Loading...
2020-09-17 ACHD ___________________________________________________________________________________________________________________ Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208 387-6100 • FX 345-7650 • www.achdidaho.org Mary May, President Kent Goldthorpe, Vice-President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner September 17, 2020 Tamara Thompson The Land Group RE: Firenze Subdivision Preliminary Plat Time Extension/ TECC-2020-0002 Preliminary Plat – Firenze Subdivision On December 14, 2016, the ACHD Commission approved the preliminary plat for Firenze Subdivision. As a part of that approval, t he developer, Albertsons Corporation, agreed to enter into a Cooperative Development Agreement with ACHD to expand the existing roundabout at the Eagle/Amity intersection, prior to the widening of Eagle Road between Victory Road and Amity Road. In addition, ACHD granted certain access points on Eagle Road and Amity Road, but also denied two access points, with the caveat that they could be considered with a specific development application. Those driveways were the sout herly right -in/right-out driveway on Eagle Road and the easterly r ight-in/right-out driveway on Amit y Road. The preliminary plat expired with the City of Meridian in August 2020; and the applicant is seeking a second time extension for the plat. Certificate of Zoning Compliance (CZC) – Grocery Store Soon after the preliminary plat approval, the applicant submitted a CZC application for the grocery store and associated uses. At that time, the southerly driveway on Eagle Road and the easterly driveway on Amity Road were approved as right-in/right-out access points, with deceleration lanes; in accordance with the procedure approved by the Commission with the preliminary plat. The CZC application is no longer valid, according to the City of Meridian and the developer will need to submit a new CZC application to move forward with a building. Therefore, the driveway approvals issued by ACHD are null and void. When a new application is submitted, ACHD will re-evaluate Site Specific Conditions of Approval, including driveway locations. Cooperative Development Agreement The developer entered into the Agreement with ACHD to design and construct the expansion of the roundabout. The civil drawings were nearly complete in 2018; but the developer could not commit to constructing the improvements and could not provide a timeline for development. The Agreement was subsequently terminated in 2019. ACHD Intersection Design/Driveway locations Because the applicant failed to satisfy the terms of the Cooperative Development Agreement, ACHD quickly hired a consultant to design the intersection so that the roundabout could be constructed with the widening of Eagle Road between Victory Road and Amity Road, in FY2021, per the Integrated Five Year Work Program. The ACHD intersection design is nearly complete. As a result of the traffic analysis prepared by the consultant, it was determined that an eastbound bypass lane is necessary at the northwest corner of the intersection to accommodate the forecast traffic volumes. Due to safety concerns related to the proximity of the easterly dr iveway, ACHD did not include the easterly driveway on Amity Road in the intersection plans. On the intersection plans ACHD has included the southerly driveway on Eagle Road as a right -in/right- out driveway with a deceleration lane. If the applicant pays for these improvements and enters into a Cost Share Agreement with ACHD to construct the driveway and dec eleration lane, prior to the beginning of project construction, then ACHD will construct the improvements with the intersection project. If the applicant does not pay for the costs, then these improvements won’t be constructed by ACHD. Additionally, the applicant will need to dedicate additional right -of-way for the deceleration lane, which ACHD will not compensate for because the deceleration lane is necessary to serve the site. ACHD may need additional rig ht -of-way or easements to construct the ro undabout, but we are working closely with The Land Group to minimize impacts to this property. Time Extension Request ACHD has no objection to the Time Extensio n and has no additional plat conditions. The conditions related to the Cooperative Development Agreement , however, are no longer valid. Sincerely, Christy Little Christy Little Development Services Manager (208)387-6144 clittle@achdidaho.org cc: Eri City of Meridian