Landscape Plan_Page_2LANDSCAPE REQUIREMENTS:
PER CITY OF MERIDIAN IDAHO MUNICIPAL CODE
PERIMETER BUFFER & STREET TREES:
*1 TREE PER 35 LINEAL FEET
STREET LENGTH (LF) TREES REQUIRED TREES PROVIDED
AMITY RD. 147' 4 4
PARKING:
* (1) TREE PER PARKING ISLAND THAT SERVES A SINGLE ROW OF PARKING SPACES OR TERMINAL
PLANTER AT END OF EACH ROW, (2) TREES AT PARKING ISLANDS THAT SERVE A DOUBLE ROW OF
STALLS.
* EVERGREEN TREES AND CLASS III TREES ARE PROHIBITED IN INTERIOR PLANTERS.
PLANTERS TREES REQUIRED TREES PROVIDED
5 5 5
MINIMUM PLANT SIZES:
PLANT TYPE:
MINIMUM SIZE
• EVERGREEN TREES:
6-0" HT. MIN.
• ORNAMENTALTREES:
2" CALIPER MIN.
• SHADE TREES:
2" CALIPER MIN.
• WOODY SHRUBS:
2 GAL. POT MIN.
ADDITIONAL REQUIREMENTS
* "TREES SHALL NOT BE PLANTED WITHIN 10' OF ACHD STORM DRAIN PIPE, STRUCTURES OR
FACILITIES", or 10' WITHIN A FIRE HYDRANT
* SEEPAGE BEDS MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE
CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM
* NO TREES OR SHRUBS OVER 36" HIGH SHALL BE PLANTED WITHIN THE 401X40' CLEAR VISION
TRIANGLES AT INTERSECTIONS
* ROCK MULCH IN PLANTER BEDS SHALL COVER EXPOSED CONCRETE FROM POSTS SONOTUBE
FOOTINGS, CONCRETE SHALL NOT BE EXPOSED.
NOTES:
1. DO NOT DAMAGE OR CUT LEADER
2. DO NOT DISTURB ROOT OR DAMAGE ROOT BALL WHEN INSTALLING TREE OR TREE STAKES.
3. TREE STAKING SHALL BE AT THE DISCRETION OF CONTRACTOR. HOWEVER ANY TREES DISTURBED FROM
PLUMB DURING THE PLANT WARRANTEE PERIOD WILL BE REPAIRED OR REPLACED AT CONTRACTOR'S
EXPENSE.
4. WATER PLANTS THOROUGHLY IMMEDIATELY AFTER INSTILLATION.
5. REMOVE ALL BURLAP, TWINE, ROPE, OR MATERIAL FROM THE TOP a OF THE ROOTBALL.
6. 4' DIAMETER PLANTER BED/MULCH RING AROUND THE TRUNK OF THE TREE. 3" OF MULCH MIN. DO NOT
PLACE MULCH WITHIN 2" OF TRUNK OF TREE.
TOP TWO STRUCTURAL
ROOTS: <3" BELOW TOP OF
ROOTBALL.
LOWEST STRUCTURAL ROOT:
<5" BELOW TOP OF ROOT
BALL
FINISHED MATERIAL
PER PLAN
SOIL SAUCER >3" HIG
REMOVE AT COMPLETION
PROJE(
CUT AND FOLD W
BASKET FROM TOP...
ROOTBALL
VISIBLE ABOVE SOIL
LINE
. LINE OF THE TOP OF
dE ROOT BALL AFTER
LOVING EXCESS SOIL.
2-3" OF MULCH
BACKFILL MIX SEE
NOTES AND
SPECIFICATIONS.
uOMPACT SOIL UNDER
ROOTBALL TO 90% PROCTOR.
BALL AND BURLAP TREE PLANTING
3/4" = V-0"
329343.33-04
NOTE:
REMOVE ALL TAGS, TWINE OR
OTHER NON BIODEGRADABLE
MATERIALS ATTACHED TO PLANT OR
ROOT MASS.
FOLD BURLAP FROM TOP
OF ROOT BALL DOWN
INTO GROUND, SET TOP
OF BALL FLUSH WITH
FINISH GRADE
12" TO 18" FOR y/
LARGER SHRUB
ROOT BALLS,
MAKE DEPTH MIN.
4" DEEPER THAN
BALL)
SOIL SURFACE
ROUGHENED TO
BIND WITH NEW SOIL
SHRUB PLANTING
1" = V-0"
BACKFILL SHALL BE 100% TOPSOIL.
WATER SETTLE ALL PLANTINGS TO
ENSURE PLANT ROOTBALL
MAINTAINS2'" HEIGHT ABOVE
EXISTING SOILS WHEN COMPLETE.
MULCH 2" MIN.
AWAY FROM TRUNK
OF PLANT.
3" DEEP MULCH MIN.
FINISHED MATERIAL
PER PLAN
BALL AND BURLAP PLANT (IF
CONTAINER -GROWN PLANT
WITH ROOTS LOOSENED AND
PULLED OUT TO PREVENT
PLANT FROM BECOMING ROOT
BOUND)
329333.16-01
LANDSCAPE NOTES:
1. REGULATIONS & STANDARDS
1.1. All contractor work shall be conducted in
accordance with ISPWC (Idaho Standard
Public Works Construction), 2019, and City
of Meridian, ID codes, standards and state
and local regulations.
2. EXISTING CONDITIONS
2.1. All utilities shall be located prior to
construction and protected. Any damage to
structures, utilities or concrete will be
replaced at contractor's expense.
2.2. The site has many existing improvements
such as underground utilities, curb and
gutter, light poles and sidewalks.
2.3. See Engineer's plans for information about
existing features; all drainage pipes and
locations. Protect and retain drainage at all
times.
3. GRADING & SITE PREPARATION
3.1. Prepare finish grades for planting by
grubbing and removing weeds. If necessary
apply Round -Up (or equivalent herbicide),
using a certified applicator. Remove rocks
and other materials over 2".
3.2. All gravel overprep to be removed and
disposed of off site.
3.3. Finish grade to be smooth transition to allow
for entire site to be a natural flowing space.
3.4. Refer to Engineer's plans for grading
information & for all drainage pipes and
locations. Protect and retain drainage at all
times.
3.5. No pooling or standing water will be
accepted per industry standards.
4. SOILS
4.1. All planter beds to receive a minimum of 18"
depth of screened topsoil. Spread, compact,
and fine grade to smooth and uniform grade
2.5" below adjacent surfaces.
FINISH GRADE AT LAWN, AND
PLANTER Z' BELOW TOP OF
STEEL EDGER.
12" LONG METAL ANCHOR
STAKES INSTALLED @48"
O.C.. AND AT EACH END.
4.2.
All lawn areas to receive a minimum of 12"
depth of screened topsoil. Spread, compact,
and fine grade topsoil to a smooth uniform
grade 1" below adjacent surfaces.
4.3.
Reuse of existing topsoil that has been
stockpiled on site is permitted if:
4.3.1.
Topsoil is tested and analyzed to ensure a
proper growing medium. Provide
additional amendments as determined
by soil tests. And
4.3.2.
Topsoil is to be loose, friable sandy loam
that is clean and free of toxic materials,
noxious weeds, weed seeds, rocks,
grass or other foreign materials.
4.3.3.
Topsoil should have a pH of 6.5 to 8.
4.3.4.
If on site topsoil does not meet these
minimum standards contractor is
responsible for providing approved
imported topsoil or improving onsite
topsoil per the approval of the project
manager.
4.4.
If imported topsoil is used it must be from a
local source and be screened free of any
debris or foreign matter. Topsoil must not
contain rocks, sticks, lumps, or toxic matter.
4.5.
Smooth, compact, and fine grade topsoil in
lawn areas to smooth and uniform grade .5"
below adjacent surfaces.
4.6.
Prepare finish grade of topsoil to elevations
set by Engineer's plans with positive
drainage away from structures. Refer to Civil
Engineer's plans for grading information.
4.7.
Amend all new plantings with 2 parts topsoil
and 1 part compost.
5. PLANTER
BED MULCH
5.1.
All planter beds to receive 3" depth of tan
rock mulch, or approved other. Apply
pre -emergent prior to placing mulch, apply
per manufacturer recommendations.
14 GUAGE 4" X 10' COMMERCIAL STEEL
EDGING. POWDER COATED BLACK.
STEEL LANDSCAPE EDGING
3" = V-0"
PLANTER FINISH GRADE 4'
BELOW TOP OF EDGER.
6. PLANTS
6.1. All plant material shall be installed per
industry standards.
6.2. All plant material shall meet or exceed the
minimum federal standards as regulated by
ANSI z60A American Standard for Nursery
Stock. Plants not meeting these standards
for quality, or plants determined to be
unhealthy by Owner's representative, will be
rejected.
6.3. All trees and shrubs to be installed per
details.
6.4. Fertilize all trees and shrubs with'Agriform'
planting tablets or approved equal. Apply per
manufacturers recommendations.
6.5. All plants shall adhere to plant schedule,
species & sizes. Any necessary subsitutions
due to availability or alternatives shall be
coordinated to the landscape architect via
submittal.
7. IRRIGATION
7.1. Irrigation system shall be built to the
following specifications:
7.2. Adhere to city codes when connecting to city
water.
7.3. All irrigation material to be new with
manufacturers' warranty fully intact.
7.4. All remote control valves (including master
control valve) to have flow control device.
7.5. Install outdoor rated controller. Coordinate
with general contractor on exact location.
7.6. Controller to include On/Off rain switch or
other rain shut off device that does not alter
program.
7.7. Irrigation system piping to be minimum class
200 PVC or approved equal, sleeves to be
double the size of pipes located within, all
wires to be contained in separate sleeves
1-1/2" dia min.
7.8.
Use common trenching where possible.
7.9.
All PVC located under hardscapes to be
schedule 40 PVC with same req's as above.
7.10.
All mainline pipe and wires to be buried a
minimum of 18" and all lateral piping to be
buried a minimum of 12" below grade.
7.11.
All wires to be 14 gauge direct bury wire at a
minimum. Size wire for correct voltage loss.
7.12.
Supply a minimum of (2) spare wires to
furthest valves from controller in all
directions.
7.13.
Sprinkler heads shall have a matched
precipitation within each control circuit.
Velocities shall not exceed 5 feet per second.
7.14.
Contractor is responsible complying with all
codes and paying all permits necessary.
7.15.
Sprinkler heads shall have matched
precipitation within each control circuit.
Velocities shall not exceed 5 feet per second.
8. CONTRACTOR RESPONSIBILITIES
8.1.
Estimated quantities are shown for general
reference only. Contractor shall be
responsible for all quantity estimates.
8.2.
All plant material and workmanship shall be
guaranteed for a period of one year
beginning at the date of Acceptance by
Owner. Replace all dead or unhealthy plant
material immediately with same type and
size at no cost to Owner.
8.3.
Landscape contractor to turn in as built
drawings at the end of project. Substantial
completion will not be granted until 2 copies
@ 1 '=10' scale are turned in and approved
by owner's representative.
9. In the event of a discrepancy, notify the General
Contractor.
NOTE:
*CURB & ADJACENT PAVEMENT PER CIVIL OR HARDSCAPE PLANS
*TREE & SHRUB TO BE INSTALLED PER RESPECTIVE DETAILS
*PLANTS & MULCH PER PLAN
MOUND PLANTER 3.5"
ABOVE TOP OF CURB
PROVIDE V MIN STEP SPACE
FOR ADJACENT PARKING
EACH SIDE, TYP
FINISHED GRADE .5"
BELOW TOP OF
CURB, TYP
FG 4 A
PLANTER ISLAND DETAIL
3/4" = V-0"
TOP SOIL DEPTH AS
SPECIFIED
TOP SOIL DEPTH AS
SPECIFIED
CURB, 6" OR
OTHER PER
CIVIL, TYP
FG
DETAIL -FILE
COLE
/ARCHITECTS
1008 W Main St
Boise, Idaho 83702
208.345.1800
colearchitects.net
Copyright @ 2019 Cole Architects, PLLC
STAMP
CONSULTANT
STACK ROCK
CCvRGUP
LANDSCAPE ARCHITECTURE &
MASTER PLANNING
404 S 8th St. #154, Boise, ID 83702
(208) 345-0500, Stack RockGroup.com
PROJECT INFORMATION
CLAYTON
GRIFFITHS DENTAL
OFFICE
3809 E. AMITY RD.
MERIDIAN. ID 83642
KEY PLAN
ISSUES
PHASE SCHEMATIC DESIGN
DATE 6/24/2020
JOB NUMBER 20-018
MARK DATE DESCRIPTION
SHEET NAME
LANDSCAPE
NOTES & DETAILS
SHEET NUMBER
Ll m50