
SS
3
PV
1
CD
43
HS
21
RF
2
PR
9
VS
2
PR
3
VS
2
CA
4
BG
11
HS
8
VS
1
GT
5
RF
22
AR
22
AR
40
BG
5
RF
1
GT
11
RH
2
PO
31
MR
2
PL
2
PO
31
MR
2
PL
PLANT SCHEDULE
QTY KEY BOTANICAL NAME COMMON NAME SIZE NOTES
DECIDUOUS SHADE TREES
2 GT Gleditsia triacanthos 'Shademaster'Shademaster Honeylocust 2" CAL. B&B Class II - 45' H x 35' W
4 PL Platanus acerifolia 'Morton Circle'EXCLAMATION!™ London planetree 2" CAL. B&B Class II - 55' H x 35' W
CONIFEROUS TREES
1 CD Cedrus deodara 'Shalimar'Shalimar Deodora Cedar 6'-7' HGT. B&B 15' H x 12' W
ORNAMENTAL TREES
2 PR Parrotia persica 'Ruby Vase'Ruby Vase® Persian Ironwood 3" CAL. B&B 3-5 Multi-Trunk; Class I - 30' H x 15' W
SHRUBS/PERENNIALS/ORNAMENTAL GRASSES
44 AR Ajuga reptans 'Black Scallop'Black Scallop Carpet Bugle #1; 24"o.c.6" H x 2' W
59 BG Buxus x 'Green Velvet'Green Velvet Boxwood #2 3' H x 3' W
2 CA Calamagrostis x acutiflora 'Karl Foerster'Foerster's Feather Reed Grass #2 4-5' H x 3' W
106 HS Helictotrichon sempervirens Blue Oat Grass #1 3' H x 2' W
93 MR Mahonia repens Creeping Oregon Grape #1; 36" o.c.2' H x 3' W
11 PV Panicum virgatum 'Cloud Nine'Cloud Nine Switch Grass #2 7' H x 3' W
7 PO Physocarpus opulifolius 'Monlo'Diabolo® Ninebark #5 5' H x 5' W
11 RH Rhamnus frangula 'Columnaris'Tallhedge Buckthorne #5 12' H x 3-4' W
63 RF Rudbeckia fulgida var. sullivantii 'Goldsturm'Goldsturm Black-Eyed Susan #1 2' H x 3' W
54 SS Sedum spectabile 'Autumn Joy'Autumn Joy Sedum #1 2' H x 2' W
20 VS Veronica spicata 'Purpleicious'Purpleicious Speedwell #1: 36" o.c.1.5' Hx 1.5' W
Mahonia repens
#1 - 36" o.c.
Veronica spicata 'Purpleicious'
#1 - 36" o.c.
Ajuga reptans 'Black Scallop'
#1 - 24" o.c.
LANDSCAPE LEGEND
QUANTITY
PLANT IDENTIFICATION KEY
TREES & PLANTS TO BE INSTALLED
TREES AND PLANTS PROPOSED IN
FINAL PLAT LANDSCAPE DRAWINGS
CUT EDGE AS DETAILED
PROPERTY LINE (VERIFY)
2
QC
PERENNIAL RYE AND
BLUEGRASS MIX TURF SOD
AND TOPSOIL AS SPECIFIED
2" MINUS CASCADE COMPOST
MULCH AT 3" DEPTH
AND TOPSOIL AS SPECIFIED
PROPOSED MAINTAINED LAWN
AREA TURF SOD AND TOPSOIL
- SEE FINAL PLAT LANDSCAPE
PLANS
LA-238STATE O F IDA
H
O
LICENS
E
D
LANDS C A P E ARCHITECTRODNEY P . EVAN
S
JR.C & O DEVELOPMENT, INC.
LANDSCAPE PLAN
21 AUGUST, 2020PINE 43 - DMB OFFICE
20134
Scale: 1" = 15'
DESIGN REVIEW
reandpartners.com + 208-514-3300 + 1014 S. La Pointe, Boise, Idaho 83706LANDSCAPE ARCHITECTURE+ URBAN DESIGN+ LAND PLANNING+ GRAPHIC COMMUNICATION+ PROJECT MANAGEMENT1.PROJECT BOUNDARY
2.VISION TRIANGLE
3.PROPOSED PARKING LOT
4.PROPOSED LANDSCAPING TO REMAIN (ROAD
FRONTAGE; COMMON LOTS, ETC. - SUBMITTED MAY
2020 FOR FINAL PLAT APPROVAL)
5.PROPOSED MONUMENT SIGN BY OWNER-(SUBMITTED
MAY 2020 FOR FINAL PLAT APPROVAL)
6.BIKE RACK - SEE ARCHITECTURAL SITE PLAN
7.SITE LIGHTING - TYP.
8.PROPOSED UNDERGROUND STORM WATER FACILITY
CALLOUT NOTES #CALLOUT NUMBERS
REFER TO NUMBERED
NOTES BELOW
L01
LANDSCAPE REQUIREMENTS
FOR SITE DATA - REFER TO THE ARCHITECTURAL SITE PLAN.
FOR ALL BUFFERS, SETBACKS AND STREET TREE REQUIRED -
REFER TO THE FINAL PLAT LANDSCAPE PLANS SUBMITTED MAY
2020 FOR FINAL PLAT APPROVAL.
LANDSCAPE REQUIREMENTS:
TOTAL NUMBER OF TREES: 9
TOTAL NUMBER OF TREE SPECIES REQUIRED: 2
5 SPECIES PROVIDED
PROVIDED PARKING LOT TREES - 6
LANDSCAPE NOTES:
1.CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION
OF THIS WORK, PRIOR TO BEGINNING WORK.
2.NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN APPROVAL. ALTERNATE
MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED PLANT MATERIALS CAN NOT BE OBTAINED.
3.COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS.
4.COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION START-UP.
5.ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS.
6.ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE
REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION.
7.IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND CALL OUT SYMBOL
NUMBERS.
8.ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF CASCADE COMPOST (2" MINUS). APPLY PRE-EMERGENT
HERBICIDE PRIOR TO MULCH APPLICATION. SUBMIT SAMPLE FOR APPROVAL.
9.ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY THE OWNER.
REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT
NO COST TO THE OWNER.
10.FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE DRAINAGE IN
ACCORDANCE WITH THE SITE CIVIL GRADING PLAN.
11.AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 SQUARE FEET.
ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL.
12.FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATIONS.
13.ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12" DEPTH OF TOPSOIL.
SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW ADJACENT SURFACES OF PLANTER BED
AREAS, 1-1/2" BELOW ADJACENT SURFACES OF TURF SOD AREAS, AND 1" BELOW ADJACENT SURFACES OF TURF SEED AREAS.
14.REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT.
VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM. PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL
AMENDMENT AS DETERMINED BY SOIL TESTS. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC
MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ONSITE
TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER:
A) PROVIDE APPROVED IMPORTED TOPSOIL, OR
B) IMPROVE ON-SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT.
15.IF IMPORTED TOPSOIL FROM OFF-SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL,
REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER
THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH.
A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THOSE FOUND ON THE
PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL-DRAINED SITES WHERE TOPSOIL OCCURS AT A DEPTH OF NOT
LESS THAN 4 INCHES.
B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL TEXTURE BY A RECOGNIZED
COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE
FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY
CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6.
16.IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF
PROPERLY OFF SITE.
17.TREES SHALL NOT BE PLANTED WITHIN 5'-0" FROM THE BACK OF SIDEWALK.
18.TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES, OR FACILITIES.
19.STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND
INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM.
20.IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
CONTACT INFORMATION
OWNER/DEVELOPER:
C&O DEVELOPMENT INC.
250 SOUTH BEECHWOOD DRIVE #120
BOISE, ID 83709
(208)-344-9515
ARCHITECT:
CSHQA
200 BROAD ST.
BOISE, ID 83702
(208)343-4635
LANDSCAPE ARCHITECT:
RODNEY EVANS
RODNEY EVANS AND PARTNERS, PLLC
1014 S. LA POINTE STREET, STE 3
BOISE, ID 83706
(208)514-3300
1
1
1
1
2
2
2
3
4 44
4
4
4
4
4
4
4
4 4
5
6
77
8
OFFICE F
10,500 SF
N. SUMMERBROOK AVE.
LA-238STATE O F IDA
H
O
LICENS
E
D
LANDS C A P E ARCHITECTRODNEY P . EVAN
S
JR.C & O DEVELOPMENT, INC.
LANDSCAPE PLAN
21 AUGUST, 2020PINE 43 - DMB OFFICE
20134
Scale: 1" = 15'
DESIGN REVIEW
reandpartners.com + 208-514-3300 + 1014 S. La Pointe, Boise, Idaho 83706LANDSCAPE ARCHITECTURE+ URBAN DESIGN+ LAND PLANNING+ GRAPHIC COMMUNICATION+ PROJECT MANAGEMENTDECIDUOUS TREE PLANTING4 NOT TO SCALE
SOIL LINE
ROOT FLARE TO BE AT SOIL LINE
NOTES:
1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM
ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY
BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL.
2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE
THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR
AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE
WARRANTY PERIOD.
3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
MATERIAL.
5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING
METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.
8.FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0" IN WIDTH, PROVIDE TREE ROOT BARRIER (DEEPROOT
#24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS
SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS, CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
REMOVE TREE WRAP TRUNK PROTECTION,
AFTER INSTALLATION
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
FINISH GRADE
PREVAILING WIND DIRECTION
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL
GROUNDCOVER PLANTING3 NOT TO SCALE
SECTION
PLAN VIEW
1.ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN.
2.APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER
BEDS.
NOTES:
FINISH GRADE PER PLANS
GROUNDCOVER PLANTING PER PLANTING PLAN
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED.
DO NOT COVER CROWNS OF PLANTS
TILL SOIL TO A DEPTH OF 12", BACKFILL WITH
APPROVED TOPSOIL AND SOIL AMENDMENTS, AS
SPECIFIED.
SUBGRADE
A = LENGTH, AS SPECIFIED
OR PER PLANT SCHEDULE
B = 85% OF 'A'
L02
1.ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH INSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR
REQUIRED WATER USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS.
2.PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO-ZONES.
3.POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS AND 18" AT PLANTER BEDS.
4.PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS GROUND COVERS OR SHRUB MASSINGS SHALL HAVE
A POP-UP SPRAY SYSTEM.
5.ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS:
a.PRECISE INDIVIDUAL STATION TIMING
b.RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES
c.AT LEAST ONE PROGRAM FOR EACH HYDROZONE
d.SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF
e.POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO
RESPECTIVE HYDRO-ZONES.
6.INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO-ZONES.
7.THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH TRIANGULAR SPACING.
8.SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS).
9.PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.C.V. LOCATIONS WITH LANDSCAPE ARCHITECT.
IRRIGATION NOTES:
1.ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDROSEEDING.
2.CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH “ROUND-UP” (CONTACT HERBICIDE) OR APPROVED EQUAL.
3.DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE.
4.CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD,
DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS.
5.APPLY SECOND APPLICATION OF “ROUND-UP” TO ALL EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND
INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE.
6.IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION.
7.AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE.
WEED ABATEMENT NOTES:
TREE MITIGATION NOTES:
NO EXISTING TREES TO BE MITIGATED.
TREE PROTECTION NOTES:
1.PROTECT THE CRITICAL ROOT ZONE (THE AREA DIRECTLY BELOW THE DRIPLINE OF THE TREE) OF THE TREES TO REMAIN ON SITE BY:
a.CONSTRUCTING A TEMPORARY CHAINLINK FENCE AROUND THE CRITICAL ROOT ZONE OF THE TREE TO BE PROTECTED PRIOR TO DEMOLITION,
CONSTRUCTION, OR ANY SITE WORK.
b.NOT ALLOWING COMPACTION BY EQUIPMENT TRAFFIC DURING CONSTRUCTION OR DURING DEMOLITION.
c.NOT ALLOWING CONCRETE TRUCKS TO RINSE WITHIN THE PROTECTION AREA, OR ANYWHERE NEAR EXISTING TREE ROOTS OR IN PLANNED PLANTING BEDS
AREAS. SEE EROSION AND SEDIMENT CONTROL PLAN FOR APPROVED CONCRETE WASHOUT AREAS.
d.NOT STOCKPILING MATERIALS, DEBRIS, OR DIRT WITHIN THE TREE PROTECTION AREA.
e.WATERING WITHIN THE CRITICAL ROOT ZONE FROM MID-APRIL TO MID-OCTOBER AT THE RATE OF NOT LESS THAN THE EQUIVALENT OF 1-1/2" OF WATER
OVER THE ENTIRE AREA PER WEEK.
f.NOT TRENCHING, EXCAVATING, FILLING, OR OTHERWISE DISTURBING THE SOIL WITHIN THE CRITICAL ROOT ZONE.
g.ADJUST PROPOSED IMPROVEMENT LOCATIONS AS REQUIRED TO AVOID DAMAGING TREE ROOTS.
2.PROTECT THE CROWN AND TRUNK OF TREES TO BE RETAINED BY:
a.OPERATING EQUIPMENT IN SUCH A WAY AS TO AVOID CONTACT WITH TREE TRUNKS OR BRANCHES.
b.HAVING TREES PRUNED BY A LICENSED ARBORIST.
3.ALL TREES THAT ARE DAMAGED, DESTROYED OR REMOVED DURING CONSTRUCTION SHALL BE MITIGATED USING THE MITIGATION STANDARDS PER THE MERIDIAN
CITY CODE AS PER SECTION 11-3B-10.
4.
5.SEE TREE MITIGATION NOTES FOR ADDITIONAL INFORMATION.
SHRUB PLANTING2 NOT TO SCALE
1.SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY.
2.WATER SHRUB TWICE WITHIN FIRST 24 HOURS.
3.THIN BRANCHES AND FOLIAGE BY 13.
4.DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE.
5.FOR CONTAINER GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED
VERTICAL CUTS.
NOTES:
REMOVE ANY PLASTIC, BURLAP, NAILS, OR OTHER
MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT
ROOT GROWTH
CONSTRUCT 2" EARTH BERM TO FORM A WATER
RETENTION BASIN, FILL BERM WITH MULCH, AS
SPECIFIED
MULCH, PER PLANS, 3" DEPTH OVER ENTIRE BED. DO
NOT COVER CROWNS OF PLANTS
PROVIDE COMMERCIAL FERTILIZER TABLETS AND
BIOSTIMULANT, AS SPECIFIED, FOR EACH SHRUB
BACKFILL WITH APPROVED TOPSOIL AND SOIL
AMENDMENTS, AS SPECIFIED. BACKFILL IN 6" LIFTS,
WATER EACH LAYER, DO NOT TAMP OR OVER
COMPACT.
CONSTRUCT 6" MOUND OF TOPSOIL
PLANTER BED CUT EDGE
(TYPICAL AT TREES IN TURF AREAS)1 NOT TO SCALE
APPROVED TOPSOIL AND SOIL
AMENDMENTS AS SPECIFIED
3" DEPTH OF MULCH AT PLANTER
BEDS
FINISH GRADE,
PER PLANS
CONIFEROUS TREE PLANTING5 NOT TO SCALE
SOIL LINE
ROOT FLARE TO BE AT SOIL LINE.
REMOVE DEAD/DAMAGED BRANCHES AND
PRUNE TO INTERNATIONAL SOCIETY OF
ARBORICULTURE STANDARDS; IMPROPERLY
PRUNED TREES (AS DETERMINED BY THE
LANDSCAPE ARCHITECT) SHALL BE REMOVED
AND REPLACED. DO NOT REMOVE MAIN
LEADER!!
RUBBER CINCH TIE
2"x 2" WOOD STAKE (LENGTH AS
REQUIRED)-DO NOT PENETRATE ROOTBALL.
SEE NOTE 1. SET STAKES PARALLEL TO
PREVAILING WIND.
CONSTRUCT 2" EARTH BERM AT EDGE OF
ROOTBALL, FILL TREE RING W/ MULCH, AS
SPECIFIED.
3" THICK MULCH LAYER, KEEP MULCH 3" AWAY
FROM TRUNK.
FINISH GRADE
PREVAILING WIND DIRECTION
COMMERCIAL SLOW RELEASE FERTILIZER
TABLETS
SIDES OF HOLE ROUGH & UNEVEN
BACKFILL WITH APPROVED TOPSOIL AND
SOIL AMENDMENTS AS SPECIFIED.
BACKFILL IN 6" LIFTS, WATER EACH LAYER,
TAMP LIGHTLY AS REQUIRED, BACKFILL
SOIL EVEN W/ TOP OF ROOTBALL,
DO NOT OVER COMPACT!!
SET ROOTBALL ON NATIVE, UNDISTURBED
SOIL
NOTES:
1.REMOVE BURLAP, TWINE, AND WIRE BASKET FROM TOP 2 3 OF ROOTBALL. REMOVE ALL NAILS, TIES, AND PLASTIC FROM
ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY
BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL.
2.THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER, THE CONTRACTOR IS RESPONSIBLE TO ENSURE
THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR
AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE
WARRANTY PERIOD.
3.IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS, THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE
ARCHITECT BEFORE PROCEEDING.
4.LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT
MATERIAL.
5.WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING
METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE.
6.WATER TREE TWICE WITHIN THE FIRST 24 HOURS.
7.IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY.