Loading...
Autumn Faire Neighborhood Park Meridian Parks & Recreation .. . . Memo From: Date: Re: Will Berg Mayor and City Council Doug Strong j) ~ August 18,2005 Autumn Faire Neighborhood Park RECEIVE:O AU(~ 1 8 20D5 To: CC: City Of Meri.difLTl City Clerk 01"fiee The Parks and Recreation Department respectfully requests the following item to be placed on the August 23, 2005 City Council agenda, under Department Reports by Elroy Huff, for council's consideration: Autumn Faire Neiqhborhood Park Development: Two bids were received for this project as summarized below. . Hillside Landscape Construction (includes add altemates)........................ $234,341.00 . Sterling Landscaping (includes add alternates) .......................................... $277,030.00 The project cost listed above consists of earthwork, asphalt parking lot, sidewalks, 8' asphalt pathway, utilities, play area curbing, security lights, trees, basketball court, turf, landscape and irrigation. The add alternates included in the total cost consists of the asphalt path, backstops, basketball courts, trees, and security lights which can be deducted from the above listed totals. Due to the increase of construction costs the bids came in higher than expected. The total budget remaining in the Autumn Faire Neighborhood Park account is $172,451.00. Park staff is asking council to approve an additional $63,000.00 from impact fees to complete the green-up of the park. Recommended Council Action: The Parks and Recreation Department recommends that City Council approve the contract for Autumn Faire Neighborhood Park with Hillside Landscape Construction, for $234,341.00 and approve the additional impact fee funds to be transferred into the Autumn Faire Neighborhood Park account and authorize the Mayor to sign it. Supporting documentation attached. " . ...JIIIL .....s IIIBBlIII!..III!!I8' .Jllllllmll1lllffUIU :~.aa; ill !III!! P **lli~*lli?~,. ...,.,i~f:m¡;1m!w.'~' OPINION OF PROBABLE COSTS Autumn Faire Park 8/05 jENSEN'BELTS ASSOCIATES ITEM QTY !UNIT PRICE SUBTOTAL CONTRACT ITEMS Grading 1,700 CY $ 6.00 $ 10,200 Drainage LS 5,520 1" Water Service LS 5,908.00 5,908 Irrigation Connect LS 3,500.00 3,500 Sanitary Sewer 210 LF 10.00 2,100 Electric Distrib. LS 11,250.00 11,250 **Securitv Lights 2EA 2,SOO.00 5,000 Irrigation Hookup (pressure) LS 1,408.00 1,408 Curb & Wheel Stops LS 2,150.00 2,150 Asphalt Parking 4,539 SF 2.00 9,078 Paint Stripping LS 700 **8' Asphalt Path 640 LF 20.00 12,800 Concrete Flatwork 6,830 SF 3.00 20,490 Play Area Curh 142 LF 14.00 1,988 **Conc. B-Ball 5,040 SF 2.50 12,600 **Court Striping LS 820 **B-Ball Goals 2EA 1,800.00 3,600 **Backstops 2EA 3,000.00 6,000 Irrigated Turf 274,430 .50 137,215 **Shade Trees 36EA 260.00 9,360 **Conifer Trees 11 EA 200.00 2,200 **Omamental Trees SEA 240.00 1,200 2 Gal. Shrubs 19EA 20.00 380 5 Gal. Shrubs 6EA 30.00 180 Contractor MOB LS 3,000 SUBTOTAL $268,647 Contingency @J .05 13,353 BASE CONS TR U CTI O.N . .......... ............. ............. ............................... ............................... $282,000 495 Main Street (Belgravia), Boise, Idaho 83702 Ph. (208) 343-7175 Fax (208) 343.7178 email jba@jensenbelts.com Autumn Faire Costing 8/05, Pg. 2 DEDUCT ALTERNATES............................................................................. ....$43,850 1. Asphalt Path Surfacing 640 LF $16.00 $10,240 2. Backstops 2EA 3,000.00 6,000 3. Basketball Courts LS 14,500 4. Trees 29EA 6,020 5. Security Light P-1 2,500 6. Security Light P-2 2,500 SUBTOTAL $41,760 Contingency (â), .05 LS 2,090 ITEMS NOT IN CONTRACT Restroom . LS Shelter LS Concrete Flatwork 1,470 SF Drink Fountains 2EA Benches 4EA Bike Racks 3EA Picnic Tables 6EA Play Equipment LS 12" Play Mix 122 CY 495 Main Street (Belgravia), Boise, Idaho 83702 Ph. (208) 343-7175 Fax (208) 343-7178 email jba@jensenbelts.com INVITATION TO BID The City of Meridian, Idaho invites you to submit a formal sealed bid for the construction of Autumn Faire Neighborhood Park - Phase One Construction. The bids will be received at the Office of the City Clerk of the City of Meridian, 33 East Idaho Avenue, Meridian, Idaho 83642, until 2:00 pm prevailing local time, on Wednesday, August 17, 2005. The bids will be opened and publicly read at that time. The project includes construction of parking lot and sidewalks, utilities, play area, security lights, trees, basketball court, and turf A Public Works Contractor's License for the State ofIdaho is required to bid on this work. A Pre-Bid Meeting will take place at Meridian Parks and Recreation Department, 11 W. Bower St, Meridian, Idaho, 83642 on Tuesday, August 9, 2005 at 2:00 pm (208- 888-3579). Bids will be prepared on forms supplied by the City of Meridian. Bid packets are available at the office of Jensen Belts Associates, 495 Main Street, Boise, Idaho, 83702 (208-343- 7175). A deposit of $50.00 per set is required which is refundable upon return of the documents in good condition. Each bid shall be accompanied by a certified check, cashiers check, or bid bond in the sum of five percent of the total bid and made payable to the City of Meridian. Dated this 22nd day of July, 2005 Tammy de Weerd, Mayor- City of Meridian Publishing Dates: July 25 and August 8, 2005 PROJECT: ~tÆ /J-Å ß.1)r~ ~~/t- ß;æ.t-c-- ~ BID OPENING: .2:oP //1J ;WC~Jd',,:;, /ñt¿;«.r-l' /7/ ¿"'os .\ , Bidder: ð-f~n;;(~ r /(/i Îj/ 'cú /. ~Jê~/ €- fúp/? Proposal Properly Completed & Sh:med General InrormaHon Required of Bidders BID AMOUNT: 2-70 030 234/ 14-1 262,~oo / .1 I , I Bidder: tJ- 2-& 0 iLL~~ ~'¡ ~667. á Sj//{td'/ ,P¿u Proposal Properly Completed 77 b 1- #2- 74£7 & Signed Information Required of 21/3ob ¿l3 23 OIJo Bidders / BID AMOUNT: 7390 #4 5919 29- 204 n. ~ 4 crs "£ V!..f 2:733 2433 'fI5 2()fj3 2083 ) !i'1 kl-¡¡':J /f6 19 ~ /22- INVITATION TO BID The City of Meridian, Idaho invites you to submit a formal sealed bid for the construction of Autumn Faire Neighborhood Park - Phase One Construction. The bids will be received at the Office of the City Clerk of the City of Meridian, 33 East Idaho Avenue, Meridian, Idaho 83642, until 2:00 pm prevailing local time, on Wednesday, August 17, 2005. The bids will be opened and publicly read at that time. The project includes construction of parking lot and sidewalks, utilities, play area, security lights, trees, basketball court, and turf A Public Works Contractor's License for the State ofIdaho is required to bid on this work. A Pre-Bid Meeting will take place at Meridian Parks and Recreation Department, 11 W. Bower St., Meridian, Idaho, 83642 on Tuesday, August 9, 2005 at 2:00 pm (208- 888-3579). Bids will be prepared on forms supplied by the City of Meridian. Bid packets are available at the office of Jensen Belts Associates, 495 Main Street, Boise, Idaho, 83702 (208-343- 7175). A deposit of $50.00 per set is required which is refundable upon return of the documents in good condition. Each bid shall be accompanied by a certified check, cashiers check, or bid bond in the sum of five percent of the total bid and made payable to the City of Meridian. Dated this 22nd day of July, 2005 Tammy de Weerd, Mayor- City of Meridian Publishing Dates: July 25 and August 8, 2005