Loading...
Z - Project Final Acceptance LetterMayor Robert E Simison E IDIANCity Council Members: Treg 8ernt Brad Hoaglun Joe Borton Jessica Perreauit Luke Cavener Liz Strader September 29, 2020 Mr. Marvin Remmich VERTICAL CORP MCMILLAN STORAGE, LLC 300 E. 35TH ST 701 ST. GEORGE ROAD GARDEN CITY, ID 83714 DANVILLE, CA 94526 RE: McMillan Storage Units Subdivision — Final Acceptance Dear Mr. McCollum: Installation of this project's sanitary sewer and/or domestic water systems has been satisfactorily completed in accordance with the approved plans. These systems have passed the required testing in accordance with City of Meridian Standard Specifications and Drawings, and therefore are hereby accepted by the City for ownership and normal maintenance. Record drawings submitted to us for this project are also accepted and are being forwarded to the Idaho Department of Environmental Quality. The engineer of record is responsible for certification of the record drawings as to horizontal and vertical location of all public water and sewer facilities installed. In accordance with the City of Meridian's Unified Development Code §11-5C-3, and the City of Meridian's Supplemental Specifications and Drawings to the Idaho Standards for Public Works Construction, Current Edition, the installation and materials of the sewer and domestic water systems are to be warranted against defect by the owner for a period of two -years from the date of this letter. Sincerely, Warren Stewart, P.E. City Engineer cc. City Clerk PW - Water Division PW - Wastewater Division PW - Construction Division File Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642 Phone 208-898-5500. Fax 208-898-9551 . www.meridiancity.org