CC - Storm Drainage CalcsPO BOX 6059 BOISE, ID 83707 (208) 946-3874 cgraham@cswengineering.com STORM DRAINAGE REPORT AND CALCULATIONS FOR EDINGTON COMMONS SUBDIVISION NO. 1 3610 N. LINDER ROAD MERIDIAN, IDAHO PREPARED BY: CORINNE M GRAHAM, PE September 14, 2020 INTRODUCTION The existing 7.73-acre site for the Edington Commons Subdivision No. 1 is currently vacant agricultural ground. The proposed development includes 45 single family residential lots, 9 common lots, and associated public roads, landscaping, and utilities. HISTORIC DRAINAGE The existing project site sits northeast of the intersection of N. Linder Road and W. Ustick Road in Meridian. The Coleman lateral, an irrigation lateral owned by Settlers Irrigation District, lies in the northern part of the site. Historically the site drains from south to north towards the Coleman Lateral. Surficial soils are comprised of fat clays. At depths of 4-5 feet, free draining gravels with silt and sand were encountered during geotechnical exploration. Groundwater was encountered at depths of 6.9 -8.7’ during geotechnical exploration and groundwater readings over the past year indicate groundwater depths as shallow as 5.5’. The shallow depth to groundwater limits the suitability of standard infiltration facilities. Therefore, shallow infiltration facilities are proposed to store and treat stormwater runoff. PROPOSED DRAINAGE The storm drainage calculations and design for the proposed improvements are intended to meet the requirements of ACHD’s storm water policy. Storm water facilities are designed to store and treat runoff from a 100-year storm event and to pretreat the water quality volume defined as the 80th percentile storm event. Storm water runoff from 45’ behind the sidewalk, including residential driveways, will be conveyed to the public stormwater system to be owned and maintained by ACHD. Remaining lot drainage will be contained within individual lots. Basin #1 storm water runoff is conveyed via curb and gutter to drain inlets within the roadway then piped to a vertical sand filter. The water quality storm event is conveyed through a sand and grease trap to the treatment bed where it is filtered through the vertical sand filter. The 25-year storm event bypasses the sand and grease trap and is conveyed directly to the percolation bed. The 100-year storm event is designed to overflow into the large open park space then recede back into the percolation bed for infiltration. Storm water runoff for the remaining basins is conveyed via curb and gutter to shallow drain inlets within the roadway then conveyed to three bioretention swales where it is stored and infiltrated. APPENDICES • Drainage Basin Map • Storm Drainage Calculations • Project Geotechnical Report SD SD M M(D,1*721&2MM21SS8%12 D5$,1$*(%$S,1M$3 PO BOX 6059 BOISE, ID 83707 Ph: (208) 946-3874 cgraham@cswengineering.com Prepared By: Corinne Graham, PE September 14, 2020 ACHD Basin Characteristics C Values Impervious = 0.90 Landscape = 0.20 Basin #1 Basin #2 Basin #3 Basin #4 Total Area (SF) 56736 28330 45870 48256 Roadway Area (SF) 17236 9505 16502 14506 Sidewalk Area (SF) 4656 2926 3671 3583 House/Driveway Area (SF) 14940 8986 13119 17880 Landscape Area (SF) 19904 6913 12578 12287 C Value: 0.65 0.73 0.71 0.72 Catch Basin Calculations CB #1A CB #1B Total Area (SF) 39076 17660 Roadway Area (SF) 10074 7162 Sidewalk Area (SF) 2369 2287 House/Driveway Area (SF) 14940 0 Landscape Area (SF) 11693 8211 C Value: 0.69 0.57 Edington Commons Subdivision Ph1 Storm Drainage Calculations Steps for Peak Discharge Rate using the Rational Method calculated for post‐development Calculate Post‐Development Flows (for pre‐development flows, increase number of storage facilities to create new tab) User input in yellow cells.  1 Project Name 2 Is area drainage basin map provided?YES (map must be included with stormwater calculations) 3 Enter Design Storm (100‐Year or 25‐Year With 100‐Year Flood Route)100 4 Enter number of storage facilities (25 max)1 Click to Show More Subbasins Subbasin   1 Subbasin 2 Subbasin  3 Subbasin  4 Subbasin  5 Subbasin  6 Subbasin  7 Subbasin  8 Subbasin  9 Subbasin  10 5 Area of Drainage Subbasin (SF or Acres)SF 17,236 4,656 14,940 19,904  Acres 1.30  6 Determine the Weighted Runoff Coefficient (C) 0.90 0.90 0.90 0.20  C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.65  7    I100, TC<=60 8 i 2.58 2.58 in/hr 9 Qpeak 2.20 2.20 cfs 10 V 2,946 2,946 ft3 V = Ci (Tc=60)Ax3600 11  Enter Percentile Storm I (95th percentile = 0.60 in)80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60‐in x Area x C)Vrr 1,043 1,043 ft3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable)0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 295 ft3 Primary Treatment/Storage Basin V 2,651 ft3 Subsurface Storage In Common Lot ‐ No Sediment Factor Required V 2,946 2,946 ft3 Determine the average rainfall intensity (i) from IDF Curve based on  Calculate the Post‐Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume ‐ Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.  These  calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. ACHD Basin #1 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default  10 min Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:51 AM Steps for Seepage Beds #REF! #REF! 1 Project Name 2 Enter number of Seepage Beds (25 max)1 3 Design Storm 100 #REF! 4 Weighted Runoff Coefficient C 0.65 Link to: 5 Area A (Acres)1.30 acres 6 Approved discharge rate (if applicable)0.00 cfs 7 Design Volume V 1,043 1,043 ft3 Water Quality Runoff 8 Set Total Design Width of All Drain Rock W 8.0 ft 9Set Total Design Depth of All Drain Rock D 3.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"‐2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰)Dia pipe 18 in 0.9  13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 11.4 ft3/ft Spf=Apf=WxD‐APerf_PipexVoids+1/2 Perf_Area 15 Calculate Design Length L 93 96 ft 0 Override Value Required for Chambers 16 Variable Infiltration Window LSWL96 ft 17 Variable Infiltration Window WSWW8.0 ft 18 Time to Drain 1.8 hours 90% volume in 48‐hours minimum OK 19 Length of WQ & Overflow Perf Pipes 96 ft 20 Perf Pipe Checks. Qperf >= Qpeak; #REF! where Qperf=CdxAx√(2xgxH)d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout.  1Type of Chambers 1‐StormTech,  SC740 2Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4Chamber Void Factor 5Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7Total Number of Units Required 0ea 8Area of Infiltration Aperc ft2 9Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0!hours 90% volume in 48‐hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers #REF! Note this spreadsheet pulls information from the "Peak Q,V" tab ACHD Basin #1 ‐ Percolation Bed (WQ Volume) C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:54 AM Steps for Seepage Beds #REF! #REF! 1 Project Name 2 Enter number of Seepage Beds (25 max)1 3 Design Storm 100 #REF! 4 Weighted Runoff Coefficient C 0.65 Link to: 5 Area A (Acres)1.30 acres 6 Approved discharge rate (if applicable)0.00 cfs 7 Design Volume V 1,074 1,074 ft3 25‐year minus WQ 8 Set Total Design Width of All Drain Rock W 8.0 ft 9Set Total Design Depth of All Drain Rock D 3.5 ft Rock Only, Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"‐2" drain rock and 3/4" Chips 11 Design Infiltration Rate (8 in/hr max) Perc 8.00 in/hr 12 Size of WQ Perf Pipe (Perf 180⁰)Dia pipe 18 in 0.9  13 Size of Overflow Perf Pipe (Perfs 360⁰), REQD if Q100>3.3 cfs in 14 Calculate Total Storage per Foot Spf 11.4 ft3/ft Spf=Apf=WxD‐APerf_PipexVoids+1/2 Perf_Area 15 Calculate Design Length L 96 96 ft 0 Override Value Required for Chambers 16 Variable Infiltration Window LSWL96 ft 17 Variable Infiltration Window WSWW8.0 ft 18 Time to Drain 1.9 hours 90% volume in 48‐hours minimum OK 19 Length of WQ & Overflow Perf Pipes 96 ft 20 Perf Pipe Checks. Qperf >= Qpeak; #REF! where Qperf=CdxAx√(2xgxH)d 0.0313 ft Optional Storage Chambers Note: This assumes chambers are organized in a rectangular layout.  1Type of Chambers 1‐StormTech,  SC740 2Volume to Store V 0 ft3 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4Chamber Void Factor 5Chamber Storage Volume, Without Rock, Per Manuf 45.90 ft3/Unit 6Chamber Storage Volume, With Rock, Per Manuf 74.90 ft3/Unit 7Total Number of Units Required 0ea 8Area of Infiltration Aperc ft2 9Volume Infiltration Vperc 0 ft3/hr 10 Time to Drain #DIV/0!hours 90% volume in 48‐hours minimum #DIV/0! ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers #REF! Note this spreadsheet pulls information from the "Peak Q,V" tab ACHD Basin #1 ‐ Percolation Bed (25‐year volume minus WQ) C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:54 AM Steps for Peak Discharge Rate using the Rational Method calculated for post‐development Calculate Post‐Development Flows (for pre‐development flows, increase number of storage facilities to create new tab) User input in yellow cells.  1 Project Name 2 Is area drainage basin map provided?YES (map must be included with stormwater calculations) 3 Enter Design Storm (100‐Year or 25‐Year With 100‐Year Flood Route)100 4 Enter number of storage facilities (25 max)1 Click to Show More Subbasins Subbasin   1 Subbasin 2 Subbasin  3 Subbasin  4 Subbasin  5 Subbasin  6 Subbasin  7 Subbasin  8 Subbasin  9 Subbasin  10 5 Area of Drainage Subbasin (SF or Acres)SF 9,505 2,926 8,986 6,913  Acres 0.65  6 Determine the Weighted Runoff Coefficient (C) 0.90 0.90 0.90 0.20  C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.73  7    I100, TC<=60 8 i 2.58 2.58 in/hr 9 Qpeak 1.22 1.22 cfs 10 V 1,639 1,639 ft3 V = Ci (Tc=60)Ax3600 11  Enter Percentile Storm I (95th percentile = 0.60 in)80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60‐in x Area x C)Vrr 580 580 ft3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable)0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 164 ft3 Primary Treatment/Storage Basin V 1,475 ft3 Subsurface Storage In R/W ‐ 25% Sediment Factor Required V 2,049 1,639 ft3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on  Calculate the Post‐Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume ‐ Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.  These  calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. ACHD Basin #2 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default  10 min C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:51 AM Steps for Sizing Bioswale #REF! 1 Project Name 2 2 Enter number of Bioswales/Borrow Ditches (25 max)1 3 Design Storm 100 #REF! Weighted Runoff Coefficient C 0.73 Link to: 4Area A (Acres)0.65 acres Approved discharge rate for the given storm (if applicable)0.00 cfs 5Design Vol With 0% Sed for Swales V 1,639 1639 ft3 6Length of Swale 180 ft 7 Infiltration Window? (Note: infiltration required if Longitudinal Slope<1%) Design Infiltration Rate 8.00 in/hr 8 Infiltration Window Width 3.00 ft 9Set Swale Bottom Width b 3.00 ft 10 Set Swale Top Width 12.00 ft 11 Set Swale Depth y 1.50 ft 12 Swale Side Slopes H:1 SXS 3.00 13 Calculate cross‐sectional area AXS 11.25 11.25 ft2 AXS=y2z+by 14 Total Swale Capacity Without Driveways 2,025 2025.00 ft3 15 Does it Have Capacity?OK 16 Time to Drain 4.6 4.55 hr 90% volume in 48‐hours minimum OK Check Swale With Driveways 17 Avg. Driveway Fill Slope in Swale (H/V) ft/ft 18 Enter Total Number of Driveways ea 0.0 ft3  Deduct driveway slope 19 Enter Total Length of all Driveways ft 0.0 ft3 Deduct driveway length 20 Lost Swale Length From Trees, etc. ft 0.0 ft3 Deduct other 21 Adjusted Length of Infiltration Area 0.0 ft 22 Excess Capacity = Storage ‐ Deductions ‐ Runoff Volume (1,639.0)ft3   23 Is Capacity Good?NO 24 Time to Drain 0.0 hr 90% volume in 48‐hours minimum OK ACHD Calculation Sheet for Sizing Bioswales & Borrow Ditches #REF! ACHD Basin #2 C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:54 AM Steps for Peak Discharge Rate using the Rational Method calculated for post‐development Calculate Post‐Development Flows (for pre‐development flows, increase number of storage facilities to create new tab) User input in yellow cells.  1 Project Name 2 Is area drainage basin map provided?YES (map must be included with stormwater calculations) 3 Enter Design Storm (100‐Year or 25‐Year With 100‐Year Flood Route)100 4 Enter number of storage facilities (25 max)1 Click to Show More Subbasins Subbasin   1 Subbasin 2 Subbasin  3 Subbasin  4 Subbasin  5 Subbasin  6 Subbasin  7 Subbasin  8 Subbasin  9 Subbasin  10 5 Area of Drainage Subbasin (SF or Acres)SF 16,502 3,671 13,119 12,578  Acres 1.05  6 Determine the Weighted Runoff Coefficient (C) 0.90 0.90 0.90 0.20  C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.71  7    I100, TC<=60 8 i 2.58 2.58 in/hr 9 Qpeak 1.92 1.92 cfs 10 V 2,577 2,577 ft3 V = Ci (Tc=60)Ax3600 11  Enter Percentile Storm I (95th percentile = 0.60 in)80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60‐in x Area x C)Vrr 913 913 ft3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable)0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 258 ft3 Primary Treatment/Storage Basin V 2,319 ft3 Subsurface Storage In Common Lot ‐ No Sediment Factor Required V 2,577 2,577 ft3 Determine the average rainfall intensity (i) from IDF Curve based on  Calculate the Post‐Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume ‐ Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.  These  calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. ACHD Basin #3 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default  10 min Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:51 AM Steps for Sizing Bioswale #REF! 1 Project Name 2 2 Enter number of Bioswales/Borrow Ditches (25 max)1 3 Design Storm 100 #REF! Weighted Runoff Coefficient C 0.71 Link to: 4Area A (Acres)1.05 acres Approved discharge rate for the given storm (if applicable)0.00 cfs 5Design Vol With 0% Sed for Swales V 2,577 2577 ft3 6Length of Swale 162 ft 7 Infiltration Window? (Note: infiltration required if Longitudinal Slope<1%) Design Infiltration Rate 8.00 in/hr 8 Infiltration Window Width 2.00 ft 9Set Swale Bottom Width b 2.00 ft 10 Set Swale Top Width 14.00 ft 11 Set Swale Depth y 2.00 ft 12 Swale Side Slopes H:1 SXS 3.00 13 Calculate cross‐sectional area AXS 16.00 16.00 ft2 AXS=y2z+by 14 Total Swale Capacity Without Driveways 2,592 2592.00 ft3 15 Does it Have Capacity?OK 16 Time to Drain 11.9 11.93 hr 90% volume in 48‐hours minimum OK Check Swale With Driveways 17 Avg. Driveway Fill Slope in Swale (H/V) ft/ft 18 Enter Total Number of Driveways ea 0.0 ft3  Deduct driveway slope 19 Enter Total Length of all Driveways ft 0.0 ft3 Deduct driveway length 20 Lost Swale Length From Trees, etc. ft 0.0 ft3 Deduct other 21 Adjusted Length of Infiltration Area 0.0 ft 22 Excess Capacity = Storage ‐ Deductions ‐ Runoff Volume (2,576.8)ft3   23 Is Capacity Good?NO 24 Time to Drain 0.0 hr 90% volume in 48‐hours minimum OK #REF! ACHD Calculation Sheet for Sizing Bioswales & Borrow Ditches ACHD Basin #3 C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:54 AM Steps for Peak Discharge Rate using the Rational Method calculated for post‐development Calculate Post‐Development Flows (for pre‐development flows, increase number of storage facilities to create new tab) User input in yellow cells.  1 Project Name 2 Is area drainage basin map provided?YES (map must be included with stormwater calculations) 3 Enter Design Storm (100‐Year or 25‐Year With 100‐Year Flood Route)100 4 Enter number of storage facilities (25 max)1 Click to Show More Subbasins Subbasin   1 Subbasin 2 Subbasin  3 Subbasin  4 Subbasin  5 Subbasin  6 Subbasin  7 Subbasin  8 Subbasin  9 Subbasin  10 5 Area of Drainage Subbasin (SF or Acres)SF 14,506 3,583 17,880 12,287  Acres 1.11  6 Determine the Weighted Runoff Coefficient (C) 0.90 0.90 0.90 0.20  C=[(C1xA1)+(C2xA2)+(CnxAn)]/A Weighted Avg 0.72  7    I100, TC<=60 8 i 2.58 2.58 in/hr 9 Qpeak 2.06 2.06 cfs 10 V 2,763 2,763 ft3 V = Ci (Tc=60)Ax3600 11  Enter Percentile Storm I (95th percentile = 0.60 in)80th 0.34 in Enter Runoff Reduction Vol (95th Percentile=0.60‐in x Area x C)Vrr 979 979 ft3 12 Detention: Approved Discharge Rate to Surface Waters (if applicable)0.00 cfs 13 Volume Summary Surface Storage: Basin Basin Forebay V 276 ft3 Primary Treatment/Storage Basin V 2,487 ft3 Subsurface Storage In Common Lot ‐ No Sediment Factor Required V 2,763 2,763 ft3 Calculate total runoff vol (V) (for sizing primary storage) Calculate Volume of Runoff Reduction Vrr Determine the average rainfall intensity (i) from IDF Curve based on  Calculate the Post‐Development peak discharge (QPeak) ACHD Calculation Sheet for Finding Peak Discharge/Volume ‐ Rational Method NOTE: This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.  These  calculations shall establish a minimum requirement. The Engineer’s methodology must result in facilities that meet or exceed these calculations in order to be accepted. ACHD Basin #4 Calculate Overland Flow Time of Concentration in Minutes (Tc) or use default  10 min C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:51 AM Steps for Sizing Bioswale #REF! 1 Project Name 2 2 Enter number of Bioswales/Borrow Ditches (25 max)1 3 Design Storm 100 #REF! Weighted Runoff Coefficient C 0.72 Link to: 4Area A (Acres)1.11 acres Approved discharge rate for the given storm (if applicable)0.00 cfs 5Design Vol With 0% Sed for Swales V 2,763 2763 ft3 6Length of Swale 174 ft 7 Infiltration Window? (Note: infiltration required if Longitudinal Slope<1%) Design Infiltration Rate 8.00 in/hr 8 Infiltration Window Width 2.00 ft 9Set Swale Bottom Width b 2.00 ft 10 Set Swale Top Width 14.00 ft 11 Set Swale Depth y 2.00 ft 12 Swale Side Slopes H:1 SXS 3.00 13 Calculate cross‐sectional area AXS 16.00 16.00 ft2 AXS=y2z+by 14 Total Swale Capacity Without Driveways 2,784 2784.00 ft3 15 Does it Have Capacity?OK 16 Time to Drain 11.9 11.91 hr 90% volume in 48‐hours minimum OK Check Swale With Driveways 17 Avg. Driveway Fill Slope in Swale (H/V) ft/ft 18 Enter Total Number of Driveways ea 0.0 ft3  Deduct driveway slope 19 Enter Total Length of all Driveways ft 0.0 ft3 Deduct driveway length 20 Lost Swale Length From Trees, etc. ft 0.0 ft3 Deduct other 21 Adjusted Length of Infiltration Area 0.0 ft 22 Excess Capacity = Storage ‐ Deductions ‐ Runoff Volume (2,763.3)ft3   23 Is Capacity Good?NO 24 Time to Drain 0.0 hr 90% volume in 48‐hours minimum OK ACHD Calculation Sheet for Sizing Bioswales & Borrow Ditches #REF! ACHD Basin #4 C:\Users\cgrah\Dropbox\Projects\18049 Edington Subdivision\Reports\Storm Drainage\ACHD_SD_CALCS Version 9.0, December 2016 9/14/2020, 9:54 AM