Loading...
ACHD Transmittal (A-2020-0129)(ETIDj1AN11___1_1' Type of Review Requested Planning Division ADMINISTRATIVE APPLICATIOT Administrative File number: A-2020-0129 Assigned Planner: Cameron Scott Related Files: Applicant Information Applicant name: GERRY ARMSTRONG, ARMSTRONG CONSULTING Phone: 2088537448 Applicant address: 11081 W MOSSYWOOD DR zip: 83709 Email: armstrong7448@msn.com Owner name: Owner address: Agent name (e.g. architect, engineer, developer, representative): Firmname: ARMSTRONG CONSULTING Address: 11081 W MOSSYWOOD DR Contact name: Contact address: Subject Property Information Location/street address: 2675 E LANARK ST Assessor's parcel number(s): R6510590100 Township, range, section: 3N 1 E8 Project Description Zip: GERRY ARMSTRONG Phone: Email: Fax: Phone: 2088537448 Fax: zip: 83709 Email: armstrong7448@msn.com Phone: Zip: Email: Project/Application Name: KB Fabrication and Welding - ALT, DES, CZC Fax: Description of Work: Industrial Use, Form It, Shear It, Roll It, Cut It, Punch It, Bend It, Cope It, and Lift It state of the art machinery. 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org 1 Application Information APPLICATION TYPES Is this application exempt from fees?: No Alternative Compliance - ALT: CHECKED Certificate of Zoning Compliance - CZC: CHECKED Does project have prior approval?: No Design Review - DES: CHECKED TYPE OF USE PROPOSED Industrial: CHECKED PROPERTY INFORMATION General Location: 2675 E. Lanark S Current Land Use: I-L Total Acreage: 2.77 Acres ZONING DISTRICT(S) I-L: CHECKED PROJECT INFORMATION Site Plan Date (MM/DD/YYYY): June 2020 Landscape Plan Date (MM/DD/YYYY): June 2020 Elevations Date (MM/DD/YYYY): June 18, 2020 Percentage of Site Devoted to Building: 9.5% Percentage of Site Devoted to Landscaping: 5.4% Percentage of Site Devoted to Paving: 12.8% Who will own and Maintain the Pressurized Irrigation System in this Development: KB Irrigation District: Meridian Primary Irrigation Source: Snyder Lateral Secondary Irrigation Source: na Square Footage of Landscaped Areas to be Irrigated by City Water Connection: None Proposed Building Height: 32.5 feet Gross Floor Area Proposed: 11,500 Number of Standard Parking Spaces Provided: 25 Number of Compact Parking Spaces Provided: 0 Number of Employees: 7 Number of Residential Units: 0 Minimum Square Footage of Living Area (Excluding Garage): 0 Gross Density: NA Net Density: NA In Reclaimed Water Buffer: No TIME EXTENSION INFORMATION Number of months extension: 24 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org 2 APPLICATION DISCLAIMER I have read and accept the above terms: Your signature: CHECKED Gerry L Armstrong 33 E Broadway Avenue, Suite 102 • Meridian, Idaho 83642 Phone: (208)884-5533 • Facsimile: (208) 888-6854 • Website: www.meridaincity.org - 19 .j I L, ';AO74:OM4'W A p6C;jj �ON Iq vi W .11,n Hl;d -m on VAN N N-14 5z HA LL71M ao km y Ij I pit V 4 'a , �., A A j A 44 Ls .5 d. 4 PLI 31 W\ �� L! p 7iL. 16 Covell 'Iwo Is[- 73umv mr, N 4Sa r � A- J A hr f+II ` if i ,„ � ✓ � j pp I i it W� 'rTSNIC77-7/VI S 1rnrl 1)49V1 L1 LI su+Arlr.W.+4r,.r.. ww4 wo AN ay.nmlww+wxru.lw+e �E 8 4 - ti� $ ,Cyr' 3d A N ? L f : iL r R p��w slip �- -� N.'� ii- �R�3a�n�- � � �`h fug 'k aqyy'. Y)� �Akc Es+� a ain4yp7!�4r YF� ��,'�!'�•fi L. 4F`F�YPf �L-"��T_��'�� '��'�iP7�� l ���i.•6a5(goz}c�,Ynl'�s�oa'�nnyOnccMA�rri M tiootl ��1ll.li�,ySylav�� t�H'dli ' �IJI�II?}�W `1']�U1S `d�}31�i� 1C'G� eL9� wham TA%73lm,%v NoflV")IN�b`J ION .1 dr — �r++rw�uMrrw°nwwr --qI tt4114' �smewr�r ' H nos MINA , RMSTRONG 11081 W Mossywood Dr. Consulting armstrong7448@msn.com Boise Idaho 83709 Phone: 208-853-7448 June 15, 2020 City of Meridian Planning Division — Design Review Meridian I❑ Re: K13 FABRICATION & WELDING, L.L.C., 2675 E. Lanark Street, Meridian ID 83642 To the Planning Division: We are submitting this application for an "Administrative Design Review" on behalf of ICB Fabrication & Welding, L,L.C, This project is to be located at 2675 E. Lanark Street, Meridian, Idaho 83642. On Lot 5 and Lots 6, Block 3 of Olson and Bush Subdivision No, 3, Total of 2.77 acres currently zoned I-L, non-residential standards/Industrial Districts. NO CHANGE OF USE IS PROPOSED FOR THESE PARCELS. This use is to do fabrication and welding structural metal, guard rails, metal stairs, grates, plasma cutting, bending and roiling metal which are approved uses in this zone. This project meets or exceeds the "Architectural Standards Compliance Checklist" All items checked are Included on the attached drawings provided for ease of review. A proposed sign design is provided as a part of this submittal in color as Attachment "A". A complete set of scaled plans, including building elevations, with building materials, colors and textures as well as the site plans with landscaping, mechanical equipment are included within the shop building shell and will be screened utilizing landscaping for the office building located at the north side of the property, This project addresses the standards contained in the "City of Meridian Architectural Standards Manual` and the "Unified Development Code" (UDC) and explanatlon.givers•on the attached drawings as noted. This new building complex is larger than the current business that is now located at 1970 W. Franklin Blvd., Meridian, Idaho. The new shop will be 9,000 square feet and the new office building will contain 2,500 square feet, The current business is a total of 9,000 square feet. The business profile may be viewed on the internet. It is understood that your Planning Division will provide us with the applicable fee amount after submittal. 5ihcer , Cerr rmstrong Attachment Armstrong Consulting ARAASTRONG 11081 W Mossywood Dr. Consulting armstrong74481)msn.com Base Idaho 83709 Phone., 208-853-7448 July 20, 2020 City of Meridian Planning Division Meridian, Idaho 83642 Re: Alternative Compliance — KB Fabricating & Welding LLC, 2675 E. Lanark St,, Meridian ID To the Planning Division: We are submitting this application to be reviewed concurrent with of "Design Review Application" and our "Certificate of Zoning Compliance Application" now in process with the Planning Division on behalf of KB Fabrication & Welding, LLC. The Affidavit of Legal Interest, signed and notarized, has been sent as a part of our CZC Application. The specific requirements that are proposed to be modified are that the current parcel of land along our west property line is currently zoned in Ada County as A-1 along with three (3) parcels along our entire southern {property lines are also zoned as R-1 in the county. All of these parcels lie along the existing Snyder lateral and border our existing land zoned I-L as well as are contiguous to C-G zoned land to the west and east along the E. Franklin Road Corridor. This would cause a hardship by reducing our property along the entire west and south property lines to provide a 2.5-foot residential buffer as well as a solid screen plastic fence set back this 25 feet greatly reducing the amount of storage area for this fabrication and welding business to function. The City of Meridian Land Use Plan adopted by the Mayor and City Council shows this land as Planned Commercial and E. Franklin Road designated as a Planned Commercial Arterial. in addition, the existing cul-de-sac constructed at the west end of E. Lanark Street is designated on our plat as a temporary turn around. The Meridian Land Use Plan shows that E. Lanark Street has been planned to extend through the property along the west of the KB property to the Meridian Academy property and designated as an Industrial Collector that will align at an angle to E. Lanark Street west of the Meridian Academy land. In addition, a proposed connection shows connecting the E. Lanark Street Industrial Collector to a new Industrial Collector next to Meridian Academy to the south connecting with E. Franklin Road. We are looking at the future land use already designated as the superior means of meeting the intent and purpose of land planning for this area of Meridian. City of Meridian Planning Division July 20, 2020 Page two Attached is the Google color aerial vicinity map showing the land connections through this area. In addition, copies of the current zoning map approved by the City of Meridian and City Council as well as a copy of the approved land Use Plan are also attached. We respectfully request the formalization of our Alternative Compliance. Thank you in advance for your favorable approval to eliminate the need for a 25-foot residential buffer along the west and south property lines. Sincerely, Gerry A mstrong Armstrong Consulting Attachments