Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2020-08-20
WE IDIAN PLANNING AND ZONING COMMISSION City Council Chambers, 33 East Broadway Avenue Meridian, Idaho Thursday,August 20, 2020 at 6:00 PM MINUTES PRESENT Chairperson Ryan Fitzgerald Commissioner Lisa Holland Commissioner Rhonda McCarvel Commissioner Nick Grove Commissioner Andrew Seal ABSENT Commissioner Bill Cassinelli ADOPTION OF AGENDA Adopted CONSENT AGENDA [Action Item] Approved 1. Approve Minutes of the August 6, 2020 Planning and Zoning Commission Regular Meeting 2. Findings of Fact, Conclusions of Law for Rock&Armor Fitness (H-2020-0076) by Matt Garner with Architecture Northwest, Located at 1649 and 1703 E. Pine Ave. ITEMS MOVED FROM THE CONSENT AGENDA [Action Item] ACTION ITEMS 3. Public Hearing Continued from July 16, 2020 for Horse Meadows Subdivision (H-2020-0060) by Riley Planning Services, Located at 710 N. Black Cat Rd. Applicant Requests Continuance to September 17, 2020 A. Request: Rezone of 4.71 acres of land from the R-4 zoning district (Medium- Low Density Residential) to the R-8 zoning district (Medium-Density Residential). B. Request: Preliminary Plat consisting of 27 single-family residential lots and 3 common lots on 4.71 acres of land in the R-4 zoning district. Continued to September 17, 2020 4. Public Hearing Continued from July 16, 2020 for Prescott Ridge (H-2020- 0047) by Providence Properties, LLC, Located on the South Side of W. Chinden Blvd. and on the East Side of N. McDermott Rd. Application Requires Continuance to Requested Date of September 17, 2020 A. Request: Annexation of 126.53 acres of land with R-8 (99.53 acres), R-15 (8.82 acres) and C-G (18.17 acres), zoning districts. B. Request: A Preliminary Plat consisting of 384 buildable lots, 35 common lots and 5 other lots on 126.53 acres of land in the R-8, R-15 and C-G zoning districts. Continued to September 17, 2020 5. Public Hearing for Loose Screw Brewery (H-2020-0081) by Mary Murphy, Grand Peak, LLC, Located at 1511 W. McMillan Rd., Ste. 100 A. Request: A Conditional Use Permit for a 2,200 square foot brewery with a tasting area and retail showroom (i.e. minor food and beverage products processing) within 300 feet of a residential district/use on 0.95 of an acre of land in the C-N zoning district. Approved 6. Public Hearing for Victory Apartments (H-2020-0065) by Wendy Shrief, J-U-B Engineers, Inc., Located at the Southwest Corner of S. Meridian Rd./SH-69 and W.Victory Rd. A. Request: Amendment to the Future Land Use Map contained in the Comprehensive Plan to change the designation on 18.45 acres of land from Medium Density Residential (MDR) to Medium High Density Residential (MHDR). B. Request: Annexation of 18.45 acres of land with an R-15 zoning district. Recommended Denial to City Council, Hearing Scheduled for September 22, 2020 7. Public Hearing for Pearson Subdivision (H-2020-0075) by Melanie Pearson, Located at 175 W. Paint Horse Ln. A. Request: A Combined Preliminary and Final Plat consisting of 2 building lots on 3.98 acres of land in the R-4 zoning district. Recommended Approval to City Council, Hearing Date to be Determined 8. Public Hearing for Modern Craftsman at Black Cat (H-2020-0022) by Baron Black Cat, LLC, Located in the Northeast Corner of N. Black Cat Rd. and W. Chinden Blvd. (SH 20/26) A. Rezone a total of 23.63 acres of land for the purpose of reducing the C-C zone from approximately 8 acres to 4.42 acres and increase the R-15 zone from approximately 15.1 acres to approximately 19.2 acres. B. Short Plat consisting of 2 building lots and 2 common lots on 21.59 acres of land in the C-C and R-15 zoning districts. C. Conditional Use Permit for a multi-family development consisting of 196 residential units on 20.13 acres in the R-15 zone. D. Modification to the existing development agreements (Inst. Ws: 106151218; 107025555; 110059432; and 114054272) for the purpose of removing the subject property from the boundaries and terms of previous agreements and enter into a new one, consistent with the proposed development plan. Recommended Approval to City Council. Hearing Scheduled for October 13, 2020 ADJOURNMENT Meeting Adjourned at 9:46 p.m. Item 1. Meridian Planning and Zoning Meeting August 20, 2020. Meeting of the Meridian Planning and Zoning Commission of August 20, 2020, was called to order at 6:00 p.m. by Chairman Ryan Fitzgerald. Members Present: Chairman Ryan Fitzgerald, Commissioner Lisa Holland, Commissioner Andrew Seal, Commissioner Rhonda McCarvel and Commissioner Nick Grove. Members Absent: Commissioner Bill Cassinelli. Others Present: Chris Johnson, Adrienne Weatherly, Andrea Pogue, Sonya Allen, Joe Dodson, Alan Tiefenbach and Dean Willis. Roll-call Attendance X Lisa Holland X Rhonda McCarvel X Andrew Seal X Nick Grove _X (Vacant) Bill Cassinelli X Ryan Fitzgerald - Chairman Fitzgerald: So, at this time I would like to call to order the regularly scheduled meeting of the Meridian Planning and Zoning Commission meeting for the date of August 20th and let's start with a roll call, please. ADOPTION OF AGENDA Fitzgerald: Thank you, ma'am. Appreciate that. The first item on our agenda is the adoption of the agenda. We have two items at the beginning of the -- that we will open only for continuance and those are Horse Meadow Subdivision and Prescott Ridge Subdivision. We will open those in order to continue them to a date certain. With that notification, can I get a -- I'm sorry. Can I get a motion to adopt the agenda as presented. Seal: So moved. McCarvel: Second. Fitzgerald: Thank you all. I have a motion and a second to adopt the agenda as presented. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. CONSENT AGENDA [Action Item] Meridian Planning&Zoning Commission Item 1. August 20,2020 6 Page 2 of 67 1. Approve Minutes of the August 6, 2020 Planning and Zoning Commission Regular Meeting 2. Findings of Fact, Conclusions of Law for Rock & Armor Fitness (H- 2020-0076) by Matt Garner with Architecture Northwest, Located at 1649 and 1703 E. Pine Ave. Fitzgerald: The next item on the agenda is the Consent Agenda. There are two items on the Consent Agenda tonight. The approval of -- approval of minutes for the August 6th, 2020, P&Z Commission regular meeting and, then, Findings of Fact, Conclusions of Law for Rock & Armor Fitness. Is there anything that needs to be taken out of the Consent Agenda or are we good to go? I think we are good to go. Okay. Can I get a motion -- Commissioner McCarvel. McCarvel: Yeah. Mr. Chair, I move we accept the Consent Agenda. Seal: Second. Holland: Second. Fitzgerald: I have a motion and a second to accept the Consent Agenda. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. ITEMS MOVED FROM THE CONSENT AGENDA [Action Item] Fitzgerald: Okay. Thank you all for your -- for being here in virtual space and in real space and appreciate your guys allowing us to be in that same situation. Commissioner Seal, thank you for being the person at the dais tonight. We appreciate you doing that again. As we start tonight's hearing process let me kind of explain how we are going to do things tonight. We will open each item individually and allow the staff to report on how each -- or application meets our Comprehensive Plan and Uniform Development Code with their recommendations. After staff's made their presentation the applicant will come forward to present their case for the approval of the application and, then, we can respond to any -- and they will respond to any staff comments. The applicant will have about 15 minutes to do so. After the applicant has finished we will open the floor for public testimony. There is a sign -- there is an option to sign up if you are in person. In the back there is an iPad you can sign up back there. And, then, if you are online via Zoom the Clerk is -- will keep a list of folks to bring in to provide their testimony and we will kind of run the meeting with the clerk giving us guidance on who is next to speak. If there is any individual that is in the audience or online is there to speak on behalf of an HOA, we will give you ten minutes to speak. We are hoping that the people that you are speaking on behalf will not also follow through with additional comments that are similar to yours. So, if you are representing an HOA we will give you that additional time to represent your -- your constituency, but we want to make sure that we don't hear multiple comments of the Meridian Planning&Zoning Commission Item 1. August 20,2020 7 Page 3 of 67 same thing. So, we -- we know there is a couple items on the agenda tonight that might have some definite public testimony. We really appreciate it for timewise and everybody wants -- we want to make sure you get your thoughts and points across, but we want to keep that -- if we heard a bunch of things about a certain issue, we would like to focus on issues that the Commission hasn't really heard of -- or heard about. So, if there is an HOA person they will have ten minutes to speak. The public in general will have three minutes to speak. And after all testimony has been heard the applicant will be given an opportunity -- a ten minute opportunity to come back up and close -- close their remarks and respond to anything that was provided by the public testimony. At that time we will close the public hearing. The Commissioners will have a chance to deliberate and, hopefully, be able to make recommendations to the Council or a decision on the application. As we move forward I think -- we have kind of gone through the process. If you are on Zoom, we would -- please make sure you -- that you mute yourself. The clerk will help you kind of get squared away. But if you have a question raise your hand on Zoom. There is only one opportunity to testify, so use your three minutes wisely. We have had issues where people want to testify again after their first time and that -- we only allow that one opportunity. So, please, make sure you get your point across in that first iteration. ACTION ITEMS 3. Public Hearing Continued from July 16, 2020 for Horse Meadows Subdivision (H-2020-0060) by Riley Planning Services, Located at 710 N. Black Cat Rd. Applicant Requests Continuance to September 17, 2020 A. Request: Rezone of 4.71 acres of land from the R-4 zoning district (Medium Low Density Residential) to the R-8 zoning district (Medium-Density Residential). B. Request: Preliminary Plat consisting of 27 single-family residential lots and 3 common lots on 4.71 acres of land in the R-4 zoning district. Fitzgerald: So, as we move down and start our public hearing process tonight, we will open the public hearing on Horse Meadows Subdivision and I know that they -- are they in the building or online, Madam Clerk, to talk about why they are requesting a continuance or maybe the staff can provide us that? Weatherly: Mr. Chair, Penelope is in house. Penelope, you want to approach the podium. Constantikes: Thank you, Mr. Chairman. Penelope Constantikes. Post Office Box 405, Boise, Idaho. 83701. We are asking continuance tonight because we had some fine tuning that we needed to do to the plat and I think we have resolved all the ACHD and staff issues. It's a somewhat complicated site and we needed a little extra time. I would be happy to answer any questions. Meridian Planning&Zoning Commission Item 1. August 20,2020 $ Page 4 of 67 Fitzgerald: Thanks, Penelope. Is there any other-- or questions for the applicant? Okay. Constantikes: Thank you. Fitzgerald: Thanks, Penelope. We appreciate it. With that we have a date for the continuance on September 17th of 2020. If there is not any other comments, can I get a motion to continue that public hearing. Seal: Mr. Chair? McCarvel: Mr. Chair? Fitzgerald: Commissioner McCarvel. McCarvel: Are we sure there is room on September 17th? I thought we -- it was full last time we tried to start putting on that meeting. Weatherly: Mr. Chair, Commissioner McCarvel, apparently we have two hearings on that date, one is for a rezone for Ada County Coroner and the other one is annexation and zoning for Compass Point. McCarvel: Okay. So, two -- okay. Perfect. Fitzgerald: I think both of these are headed there, so -- McCarvel: Yeah. Okay. Fitzgerald: Anyone want to follow up with a motion? Seal: Mr. Chair? Fitzgerald: Commissioner Seal. Seal: I move to continue file H-2020-0060, Horse Meadows, to the date of September 17th, 2020, to give the applicant more time to finalize the application. Holland: Second. Fitzgerald: I have a motion and a second to continue application 2020-0060, Horse Meadows Subdivision. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. 4. Public Hearing Continued from July 16, 2020 for Prescott Ridge (H- 2020-0047) by Providence Properties, LLC, Located on the South Side of W. Chinden Blvd. and on the East Side of N. McDermott Rd. Meridian Planning&Zoning Commission Item 1. August 20,2020 191 Page 5 of 67 Application Requires Continuance to Requested Date of September 17, 2020 A. Request: Annexation of 126.53 acres of land with R-8 (99.53 acres), R-15 (8.82 acres) and C-G (18.17 acres), zoning districts. B. Request: A Preliminary Plat consisting of 384 buildable lots, 35 common lots and 5 other lots on 126.53 acres of land in the R- 8, R-15 and C-G zoning districts. Fitzgerald: Moving on to the next item on the agenda, which is a public hearing for Prescott Ridge, File No. H-2020-00474. Madam Clerk, is the applicant in house that they can provide input? Weatherly: Mr. Chair, I don't believe that the applicant is here, but I do have a raised hand. One moment, please. Fitzgerald: Thank you. Weatherly: Stephanie, one moment. Stephanie Leonard will be joining us in just a second. Okay, Stephanie, you should be -- Fitzgerald: Stephanie, do you want to unmute yourself or -- Leonard: Can you hear me? Fitzgerald: Yes. Go right ahead, Stephanie. Leonard: All right. Good evening, Commissioners. We are requesting a continuance because we determined that we would like to add a couple of plats to the multi-family portion of the site. In discussing that with staff we -- it was determined that we would have to renotice the site to be able to do that. We discussed with her -- with Sonya about that and also thought that it would be good to give staff and other agencies enough time to be able to review the changes that we have made per ACHD's staff comments and that was, essentially, the reason that we are requesting a continuance -- I believe to September 17th as well. Fitzgerald: Perfect. Any questions for the applicant? Thanks, Stephanie. We appreciate it. Leonard: Thank you. Fitzgerald: Any other comments or questions? If not, if I can get a motion that would be wonderful. Grove: Mr. Chair? Meridian Planning&Zoning Commission Item 1. August 20,2020 Flo] Page 6 of 67 Fitzgerald: Commissioner Grove. Grove: I move to continue File No. -- I just lost it there. H-2020-0047 to the hearing date of September 17th. Fitzgerald: Did I get a second there? McCarvel: Second. Fitzgerald: I have a motion and a second to continue the -- File No. H-2020-0047, Prescott Ridge Subdivision, to the hearing date of September 17th, 2020. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. 5. Public Hearing for Loose Screw Brewery (H-2020-0081) by Mary Murphy, Grand Peak, LLC, Located at 1511 W. McMillan Rd., Ste. 100 A. Request: A Conditional Use Permit for a 2,200 square foot brewery with a tasting area and retail showroom (i.e. minor food and beverage products processing) within 300 feet of a residential district/use on 0.95 of an acre of land in the C-N zoning district. Fitzgerald: Okay. Moving on to the next item on the agenda -- on the agenda. We have a public hearing for Loose Screw Brewery, H-2020-0081, and let's kick it off with the staff report. Alan, are you available? Tiefenbach: Good evening, Mr. Chair, Members of the Commission. Alan Tiefenbach, Associate Planner with the City of Meridian. Good evening. This is a conditional use for a drinking establishment. The -- the site is approximately two acres in size. It's zoned neighborhood business district and it's located at 1511 West McMillan, which is basically the southeast quadrant of West McMillan and North Linder Drive. The future land use map recommends a mixed use neighborhood. As I said, it's already zoned neighborhood business district and you can see here on the aerial where it's located. Real quickly-- so, this property was part of a larger annexation in 2013. At that time part of that annexation included what is now known as the Sawtooth Village, a retail center. This is about a two acre piece of land. It's right on the corner. It's comprised of two buildings of 10,000 square feet each. The -- the property is presently in the -- in the process of building out. If you look at the photographs here on the top left that is looking from West McMillan -- McMillan. That is the Sawtooth Retail Center. So, Building A is on the right, Building B is on the left and in the middle there between those two towers, what you see here, this is a plaza and this is going to be important here in a minute. On the bottom here this is a picture from the back at the south and this is looking into a four-plex complex. There is a path that runs through and there is a path that connects here. You see the chain link there, because, as I said, these buildings are presently in the process of building out, so Meridian Planning&Zoning Commission Item 1. August 20,2020 Fill Page 7 of 67 there is construction fencing all around it. This is an application for a conditional use permit to allow a 2,200 square foot brewery. These are -- this is defined in our UDC as minor food and beverage product processing. This will include outdoor seating and potentially live music. The applicant will be leasing a space within this building here, again, about 2,200 square feet. Because there is residential within 300 feet of this property, it's required to do a conditional use. As I said, outdoor music is a possibility. The -- the -- this development has 58 parking spaces that are -- that are -- have been approved as part of the certificate of zoning compliance. Forty parking spaces would have been required, so it's one parking space per 500 with -- with two 10,000 square foot buildings that would be 40 parking spaces. Again, 58 are provided. It's also I think important to mention that different uses share different peak parking demands. Some of these uses are going to be office and like your nail salon type uses, which are between 8:00 and 5:00. Then there is other uses that are the more after hours uses, which would be the restaurant and this brewery, but staff -- it's staff's opinion that 58 parking spaces, given these different types of competing uses, would definitely be sufficient. The only real concern that staff had with this proposal was, first of all, the hours of operation. There are certain hours that are required -- that are allowed for drinking establishments, those are between 11:00 a.m. and 10:00 p.m. Staff recommends as a conditional use it would be limited to those hours. The other concern we have -- and I will go to the site plan. This is the landscape plan that was approved as part of the certificate of zoning compliance. This is Building A. The brewery will be proposed in this area, why I made that mark here. There is this an outdoor plaza here and the applicant wants to share seating. There is -- there is a restaurant over in this building that's coming in and, then, the Loose Screw Brewery would be over here and these two different restaurants have already worked with the owners of this development to work out an arrangement where they can both have outdoor seating. There would be approximately five tables is what Loose Screw has said. Our only concern with this would be the residential that's directly to the south. We wouldn't want this -- the activities that are associated with this brewery to start sort of drifting out into other areas, either in towards the back or towards the front, so our recommendation is that any outdoor activities associated with this brewery would be limited to this plaza and no more than 1,500 square feet and that's the size of this plaza. Other than that staff has no other concerns and we recommend approval of this project. If there is any questions I would be happy to take those now. Fitzgerald: Thank, Alan. We appreciate it. Are there any questions on this app -- on this application? Hearing none, would the applicant like to be recognized to touch base on this -- on this project? Are they in person or online? Weatherly: Mr. Chair, the applicant is in person and approaching the podium. Fitzgerald: Awesome. Thanks, Madam Clerk. Good evening. Would you, please, state your name and your address for the record and the -- Murphy: Good evening. I am Mary Murphy. 3030 Boulder Creek Place, Meridian, Idaho. 83646. And I am the applicant with Grand Peak Development. I am representing TS Development, the owner and the tenant, that would be Loose Screw Beer Co. We just Meridian Planning&Zoning Commission Item 1. August 20,2020 F12 Page 8 of 67 wanted to say that we agree with staff and their recommendations and other than that if you have any questions for me I would be more than happy to answer. Fitzgerald: Thank you so much, Ma'am. Are there any questions for the applicant on this? Seal: Ryan, you are muffled. Weatherly: Ryan, sorry about that. Go ahead and repeat what you just said. I had you turned down. Fitzgerald: Okay. Thanks. Are there any questions for the applicant on this project? Thank you, ma'am, very much for being here and if there is any public testimony we will let you come up and close and respond to anything that's said, so -- Murphy: Great. Thank you. Fitzgerald: Thank you. Is there public testimony? Anyone who would like to testify on this application that signed up, Madam Clerk? Weatherly: Mr. Chair, we had one person sign in, but not wishing to testify. Fitzgerald: Okay. If is there anyone in the audience or online that would like to testify on this application, please, raise your hand. We will give it a few seconds. Raise your hand via Zoom or raise your hand in the audience. Either one. Commissioner Seal can always be my eyes. Okay. We appreciate it. Ms. Murphy, do you want to have any -- do have any other comments to make, ma'am? Murphy: No. Fitzgerald: She is probably saying no. Weatherly: Mr. Chair, she indicated no. Fitzgerald: Okay. Thank you, Madam Clerk. With that can I get a motion to close the public hearing, unless someone has questions for staff. Seal: Mr. Chair? Fitzgerald: Commissioner Grove -- or Commissioner Seal. Seal: I move we close the public hearing on H-2020-0081. McCarvel: Second. Grove: Second. Meridian Planning&Zoning Commission Item 1. August 20,2020 F13 Page 9 of 67 Fitzgerald: I have a motion and a second to close the public hearing on H-2020-0081, Loose Screw Brewery. All those in favor say aye. Any opposed? MOTION CARRIED: FIVE AYES. ONE ABSENT. Fitzgerald: Anyone want to start off? This one is pretty easy for me, but -- I need more restaurants in my neighborhood, so I will just -- I'm looking forward to breweries nearby. So, anyone want to -- go ahead. Commissioner Holland, you unmuted yourself. You want to comment? Go right ahead. Holland: I was just going to say, I ditto that. I think it looks like a nice concept fit in there. I like the alternating uses, so I don't see any concerns. McCarvel: Mr. Chair? Fitzgerald: Commissioner McCarvel. McCarvel: Yeah, I agree. I think the staff's addressed, you know, any issues and I think they have been addressed, you know, just to keep the usage there in that little patio and not extend out. So, I think it will be a nice fit. Fitzgerald: Agreed. I think that the hours of operation make sense. I'm glad there is going to be some interweaving into that neighborhood behind them, too. So, I think it's great. Seal: Mr. Chair? Fitzgerald: Commissioner Seal. Seal: I echo what has already been said and I will go ahead and throw a motion out there. Fitzgerald: Sounds great. Seal: After considering all applicant and public testimony, I move to -- this is a CUP; correct? Fitzgerald: Yes. Seal: So, we are approving. So, after considering all staff, applicant, and public testimony, I move to approve the City Council File No. H-2020-0081 as presented in the staff report for the hearing date of August 20th, 2020. McCarvel: Second. Meridian Planning&Zoning Commission Item 1. August 20,2020 F14 Page 10 of 67 Fitzgerald: I have a motion and a second to approve the conditional use permit for Loose Screw Brewery, H-2020-0081. All those in favor say aye. Any opposed? Motion passes. Good luck to you all. I look forward to having a beer at the establishment down the road. MOTION CARRIED: FIVE AYES. ONE ABSENT. 6. Public Hearing for Victory Apartments (H-2020-0065) by Wendy Shrief, J-U-B Engineers, Inc., Located at the Southwest Corner of S. Meridian Rd./SH-69 and W. Victory Rd. A. Request: Amendment to the Future Land Use Map contained in the Comprehensive Plan to change the designation on 18.45 acres of land from Medium Density Residential (MDR) to Medium High Density Residential (MHDR). B. Request: Annexation of 18.45 acres of land with an R-15 zoning district. Fitzgerald: Moving on to the next item on our agenda is a public hearing for Victory Apartments, File No. H-2020-0065, and we will start with the staff report. Sonya, are you on? Allen: Thank you, Mr. Chair, Members of the Commission. The next applications before you are a request for a Comprehensive Plan map amendment and annexation and zoning. This site consists of 18.45 acres of land. It's zoned RUT in Ada county and is located at the southwest corner of West Victory Road and South Meridian Road and State Highway 69. Adjacent land uses and zoning. To the north is Victory Road and single family residential and office uses, zoned R-4 and L-O. To the south are single family residential uses, zoned R-8. To the west is rural residential zoned RUT in Ada County. It's designated medium density residential on the future land use map. And to the east is South Meridian Road, State Highway 69, and multi-family residential apartments, zoned R-15 and single family residential homes, zoned R-8. The Comprehensive Plan future land use map designation for this property is medium density residential, which calls for three to eight dwelling units per acre. The applicant is requesting an amendment to the future land use map contained in the Comprehensive Plan to change the land use designation on 18.45 acres of land from medium density residential to medium high density residential and annexation with an R-15 zoning district. The subject property, along with a four acre parcel to the west, are enclaves surrounded by city annexed and developed land. Annexation and development of this property will reduce the enclave situation, leaving only one parcel in the county, which will provide for more efficient delivery of city services in this area. The existing medium density residential designation, as I said before, allows for dwelling units at gross densities of three to eight dwelling units per acre. The proposed medium high density designation allows for a mix of dwelling types, including townhomes, condominiums, and apartments at gross densities of eight to 12 units per acre. Medium high density residential designated areas are relatively compact within the context of larger neighborhoods and are typically located around or Meridian Planning&Zoning Commission Item 1. August 20,2020 F15] Page 11 of 67 near mixed use commercial or employment areas to provide convenient access to services and jobs for residents. Development should incorporate connectivity with adjacent uses and area pathways, attractive landscaping, and a project identity. The applicant's request for approval of an amendment to the future land use map to change the land use designation for this property to medium high density residential for an increase in density for development on this site is based on recent market studies included in the application to corroborate the demand for housing in Meridian as high and a range and diversity of housing types is needed and the map you are looking at there is the existing future land use map and the proposed change to the future land use map. A conceptual development plan was submitted with the annexation request as shown that depicts a total of 170 multi-family residential units consisting of a mix of two-plex and four- plex structures at a gross density of ten units per acre, consistent with and at the mid range of the desired density in the proposed medium high density designation. Duplex structures are proposed along the southern and western boundaries of the site as a transition to the existing single family residential properties from the proposed four-plexes. The proposed development is located in close proximity to a mix of office and commercial uses. Healthcare services and other office uses exist to the north across Victory Road and along South Meridian Road and Legacy Feed and Fuel with a convenience store and gas station exists kitty corner to the site across Meridian Road. Other commercial uses are currently in the development process in this area that are anticipated to consist of retail, healthcare, office and flex space for small commercial businesses and that is around the Legacy Feeding and Fuel site. Access is proposed via a public street from Victory Road, an existing two lane arterial street, which is proposed to stub to the west for future expansion. An emergency access only is proposed via South Meridian Road. No improvements are planned in the capital improvements plan or the five year work plan for this section of Victory. ACHD is not requiring Victory to be widened adjacent to this site, because there is insufficient area to do so with the proximity of the Ridenbaugh Canal to Victory Road, which runs along the northern boundary of the site. The traffic level of service for this road is better than E, which is an acceptable level of service for a two lane roadway per ACHD's report. Qualified open space and site amenities are required to be provided with development in accord with UDC standards. A minimum of ten percent open space and one amenity are required. The concept plan depicts a central common area with a clubhouse, swimming pool, and tot lot. A dog park is proposed at the northeast corner of the site across the Ridenbaugh Canal with a pedestrian bridge for access over the canal. Off-street parking is depicted on the plan in excess of UDC standards with 50 extra space. The UDC requires a 25 foot wide street buffer and detached sidewalk to be provided along arterial streets, such as Victory Road. However, because there is not sufficient area between the Ridenbaugh Canal and the -- and Victory for a sidewalk, ACHD is requiring the sidewalk to be constructed on the south side of the canal. If the easement for the canal entirely encompasses the buffer area, a minimum five foot wide area outside of the easement is required for landscaping. A minimum 35 foot wide street buffer, with a detached ten foot wide multi-use pathway, is required along South Meridian Road and State Highway 69, which is designated as an entryway corridor. Noise abatement is required for residential uses along the highway in accordance UDC standards, which requires a berm or berm and wall combination parallel to the highway, the top of which is required to be a minimum of ten feet higher than the elevation at the Meridian Planning&Zoning Commission Item 1. August 20,2020 F16 Page 12 of 67 centerline of the state highway. Conceptual building elevations were submitted for the four-plex structures that are a pinwheel design similar to those constructed in the Little Creek Development off Locust Grove behind D&B Supply, with the front door of each unit on a different side of the structure. The duplex structures are similar to the four-plexes in design, but the front doors of each unit will be on the same side on the front of the structure. Building materials consist of a mix of vertical and horizontal siding with stone or brick veneer accents. All structures are required to comply with the design standards listed in the Architectural Standards Manual to ensure a high quality of design. Multi- family residential developments require conditional use permit approval in the R-15 district in compliance with the specific use standards for such listed in the UDC. If the subject applications are approved detailed review of the development for consistency with UDC standards will take place with the conditional use permit application. West Ada School District submitted comments on this application that show enrollment for the 2020- 2021 school year below capacity in this area for all grades. Although Victory is only slightly below capacity, which will be exceeded with any future development in this area. Written testimony has been submitted on this application as follows: There have been many letters of testimony received on this project that are included in the public record, the majority of which are against the applicant's proposal for reasons pertaining to density, they feel it's too high. Type of development proposed, the apartments. Too much existing traffic and congestion in this area and on Victory Road. And desire for Victory to be widened before anymore development is approved in this area. And concern pertaining to the ability of area schools to handle more students. The applicant did submit a response to the staff report. They are in agreement with the staff recommendation. The staff is recommending approval of the amendment to the future land map in accord with the Comprehensive Plan provisions that encourage higher density residential uses along major transportation corridors, near commercial mixed use and employment areas, with pedestrian connectivity to these uses and approval of the annexation and proposed development plan with the requirement of a development agreement, as it provides a transition in uses and density to existing single family residential properties will contribute to a range of residential land use designations and diversity in housing types and densities in this area and will provide convenient pedestrian access to nearby services and jobs for area residents with construction of a sidewalk along Victory and a multi-use pathway along Meridian Road. Staff will stand for any questions the Commission might have. Weatherly: Hang on, Ryan. Fitzgerald: Thank you. I can mute myself, but I'm not loud, but is there any questions for Sonya? Grove: Mr. Chair? Fitzgerald: Commissioner Grove. Grove: Sonya, I had a question. On the site map I didn't see the pathway depicted on the south side of the canal. Is that articulated in any other plans or is that something that will come later? Meridian Planning&Zoning Commission Item 1. August 20,2020 F17] Page 13 of 67 Allen: Mr. Chair, Commissioner Grove, Commissioners, it is not depicted on the plan, but it will be a requirement of development by ACHD and the city. Seal: Mr. Chair? Fitzgerald: Do you have follow up -- Seal: Can't hear you, Ryan. Weatherly: Sorry, Ryan. We are trying something new tonight and I have to turn you down every time somebody else talks in chambers. So, I apologize for going back and forth on you. Fitzgerald: You are fine. No worries. Commissioner Grove, did you have a follow-up? We can talk to the applicant about where that's going to go, because I had the same question. Seal: Mr. Chair? Fitzgerald: Additional questions for staff? Seal: Mr. Chair? Fitzgerald: Commissioner Seal. Seal: Just on the future land use map with the modifications that were done recently to it did that change on it or did that -- is it the same as it used to be? Or has it changed in recent past? Allen: Mr. Chair, Commissioners, no, it did not change with the last amendment. Seal: Thank you. Fitzgerald: Additional questions for Sonya? Okay. Hearing none at this time, would the applicant like to come forward or raise their hand if they are in attendance. Madam Clerk, can you bring Thad over? Weatherly: Just a moment. Erik P, if you are part of this as well, will you, please, raise your hand. Oh. Shrief: Wendy Shrief with JUB Engineers. Weatherly: Is Erik with you as well? Meridian Planning&Zoning Commission Item 1. August 20,2020 F18 Page 14 of 67 Shrief: He -- he is calling in through Zoom. Again, Wendy Shrief with JUB Engineers and Erik Pilegaard -- I spoke with the Clerk's office, he is on the Zoom call and he will -- he will speak if needed, if we have any questions for him. Weatherly: Okay. I'm going to move you over, so that if you do talk you will have the ability. So, one moment. It's going to look like I kicked you out, but one moment. Okay, Wendy, you are good to go. Thank you. Shrief: Okay. And which microphone is better? Weatherly: Probably the one you -- yeah. Shrief: Okay. And if-- Sonya, if you could put up the future land use map I will get started. Good evening. My name is Wendy Shrief. I'm a planner with JUB Engineers. My business address is 250 South Beachwood Avenue in Boise, Idaho. Again, we are here this evening not with -- not with a CUP or a preliminary plat, we are here with the annexation -- a request for an annexation of 18.45 acres with zoning of R-15 and a Comprehensive Plan map amendment. We are requesting medium high density residential, which would allow us to request the R-15 zoning. I think a really key part of -- of our proposal and what -- why we think this project makes sense here is to -- to look at the location of where -- where the site is. We are located on Meridian Road, on a principal arterial where there is an existing 36,000 trips a day. So, we are on a principal roadway, fairly heavily trafficked, which is actually an ideal location for multi-family. If you look at directly -- if you look at the ACHD staff report there also are -- there will be -- in the capital improvements plan in the future, future widening of Victory Road. I know we have a number of neighbors here with concerns about Victory Road. In the ACHD staff report there is mention of that being in their future capital improvements plan where that section will be widened to three lanes between 2026 and 2030. So, that is listed in the ACHD staff report and we will be dedicating additional right of way for those future improvements. When I -- I want to look at where our site is located. We are -- is the pointer the best way to do this? We are located immediately adjacent to the Ridenbaugh Canal. It's the northern border of our site and it separates Victory Road and the Ridenbaugh Canal separate us from some single family residential, which is to the north of us, and out of our surrounding land uses to -- to the south we have some R-8 single family residential. To the -- immediately to the north we have some light office uses and where we have R-4 zoning that is buffered by both the Ridenbaugh Canal and Victory Road. Separates our future land use -- or potential land use from that single family. And I wanted to kind of walk us through the four corners of this area. If we look at the -- the northwest corner of Victory and Meridian Road, immediately to the north of us we have light office uses. You can see that in purple. Oh, I can use this. Thank you. Okay. I'm going to pretend. And, Sonya, there is another site plan. I gave -- I e-mailed to Adrienne and I e-mailed -- I just e-mailed it to you. I don't know if you can pull it up. That -- that has some of our color renditions and some of our landscaping and actually shows that pathway sidewalk that one of the P&Z Commissioners brought up. And, Adrienne, if you can put that up. I sent you a couple of elevations and there is also -- there is a site plan. Meridian Planning&Zoning Commission Item 1. August 20,2020 Fig] Page 15 of 67 Weatherly: It's likely that I put them in the public record, but I didn't put them for presentation. So, I hang on. Shrief: And I just e-mailed it to Sonya a little bit ago, too. And I have got my board if that won't come up. I think our -- our colored plan does give a nice representation and shows where that -- where that sidewalk is going to be put in. While you look for that I'm going to go ahead and run through the corners. Yeah. It looks like this was sent over -- well, so we are going to go through the -- at the northwest corner of Victory and Meridian Road, immediately to the north of our site, we have light office use and where we have single family residential to the north we are buffered. Actually, a couple of things. We have Ridenbaugh Canal, Victory Road, and on the northern portion of our site to create a future buffer, we are actually proposing townhomes, rather than four-plex units. If you look at the northeast corner of Victory and Meridian Road, we have commercial land uses and this is actually a fairly high intense land use. This is where we have Legacy Feed and Fuel and some future commercial development. So, these are -- these are our neighbors where we are proposing this multi-family. If you would go and you look at the southeast corner directly across the street from our proposed land use, we have R-15 zoning and the Red Tail Apartments. So, this is a high-end, multi-family -- I think a comparable project directly across the street with the Red Tail Apartments. If you look at the southwest corner where we are located at Victory, we have R-8 to the south and, then, immediately to the west we have kind of an out-parcel, which is currently still in the county, with RUT zoning, which -- I know one -- the property seller had gone and spoken with those -- with those neighbors and they staying put with that. That's a property that will eventually be brought into the City of Meridian and probably developed at some point. That's currently in -- thank you. That's the site plan. So, this is our colored site plan that actually shows -- Johnson: You should now be able to use the mouse. Hopefully. There you go. Shrief: Thank you. This is -- yeah, I think a much better representation of what -- what we are proposing and we have a number of changes from when I held my neighborhood meeting several months ago. I did a virtual neighborhood meeting with the neighbors within 300 feet and they saw a different site plan with all four-plexes. So, I want to kind of tell you we are actually -- from when we initially came in and did a pre-application meeting with the City of Meridian, we have -- we have done a lot of work and really staff has helped us to make sure what we are proposing is compatible with the surrounding land uses. We are on the -- the 13th version of our site plan. So, this is -- I believe site -- actually this may be site 14. This came up just this week. We made many many changes to make sure that our design fits the neighborhood. We started out with 200 plus four-plex community -- a four-plex unit project. We are now down to 170 units and I will go through and point out where we are now proposing townhomes, which is actually, technically, a single family use. We are proposing townhomes where we are bordering the site to the property to the north along the Ridenbaugh Canal. This entire area, which is located in the northwest corner of the site, these are now all townhomes, where we are just --where we are to the south of Victory Road and that single family neighborhood with R-4 zoning. We are proposing all townhomes and where we are adjacent to single family, Meridian Planning&Zoning Commission Item 1. August 20,2020 F20 Page 16 of 67 the southern portion of our site, those are also all townhomes. So, we are -- what we are proposing is, essentially, an R-8 use. These are townhomes where we are boarding single family. So, we are not proposing any four-plexes or what are technically multi- family uses adjacent to single family. I wanted to kind of run through some of our amenities. I think once this is constructed there is going to be a really first rate project. This developer recently constructed the enclave on Locust Grove. It's a -- a top notch project. It was rented out. Just to kind of show you demand in the Treasure Valley, all units were rented out within 90 days and you have heard this, that we have a flyover we could show you kind of showing what that project looks like. I know a lot of people in Meridian have -- have seen it and we are proposing similar amenities in this project. We are proposing a clubhouse and swimming pool. We have a large open space recreation area and I think kind of a really neat unique feature for this project on the north side of the Ridenbaugh Canal in that northeast corner we are proposing a dog park -- a dog park with landscaping, art features, and we are going to have a pedestrian access point across the Ridenbaugh Canal for residents to -- to take dogs in this recreation area. We are planning a dog park. So, we are -- we will have over ten percent open space. We are putting in along Meridian Road a pathway section and, then, we will be -- we will meet ACHD's recommendations on -- it's, essentially, kind of the southern sidewalk for West Victory Road will be located -- it's not technically a pathway, it's a sidewalk -- will be located on -- on the south side of the Ridenbaugh Canal and we will put that into our -- into our concept plan -- our future plans. So you can see -- excuse me -- on the north side of the Ridenbaugh Canal. You can see this on our site plan and I want to talk a little bit about the Comprehensive Plan amendment that we are proposing. We -- the Comprehensive Plan designation currently is medium density residential, which would allow R-8 zoning as an outright use. So, our townhomes that we are proposing are an outright use with our current Comprehensive Plan. In order to request R-15 zoning and to do four-plexes, we -- we are -- we do need to make a request for medium high density residential. We worked a lot with city staff on what they needed to see to feel comfortable and to be supportive of this Comprehensive Plan change. We do -- we have a positive recommendation from staff, which we earned. We made a lot of changes to our site plan. We dropped our density down quite a bit and, really, I think negotiated that for what's going to be the best deal for the city. The Comprehensive Plan policies that do -- that are supportive of what we are -- our Comprehensive Plan change are -- your Comprehensive Plan asks for higher density to be located along transportation corridors, which is what we are located in here along Meridian Road. Again, this is a principal arterial with 36,000 trips a day. So, this is where you do want to see your multi-family housing is in this type of transportation corridor. Your Comprehensive Plan also calls for diversity of housing types. I know in this area directly -- just across the street I worked on the Cavenaugh Ridge project, which were some single family projects with R-8 zoning. So, this is helping to bring some diversity of housing types and needed housing types for Meridian. There is extremely low vacancy rates for multi-family and I think actually multi-family has changed maybe from what we lived in when we first got to college. Most of the multi- family in -- in Meridian, the -- the rental for one or two bedroom units is more than my house payment in Boise. So, it is -- has gotten quite a bit more expensive, but it does provide people a diversity of housing types where you have young couples who are new to the area, gives them a place to -- for seniors, it gives them housing where they don't Meridian Planning&Zoning Commission Item 1. August 20,2020 F21 Page 17 of 67 have maintenance. So, there are a lot of different people where their positions in their life where it makes sense to be in multi-family and this helps to create a diversity of housing types within the City of Meridian. And, again, we -- we have really gone in and with our site plan revisions made a lot of changes to make this -- make sure that we are compatible with -- with the surrounding land uses. We had originally come in with the pre-application meeting with -- with all four-plexes. We have -- where we are adjacent to single family, we are now only proposing townhomes. So, it's -- it's an R-8 zoning use, the townhomes we are proposing, and we really made a lot of concessions to make sure that we are compatible with the surrounding neighbors. So, I'm here for any other questions. I also wanted to run through some of the elevations, just to show you the quality of the project that we are proposing, if you could put those up. So, these -- these are some of the townhome units where you can see they are definitely with a variety of building materials. It's an higher end project with -- with the two -- the two doors on the front and we have got two different sets of elevations for the townhomes, but these are definitely very compatible with -- they have garages included, they will have driveways, very compatible with --with the surrounding single family uses and, again, we will not have any four-plexes immediately adjacent to -- to any of the single family land uses and our -- our neighbors to the north, again, we -- we have -- we are bordered by the Ridenbaugh Canal and Victory Road and a row -- and a row of townhomes. We do not have any four-plexes adjacent to single family uses. So, I think this is going to be -- really going to bring a diversity of housing types, but I think it will be a nice addition to -- to this part of Meridian. We have -- we have had one neighborhood meeting with the neighbors and it was early on. Unfortunately, we have -- we have done a lot of changes since they last saw the site plan and I don't know if they have seen the changes that we have made with -- with the townhomes, but I think we have really answered a lot of their concerns and I think ACHD's staff report where they talk about the changes that will be made to Victory Road in the future I think address some of those other concerns for the neighbors in regards to traffic and we will be -- when we submit a conditional use permit we will be submitting a TIS at that point and a full site plan for review. So, this -- at this point we are just asking for, again, annexation to the City of Meridian for 18.45 acres in the R-15 zoning and we will be held in compliance with -- with the site plan that we presented this evening. So, I'm here for any other questions. Seal: Mr. Chair? Weatherly: Sorry, Ryan. One moment. We can't hear you. Okay. Try again. Fitzgerald: Wendy, a quick question. I -- reading in the staff -- or reading through the ACHD report on the plan, did they give you any dates, because my understanding is it's not on a CIP where there is a date yet. Shrief: Yeah. Chair, Commissioners, I'm going to go ahead and get out my -- my ACHD staff report. It was just finalized -- I believe it was on Tuesday and -- Fitzgerald: I might have missed the date, but I thought it wasn't on there. Meridian Planning&Zoning Commission Item 1. August 20,2020 F22 Page 18 of 67 Shrief; Page -- page two, item eight, and I'm going to go ahead and quote it. Victory Road is listed in the CIP to be widened to three lanes from Meridian Road to Locust Grove between 2026 and 2030. Fitzgerald: Thank you for pointing that out, because I thought it -- Shrief: That is from -- that is from the ACHD staff report. Fitzgerald: Commissioner Seal, go right ahead, sir. Shrief: And, again, we would be submitting a full transportation study with -- with our conditional use permit. Anytime you are proposing one hundred homes or units that is a part of review and you are required to mitigate for your -- for your impacts at that point. But because we are just applying for annexation at that -- at this point, we don't have a TIS this evening -- or at this point. Seal: The question I have is -- and the reason I asked staff about the -- if there had been a change to this in the -- the 13 or 14 plans that you have went through were any of them R-8 or did this -- or was it just -- you planned for R-15 from the beginning and hoping for the change -- Shrief: Well, Chairman -- Chairman, Commissioners, we have -- due to the site constraints we have a really unusually shaped parcel where we are -- we are bound by the Ridenbaugh Canal and Meridian Road and current market prices for property, it would not be feasible to develop this as single family. For this to go in -- for someone to come in and look at an R-8 zoning it -- it doesn't pencil out. I mean to go in and develop a project is a business. At the end you need to be able to, you know, make a profit and it would be financially infeasible to go into this site with --with the crossing that's proposed, with the improvements, with the utilities that are extended, with the road improvements in this area, it would be unfeasible to develop it as a single family site. So, most likely this -- the site would -- would sit, if not developed for a higher intensity use. Seal: Okay. Fitzgerald: Commissioner McCarvel, go right ahead, McCarvel: Thank you. When are you anticipating occupancy on this project? Shrief: Chairman, Commissioners, if -- if we are able to achieve annexation we would -- I think it's most likely that's two years down the road. We would, at that point, go in, do engineering design, do a traffic study, come and do another round of hearings through Planning and Zoning and City Council with -- with our conditional use permit, have review of our engineering drawings. We would start construction I think -- most likely at least one and a half to two years from that and, of course, it depends on market -- Meridian Planning&Zoning Commission Item 1. August 20,2020 F23 Page 19 of 67 Fitzgerald: In regards to the Comprehensive Plan process we just finished, why didn't you guys bring this to that plan process. Because I -- if you didn't own it, that's one thing, but how long this process has been going on when it wasn't involved in the process, when we just changed the Comprehensive Plan. Shrief: Chairman, Commissioners, yeah, that's a good point and I -- my -- my client, the developer who -- who constructed Little Creek, the enclave, he -- he does not own this property. He has an option -- the property owner is in Idaho Falls and I think that they did not get a comprehensive -- they were not part of the comprehensive planning process. I think -- I think that is what happened. My client was not part of -- did not have an interest in the property at the time it went through the process. Fitzgerald: Thank you. Commissioner Holland, go right ahead. Holland: Thank you, Mr. Chair. Hi, Wendy. So, one question I have -- there is a lot of public testimony. I know -- I read 70 some responses that were there this afternoon. One of the biggest challenges a lot of people were talking about was the access to Victory and how people would come in there. It is a really funny road the way that it curves and I have driven it many times. Would it be a right-in, right-out kind of concept or would there still be people crossing traffic there on that curve? Can you talk a little bit to the safety of that intersection of entering the complex, because that was one of the biggest concerns I heard. Shrief: Chairman, Commissioners, I don't know if we can get our site plan back up here, but let's talk about that. And, again, this would be addressed when we -- when we submit engineering and when we submit a transportation study. But I think at this point it would be -- it would be a right-in, right-out at -- at Victory. We --we will not have a direct access point on Meridian Road. So, our access point will be -- will be on -- on Victory. And if we can get our site plan up. But we will -- we will work with engineering and that would be a part of our transportation study would be what -- how that access would work. But at this point it would be -- it would be a right-in, right-out. Any other questions on that? I think you could probably condition that as, you know, we will meet ACHD and Public Works requirements regarding access on Victory Road. So, we -- we will be -- we will be adjoining -- or we will be aligning with a road to the north that continues through -- through the subdivision to the north of our property and we are -- we are proposing to construct a public road section, so when there is future development in the area we will be creating a road -- a public stub to the property that's immediately to the west of our property. So, that will allow for that roadway to continue. That was -- that was the recommendation of staff, that we provide that public road stub. Fitzgerald: Mr. Grove, go right ahead, sir. Grove: Yeah, Mr. Chair. Wendy, I have a couple of questions for you. On the ACHD report it says that the Victory Road improvements would take place between Meridian and Locust Grove. Is that -- my understanding that is on the east side of Meridian Road, so this -- that has no impact on this project; is that correct in how I'm reading that? Meridian Planning&Zoning Commission Item 1. August 20,2020 F24 Page 20 of 67 Shrief: Commissioner, we -- that is -- that is the portion that is in -- that is in the CIP. We are also -- we are dedicating the additional right of way for the -- for future improvements for Victory Road. That is a part of our ACHD recommendation. And I will look for that -- Grove: I guess what I'm getting at is -- I guess I didn't see anything that indicated what would be possible with Victory Road, because the comments were about a section of Victory Road that is not adjacent to your project. So, have you been in discussions with them on what those improvements will be in terms of how it impacts this project? Shrief: Chairman, Council Members, Victory Road is currently at an acceptable level of service. When we submit our transportation study -- and that's -- and that's in our staff report. When we submit our transportation study we will at that point be providing projected traffic counts based on the land uses proposed and if there are additional mitigations at that point we would either construct additional improvements or we would be charged impact fees for those improvements. So, that -- but that is something that doesn't go along with the annexation, that will come along with our conditional use permit. We have not done the TIS at this point, we are just requesting annexation. That would be a -- that would be a condition of the conditional use permit. We would not be allowed to -- to construct, obviously, until we -- we met ACHD's recommendations for access, for traffic and City of Meridian. But that's something to be determined with a conditional use permit. Grove: Mr. Chair, I have a second question if I could. Fitzgerald: Go right ahead. Grove: Another road question. It looks like you are stubbing to the west potentially -- with a potential future roadway extension, but there is nothing that is connecting to the south. I'm assuming that because the property that would connect to the Peoria Way is not a part of your project. But is -- I guess my question is how do you feed this time into the subdivision that's directly south of your project. Shrief: Chairman, Commissioners, if you -- if you take a look at the -- a look at the site plan we have, the -- the property that is immediately to -- at the southeast of our project where we have that existing single family, we -- that's a constructed subdivision. We -- we are not stubbing, those are existing homes. The property that is not a part of our project that's immediately to the west, that square, we are proposing to stub the public road. They also -- if that property were to develop, they -- they are adjacent to an existing built out area. So, I would not anticipate that they would stub or that there be a need for them to stub. So, no. And typically -- I mean as a planner you -- you provide a stub to each -- each of your surrounding areas. When you are -- when you are proposing a project next to a constructed subdivision you are essentially in-fill. You don't provide that stub. And I -- I don't imagine the neighbors would -- would want us to. The road that we are -- Chairman, Commissioners, I do want to point out that we are -- where we are going to have our access point onto Victory Road, we are -- we are aligning with an existing stub for the residential neighborhood that's to the north and that's kind of the Meridian Planning&Zoning Commission Item 1. August 20,2020 F25 Page 21 of 67 recommendation of staff, recommendation of ACHD, that we -- that we align our access point with -- with that other existing access point. Fitzgerald: And, Wendy -- and you haven't done your TIS yet, but do you have a traffic count estimation with the current numbers right now, just for informational on the record? Shrief: Chairman, Commissioners, without -- without having done the TIS I wouldn't be comfortable having that on the record. Fitzgerald: Okay. McCarvel: Mr. Chair? Fitzgerald: Commissioner McCarvel. McCarvel: Yeah. I guess let me ask it another way. I mean given the conditions of that roadway and I have -- I, myself, have driven it many times. It's a 25 mile an hour zone through there because of the way that road is. How do you anticipate this being functional without having the third lane in there? I mean, obviously, people are going to turn in from Meridian Road and want to take a left there. How do you anticipate that being functional without a third lane? Shrief: So -- and Chairman -- Chairman, Commissioners -- and I think if you look at the scale of what we are proposing, it's not -- we are not proposing a commercial use that generates a lot of trips, this is a residential use with 170 units and currently there is -- there is an acceptable level of service on Victory Road. As a part of our TIS we will -- we will be projecting our future trips and -- and if there are improvements that need to be made or impact fees to be paid, that -- that will be a part of the conditional use process. But right now there is an acceptable level of service, you know, according to ACHD on Victory Road and we -- we are proposing 170 units. It's not a huge project or -- or heavy intensity commercial use with a lot of traffic. It is a change for this area. This property has been vacant, yes, but it's an existing acceptable level of service on Victory. Fitzgerald: Wendy, I get what you are saying on the acceptable level of service. The challenge I think I have and I think what -- and I don't want to put words in Commissioner McCarvel's mouth, but I think the concern is that we are up zoning -- I mean the comp plan is changing to basically take it to a higher density and if we are bringing 170 units of traffic into that small space without a connection point going south or west, that road is not being changed and potentially not until 2030, that's I think our concern is we are --we are taking a comp plan that just got completed and dropping a higher level of intensity in that corner with a road that's really challenged I think is -- and so I understand what you are saying, but I think the question we are trying to get at is it's a single point of access with 170 units dumping out onto a road that is probably not the best of shape, at least this -- for traffic flow right now. Can you comment on that? I guess that's the crux of a lot of our questions. Meridian Planning&Zoning Commission Item 1. August 20,2020 F26 Page 22 of 67 Shrief: Okay. So, Chairman, Commissioners, again, with -- with Victory Road and what we are proposing -- I mean I think at the end of the day it would be -- our client would be proceeding at their own risk. They would be securing annexation, a Comprehensive Plan change and zoning, they are not going to be able to pull a building permit or get a CUP approved until those traffic issues are resolved. So, you -- this is -- this is kind of the first round of entitlements, but I think what you have, you know, in your back pocket or, you know, for your sense of security is this -- unless we have a TIS that shows an acceptable level of service or improvements to be made, this CUP, which would enable them to pull permits and develop this project, would not be approved. So, we are applying just for annexations and zoning at this point with -- with a concept plan, but this -- this project would not reach fruition unless that was adequately dealt with in the future. So, that's -- that's your safeguard you have this evening. Fitzgerald: Okay. Appreciate that. Additional questions for the applicant? Okay. Wendy, thank you very much. We will definitely have you back up to close and cover anything that comes up in public testimony. Shrief: Right. And thank you very much and I just want to make sure that you -- you know that we are definitely -- we are -- we are here to talk with you and, then, if you -- if you have ideas on changes or improved, we -- we want to talk, we want to work with -- with the Planning and Zoning Commission and with the neighbors. So, we are definitely -- this is not the only plan we can produce. If we -- if we need to come back and talk with you some more, please, let us. We want to make sure that we -- this project works for -- for the City of Meridian. Thank you. Fitzgerald: Thanks, ma'am. We appreciate it. Madam Clerk, do you -- do you have an initial list of public testimony that we would like to start from? Weatherly: Yes, Mr. Chair. I have several people online and several people in the room that have indicated they wish to testify. I'm going to start first with Thad. He is already online and ready to speak. Thad, if you want to unmute your microphone and state your name and address for the record, please. You will have three minutes. Murata: Hi. My name is Thad Murata. I live at 3857 South Alfani Way, Meridian. 83642. I just had a few questions earlier and I think you guys addressed them. Great. But I have one question and that's regarding home values and the impact to home values. I guess, actually, I have two questions. On that -- that gets taken in consideration. And, then, the other question I have is with the accessible traffic or amount of traffic that is going through Victory Road, is that -- is that the current state or is that taking into consideration a new development that's occurring to the east in the same area? Fitzgerald: And, Thad, I think we will probably -- we will get the applicant to comment on that as they come back up and we will make sure your question gets answered. Murata: Thank you for your time. I appreciate it. Meridian Planning&Zoning Commission Item 1. August 20,2020 F27 Page 23 of 67 Fitzgerald: Thank you for being -- we appreciate you participating. Thank you. Seal: Mr. Chair? Fitzgerald: Commissioner Seal. Seal: Do we want to see -- do we want to try and recognize if there is anybody from an HOA or something like that before we -- Fitzgerald: That was actually my next question. Yeah. Good call. Madam Clerk, do we have an HOA president? Was he going to speak tonight to start this thing out? Weatherly: Mr. Chair, I am unaware. I do have people signed in, but the format we are using currently doesn't have the information regarding whether the person is representing an HOA or not. I do have a gentleman in the front row who is indicating he is with an HOA. Do you want to go ahead and step forward to the podium. Is there anybody that has signed up that is ceding their time to the gentleman who is representing the homeowners association? Okay. And are you representing anybody in the room that has also signed up? Okay. But you are representing a homeowner's association? Oh. Okay. So, he indicated that he just wants -- he just needs his three minutes, so will not be representing that association. Fitzgerald: Okay. Weatherly: But you don't need ten minutes. Sorry. I'm a little confused. Chase: Okay. What do we have here? The front picture. My name -- first of all, I am Larry Chase. I live at 309 West Galvani Drive, which is directly north of this project in a subdivision called Strada Bellissima, which has 89 homes in it. I am the HOA board president. When this project was proposed we first learned of it, the board met. We meet via e-mail these days and the board had much discussion about this project and passed the motion that the board does not approve of this project. We had --the discussions that we held primarily revolved around the entryway, they revolve around the number of additional children in the schools. Let me go back to the entryway, because I want to talk about that for a minute. On this chart that you are seeing on your screen, that entryway on Alfani Drive -- I don't even know how to pronounce it -- is a two lane with an island in the center. I noticed on their proposal it's a -- it's a two lane with no island in the center, because they have to build a bridge across the canal and so you have a little mismatch to start with in how these two roads come together. Alfani Drive that comes out does -- Strada Bellissima are 89 homes, but it also serves the subdivisions that are north of Strada Bellissima. There is about three or four hundred homes. So, this intersection today is quite busy -- extremely busy. Adding this to this intersection is going to create some issues that I think from your point of view, you who are voting on this, who will, then, pass it to City Council, will become a future issue that you have to be dealing with on an ongoing basis. Adding the children to the schools is also a future issue that you wind up adding to the future and, then, you said about -- you think about property tax. Property Meridian Planning&Zoning Commission Item 1. August 20,2020 F28 Page 24 of 67 tax has a -- has to do with the value of the homes in the area and if the value of the homes in the area begin -- become influenced by the additional projects that are putting in the area, that is the revenue of the city. So, for those reasons the board of Strada Bellissima say we do not approve of this and I believe there are other folks here that want to say similar things and I will let them do it. And thank you very much. Fitzgerald: Hey, guys, let's keep the applause to a minimum. We are going to let everybody have their piece and let everybody say what they want to say. Let's keep the applause to yourselves, please. Appreciate that. Madam Clerk, do you want to go to the next person. Weatherly: Mr. Chair, I will go ahead and admit Annette Alonso. She raised her hand when we talked about HOAs, so, Annette, one moment. Annette, go ahead. Alonso: Can you hear me now? Fitzgerald: Yes, ma'am. Alonso: Okay. Hello, Commission and Commission Chair. This is Annette Alonso and I'm representing the Southern Rim Coalition and I know you guys have heard from me before and I'm sorry to be on here, but I'm helping my community here. So, I'm a little confused, because it's my understanding that FLUM amendments are just supposed to be done twice a year or maybe that's the new change, unless they are a subdivision plan that's coming off at the same time and so I don't understand what's happening here, because they are not applying for the development right now, they are just applying for a FLUM change and this -- this whole thing was -- this whole Comprehensive Plan that was just approved in January of this year, but I think it's a little preemptive for us to be changing things already to a higher density when we just got this thing set. So, I'm a little confused by that to start out with. So, I just would like some -- maybe some thought on that or some -- something from the developer to talk about that. My second point is going to be that according to 3.03.03, annexations of land are only -- only -- it says only when it conforms to city vision. Okay. This is -- obviously, isn't conforming to the city vision, because this is going from medium density residential to medium high density residential and we are having to do an amendment. So, that's probably my main point. Second point is 2.02.01 E, it says we are supposed to encourage development of high quality dense residential near -- in and around downtown, employment, large shopping centers, public open space and parks and based on this location there is no shopping center. There is a small -- there is a small area across -- kitty corner across Meridian Road and Victory that's being developed, but it's not going to be a shopping center by any stretch -- stretch of the imagination and across to the north of this development is an orthodontist office and a dentist office. So, that isn't what's there. There is no public open space or parks and it's not your downtown and there is absolutely no public transit here, which is generally essential when we have higher density residential, they generally like to take the public transit. So, then, that moves me on to my third point. Their reasoning for asking for this -- this amendment and generally when we ask for an amendment there has to be some really good reasoning here and the only reason I hear is that they said Meridian Planning&Zoning Commission Item 1. August 20,2020 F29 Page 25 of 67 some things about housing diversity and how they put some documentation in there that they looked and -- and that the south -- let's see --that units around here in Meridian need to be more diverse in their -- in their housing types and the other reason was to do anything else was financially infeasible. Well, I don't think the city's job is to make sure that developers make money. I don't -- I don't think that that's the point of this. So, I think that their reasoning is a little short. And, then, my fourth is, of course, Victory. When you come -- if you are coming from the west and you are going towards Meridian Road, coming down that hill, you know, it looks like you are going to run directly into the canal. It's a very very dangerous road, especially if it's an icy road to make that turn right there or you are going to go straight into the canal and I can see why the people around here, the residents, are complaining, because it is a very dangerous road and this will add a lot more cars to it. So, with that that's about all I have to say. Take it for what it's worth. But that's how we feel from the Southern Rim Coalition's point of view. Thank you. Fitzgerald: Thanks, Mrs. Alonso, we appreciate you being here. Thank you. Madam Clerk, you want to swap back and forth between in person and online? Weatherly: Yes, Mr. Chair. Next we have in person Tanya Edmonson. Fitzgerald: Hi. Thank you for being here tonight. Please state your name and your address for the record for us. Edmondson: Tanya Edmondson. I'm at 3086 South Silvertip Lane, Meridian, Idaho. 83642. Where I live, as you look at this, is right around the corner. I live right up on the corner of Victory and Stoddard. I pretty much try to avoid Victory as much as I can. I'm going to, you know, continue to restate what everybody else has been stating about West Victory Road. It is one of the most dangerous roads out there. There is a lot of young drivers that like to drive there. One of the things I see about this as we get a lot more younger drivers, younger people going through there, there was the talk about right-in and right-out. I don't see how you could do that if people are coming home on South Meridian Road, turning right and, then, lining up to turn left in there, 5:00 o'clock traffic, it does back way up. There is quite a bit of traffic that still comes down West Victory Road going towards Meridian and to me that's one of the biggest issues is just the danger of that whole corner and I look at this and I see that once they start putting those -- those townhouses in, that it takes away all possibilities of West Victory Road ever being straightened out, which is what I really think needs to be on the plan at some point is to straighten that section of Victory Road out. Thank you. Fitzgerald: Thank you, ma'am. We appreciate it. Weatherly: Mr. Chair, next on the line we have Jen Loveday. Jen, one moment. Loveday: Hi, can you hear me? Fitzgerald: Yes, ma'am. Please state your name and your address for the record and the floor is yours, ma'am. Meridian Planning&Zoning Commission Item 1. August 20,2020 F30] Page 26 of 67 Loveday: All right. Thank you. My name is Jen Loveday. I live at 1113 East Crest Ridge Drive in Meridian. 83642. 1 have a lot of concerns, most of which have been raised already. Traffic primarily, with a lot of two lane roads out here and what used to be the country is quickly becoming more and more tied in with denser housing units, like we see here, and a couple of things that I heard, you know, it was an ideal spot, because it's right across from another apartment complex and to me that doesn't really justify having a high density area existing and, then, pop on even more higher density housing on top of that, because at that rate we are just going to keep having more and more higher density transition out here in the south. You have got all the high density in the north already. Most of the people that I know that moved out south here have lived here for a long time, we enjoy the peace and quiet and more spread out, not so dense and packed in next to each other. We -- we love the quiet, we love having fields, we love having, you know, space to go out and drive and see some farms, you know, or nice houses or whatever. We don't have the services out here yet to support even more housing. I know it's coming, but when will that be? It always seems like we are lagging behind new construction. You always throw the houses in and, then, we suffer for four or five years and, then, we finally get improvement. You know, I think what everybody's saying, at least from my perspective, is let's do it smart. Let's -- you know, let's give some people a break coming home from work and put some infrastructure in place and, then, maybe look at some higher density housing. But I know for me south of the freeway I just really like it quiet. You are getting further away from the city and so, yeah, and just echoing what everybody else was saying with housing -- you know, is our housing values -- are our housing values going to go down, you know. So, that's all I have to say. Thank you so much for listening. Fitzgerald: We appreciate you being here tonight. Thanks for your participation. Weatherly: Mr. Chair, next in person we have Steven Humphries. Fitzgerald: Mr. Humphries, please state your name and address for the record and the floor is yours when you are ready, sir. Humphries: My name is Steven Humphries. We live at 300 West Fortini Street, Meridian, Idaho. 83642. My wife and I have lived in this property for 13 years. We have seen a lot of changes taking place. Not all of them for the better, but we hope to get there someday. Without sounding too repetitive, my concerns are the concerns that are shared by many of the people that submitted public comment. The practical reality is that I took the time to read everything. The Comprehensive Plan, the applicant's application, and I understand what the concerns are and I share the concerns. The traffic issue is exactly as everybody has spoken it would be. Victory Road is a nightmare and it's not going to heal itself. The person that was just speaking had a great idea and that is to put the infrastructure in first before we put the high density housing in and I absolutely agree with that. On the corner of Alfani and Victory Road near the sub it -- on the entrance to the subdivision of Strada Bellissima there is a school bus stop. So, now we have got children entering into this single access point into this proposed development. I fear for their safety. There are continuing bus stops heading to the west towards Stoddard Road and Linder Road. The question was once asked earlier about people coming through Strada Meridian Planning&Zoning Commission Item 1. August 20,2020 F31 Page 27 of 67 Bellissima Subdivision and if you were coming in the afternoon to evening home from work and you are heading south on Meridian Road and you can't turn left into this proposed subdivision -- proposed townhouse, because you -- it's right-in and right-out, people are going to take the shortest path and they are going to cut through the Strada Bellissima Subdivision where we have a 25 mile an hour speed limit. They are going to drive right past our little park that we have in there where the children play and we just put these children at risk one more time. Speaking of the children, West Ada School District, the three schools that are represented to be the closest to this project are all at or above capacity. I don't know how we can serve this any further without building new schools, without funding this and, again, put the infrastructure before the construction. There is no transit. Somebody brought that up earlier. The closest transit point is on Overland approximately a mile and a half away from this. So, if that's the goal is to have transit for the occupants of these -- of this high density project, that's not going to work and that's going to have to change. How are you going to do that? Are you going to put transit on Victory? No. And they are not going to allow it on Meridian Road. So, again, just one more problem that we have to face. Concern with the effect of property values being affected. The bottom line is that a lot of people that I have come in contact with feel that the City of Meridian leadership doesn't really have any concern over what their opinions are, how they feel, and I would like to bring it to this Council that it's important that you do understand what we are concerned with. You do feel our pain with this and will do the right thing and just, please, deny this application for annexation and for a zone change. We don't need that right now. We are in a good place with that. There is a developer that will come along and develop that property for a use that is more applicable to where we live. Thank you for your time. Fitzgerald: Thanks for coming. Appreciate it. Weatherly: Mr. Chairman, joining us on Zoom is Julie Langlois. Langlois: Good evening. Fitzgerald: Good evening, Julie. go ahead and state your name or your address for the record, please, ma'am. Langlois: Thank you. Julie Langlois. 3556 Rustler in Meridian. The Ridenbaugh Canal was begun in 1878 by William Ridenbaugh to irrigate a large ranch owned by his uncle. By 1913 the canal had been expanded from an original length of six miles to nearly 40 miles and it carried water to more than one thousand customers, including over 600 farms. This is one of the most unique water canals in Meridian. Victory Road was built alongside this original canal as it twists and turns from Meridian Road to the west. This beautiful canal needs to be made a feature in southwest Meridian with a wide linear park, gathering spaces, and a multi-user pathway, so that our residents can enjoy this historic water feature. The Comprehensive Plan states: Protect and enhance existing waterways, groundwater wetlands, wildlife habitat, soils and other natural resources and the Idaho Code says to ensure that the important environmental features of the state and localities are protected and also to ensure that the development on land is commensurate with the Meridian Planning&Zoning Commission Item 1. August 20,2020 F32 Page 28 of 67 physical characteristics of the land. Mr. Hood once stated that leaving the Comprehensive Plan open to some change allows for Meridian to grow or adapt to the request of the market and residents. Residents clearly do not want higher density and whether the market calls for more apartments or not is a moot point. This is clearly not an area suited for medium high density. If anything we would ask that there be a Comprehensive Plan amendment lowering the density of this property. In October -- in October of 2019 the then developer of this property tried to make a case to have the property designated commercial or mixed use community. Now the new developer is trying to make the case for medium high density. This corner, located on a busy corridor, is most certainly a place for multi-use commercial, residential, or office, similar to Strada Bellissima developed to the north, which has done a -- which has a well done transition from the busy Meridian corridor to the low density neighborhood behind it. This is what many stakeholders would like to see on this corner, along with -- and this is important -- a proper transition from the properties to -- with the properties to the south and west. We also agree with the former developer that the Red Tail Apartments across the street are underserved by the lack of significant commercial retail, transit, and employment nearby in violation of the Comprehensive Plan. The addition of the recent South Ridge Apartments with 476 units on Overland, west of Ten Mile, is more suited to the higher density, although when built they will also lack a large shopping center and any public open space or park. We in southwest Meridian would prefer to play, work, and recreate in our own neighborhood, yet there is a lack of services and gathering places to keep us here. Most of us would like to avoid Eagle Road as much as possible. We in southwest Meridian need family friendly areas to gather, shop, and work, not higher density housing. Thank you. Weatherly: Mr. Chair, next in person we have Gary Wenzel. Thank you, Mr. Wenzel. He is ceding his time to his other neighbors. He says that they have echoed his concerns already. We will move on to Pam Leaton. No. I'm sorry, Pam. You did not indicate a wish to speak. How about Jeff Leaton. Fitzgerald: We greatly appreciate you guys consolidating your comments, because that helps us get through and make sure everybody gets heard. We have heard from your comments that helps us get all the big issues out there. Thank you for that. Leaton: Thank you. My name is Jeff Leaton. I live at 3010 South Jiovanni Way in Meridian, Idaho. 83642. 1 have already submitted my statement online with my wife. I would just like to talk about a couple issues. We have talked about the intersection at Alfani. It's important to know that's the only southern -- let me think directly. Southern exit for that for -- for Strada Bellissima or Bear Creek, unless you go over to Stoddard. So, all that -- those two subdivisions will come -- if they are going onto Victory they are going to come out on Alfani. It's also important to know that from Victory that's the only stoplight we have where we can turn left, get on the street to go towards Meridian all the way down to Meridian Road. So, those two spots are log jams if we are not careful about it. The road --Victory Road has been talked about as being an S road. When they started building the additions to Kentucky Ridge there was a time for the ACHD to fix that canal. They are going to have to cover that canal. On the -- the north side of the canal there is Meridian Planning&Zoning Commission Item 1. August 20,2020 F33 Page 29 of 67 property, a part of Bear Creek, that drops down probably 30 feet. To straighten out that road you are going to have to bring in dirt to fill that road -- to straighten that road. They should have done that while they had the room to do that. It's too late now. And, then, there is a new subdivision on the other side, but in the time we have lived in our -- we have lived in Kentucky Way for about eight years and, then, we moved over to Strada Bellissima. So, we have been in the area for 20 years. In those 20 years I would like to point out that Strada Bellissima was built, we are currently going through Timberline Estates, Kentucky Ridge expansion, Oakwood, Edge Hill, an unnamed development that's on Linder and Victory that is taking up half of that whole area, which used to be fields, South Ridge, Fall Creek, Observation Point and Red Tail and all of those subdivisions feed into that intersection at Victory and Meridian Road. The streetlight -- if we have a streetlight when we come out of our subdivision there on Alfani, I have seen traffic already backed up to where you couldn't turn left to get on now without any of the additions. Right now if you go there and look it's pretty desolate with the pandemic, but in high traffic areas there is traffic jams already without anything else. So, I would just like to ask you to consider those when you are making your decision. Thank you. Fitzgerald: Appreciate it. Weatherly: Mr. Chair, next online we have Saul Hernandez. Hernandez: Good evening and thank you for the time. I'm going to be respectful, but will -- Fitzgerald: Can you state your name and your address for the record, sir. Sorry to interrupt you. State your name and your address. Hernandez: No, I apologize. I apologize. Saul Hernandez. 2811 South Alfani Way, Meridian, Idaho. So, I was saying, I will be respectful, but I also want to be bold in my statement. I heard mention of this as beneficial because of -- to -- for people to get to jobs. I don't know what jobs we are talking about in our area. There was also mention that currently it's acceptable enough service according to ACHD, meaning traffic patterns, and I have also heard we have not done a study yet. We will keep -- I keep hearing we haven't done a study, yet we are trying to propose a project that it sounds like it will start a year and a half to two years down the road, but when I hear currently there is enough -- enough service according to ACHD that's currently a year and a half to two years from now it's going to be a different story. If you guys approve the annexation of this project a year and a half to two years down the road it may not happen. The last thing I will say is this only makes sense for investors. It was mentioned that we didn't develop this property to housing, because it doesn't pencil. It's not profitable. The only reason why this project makes sense is because an investor will market this property that we are a mile off of the freeway, therefore, they can charge more for rent. They make it sound like they are doing these families a favor -- our community a favor by having this property -- this project in this area. What makes sense for families is to lower their monthly rent. If you are that concerned about families and how much money they are spending, there is plenty of land that you can build this project. The issue is that it won't pencil for an investor. It won't Meridian Planning&Zoning Commission Item 1. August 20,2020 F34 Page 30 of 67 pencil, because they can't market it as one mile off the freeway. The best thing for families would be to put this in another place where they can charge less. Of course, if that's the real intent, which we all know that that's not their real intent. The only benefactor of this project will be the investor. The last thing I will say -- somebody mentioned how -- how are these people going to get to that -- to the property from South Meridian and, then, west on Victory? I will tell you how these other people will -- and my neighbors said already -- they are going to go through Alfani. They are going to go right in front of my house where my children play. As it is there is the late times of the day that I tell my children don't go out there. This will further increase the risk to my children and the last thing that no one -- we haven't really discussed -- it's been mentioned, but we haven't really discussed is education. What are we --what are we going to do with education and provide schooling for our children? We are at over capacity already. Thank you. Fitzgerald: Thanks, Mr. Hernandez, we appreciate you being a part tonight. Weatherly: Mr. Chair, next we have Joanne Phillips joining us in chambers. Fitzgerald: Mrs. Phillips, thank you for being with us tonight. Please state your name and your address for the record, please, ma'am. Phillips: Okay. Which one do I use? This one. Okay. My name is Joanne Phillips. I live at 291 West -- Meridian. 83642. I'm in the Strada Bellissima Subdivision. My husband and I have been there about seven years and most of the stuff that I was going to talk about has already been brought up, so I'm not going to repeat it, but I do agree with most of the speakers that live in the subdivision in the nearby areas. I do have a couple of questions on record. The owner I noticed is SW Victory, LLC, out of Twin Falls. And -- okay. Okay. And I understand that the entity that -- I'm not going to mention his name, but he's got probably 350 LLCs in the Twin Fall areas, so -- but it never was mentioned who the client was that is building this complex. Is there anyway that we could get that on record that's purchasing the property from SW Victory, LLC? Is that something that we -- should be on public record? Okay. And, then, one small thing is they mentioned they were going to put the sidewalk on the opposite side of the canal, which is really strange, because that's not really going to help anybody that's walking down Victory. They are not going to go all the way into an apartment complex and use their sidewalk on the other side. I'm not really sure what kind of fencing, but I thought I read something that there was just going to be chain link fencing on that side where Strada Bellissima is to protect people from the canal. Then I read -- some of the notes it says Victory Road is listed in the CIP to be widened to three lanes from Meridian Road to Locust Grove Road between 2026 and 2030 and I think that's been mentioned that doesn't really help our situation right now and it really doesn't affect that area where the apartment complex is and, then, there was a -- I just lost it on my phone. I think my phone is losing battery. But, anyway, it said that under normal situations a complex -- a complex like this would require the developer to improve the adjacent road, which would be Victory, 17 feet from the center of the road as far as pavement, but that in reviewing it, since the canal did not allow this, that you didn't feel it would be necessary for those road improvements. Okay. So that I was questioning. And, then, my biggest concern is a lot of people that rent Meridian Planning&Zoning Commission Item 1. August 20,2020 F35] Page 31 of 67 apartments are younger and they don't have the driving experience and they get frustrated and so I just can see what's going to happen in the subdivisions, they are going to be jetting through the subdivisions at well over 25 miles an hour and there is children in the subdivision -- I have a granddaughter that's nine and I just fear for the safety of the citizens in our subdivision and Beer Creek and that's about all I want to add. Thank you very much. Fitzgerald: Thank you, ma'am. We appreciate it. Weatherly: Mr. Chair, at this point we just have in-person testimony, so we are taking a cleansing break for just a second and Chris Wentzel will be up next. Fitzgerald: And if you are online on Zoom raise your hand -- using the Zoom raise your hand, motion if you would like to testify and we haven't gotten to you yet. Weatherly: And, Mr. Chair, Chris has said that they will pass on their turn, so Peter Parpart. Sorry if I misspoke. Fitzgerald: Madam Clerk, you are breaking up a little bit. Just FYI. Weatherly: Thank you. I turned it on. Sorry. I had to turn it off while Chris cleaned it. Parpart: Got you. Okay. Peter H. Parpart. 3090 South Alfani Way in Meridian. Strada Bellissima. If you look at the site access site map that they were giving us, I'm the guy that lives right across the street from that bridge. Anyways -- so, yeah, I came here to talk a lot about the traffic and whatnot. If I tend to drift, I'm a night shift person. I just woke up. So, I haven't had a lot of coffee yet. Came straight here. But we heard a lot of points regarding different issues tonight and the school over overcapacity, Victory Road congestion, poor planning regarding the access point and I have been to that Locust Grove development that was mentioned over by like the Fred Meyer near Fairview and Locust Grove there and that, too, has one access point and it's right by the lights at Locust Grove and Fairview, so as you are trying to get to like the Fred Meyer you are always stopping, because there is five people wanting to get out and, then, you miss the light and it takes forever. It's very poorly planned. Bottom line on this project, though, is that it will violate the Meridian Comprehensive Plan policy by not, quote, preventing or mitigating against incompatible and detrimental neighborhood uses. If you approve this project you will be violating Meridian Comprehensive Plan policy. Your own policy. It makes no sense to build 170 high density apartments and condos or townhomes across the street from these half million dollar homes and I'm not sure the square footage of these townhomes that will be put, quote, adjacent to the Strada homes. But I can bet you their square footage is not compatible with my square footage. They are townhomes. Anyways, it makes as much sense as permitting a strip club and a liquor store across the street from the school. It just makes no sense. And did anyone tell the folks at Timberline Estates -- they are building there now and I'm sure a lot of people have prepaid for these lots and has anyone told them that there is going to be these --this contraption built there, this -- this monstrosity with the traffic -- oh, it's going to be great. Yeah. I can't wait -- Meridian Planning&Zoning Commission Item 1. August 20,2020 F36 Page 32 of 67 can't wait for that. There was a couple of things I wanted to -- I had so much math I did, but, then, they changed the plan and so all my math is wrong, but the in and out thing -- the in and out access, completely undoable. They are just going to come ripping past my house and since I sleep days I will thoroughly enjoy that. But the plan proposal also shows -- and now the new one shows an extension -- a road extension -- a proposed road extension that would drain yet another subdivision out through their proposed project here right into my front yard and the one thing I wanted to really really mention -- and I will close with this -- and nobody I guess has noticed this, but I have lived at that corner for -- oh, gosh, since 2010 and for the last eight years I have been really excited to watch this every year. There is a nesting pair of peregrine falcons that live right on the other side of the canal where they are proposing a dog park. Now, the dog park would provide prey for them for the -- for the falcons, but I'm sure -- yeah, I'm sure there could be -- but by building this you are going to put out of -- you are going to make homeless a pair of protected raptors and maybe we need to just make it a raptor park or something. I don't know. It's fun to watch these things and I invite you all to come out and park somewhere -- not in front of my house, but they -- they sit and they roost on the -- the phone lines and the trees right there and they hunt all the little critters in the -- and they hunt the field mice in my backyard, thank goodness, but they are fascinating to watch. They have been there for years. They raise their young every year and with this all those locust trees will be gone. There will be a dog park. There will be apartments. And both -- those falcons are going to be gone and, you know, it's a protected thing. We should -- we should cherish this kind of stuff. That's all I got. Yield any time that I have left. Thank you. Fitzgerald: Thanks, sir. We appreciate it. Weatherly: Mr. Chair, next we have Karen Schmidt. Schmidt: My name is Karen Schmidt. 355 West Victory Road, Meridian. So, me and my husband live on the five acres to the west of the land that we are talking about. We have been there for 22 years and through those years we have had multiple developers come and talk to us about our property -- purchase our property, you know, to add to the 18 acres, purchase part of it for access, or to include us in the development and our impression was always -- and I think Annette was the one that brought this up -- our impression was always that this would be zoned light commercial with transition to R-4 like Strada Bellissima and Observation Point. So, this is a really unique piece of property and Meridian has the opportunity here to do something special with it and it was Julie that mentioned the Ridenbaugh Canal and I just want to add something to that. So, I have documented this year probably about two dozen birds that have passed through or they are living there and out of those birds the majority are on the migratory bird protected list and all that's on the public record. I put the links and stuff there for you. I just want to say that. The other policies that I wanted to mention have already been covered, you know, one about the property values and the one about transition. So, when I look at the plan -- when I look at the new plan there is a couple things I want to point out. The sidewalk that they talked about, that's going to have to dead end into our property, as it runs -- as it runs along the canal there. It will dead end into our property. The other thing I think Wendy mentioned -- I couldn't really hear her. I thought she said that she had Meridian Planning&Zoning Commission Item 1. August 20,2020 F37 Page 33 of 67 talked to us -- or the developer had talked to us and I see that you have the road running through our property for future development. It's stubbed off, so that it will end -- yeah. It's stubbed off at our property and, you know, the future development you see it running through our property and nobody's talked to us about that. So, the other thing I wanted to ask about was staff mentioned that the school system had capacity and when I read the agency reports from West Ada County had said that those three schools affected were under capacity or at capacity. So, I would like clarification of that. And so that's it. Thanks. Fitzgerald: Thanks, ma'am. We appreciate it. Weatherly: Mr. Chair, next we have Kateri Bilay. Sorry. Bilay: My name -- my name is Kateri Bilay and I live at 3315 South Peoria Way. 83642. And I have lived there since 1999 and when we moved in everything around our subdivision, the Willow Creek, was fields and now everything surrounding us, except for this one field in front on this corner, is all subdivisions or planning to be subdivisions and so what has happened is that all of the surrounding wildlife has been kind of compressed into this one field. I'm a biology student at Boise State. I'm also an intern with the Peregrine Fund and with the Intermountain Bird Observatory and Ruth Melichar Bird Center and I also studied in Spain with migration as well. So, I have spent a lot of time watching the birds and watching the falcons and the raptors and the kestrels use this area, as well as the fox that got my cat and the raccoon that comes and eats the cat food and also the skunks and the voles and the moles, the ground squirrels and all the animals that my cats would bring home, as well as songbirds. There is Swainsons hawks, kestrels, American kestrels, two nesting pairs of red tails. There is -- I believe they are sharp-shinned hawks who nest in one of the trees in our neighborhood. They all use that field daily all the time and, you know, obviously, people have talked about what's wrong, you know, that -- there is a lot of things wrong with the development of this property, but no one's really talked about other options. You know, the lady talked about the Ridenbaugh Canal and that it should be a feature that is accentuated. We had the other gentlemen talk about a raptor park and also the fact that that little corner area where they are suggesting a dog park is very small and there are Canadian geese and mallards who nest and raise their young there every year as well and so it could be more feasible, if I could make a suggestion, to make it into a nature center. I grew up there, so I went to Mary McPherson, I went to Mountain View. I graduated 2013. Mountain View was overcapacity then. Highest population school in the state of Idaho when I graduated seven years ago and there is not any other high school that is around the area and I can only imagine how much worse it is now for those kids. I feel bad, because we were already overpopulated then and you have the -- I believe it's Victory Middle, Mary McPherson. If we make that into a nature center that would be an area for outdoor learning, that would be an area for people who live in the area to enjoy nature, they could learn about the native habitats. The MK Nature Center in Boise that's along the river there, it is interactive, but it has native plant life that you would normally find in that area. Do the same thing with this area, make it into an area that has sagebrush, the native ecosystem that we used to have in this area and that would support the wildlife that Meridian Planning&Zoning Commission Item 1. August 20,2020 F38 Page 34 of 67 already exists there. So, that would be a suggestion possibly that would be cheaper and make the quality of life much better for everyone that lives there. Thank you. Weatherly: Mr. Chair, next signed up is Chris -- or Chris and Amanda Mahler -- Mahler. Fitzgerald: Again I appreciate the attendees kind of keeping your -- your issues -- if we have heard them already, kind of keeping them to specific points that are new would be appreciated. Thank you. Mahler: Yeah. I guess I -- first of all, my name is Chris Mahler. Live at 3022 Jiovanni Avenue. In addition to the points that were brought up about the potential for people going through the neighborhood, Strada Bellissima, to access this new development, what I can say is it's already happening frequently. In fact, my kids are the kids that we are talking about. I got an almost two year old and an almost five year old that, yeah, we would like to have them play in the front yard, because we got a nice big driveway. Cars coming down the street, obviously, not from our neighborhood, because they come in one entrance and leave -- leave out the other, my house is one of the houses they have to drive by just before they leave the neighborhood. They are going 25 miles an hour with one house to go. So, it's a -- it's already happening, it's just not like a potential. So, I want to make that point. One of the points about the light commercial or light office just to the north of this development, that was brought up as one of the -- I guess adjacent employers per se, you know, for this community, but if it's a right-in, right-out, I don't understand how they are even going to get to work. For one, you got to turn out onto Meridian. You can take a left, but you can't take another left back into the light office area. So, you are expecting people to drive, what, four or five miles to get across the street to work? That doesn't make any sense. So, that -- that's a nonstarter for these people. You know, you are relying on their best intentions to follow the traffic rules, right-in, right-out, but, you know, that's -- if you're relying on people's best intentions, you are -- you are probably going to be disappointed a lot of the time, so -- and I guess the other thing I wanted to find out, there was mention about, you know, if -- you know, if they couldn't meet the traffic requirements that -- or further down the road they would either meet the requirements or there is some sort of a -- it almost sounded like a fine -- you know, almost like a penalty against the developer that would be in place of actually making the requirement -- meeting the requirements and I guess I was curious is that -- is there a public place where we can understand what those fines are? I mean I guess I just don't want to be one of these things where they say, well, go ahead and charge us, because that's -- that's a lesser penalty than actually making the improvements required to -- to meet the requirements for the development. You know, almost like, you know, paying the fee rather than, you know, providing insurance for your employees if you are under the Obamacare plan. You know, it's just one of those things where, you know, if it's less expensive to just pay the fee and walk away, you know, that's probably going to happen, but, you know, we should probably understand what that -- what that is and I'm making one last pass through here. And I think that was everything I had to say. So, I appreciate your time. Meridian Planning&Zoning Commission Item 1. August 20,2020 F39 Page 35 of 67 Fitzgerald: Mr. Mahler, we will have the applicant address the traffic issue and when they can actually pull the trigger on developing. It's not necessarily fine, but we will have the applicant address that when they come back to close. Mahler: Okay. Thank you. Fitzgerald: Thank you. Weatherly: Mr. Chair, that's all we had that signed up to testify, both online and in the room. Fitzgerald: Is there anyone in the audience or online that would like to testify that hasn't yet? Commissioner Seal -- oh, I see a gentleman in the orange and black. If you want to come forward. Weatherly: We also do have one online, Mr. Chair, that has raised their hand, so we will go ahead and go to them next, if that's okay with you. Fitzgerald: Okay. Sir, please, state your name and your address for the record and the floor is yours. Keith: Hi, I'm Chris Keith. I live at 181 West Winnipeg and it just aggravates me a whole lot. We got the new subdivision -- I live directly south of this planned thing. We got the new monstrosity complex of apartments. Our crime rate has gone up ridiculous. People are spray painting BLM on brand new fences. Somebody's car got tagged with BLM and somebody else tagged another fence. F COVID-19. Granted, these are probably kids, but that's all we are getting. It really aggravates me. I'm a native Idahoan. It's just so aggravating. Nobody ever touches down on pumping more people in. We don't have the infrastructure. I'm not just talking traffic, the water--we are going to end up like California with no water all the time. It's just so aggravating. That's all I have got to say. Thank you. Fitzgerald: Thank you, sir. We appreciate it. Madam Clerk, do you want to head to the person online. Weatherly: I'm getting them in the speaking mode right now. Catherine, go ahead. Fitzgerald: Catherine, can you hear us? Go right ahead, ma'am. Cantley: Can you hear me? Fitzgerald: Yes, we can hear you. Cantley: Hi. My name is Catherine Cantley. I'm at 3007 South Alfani Way, much like many of my neighbors here that have talked. I think a lot of the great points that were brought here I respectfully agree with and I hope that you take those into consideration. Meridian Planning&Zoning Commission Item 1. August 20,2020 F40 Page 36 of 67 My only comment really is just that I hope that before you make a decision you really fact check all of the data that our developer has brought to the table when they say things like I'm under the -- we are under capacity for schools and so forth, I hope you look at those trends going forward. I hope you look at how much under capacity they are. There is a lot of development in this area as you know south of the highway and I just hope that you really look at those trends before you make a decision. We may be at or under capacity barely by one or two kids right now, but I guess I would just encourage this group to really look -- look at the trends to see whether or not in two years, in five years, in ten years we really truly will be under capacity for a lot of those developments and that's the only comment I really want to make. I respect your decisions. I just -- I really would really hope that you look at the data going forward, not just at the present time. Fitzgerald: Thanks, Catherine. We appreciate you being -- participating tonight and giving us your opinion. Cantley: Thank you. I appreciate it. Fitzgerald: So, last call for anyone in the audience or online who would like to testify, please raise your hand. Weatherly: Mr. Chair, we have two people raising their hands. Sir, you raised your hand first, so if you want to come up, please. Howard: So, one thing kind of struck me as odd -- Fitzgerald: Sir, can you state your name and your address for the record, please. Howard: 359 West Oroso. Steven Howard. So, we are living on the main street going through. There is already a lot of traffic. Kids -- don't even let them go out there. But -- so, she said that, basically, there is an acceptable level of traffic, but yet they are going to expand it to three lanes. That struck me as odd, because it's just -- it's not in the part of Victory Road where they are expanding. So, is it suitable for the traffic or is it not? I just -- that's just what I noticed. Thank you. Fitzgerald: Thank you, sir. Weatherly: We have one more in the audience that wishes to speak. He will come up in just a second when we are done getting cleaned up. Fitzgerald: And I think you have one more online now. Weatherly: Thank you, Mr. Chair. Weimer: Hello. My name is Kurt Weimer at 3322 South Cobble Place. I'm in the Preakness Subdivision and primarily when I came here I was concerned about the traffic and also about the home values and thanks to my neighbors they brought up a lot of extra Meridian Planning&Zoning Commission Item 1. August 20,2020 F41 Page 37 of 67 valid points on why this should not be approved. My question -- how many projects have already been approved -- other than Preakness, CBH is building dozens of homes right next to me and, you know, it's all single family homes and, then, you get -- you have Timberline, you have L-3, and you are talking hundreds possibly homes -- how many more area is being built out as just single family homes and the effect that that's going to have on the traffic there, too. And that's my primary question. Thanks. Fitzgerald: Thank you, sir. Weatherly: Okay. Go ahead. Schneidau: Hello. Peter-Mark Schneidau. 321 West Galvani Drive, Meridian, Idaho. 83642. Our backyard butts up against Galvani Drive and we have lived here for six years. I'm sorry. Against Victory. We have lived here six years. In six years we have awoke in the middle of the night to three accidents -- crashes on Victory Road. I just want to make sure that that's included in the record. Two cars going into the canal and one going westbound into a -- off the road there at the curve. It's -- it's a dangerous curve. It's -- that should be documented that the S curve there on Victory Road is not to be underestimated for its effect on traffic and I second everything else regarding the schools, regarding the exit from Strada Bellissima. I'm not -- I don't recall it being mentioned, but we should mention that if somebody was to try to turn left into the Victory Apartments on Victory Road, there is not a lot of distance between that proposed entrance and Meridian Road, so if it got backed up you could conceivably be -- have a green light on Victory Road on the other side of Meridian Road and not be able to proceed across the intersection on your green light, because traffic is backed up. Or, of course, you could also not be able to turn right from southbound Meridian onto Victory Road. There is just not a lot of distance there and we are trusting that people would not try to turn left into the apartment complex if that was the rule and that's all I have. Thank you for your time. Fitzgerald: Thank you, sir. We appreciate you stating those points. Thank you. Is that -- do we have any additional raised hands or -- Commissioner Seal, you don't see anyone? Weatherly: Mr. Chair, we have one more that would like to speak who is in person with us. Fitzgerald: Perfect. Sir, welcome. Please state your name and your address for the record. Edmondson: Yes. My name is Leif Edmondson and my address is 3086 South Silvertip Lane. I'm a little concerned, because the applicant -- they kept stressing in their presentation that there was -- the property planned is on Meridian Road. It's not even on Victory Road, that's where it's all going to happen. It's already bad now. It's going to get worse if they do this. Also I have another question for staff. Please do a little more research on the fire code. Yeah. A hundred and seventy units in a place that's got one entrance and an exit and if fire goes through there it's bad. I just -- you know, I can't Meridian Planning&Zoning Commission Item 1. August 20,2020 F42 Page 38 of 67 believe that the fire people would say, yes, to the plan. That's my biggest concern. Thank you. Fitzgerald: Thank you, sir. We appreciate it. With that would the applicant like to come back -- Wendy, would you like to come back in and close. Oh, Chris is on sprint mode. Thanks, Chris. Weatherly: Mr. Chair, Chris wants you to know he's got his step counter on, too. Fitzgerald: I love it. He's running fast. Shrief: Chairman, Commissioners, I wanted to wrap up a few points and also I have the -- the actual developer has been on Zoom and online and he -- Erik Pilegaard wanted to have a chance to testify and address a couple -- a couple of questions that came up and I -- I wanted to clarify the ownership issue. The -- the property is currently owned by an entity in Idaho Falls. My client, who my contract is with, is -- is actually the developer who is intending to purchase the property. He does not own the property now. It's owned by an entity in Idaho Falls. My client is -- has an option on the property and would like to purchase the property. But with that I want to let Erik Pilegaard, who is the developer of Little Creek, the enclave, I wanted to let him -- he wanted to have a chance to answer a couple questions. And, then, I would have an opportunity to wrap up after that. So, if we can get Erik online, he should be on there. Weatherly: He's ready to go. He just needs to unmute himself. Pilegaard: Thank you. Can you hear me? Fitzgerald: Yeah. Erik, go ahead and state your name and your address for the record, please, and you are good to go. Pilegaard: Perfect. Eric Pilegaard. 10981 Olana Drive, Truckee. Zip code 96161. 1 want to thank the Commissioners and actually everybody that's testified as part of the record, but I want to illustrate a few key points that when we designed this and we also design the other project, what is important to know is that we are designing this for family members, so we have no studio units, we have no one bedroom units. The entire project is made up of both two bedroom and three bedroom units for families. We create our own park off site with the swimming pool, the clubhouse, barbecue features and that's where they get to enjoy their community. The reason we selected this site from the previous owner is due to its location, its proximity to the intersection and main arterial. Single family homes are somewhat less desirable when you have a large intersection like that of 36 homes for homeownerships, so we are giving the community an option for -- if they don't want to purchase a home, but they can definitely rent and lease a home, they are up to -- you know, a year or two years are standard for some of our contracts. As we all know that the Ridenbaugh Canal is a dry feature come October until springtime. We agree that we should enhance that, because it is a nice feature, so we will talk about fencing and so forth. We would probably do some type of wrought iron fencing to protect Meridian Planning&Zoning Commission Item 1. August 20,2020 F43 Page 39 of 67 the -- you know, that quality of a feature. Our intersection across from the project, we are happy to match the island design for the crossing. We were told to locate it there, because we are roughly one thousand feet from the Meridian intersection. So, a lot of the concerns about, you know, a left turn in and a right turn, they are pretty fairly mitigated due to that distance from that intersection and that was the approximate distance that Wendy had provided. That's almost a quarter mile from Meridian Road. We are kind of bound by ACHD and the traffic for what they tell us to do. We don't try to dream these things up. We try to build good quality development that will represent the community for years going forward. As far as, you know, home values and pricing, these units for rental -- or actually I should say lease -- lease to family members in the range of about 1 ,500 a month. That's not cheap for the kind of quality developments that we try to do for the community and we have been very very successful on the enclave project and just for the record as well, the enclave project has two entrances, one on Wilson and one on Locust Grove, just -- just for the record. As it relates to the -- the access and ingress, all these units are -- have fire sprinklers, which is a new building code in the City of Meridian for these types of projects. So, every home -- every unit has a fire sprinkler in it and the Fire Department did require that emergency access if ever needed. So, that's -- wanted to clarify that response. We are located on a -- on a major arterial and we feel that it's a very very good location for some new community members to enjoy Meridian. I want to just thank Wendy for all of her time and effort and I want to thank staff for doing the research on the schools, on the traffic, that we fall within the guidelines for that. We don't -- we wouldn't consider going forward with a project if we didn't have staff's approval and we -- they have worked diligently and we worked diligently with them and Wendy has as well to build a -- a very good community. I just wanted to kind of close and say thank you for your patience and we hope you support the Victory project going forward. Thank you. Fitzgerald: Thanks, Erik. We appreciate it. Shrief: Mr. Chair? And if I -- if I can get a couple more minutes I just wanted to address some of the audience comments and do a little bit of a wrap up. I know we had a lot of discussion on traffic this evening. I wanted to read a section of the ACHD staff report and kind of emphasize where -- where we are at in the planning process. So, these are from the ACHD site specific conditions of approval and prior to listing their conditions, which are general, make this statement: This application is for annexation only. Site specific conditions of approval will be established as part of the future development application. So, I'm reading that, because I want to emphasize that -- that that's where we are at in the process. Right now we are planning for annexation. We have a concept plan and we are applying for our zoning, but ACHD, which is our agency which dictates our traffic and how we are going to pay for our traffic impacts, how we are going to start this project and deal with traffic in the neighborhood, that's -- that's their recommendation that this application is annexation only and that the site specific conditions will be established as part of a future development application. So, I just wanted to clarify that. I know we have a lot of discussion on traffic this evening. Again, what -- what we are applying for is our Comprehensive Plan designation. Previously, prior to your comp plan change, in Meridian you could actually request a step up. If you had medium density residential you could go in and as part of your zoning request to step up through the Comprehensive Meridian Planning&Zoning Commission Item 1. August 20,2020 F44 Page 40 of 67 Plan for R-15. That provision has gone away. I don't think it's a bad thing, but that's gone away in Meridian and what we are -- so what we are requesting is, essentially, what had been a step up on your previous comprehensive plan, the -- the -- the current property owner who is based in Idaho Falls, basically was -- was left out of the Comprehensive Plan update, they weren't aware that the process was undergoing. They had a number of properties all over the country and they missed out on the comp plan update. So, that's -- that was not my client, but that the current property owner missed out. I know I have several property owners I wrote letters for when you were under -- when they were undergoing the comp plan update and they missed out on that part of the process. But I think when we -- when we look at this area and whether it makes sense to have this Comprehensive Plan designation, again, we are on a principal arterial, Meridian Road, we are across the street from R-15 multi-family. We have light office to the north. Across the street on the corner we have a commercial land use and we are providing a buffer, essentially an R-15 -- and R-8 buffer where we adjoin single family. So, I think what we are proposing this evening absolutely makes sense and we will work through -- through the details in regards to traffic planning with -- with that conditional use permit and once we have our TIS in hand and ACHD can assess what our -- what our impacts are in the neighborhood. So, I know we had a couple questions about fire, which we -- we did address. We -- we will have sprinklers in all units and we will have a secondary access point for emergency access only. We had a number of neighbors who brought up questions regarding where the data on the schools had come from or from the traffic. This -- this data is all reported from agencies. That school data came from the West Ada School District and the assessment on the current level of service of Victory Road came from Ada County Highway District. So, this is not reported by the developer, this is -- these are from agencies as a part of our -- as part of the application process and -- and the links to that were provided through -- through the staff report. So, we -- we definitely are here to this evening looking for approval. I'm here for any additional questions and -- and in regards to the impact fees and kind of how that works, with a TIS with that submitted to -- to ACHD and that's required to be submitted to the highway district prior to even making an application for a conditional use permit or a plat to the City of Meridian, that document will be used to assess what our traffic impacts are and what fees we are going to pay for those impacts. So, that's -- it's not a fine, they have an equation for it, and it's a cost of doing business and that's -- it's assessed through Ada County Highway District. There are additional impact fees case to the city of Meridian also. But I'm here for any additional questions and, again, we are hoping for a favorable recommendation this evening. Fitzgerald: Any questions for the applicant? Shrief: Okay. Fitzgerald: I appreciate your clarification on the highway -- or the ACHD report. I want to make sure we get that clear. Any questions for Wendy at this time? Thank you, Wendy. We appreciate it greatly. Meridian Planning&Zoning Commission Item 1. August 20,2020 F45 Page 41 of 67 Shrief: Okay. And, Chairman, Commissioners, again when -- during your discussion if you have any questions I'm happy to come up and discuss things. Fitzgerald: Just to clarify, when we close the public hearing that's kind of the end of it. So, we will make sure nobody has questions before we close the public hearing. Shrief: Okay. Fitzgerald: Any questions for staff or for the applicant before we close the public hearing? Schneidau: P.M. Schneidau. I am online and I have a question. I just want to make something clear -- Fitzgerald: Sorry, Mr. Schneidau, we -- the time for public testimony is over. Schneidau: Okay. Sorry. Fitzgerald: Team, anything we need to talk about with staff? If not, I would entertain a motion to close the public hearing, either way you guys want to move forward. Holland: Mr. Chair, I move we close the public hearing and move to deliberation. McCarvel: Second. Seal: Second. Fitzgerald: I have a motion and a second to close the public hearing for file number H- 2020-0065. All those in favor say aye. Aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. Fitzgerald: Commissioner Holland, does that mean you want to lead off or -- Holland: I guess I can. Fitzgerald: I'm -- I'm happy to lead off if you want to, because I have some initial thoughts if you guys want me to go first. Holland: Why don't -- why don't you go ahead, Mr. Chair. I will go second. Fitzgerald: Okay. So, my -- and I kind of laid this out for Wendy a little bit. I -- I have concerns about that area and the road and I know we have to make sure we -- we stick to the Comprehensive Plan and code and those kinds of things, but these are one of those things where I think we may be getting into a hornet's nest of traffic problems that is a safety issue, which is part of our-- part of our Comprehensive Plan issue. One of the biggest things I have is we just finished the Comprehensive Plan and the future land use Meridian Planning&Zoning Commission Item 1. August 20,2020 F46] Page 42 of 67 map process and we literally just did it. I think the Council approved it and it was less than a couple months ago. It was -- it's -- it's recent and when we are asking the public to give us feedback and it goes through that long a process and spend taxpayer dollars to do it and, then, immediately we respond with a Comprehensive Plan and future land use map change, I have a challenge with that. That's my biggest concern is we just went through this process and I'm sorry they missed the date or they weren't -- the person involved in the process was not part of it, but I think that's -- it's a challenge when we set this process forward and we give everybody certainty about what we are trying to build there and two seconds later we immediately try to amend it and so that's my biggest heartburn with it. In addition to the snarled area that area seems to already be -- be surrounding. I think the two neighborhoods emptying out onto that spot and, then, having no -- like direction for the CIP to actually have traffic or that -- that road to be widened or an answer for that road until after 2030, that's not an okay situation, at least in my opinion. So, I would love to hear others and, again, I'm always up for being swayed other ways. I'm just -- this is a concern for me. Holland: Mr. Chair? I had the opportunity to sit on the committee that reviewed the Comprehensive Plan and I know it's -- it's an involved process. They were working on it for a long time and I -- I would echo your same comments, it's really tough to come back with a newly adopted plan and -- and make changes to it. Certainly understand the applicant's desire there and I know that it's a really tough piece of property. For me when I look at planning and from my experience, yes, I agree that multi-family works really well along high traffic corridors, but it's also got to have a combination of several other things that go with that. One being that there is walkability to neighboring services, that there is safety of pedestrian pathways, those kind of things. So, you know, what we have done with Ten Mile makes sense for a lot of that, but in this specific area, if it was on a different intersection that was tied to Meridian Road it could be a possibility to work there, but I have a lot of concerns about access roads coming into the neighborhood. Same reasons you just stated as well. It's one thing to say it's right-in, right-out, but there are going to be people -- what would probably happen if they actually put a median in the road is that people are all going to go up and turn right on Stoddard and do an illegal U-turn and come back. So, I think that we will be creating some strain on some of our other neighboring properties that are around it. I appreciate the concept of them -- the conceptual plan of the multi-family developments that they presented to us. I think it looks like a great concept for somewhere in Meridian, but that specific piece of property to me is a challenge. Fitzgerald: Comments? Commissioner McCarvel. McCarvel: Yeah. I would agree with what's been going on. I mean that was -- you know, my question to the application right -- there is just -- that road just does not work. I -- and I understand -- I mean any other place I'm -- I would probably be okay with it -- of doing just a little bit of an upset, because being a medium density already -- I mean they could go in there and put a whole bunch of skinny, you know, R-8 housing in there with some pocket parks and, you know, that wouldn't fall in it, but --- and that's not always desirable either. So, the concept in general, you know, I like, it's just that corner and that access Meridian Planning&Zoning Commission Item 1. August 20,2020 F47 Page 43 of 67 there, we are just asking for trouble to have people lining up there to take a left, because -- I know. I avoid that-- I avoid that intersection if I have got to go west. I will go Overland or Amity every time. And I agree. I mean we did just do this Comprehensive Plan and I'm sorry that the owner lives somewhere else, but it was not a short process, this was two years in the making. There was plenty of time if they were interested. That's my thought. I just -- I think that whole section of road is a no go that -- I mean the only way I would be remotely in support of it is if it was conditioned that it had to go to three lanes upon occupancy. I mean it -- I think that's part of why we are here. You know, there is the dotting the I's and crossing the T's of a project, but, then, there is the common sense to it as well and we know how that -- I mean that road is just -- it's already dangerous. Holland: Mr. Chair? Fitzgerald: Commissioner Holland. Holland: One more comment I forgot to make. So, I know that one of the last applications we looked that was close to this curve, I think we just reviewed it in our last meeting or the one before, they had a challenge with having enough frontage in front of the Ridenbaugh Canal to even do sidewalks off of Victory and so having connectivity for pedestrian access, it scares me on that corner for sure, especially when you have got a lot of residential and you are having a dog park and, you know, trying to encourage people to walk and bike and I just don't think it's the right spot for a dense project. Fitzgerald: And I'm with you on that. I mean I think there is -- and you know me, I like density on hard corners, especially on major highways. I think that it makes sense there. I think there is just pieces of this that -- that don't add up and that -- that property to the -- to the west seems like it needs to be brought into this discussion before we get into our master plan, so the route going forward and where it ends up in on Victory Road there are all taken care of and so that's my -- my challenge with this and I think they did a great job of laying it out. I know it was a lot of work from staff and a lot of work from the applicant and so it's not that I don't like the project itself, I don't like the piece of property that we are trying to fit it into. So, additional comment? Grove: Mr. Chair? Fitzgerald: Commissioner Grove. Grove: I will echo a lot of what people have said. 1, too, am in favor of density and diversification of housing in all the neighborhoods that give neighborhood a balance and also having the density, you know, close to major arterials. The -- the lack of like projection on where this road is -- with Victory is going to be with ACHD and what really concerns me in trying to put this in. I also like -- you know, the layout for the most part, but I feel like the project ends up being an island and doesn't improve connectivity in any way and that concerns me moving forward just with -- in terms of how -- how integrated it becomes with the rest of the -- the neighbors and, then, also just anytime we have, you know, larger developments in south Meridian schools are a major concern for me and, Meridian Planning&Zoning Commission Item 1. August 20,2020 F48 Page 44 of 67 you know, maybe with COVID changing how schools, you know, end up being enrolled and whatnot might make some changes, but for now, you know, I have some major concerns with how -- how that starts to impact the schools and not having a -- necessarily a roadmap on how to get out of that in the short term is also concerning, but I -- I have a lot of concerns with -- with the project, where it is and when it is. Fitzgerald: Thank you, Commissioner Grove. Commissioner Seal, do you have some thoughts? Seal: Yes, I do. I'm -- a lot of -- Fitzgerald: Go ahead. Seal: I will echo a lot of what, you know, other Commissioners and the public have -- have already stated. I mean one thing that I will say -- because we are trying to speak to some of the positive in here and, you know, I do -- I like the layout that they came out with. I like that they are trying to, you know, essentially, blend in with R-8 style housing features that are there within, you know, adjacent properties and things like that. I -- I do agree that with as much of this property on the canal that -- I just don't see that they made the canal a feature. It's -- I mean it has a walking path next to it, but I think the -- a lot more could have been done with that. You know, again, the traffic concerns and all that are -- are very valid. I mean I -- it's almost worthy of, you know, more communication with ACHD, in my opinion. I mean I think if ACHD is going to continue to hand down that it's adequate and we are going to come back that it's not adequate, then, that leaves this piece of property landlocked, you know, at an impasse. So, I don't think that's fair to, you know, a person that's going to try and develop it or a landowner that is, you know, basically incapable -- or, you know, can't sell their land to be developed, because, you know, like we all know, there is -- there is a large demand out there for this. So, I was a little disappointed that -- I asked the question of R-8, that the answer was no. That's -- that's unfortunate, because I mean at this point without -- without the ability to, you know, come back and kind of reduce the density and trying to work on some things like that, then, I'm -- I'm at a point of denial on it and so -- I was going to say, Wendy's got her hand up, but the public hearing is closed, so -- Weatherly: Mr. Chair, Wendy is asking if she can request to be recognized. Fitzgerald: Commission, I have a problem if we are -- but I'm not going to get into a back and forth, Wendy, in regards to how we are going to move forward. I -- if you want to do something that's going to be significant, that's fine, but we are --we are not here to debate the project in the middle. So, if it's okay with the Commission we will open it back up to let everybody have some comments, if that's okay with you all. Any concern? Holland: Mr. Chair, I think we would have to vote to reopen the public hearing if we were going to hear from the applicant. Meridian Planning&Zoning Commission Item 1. August 20,2020 F49 Page 45 of 67 Fitzgerald: Yeah. Agreed. That's my -- and that's up to the Commission. I can't reopen it, so I got to have a motion and a second and a vote. So, with that, Wendy, I'm sorry, think we have already closed public hearing, so we appreciate it and let us keep deliberating and we will see where we go. And I can't hear her, so -- additional comments or thoughts? Commission Seal, I really appreciated your -- I do agree with you on R-8. think, again, there is some -- some issues with regards to how they are going to exit that place without having a secondary access still for me, because I know that's not an easy fix right now and they are not going to get access to Meridian Road. So, I think without secondary access or a master planning with the neighborhood -- or the neighbor next door or that road being widened, it's very difficult to move forward. At least with the current plan. But always up for additional comment. Holland: Mr. Chair? Simison: Commissioner Holland. Holland: My last comment is I know we -- right now we are not looking at the concept plan, we are not looking at the multi-family, they would have to come back to us with whatever that request is later. We are solely looking at the request for a comp plan change into the annexation and, in my opinion, from what we have heard tonight, all of the things that we have deliberated, those two things, regardless of how the site plan would lay out, would cause the same chances regardless of what layout they come back to us with for an R-15 zone, so I don't know if we are ready for motions and that, but certainly could try to throw something out there and I want to say I think that the team has done a great job and I know the firm did a nice job putting together a great layout that we think is, you know, could be an exemplary concept for multi-family projects. I think it's just a tough piece of land in -- in the area and I hope that they can find another piece to do this concept better and in a different spot. Grove: Mr. Chair, could I -- Holland: And they can put -- and they still try to take this forward to Council. Yeah. Fitzgerald: Yeah. Absolutely. Holland: Go ahead. Fitzgerald: It's a recommendation only, so they have an opportunity to go present to Council and maybe there is -- the people who get paid the big bucks -- and I give them a bad time, but the ones that have the names on a ballot and are not appointed volunteers get to make the judgment calls. We are here to make sure that it meets code and -- and Comprehensive Plan and -- and those kinds of things and we just went through a comp plan and that's kind of where I come from, but Commissioner Grove. Grove: Mr. Chair. I was just going to say one last thing in terms of -- I -- I -- if they could answer some of the things moving forward in terms of connectivity, it would make the Meridian Planning&Zoning Commission Item 1. August 20,2020 F50 Page 46 of 67 project a lot easier to discuss. So, I think they have to address that in some way, shape, or form at some point. Seal: Mr. Chair? Fitzgerald: Appreciate that, Commissioner Grove. Commissioner Seal. Seal: Yeah. And -- and on that I mean we are -- you know, again, I hate -- well, I don't hate to beat up on ACHD, I do it all the time, but I mean we are -- that's the impasse that we are at is, basically -- I think without the track -- the traffic improvements, then, this piece of property is going to be a no for almost anything that would want to try and develop there because of the safety issues involved. Like Commissioner Holland -- I believe it was -- no, it was Commissioner McCarvel brought up that -- I mean in the last application that we looked at, I mean they couldn't even build a sidewalk along the road, because of where the canal is and how closely the road is to it. So, trying to have, you know, adequate turn lanes in there for this is something that's just -- I mean it -- there is almost no way they can possibly do it with the amount of land that's around it with a canal placed where it is, so, you know, again, what--whatever we send to --to City Council -- hopefully, we can phrase it in such a way that encourages them to, you know, have staff work with ACHD in order to provide some kind of solution, so that we can, hopefully, move forward with this spot of land in the future. Fitzgerald: Appreciate that. And I think -- yeah, no, I think that's a very -- very good counsel. Commissioner Holland, did you have a motion or a thought that you wanted to move forward with? Holland: I could certainly throw it out there and I would just make the comment to you that, you know, if they wanted to work with that landowner that has the five acres and see if there is some way to connect in with that other neighborhood and do a more mixed use concept there that would fit better, I think it would be an easier concept to look at, but even still I think the R-15 is going to be a stretch for them on the site in the comp plan change, so with that, after considering all staff, applicant, and public testimony, I move to recommend denial to City Council of file number H-2020-0065 as presented during the hearing of August 20th, 2020, for the following reasons: That the city just adopted a new Comprehensive Plan and we feel it's too soon to make significant changes. That there are some roadway challenges that don't seem to be in the immediate future for reconciliation with ACHD and Victory Road and that we believe that the density might be too high for the surrounding uses. Seal: Second. McCarvel: Second. Fitzgerald: Motion and a second to recommend denial of File No. H-2020-0065, Victory Apartments. All those in favor say aye. Any opposed? Motion passes. Meridian Planning&Zoning Commission Item 1. August 20,2020 F51 Page 47 of 67 MOTION CARRIED: FIVE AYES. ONE ABSENT. Fitzgerald: Appreciate the work of the team on this and we will move on to the next item on the agenda. And thank you to the public for your participation this evening. We really appreciate it. Next item on the agenda is a public hearing for Pearson Subdivision, H- 2020-0075, and we will start with Joe in the staff report. Seal: Mr. Chair? Could we do a -- Fitzgerald: Go ahead. Seal: Could we do a quick break while they are -- Fitzgerald: Yes. That sounds great. We will take a five minute bio break and we will be back in five and be prepped for the next -- Seal: Thank you. Fitzgerald: -- discussion. Thank you. (Recess: 8:40 p.m. to 8:45 p.m.) 7. Public Hearing for Pearson Subdivision (H-2020-0075) by Melanie Pearson, Located at 175 W. Paint Horse Ln. A. Request: A Combined Preliminary and Final Plat consisting of 2 building lots on 3.98 acres of land in the R-4 zoning district. Fitzgerald: Mr. Seal, thank you for the break idea. That was great. So, we will open the public hearing on 2020-0075, Pearson Subdivision and, Joe, I will turn it over to you. Dodson: Thank you, Mr. Chair. Can everybody hear me all right? Okay. No objection, so let's move forward. This project before you consists of 3.98 acres of land currently zoned R-4 and specifically located at 175 West Paint Horse Lane. To the west and south is City of Kuna area of impact, as just discussed, and directly to the east and north is existing R-4 City of Meridian zoning. Uses appear to be county residential in all directions and/or some agricultural land. The subject application is proposing to subdivide one four acre lot into two lots for the purposes of allowing the current owner of the parcel to deed the new lot over to her daughter, so that her and her family are close by and this does include helping raise Mrs. -- Melanie, Mrs. Pearson's newborn child, or soon to be. The subject property was annexed in 2015 as part of a larger annexation in south Meridian. There is an existing development agreement associated with the original annexation and this property and this application constitutes development under city code. In reviewing the existing DA the applicant needs to apply for a development agreement modification prior to the City Council hearing for this combined preliminary/final plat. For the existing DA, the first modification is at no cost to the applicant. The reason why they did not apply Meridian Planning&Zoning Commission Item 1. August 20,2020 F52 Page 48 of 67 with one with this was, frankly, a staff oversight. I originally told them that they did not need to and after reviewing the DA in more detail, the existing DA, I had found that they do, in fact, need to apply for one. The subject application has also received city engineer and Public Works director approval for a utilities waiver to not connect to city services at this time due to services being more than a half mile away. Staff finds that making a singular property owner pay for extending city services for a two lot subdivision is neither fair, nor necessary at this time. Central District Health has also approved for an additional temporary well site and septic system. This fact further diminishes any concern staff has with the applicant's application regarding water and sewer services. As noted, there is an existing single family home on the subject property that is not connected to city services. This property, along with nearby properties, again, was annexed in 2015 and they were not required to connect to city services at that time, because services were not available. This situation has not changed for this area of south Meridian. However, when services do become available in Meridian Road, the applicant will be required to connect to them as conditioned in this application and in the existing DA. Access to this development is proposed via an existing private lane, West Paint Horse Lane. ACHD is not requiring any public road dedication due to the access not being changed. The subject application does not warrant a public road or road improvements at this time, according to ACHD. In accord with the existing access, UDC 11-3H-4 requires that an existing state highway access as -- if an existing state highway access has an increase in intensity that is to be removed upon development or dedicated to ACHD and be constructed as noted on the master street map. Paint Horse Lane is shown as a future collector roadway on the master street map, but the addition of one single family home does not warrant the construction of a collector roadway at this time and with the DA modification the applicant needs to apply for prior to City Council new DA provisions will address this and ensure any future development meets the required development standards. Staff and ACHD find that the existing private access is sufficient for one additional single family home. Because other properties -- other abutting properties are not redeveloping at this time, there is no feasible way for the applicant-owner to comply with those requirements in 11-3H and take access from anywhere else. In addition, adding one home does not create sufficient traffic to warrant construction of the collector roadway. However, staff understands that should anymore intensive redevelopment occur on site or on those surrounding properties, the access will -- will need to be evaluated for compliance with these requirements. Staff is recommending DA provisions be added with the modification application that requires a future collector street consistent with the master street map if or when this or adjacent properties redevelop with more intense uses consistent with the mixed use regional future land use designation that exists in this area as noted. And I didn't put that on there. But the whole area around here is mixed use regional future land use. To summarize, the subject application is proposing to subdivide a four lot acre -- a four acre lot, I apologize, into two lots for the purposes of allowing the current owner of the parcel to deed the new lot over to her daughter. Staff does not find that the city loses anything by approving this application and understands that this area may not redevelop for quite some time. Staff recommends approval of the subject preliminary final plat per the conditions of approval in the staff report and I will stand for questions. Meridian Planning&Zoning Commission Item 1. August 20,2020 F53 Page 49 of 67 Seal: Mr. Chair? Fitzgerald: Commissioner Seal. Commissioner Seal, go right ahead. Seal: A couple questions for -- where they are really questions just for the -- is there a time frame -- an approximate time frame when services will be available to the area? If so, what would their proximity be and what's the cost attached to city services? Dodson: Commissioner Seal, Members of the Commission, the closest services are about a mile away up Meridian Road right now. I do not know the costs for that, unfortunately. That was not part of the discussion. Public Works has not told me that or the applicant. Developmentwise, it is coming, but it -- it's not coming very quickly in this specific area. As you have probably seen with other development and you can see on our plan development map here, there is -- this is approximately half a mile square, half a mile, and there is nothing within that right now. So, I would assume that it's going to be years before services are close by. Seal: Okay. Thank you. Dodson: You are welcome. Fitzgerald: Thanks, Commissioner Seal. Holland: Mr. Chair? Fitzgerald: Any additional -- Commissioner Holland. Holland: If it's helpful for Commissioner Seal's question, I know we estimate in other cities that it takes about a million dollars per mile for extending services, so it would be a significant chunk, especially at a major corridor. If that helps. Fitzgerald: Any additional questions for staff? Commissioner Seal, did you have any follow up? Seal: Just -- the question was more based around the property owner. I mean they are -- they are -- it looked like they are going to sink a significant investment into the second property to put a well in there and if -- even in the next five years city services get to that and they are required to establish connectivity to that at a cost, then, you know, just want to make sure that the property owner is well aware that that is actually something that could happen sooner rather than later and that there is a, you know, probably a pretty big cost associated with it. Fitzgerald: Appreciate the input and I think that's a great call. Eyes wide open is always better. Any additional questions for Joe? Would the applicant like to join us, either online or in person. Meridian Planning&Zoning Commission Item 1. August 20,2020 F54] Page 50 of 67 Weatherly: Mr. Chair, the applicant is online and, Melanie, if you want to unmute yourself you can have the floor after stating your name and address. Pearson: Hi. I'm Melanie Pearson. 1717 North 7th Street, Boise. 83702. 1 don't have any additional comments. Fitzgerald: Ms. Pearson, just -- everything that kind of -- Mr. Seal put forward, you guys are aware as you are drilling a well or putting in a secondary well and there could be sewer and water at your door down the road not very long, you guys are aware of that; right? Pearson: We are aware. Yes. Fitzgerald: Any questions for the applicant? And, Ms. Pearson, you guys are all in agreement with the staff report; correct? There was no concerns you had? Pearson: Correct. We are in agreement. Fitzgerald: Okay. Perfect. No questions for the applicant? Perfect. With that, Ms. Pearson, thank you for being a part of tonight and we will probably close the public hearing and, hopefully, get this wrapped up quickly. Is there a motion out there for a -- to close the public hearing? Weatherly: Mr. Chair? Fitzgerald: Oh, yeah, we do need to see if there is public. Sorry. Weatherly: I just wanted to note there is no public testimony for this. Fitzgerald: Thank you. Weatherly: You are welcome. I didn't -- I didn't see anyone in the audience. I think Commissioner Seal and you guys are alone now. I didn't see anybody in the attendance side. So, thank you for clarifying. I was trying to go too fast. With that, there being no public testimony and there is nobody online that wants to raise their hand, could I get a motion to close public hearing. Seal: So moved. Grove: Second. Fitzgerald: I have a motion and a second to close the public hearing on H-2020-0075, Pearson Subdivision. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. Meridian Planning&Zoning Commission Item 1. August 20,2020 F55] Page 51 of 67 Fitzgerald: Any comments, concerns, thoughts? McCarvel: Mr. Chair? Fitzgerald: Commissioner McCarvel. McCarvel: I would be in support of this. I don't see any issues with it. We are not adding much of anything, you know, except the one house, so I -- I just don't see a problem with it. They are going in eyes open, so -- when utilities might be there, so -- Fitzgerald: I'm with you. I think if we were in other cities around the valley this would be a lot line -- a one -- one time split and not a development, so -- we don't have that function in Meridian, but I know Boise and Eagle do that, and Kuna may as well, but this is just some family carving up their land for their -- for their family. So, I have no problem with this and with them being aware that they are to hook up when the sewer gets there and water gets there, then, I think we are good to go. Additional comments or motion? Commissioner Seal. Seal: I will take a stab at a -- at a motion here. So, after considering all staff, applicant, and public testimony, I move to recommend approval to the City Council of file number H-2020-0075 as presented in the staff report for the hearing date of August 20th, 2020. McCarvel: Second. Fitzgerald: I have a motion and a second to recommend approval of File No. H-2020- 0075, Pearson Subdivision. All those in favor say aye. Any opposed? Motion passes. Thank you all very much. And, Ms. Pearson, good luck. We hope your process goes well. MOTION CARRIED: FIVE AYES. ONE ABSENT. 8. Public Hearing for Modern Craftsman at Black Cat (H-2020-0022) by Baron Black Cat, LLC, Located in the Northeast Corner of N. Black Cat Rd. and W. Chinden Blvd. (SH 20/26) A. Rezone a total of 23.63 acres of land for the purpose of reducing the C-C zone from approximately 8 acres to 4.42 acres and increase the R-15 zone from approximately 15.1 acres to approximately 19.2 acres. B. Short Plat consisting of 2 building lots and 2 common lots on 21.59 acres of land in the C-C and R-15 zoning districts. C. Conditional Use Permit for a multi-family development consisting of 196 residential units on 20.13 acres in the R-15 zone. Meridian Planning&Zoning Commission Item 1. August 20,2020 F56 Page 52 of 67 D. Modification to the existing development agreements (Inst. #'s: 106151218; 107025555; 110059432; and 114054272) for the purpose of removing the subject property from the boundaries and terms of previous agreements and enter into a new one, consistent with the proposed development plan. Fitzgerald: Opening up the final item on our docket tonight is -- is Modern Craftsman at Black Cat, File No. H-2020-0022. You all may recall -- and I think most of us, if not all of us, were here when this came before us before. What we requested at that time was that any testimony that is brought -- we focused in on the commercial side and on the request that we made, the changes in the requests that we brought earlier. We requested that -- a continuance for it, so will hopefully keep that narrow this evening, if there is any public testimony, we would like to keep it narrow and to the -- the changes that were made to the project. So, with that let's start with the staff report and I will turn it back to Joe. Dodson: Thank you, Mr. Chair. So, as Mr. Chair had said, this is continued from the July 9th hearing and it was for the purpose of the applicant to review amount -- the amount of proposed commercial on their site. So, I -- I don't want to rehash everything, but I will do just a brief overview of the project again and, then, I will go into what they did change. So, the applications that are being applied for are a rezone, short plat, a DA mod, conditional use permit and, then, for staff's side of it, private streets and administrative design review. The site consists of approximately 23 and a half acres with existing C-C and R-15 zoning located at the northeast corner Black Cat and Chinden Boulevard. Adjacent land uses are R-4 and R-8 to the north, C-N zoning and future church site to the east. Chinden Boulevard abuts the site to the south with residential and a small portion of L-O on the south side of Chinden. North Black Cat abuts the site to the west with C-C zoning and future commercial planned on the west side of Black Cat north of Chinden. The future land use designation out here is mixed use community. So, they are -- the changes that were made since the Commission hearing on July 9th were concerning the limited amount of commercial development that was proposed as part of the project. In response, the applicant has submitted revised plans to Planning staff, which has resulted in a number of recommended changes to the conditions of approval and development agreement. Some of the main points are as follows: The C-C zoning increased from 2.2 acres to 4.2 acres and now includes that area containing the clubhouse. The clubhouse incorporates offices that residents may run out and use for their home businesses or meetings, adding approximately a thousand square feet of leasable space. The applicant added 5,070 square feet of vertically integrated commercial square footage for the building here, which is along Black Cat. The corner commercial building on the southwest corner here is proposed as a two story structure in this site plan, with parking below the first level of one half of the building. The two story variation allows the building to have up to 19,450 square feet of commercial space, which staff fully supports, versus a one story concept. The total commercial square footage proposed for the site is now approximately 27,000 square feet. With the increase in commercial square footage staff finds the site can accommodate smaller scale, more neighborhood serving commercial uses to serve area residents as discussed by the -- by the -- as discussed and envisioned by the comp plan and discussed with public testimony at the previous hearing. The Meridian Planning&Zoning Commission Item 1. August 20,2020 F57 Page 53 of 67 applicant did respond to my staff memo with a request to remove one of the recommended conditions of approval regarding the corner commercial lot being two stories only, not the one story concept. Staff does recommend approval of the requested applications still, with the DA provisions and the updated conditions of approval in my staff memo and I will stand for questions. Fitzgerald: Joe, thank you very much. Are there any questions for staff? Seal: Mr. Chair? Grove: Mr. Chair? Fitzgerald: Commissioner Grove, go ahead, sir. Grove: Joe, so let me just -- that last point that you made, they want to have it removed from the condition, but still build two stories. Is that what they are asking? I guess I was confused on that last piece. Dodson: Commissioner Grove, I apologize. So, one of my requested -- or recommended new conditions is to require that the -- this corner building be built as two stories and the applicant would request that that condition be removed, so that they can choose whether one story or two stories is appropriate. Fitzgerald: Thank you for that information, Joe. Commissioner Seal -- or, Commissioner Grove, did you get everything you needed? Yeah. Commissioner Seal, go ahead. Seal: I had the same exact question. Thank you. Dodson: Mr. Chair? Fitzgerald: Joe, go ahead. Dodson: Just to -- something that I did forget to mention. With the increase in the C-C zoning there is an automatic 25 foot buffer between uses and so between the C-C zoning and the residential R-15 zone that may create an issue between the clubhouse and this area here. That is something that I did not note in my review. It is likely something that the applicant can request a reduction in from City Council, but I did want to put that on the record that that is something that they will have to do moving forward going to City Council. Fitzgerald: Thank you for that clarification as well. If there are -- I don't see any questions -- additional questions for Joe. Is the applicant ready for us? Hello. Welcome back and, please, state your name and your address for the record for, please, and the floor is yours. Johnson: Mr. Chair, I think they are just loading a presentation. Meridian Planning&Zoning Commission Item 1. August 20,2020 F58 Page 54 of 67 Fitzgerald: Perfect. Thank you. Nelson: Adrienne, it's not letting me control it. Okay. Okay. Thank you. Good evening, Commissioners. My name is Deborah Nelson. My address is 601 West Bannock Street in Boise. I'm here tonight on behalf of the applicant. Tonight with me Matt Riggs, Jeff Riggs, and Greg Hector of Baron Properties, as well as our planner Kent Brown. I'm going to make a very brief presentation and, then, we are all available to answer any questions you may have. Starting with our updated site plan, in response to the Commissioners' comments that we heard at the last hearing, we have provided these updated plans to expand the C-C zone and add new commercial and mixed uses. Just in the briefest of overview, since Joe just covered this, we extended the C-C zoning north along Black Cat. We removed the townhomes that had been there along Black Cat and replaced them with a new vertically integrated product. We kept the commercial pop up and we redesigned the commercial corner lot. The resulting C-C zone size is 4.23 acres, up from 2.26 acres. We received a comment letter just today into the record from a neighbor questioning about the uses that are within or outside of the C-C zone, specifically asking about the dog park and the clubhouse, and so wanted to address that. The dog park is actually outside of the C-C zone that we have proposed. The clubhouse is inside of that zone. Both of those uses could be in. The C-C zone allows and encourages a variety of uses, including allowing with a conditional use permit multi-family residential. As a result, all of the uses that we are proposing with this development could occur without a rezone application. The reason we have a rezone application is really an outgrowth of early discussions with staff before we filed the application or city staff had a preference to reduce the C-C zone to circumscribe the principally nonresidential uses and we were fine with that. With this change and the request to add more opportunity for commercial uses, we have kept that same theme where we have drawn the C-C line around the principally nonresidential uses. The location of the clubhouse was also an outgrowth of our discussions with staff. Through iterations of the site plan staff requested that we move the clubhouse to this location, so that it created better integration with our commercial uses. It's really oriented around the plaza that they also encouraged and we really like the result of that layout as well. The comment letter that was received today also questioned the size of this C-C zone. At the last hearing there was a fair amount of commentary about this and, Commissioner Holland, you suggested that four to five acres would allow multiple users to site on one location, creating positive synergy between them. We have created exactly that space for not only multiple uses, but a variety of uses. We have space for six live-work units, four pop-up units, plus the corner commercial lot with a building that can accommodate multiple commercial uses as well. So, this isn't just more commercial space now, it's also innovative space that can incorporate a number of different types of uses. We have provided renderings for each of these spaces and I just want to walk through and show some of them. Starting with the main entry in the clubhouse, as you enter the main entry you come right upon the clubhouse. This provides extensive amenities for our residents. Specific to the discussion tonight those amenities include over a thousand square feet of office space, including three enclosed offices that can be reserved for a fee and used for meeting space by our residents. So, an architect or an attorney or anyone who decides that they want to work at home also has space where they can go and meet a client. In addition, in this clubhouse, but not included in Meridian Planning&Zoning Commission Item 1. August 20,2020 F59 Page 55 of 67 our thousand foot office space that we described, are the offices for our employees. We added a new vertically integrated residential product along Black Cat with six units and over 5,000 square feet of usable ground floor commercial space below the second story residential. It has an attractive facade to both Black Cat and to the internal site as well. We anticipate longer term leases here than in the pop-up commercial that we will discuss next. It could even accommodate larger users if they want more than one bay here. Across the landscaped plaza from both the clubhouse and that vertically integrated building we have our commercial pop-up building that has four units and 2,500 square feet of commercial space. We call this a pop-up commercial, because it allows a variety of smaller commercial uses, but don't mistake this for a temporary structure, this is a permanent building, not a booth at a Saturday market. It's the uses that are pop up. We envision short-term leasing with something perhaps as short as a weekend event or a month long exhibition or seasonal uses or perhaps startups, such as for a restaurant that wants to try out new concepts or, Commissioner Seal, you suggested something along the lines of BSU's think tank or a business generator. These are the types of exciting uses that we think could site here in this building and, then, we have our commercial corner. We redesigned this corner based on feedback at the last hearing raised by staff and the Commissioners about parking. We also proposed building concepts to illustrate how this site can create a striking commercial presence on this signalized corner, while also opening up and integrating internally to the site. We propose two concepts, a single story and a two story. The amount of usable commercial space between those two concepts doesn't actually vary very much and the reason is because the additional second story requires additional parking that, then, in turn, eats up some of the space. We have designed this nicely to incorporate some of that parking underneath, so that you don't end up with a sea of surface parking. The resulting range between the two options is 13,000 to 19,500 square feet. Here you can see the single story concept as well. And now I would like to ask the clerk -- we will pause here and -- and if we could play a video that we have got proposed. At our last hearing you saw a fly through the whole project and now we have got a fly through just of this C-C zone area and as updated with this submittal. Weatherly: Mr. Chair, Chris is pulling that up at his office desk, so he's going to share it as soon as he's able to pull it up which will take very momentarily. Fitzgerald: Thank you. Nelson: Is it possible to play the sound? Weatherly: Chris, we can't hear the sound. Nelson: Not a problem. It's just music. Weatherly: Zoom challenges. Nelson: That's okay. Envision your favorite song playing now, Commissioners. With that, Commissioners, we appreciated the comments that -- that you made at the last Meridian Planning&Zoning Commission Item 1. August 20,2020 F60] Page 56 of 67 hearing that were supportive of the overall layout here. We believe this expanded C-C zone and the new features, such as the vertically integrated residential product and the redesigned commercial corner lot, have been responsive to your comments. We appreciate staff's continued support and work on this. It's been a long process and we appreciate everything they have done with us. We are in agreement with all of their recommended conditions, except the one that Joe mentioned, the 1-I, where we are just asking for flexibility to use either the one story or the two story concept on that corner just so that we can respond to market conditions and demands. The Baron team is super excited to bring this unique community to Meridian. We ask for your approval tonight and we would stand for any questions you may have. Fitzgerald: Thanks, ma'am. A quick question I have is -- there are two, actually, to start off. One is I really like the two story and -- and is there a reason for the latitude? I understand the market conditions, but I think we were asking for as much commercial space there as we could make work and so including the clubhouse piece, I know you said there is offices in there, so I got a couple questions around that. Is that kind of like a we workspace, short term leases? How do you make that work? Nelson: Chairman, great questions. So, the space inside the clubhouse could be very flexible. We anticipate that that could be by the day, by the week, by the month, just as the demand warrants and so if somebody just has a quick meeting they need to do with a client, they could accomplish that without reserving the space for an entire month. They may have a project that requires more time and so they could reserve that and pay for it for longer. Fitzgerald: Okay. That helps me there. And how many offices are in that space? It's two, is that right? Nelson: Chairman, the space that we described in that thousand square feet -- it's over a thousand square feet is three enclosed offices. In addition to that we didn't even count the offices for our employees, which, of course, is appropriate within the C-C zone as well, because it's just an employment base. Fitzgerald: Okay. That helps me. And, then, the last question is --was there any thought of taking that live-work space -- live above commercial space all the way down Black Cat? Was that ever a consideration? Nelson: Chairman, I will -- I will do my best to answer that and these guys can tell me if there is more to it. I think that we fit really as much as was reasonable to fit there from a site plan standpoint with the roads and the utilities and the open space requirements. I think that that was what made sense there. I think it also was an attractive facade feature trying to respond to comments about the neighbors, about two story along Black Cat, but also to provide a building that oriented well to the inside and so I think there was a lot of balancing going on there. Meridian Planning&Zoning Commission Item 1. August 20,2020 F61 Page 57 of 67 Fitzgerald: Okay. And, then, any comment about -- if we wanted to limit it to two story, would that be a concern to you guys, because I think we -- I really like that look, but I was -- any thoughts on limiting it to only true story and keeping that requirement in there? Is it -- besides market conditions only? Nelson: Yeah. Chairman, thanks for the opportunity to comment on that. Certainly what we are here to ask for tonight is for your approval and so if the Commission is, you know, set on approving it only with that condition, then, we would take that and like to proceed on to the Council and we understand. If you would consider removing that condition, we are asking for that for -- yes, for market flexibility. There -- it really is -- we want to make sure this is viable commercial that gets filled quickly and is actually used. We don't want to have a vacant lot. We want this to be useful and activated and have a real presence and if the market is dictating a single story to accomplish that, then, we want to be able to respond to that. Both buildings -- we tried to design both buildings to create the same features we heard from you. There was discussion at the last hearing about asking for that corner presence that was visible from Chinden and so we tried to create that dynamic with a signalized light there. We think that corner shaped building provides a lot of opportunities. And, then, oriented to the site, either way it looks really nice from the inside and can accommodate multiple uses. So, with the range being from 13,000 to 19,500, you know, we are not talking about a significant change in the available square footage total for the site, but it gives us a whole lot of flexibility. So, that's why we have asked, so I appreciate the opportunity to comment on it. Fitzgerald: Thank you very much. Andrea, I have one quick legal thing I forgot to disclose. I live in Spurwing and I want to make sure my counterparts on the Commission are aware and if they would like -- I feel like I'm being impartial. I proposed this at the last hearing, but I wanted to make sure I was -- I did that on this hearing, too. So, is there any concerns of me continuing to be a part of this process. Sorry, I should have said that earlier. Apologize for that. Pogue: No concern. Fitzgerald: Okay. Any Commissioner concerns? Okay. Thank you. I had forgot to disclose that and I apologize to the applicant I didn't disclose that earlier. Additional questions for the applicant? Seal: Mr. Chair? Fitzgerald: Commissioner Seal. Seal: Just a couple of questions on the -- the leasable space that's within the clubhouse, is that open to the public to lease or is that only tenants? Nelson: Mr. Chairman, Commissioner Seal, those spaces within the clubhouse will be open to residents only. Meridian Planning&Zoning Commission Item 1. August 20,2020 F62 Page 58 of 67 Seal: Okay. Nelson: Just like in the live-work building, there will be residential units that are just private spaces. There is a mix here. Seal: And, then, the 25 foot buffer between the clubhouse and the residential space, how are you looking to address that? Nelson: I think we will just have to work with our engineer and see how -- how we can accommodate that and, if not, as Joe pointed out, I guess we will be asking the Council to address that. That was news we just learned this evening. Seal: Okay. And, then, would that be -- if they couldn't address it completely, would that be an alternative compliance? Dodson: Commissioner Seal, Members of the Commission, my understanding is that it is a waiver by City Council to reduce the required buffer. My opinion, if that matters in this instance, is that they would likely have a good case for that considering it still mixes well and it's not a --the vertically integrated building isn't butting up against the residential, it's -- it's the existing clubhouse and the plaza that would have been there anyways, so -- but that would be a waiver from City Council. Seal: And a follow up to kind of tie the whole thing together. So, the clubhouse still qualifies as open space or does it not qualify as open space, because it's in the commercial portion of it. Dodson: Commissioner Seal, regardless of the zoning of the use -- you have a good question. I believe it should still be open space. I did notice on the revised open space did count the commercial, the -- what they are calling the pop up, which is not qualifying, because it's just commercial, but that's a small area compared to the clubhouse, but all that plaza and the clubhouse area would -- should still count for open space. Seal: Okay. Thank you. Nelson: Mr. Chairman, may I address that as well? Fitzgerald: Go right ahead, ma'am. Nelson: Thank you. Commissioner Seal, that's right. It does still count as qualified open space and an amenity and as I mentioned earlier we didn't even need to rezone. That could have fallen within the C-C zone earlier, that -- that use would be appropriate there and it still would qualify the same way. Seal: Okay. Thank you. Meridian Planning&Zoning Commission Item 1. August 20,2020 F63] Page 59 of 67 Fitzgerald: Thank you, ma'am. Commissioner Seal, did you have any additional follow up or are you good? Seal: I'm good. Thank you. Fitzgerald: Commissioner Holland, go right ahead. Holland: I don't really have any questions per se, but I do want to thank -- thank you for your consideration of our comments last time and it looks like you have done some great work in increasing it. I'm much happier with the four to five acre commercial than I was with the two acres, so appreciate that. The only other thing I remember we talked about a little bit was the frontage off of Chinden backing up to some of the residential units and I know we are not really here to discuss the residential as much, but where there would be a break in -- in fencing or berming to kind of open back up to that commercial, can you talk about that transition a little bit? Nelson: Mr. Chair, Commissioner Holland, we did preserve the community garden in that location to create that spacing between the commercial corner and the residential uses and as far as the break I may have to get some input on that. Is our berming consistent across? Okay. So, it is consistent across, but we can place our trees carefully to make sure you have got visibility there, but also creating some buffers. Holland: Thank you. I appreciate it. Dodson: Mr. Chair? Fitzgerald: Go right ahead. Dodson: I just wanted to -- this is Joe. Staff. Just want to clarify that as well. The berm would stop at roughly where that C-C zoning begins and the residential stops. It wouldn't -- the berm will not continue in front of the commercial buildings, just to be clear on that, and that is, one, because of the zoning there does not require a berm along Chinden, but the residential does and also that would defeat the purpose of the visibility that we would want for a commercial use on the corner as well. Nelson: Thank you, Joe. And Kent is nodding as well, so I just relayed that improperly. Fitzgerald: Thank you for the clarification both of you. That helps. Is there any additional questions for the applicant? Ma'am, thank you very much. Nelson: Thank you. Appreciate it. Fitzgerald: And if there is opportunity -- if there is public testimony we will have you come back up and close. We will let you close either way, but -- is there public testimony, Madam Clerk? Meridian Planning&Zoning Commission Item 1. August 20,2020 F64 Page 60 of 67 Weatherly: Mr. Chair, two people signed in online. One indicating a wish to testify, but don't see them attending online, nor do I see them in the room. Fitzgerald: Okay. If there is someone who would like to testify online, please, raise your hand and I don't see any attendees currently. Is there anyone in the room who would like to testify? And give the high sign to Andy -- or Commissioner Seal. Seal: Nobody else in the room. Fitzgerald: Okay. Mr. Brown, anything you would like to -- okay. Well, is there -- did you have any closing remarks you would like to make before we deliberate as a group? Nelson: Chairman, Commissioners, if I could, just a couple of very quick comments at -- we appreciate your consideration of these plans and we -- as we said before, we feel like we have tried to be very responsive to the specific comments we heard. We also just want to remind you that the original support we had from -- from staff was really looking at not just this site, but all of the surrounding commercial uses and we think that they still are complimentary of what we are providing here. So, while we are bringing in all these opportunities for neighborhood uses, neighborhood commercial and office uses, we still have, of course, the Fairbourne across the street, the Central Valley Plaza down the street, we have got Costco nearby, we have got areas that are zoned and designated in your comp plan to have commercial and mixed use -- even mixed use regional on the southwest corner of this site. So, we have got the church, of course, we have got significant nonresidential and commercial uses around you. So, we have tried to find that balance again of trying to listen to what you wanted here, but also appropriately looking off site as is -- as is called for in your Comprehensive Plan as well. So, just those additional comments and would stand for any other questions that you have. Fitzgerald: Appreciate that. Are there any additional questions? Are there any addition questions? Seeing none. Nelson: Thank you. Fitzgerald: Appreciate the input. Thank you so much. Can I get a motion to close public hearing? Seal: So moved. McCarvel: Second. Fitzgerald: I have a motion and a second to close public hearing on H-2020-0022, Modern Craftsman at Black Cat. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. Fitzgerald: Okay, team, anybody want to lead off? Meridian Planning&Zoning Commission Item 1. August 20,2020 F65 Page 61 of 67 Grove: Mr. Chair, I will jump in real quick. Fitzgerald: Go ahead, Commissioner Grove. Grove: I appreciate what they have done to make adjustments to this and they have listened to our feedback and it -- it looks a lot better, even from just a -- like a simple landscaping piece on that hard corner for Chinden and Black Cat it looks better. I definitely would be in favor of keeping it two stories, just to really give more character, especially as people are driving down the highway in that section of town and I think -- I mean as far as the two stories, it's -- to me it's almost as much esthetics as it is function to a certain extent. I think, you know, having more commercial space is great, but I think it makes it look a little bit more enticing for an overall project. But I appreciate them also doing the mixed use on Black Cat there. It's a good addition to their already interesting product, so -- Fitzgerald: Commissioner Grove, I -- I agree with your two story comments as well. I think it -- it sets off that corner and makes it look -- it kind of -- it appeals to me that that hard corner has that two story building with parking underneath and I -- that's how I -- I love parking underneath. I think it's useful use of space. But, Commissioner Seal, did you have a comment or did I hear that incorrectly? Seal: I can -- I can go ahead and go. Fitzgerald: Okay. Sorry, I just -- I thought I heard your voice. Seal: That's okay. I mean the -- the project as a whole I really like it. I like the concept that they came up with for the multi-family units that are there and, you know, I know we have hashed that out, but I want to make sure that we, you know -- I mean to me that's the -- the really exciting part of it. You know, the commercial piece of it, I definitely -- you know, your remarks about the parking that's underneath and as far as that being commercial space, I think somebody's going to gobble that up pretty quick with that parking being available there. You know, parking is always an issue and if you take care of that right out of the gate, then, somebody's going to come in there and want to grab that up for sure. So, I do like the -- the buffer that they have there with the community garden space and, you know, the rest of it, as far as the -- the two story, you know, with -- with the ability to live above, I think that's -- that just as a product is probably going to be something that, you know, again, I think that's probably going to be picked up pretty quick. There is a lot of -- you know, a lot of growth in the valley, a lot of entrepreneurs that are starting out and they need space to grow and so having the -- the pop-up space that it can allow people to come in short term with the capability of having the two story spaces right across the parking lot from that, you know, I think that's going to create a lot of opportunity and, hopefully, you know, Meridian takes full advantage of that and, you know, I would like to see the city kind of reach in and really bolster that for -- for the communities, because it's -- it's going to help all of our numbers. So, as far as, you know, providing a place to work for the people that live here, but overall really -- really nice project. I'm -- I'm pretty impressed with the whole thing. So, it's -- it's very out of the box Meridian Planning&Zoning Commission Item 1. August 20,2020 F66 Page 62 of 67 overall and -- and what they have come back with and it's right -- right along that path as well. McCarvel: Mr. Chair? Fitzgerald: Commissioner McCarvel. McCarvel: Yeah. I would agree, I would want to see the two stories stay is -- I know it doesn't add a ton of square footage commercialwise there, but it does add parking, which was one of the big issues on having the commercial on the corner on the last plan and I do like the mix of what the -- what they are providing there is the pop up and that kind of thing is an interesting option and one I think we are going to see used a lot in the future. Holland: Mr. Chair? Fitzgerald: Commissioner Holland, go right ahead. Holland: And I would echo a lot of the comments and I don't need to deliberate much more on anything else. I appreciate that they listened to our comments last time and that they added some commercial space and are willing to try some innovative things. I think it's a product type and a mixed use type we don't have in Meridian, so it's -- it's nice that it's not just a bunch of four-plexes or a bunch of high towering structures that are all next to each other. I just appreciate that there is a little bit of breathing room in there and it looks like a nice place for people to live and work and have amenities close by, so I think they have done a nice job. The only comment I would make is the --whatever the frontage looks like on Chinden I just want to make sure that they do a good job of what that transition and buffer looks like, so that it's not just your driving and there is a berm and wall and, then, a small little pocket where you see a building. But I think for that reason I like the two story building there, too, because I think it would help with the -- the break there. Fitzgerald: I echo exactly what you said. I think Commissioner Seal -- well, everybody's comments I think are well taken. I think this is something that's outside the box. If I could, you know, have a perfect world I would have taken that live-work all the way down Black Cat, but that's just me. So, I like those things. I think we don't have enough of them. They have done them in Boise a couple -- in a couple of spaces, but not enough in Meridian and much like Commissioner Seal said, I -- I hope we grab on to some of these concepts that they brought and take it to other places. I'm really tired of seeing pinwheel four-plexes. It makes me want to throw something. But the use of space, the modern look and feel, and really thinking of it being a sense of place, bringing people together, having thought through how they might live, how they might work and, then, giving a place for entrepreneurs to work just like Commissioner Seal said, I think is -- is rare in our community and I think it needs to be utilized more. So, kudos on that. I love the -- the architecture and the plan for the layout and it's not a -- and it's a different kind of product that we needed in this valley, too. So, huge kudos there. I really appreciate the work that Meridian Planning&Zoning Commission Item 1. August 20,2020 F67 Page 63 of 67 went into it and for taking into account our thoughts. I'm just -- I'm partial to the live-work stuff, but that doesn't mean I am opposed anything, so -- Seal: Mr. Chair? Fitzgerald: Commissioner Seal. Seal: After considering all staff, applicant, and public testimony, I move to recommend approval to the City Council of File No. H-2020-0022 as presented in the staff report for the hearing date of August 20th, 2020. Fitzgerald: Can I make clarification before you do that? Seal: Yes, sir. Fitzgerald: Are you putting any stipulations on this one story or two story of that commercial space? Seal: I would rather keep it in there as -- as it's written by the staff. Fitzgerald: Yeah. Just wanted to make sure. In their staff report it said -- just want to make we are all clear on that. Seal: Yes. Holland: Mr. Chair? Fitzgerald: Commissioner Holland. Holland: In the memo from staff about some of the things they wanted to make sure we mentioned in a -- in motions, do we actually need to include that in the motion or is that sufficient in the staff memo that we got about the updates? Seal: I can amend the -- the motion, so -- Fitzgerald: Joe, do we have to put anything in additional than recommending -- anything additional than you have in the staff memo? Dodson: Mr. Chair, to be honest, I do not know if we need to specifically state those or if you can just say as presented in the staff report and staff memo might be sufficient. Seal: Along with the update conditions of approval in the staff memo. McCarvel: Second. Meridian Planning&Zoning Commission Item 1. August 20,2020 F68 Page 64 of 67 Fitzgerald: I have a motion and a second to recommend approval of File No. H-2020- 0022, Modern Craftsman at Black Cat. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. Fitzgerald: Thank you all very much. That was a lot smoother than I actually expected it to be, so Baron Land -- or Baron Properties, good luck with that project. I look forward to seeing it when it's done. I might could get a lemonade stand over there. I'm joking. Okay. I need a -- I need a last motion from our team here. McCarvel: Mr. Chair? Fitzgerald: Commissioner McCarvel. McCarvel: Before Commissioner Holland goes into labor, I move we adjourn. Fitzgerald: Oh, wait. No -- yeah, we might not see her. Holland: Yeah. I might not be here for the next one. We will see. Fitzgerald: I was going to say, I may need backup, Commissioner McCarvel, for -- if we losing our vice-chair. I mean the old previous chair is -- the previous chair that I took direction from for a long time and stepped in their role at the beginning of September. I may have a conflict on the 3rd and I may be out of town. So, if Commissioner Holland goes into labor -- McCarvel: Then we definitely have a quorum issue, because I'm out on the 3rd and Commissioner Pitzer is no longer with us, so -- Seal: Yeah. The 3rd is going to be an issue -- Pogue: We don't have to worry about the vacancy counting towards quorum. McCarvel: Okay. So, what is quorum then? Pogue: Is this better? Fitzgerald: We have to have four; right? Pogue: Yes. Why is it doing that? So, can you hear me now? Fitzgerald: Have to have four for the vote. Pogue: I did do the off thing like I did when you sign on with the audio. Meridian Planning&Zoning Commission Item 1. August 20,2020 F69 Page 65 of 67 Grove: We can still hear you. Fitzgerald: Let's talk through that, because I -- Commissioner Holland maybe in a situation where she's not here and I am not here either, so -- Holland: I might be here, but it's going to be hard to predict. Pogue: Okay, guys, can you hear me? Fitzgerald: Who also is going to be here? Are you guys all going to be able to be available if -- McCarvel: I am not on the 3rd. Pogue: I don't think they can hear me. Fitzgerald: You are not. Okay. McCarvel: I can hear you, Andrea. Pogue: You can hear me? All I was going to say is we don't count the vacant seat for quorum. So, it was seven, now it's six, so we need four, Ryan. Agreed. Seal: And I won't be here. This is Commissioner Seal. Fitzgerald: So, we definitely don't have a quorum. Pogue: Then we don't. McCarvel: We have two people. Grove: Be here by myself. Pogue: Okay. Weatherly: Just to clarify, that was no quorum on September 3rd; is that correct? Pogue: Correct. Fitzgerald: Yes, ma'am. I think you have got three -- three and a half still in -- maybe Commissioner Holland might not be here, but I don't think you can plan on her. Commissioner McCarvel is out. Commissioner Seal is out. And I'm 92 percent sure I'm out. So, we may have to shift gears to a different date in September. McCarvel: Okay. Meridian Planning&Zoning Commission Item 1. August 20,2020 F70 Page 66 of 67 Fitzgerald: Are you guys back the week after? McCarvel: Maybe. Seal: Yes. Holland: I'm more likely to be out the week after than I am on the 3rd. Fitzgerald: Yeah. You're definitely out for September, ma'am. McCarvel: I don't think we are going to count you for the next month. Fitzgerald: Yeah. Madam Clerk, how do you want to handle this, ma'am? Weatherly: Mr. Chair, with Andrea's direction, my opinion would be that since we have established there is not going to be a quorum on the 3rd, you can agree on a future date. I would recommend sooner rather than later after that date to meet and have a meeting. Now, if the next -- so, the next Thursday would be September 10th, but keep in mind if you are having a special meeting it doesn't necessarily have to fall on the same day, it's just convenient, because we have planned for Planning and Zoning on Thursdays. But if it's not convenient for a quorum with the Commission, then, you can choose a different day that's more favorable for all your schedules. Fitzgerald: Okay. Do you want to send out an e-mail and see when everybody's available on those dates -- around those dates? I'm definitely available on the 17th. Weatherly: Okay. I can take -- I think Bill -- Pogue: We will circulate an e-mail and, you know, let the planners talk, see which date they might be able to work with and, then, they will circulate it to you guys to see -- you know, float an option or two for you. I think Bill usually handles that. Weatherly: Yeah. And I thought -- Bill was on the call earlier. I'm not sure if he heard this conversation. He's not there anymore. But I'm happy to send an e-mail to reach out to him and let him know that we definitely won't have a quorum on the 3rd, so we need to look at another date. Fitzgerald: I know -- I know Vice-Chair Holland is a rock star and is going to try and -- being in labor and be a P&Z Commissioner. I was going to let her like have a month off or so, so -- Weatherly: Absolutely. Pogue: I'm not going to let her do that. Holland: If I'm in the hospital I'm not getting on the phone. Meridian Planning&Zoning Commission Item 1. August 20,2020 F71 Page 67 of 67 Weatherly: Sorry. Just so you know, there will be four public hearings that will have to be reconsidered or continued from that date. Pogue: How many? Weatherly: Four. Pogue: Okay. Fitzgerald: Well, if you will touch base with Mr. Parsons and let us know what they think will work and -- or circulate a poll or something like that where we can all be available, except Lisa, then, we will make a plan and get us -- get us squared away for next month. Weatherly: I will be in touch. Grove: I would just like to say, Mondays and Tuesdays are hard for me, so if we do change days it -- I need to have it further out if we are going to make it on a Monday or a Tuesday. Fitzgerald: Yeah. Thanks, Commissioner Grove. McCarvel: I think Thursdays we can -- Fitzgerald: Yeah. Thursdays work better for me, so -- okay. McCarvel: My motion stands. I move to adjourn. Seal: Second. Fitzgerald: Motion and a second to adjourn. All those in favor say aye. Any opposed? Motion passes. MOTION CARRIED: FIVE AYES. ONE ABSENT. MEETING ADJOURNED AT 9:46 P.M. (AUDIO RECORDING ON FILE OF THESE PROCEEDINGS.) APPROVED 9 1 17 1 2020 RYAN FITZGERALD - CHAIRMAN DATE APPROVED ATTEST: CHRIS JOHNSON - CITY CLERK Item 1. 4 E IDIAN 'aAHO AGENDA ITEM ITEM TOPIC: Approve Minutes of the August 6, 2020 Planning and Zoning Commission Regular Meeting Meridian Planning&Zoning Commission Item 1. August 6,2020 F46 Page 42 of 42 Seal: I know I would not be able to attend on the 29th. McCarvel: Either is fine with me. Holland: I will technically be out on maternity leave at that time, but if it's -- still available via Zoom I probably can attend if it's on the 22nd or the 29th. McCarvel: I would say that if it's staff's preference for the 22nd, let's do the 22nd. Seal: Agreed. Parsons: Thank you. Appreciate that. I will make a note of that and as we start moving closer to that hearing date I will make sure everyone else is aware of that as well. Thank you. Holland: Thanks, Bill. Commissioner Pitzer, we have appreciated you being with us and tonight is her official last meeting with us, so we wish you well in your new location that you are moving to and we will certainly miss having you on the Commission. But thanks for all your -- your work and effort with us. We appreciate you. Pitzer: Thank you very much. And I'm going to -- I'm going to miss it myself. I'm very sad, so -- with that I move that we adjourn the meeting of August 6th, 2020. Word is adjourned. I got it. Holland: Perfect. A second for the motion? Seal: Second. Holland: All right. We have got a motion and a second. Thank you, Commissioner Pitzer, for that last motion. We appreciate you and thanks, everybody, for a great meeting. Pitzer: Thank you. McCarvel: We might want to vote on that motion. Holland: Oh, yeah. Sorry. All those in favor? All right. Any opposed? Motion to adjourn -- we are adjourning at 8:08 p.m. on August 6th. MOTION CARRIED: FIVE AYES. TWO ABSENT. MEETING ADJOURNED AT 8:08 P.M. (AUDIO RECORDING ON FILE OF THESE PROCEEDINGS.) APPROVED 8 120 1 2020 LISA HOLLAND - VICE-CHAIRMAN DATE APPROVED ATTEST: CHRIS JOHNSON - CITY CLERK Item 2. 47 E IDIAN 'aAHO AGENDA ITEM ITEM TOPIC: Findings of Fact, Conclusions of Law for Rock&Armor Fitness (H-2020- 0076) by Matt Garner with Architecture Northwest, Located at 1649 and 1703 E. Pine Ave. Item 2. F48 CITY OF MERIDIAN E IDIAN:==- FINDINGS OF FACT, CONCLUSIONS OF LAW AND ! ❑A P DECISION& ORDER In the Matter of the Request for a conditional use for Rock and Armor Fitness,located at 1649 E. Pine Avenue in the I-L Zoning District,by Matt Garner of Architecture Northwest. Case No(s).File H-2020-0076 For the Planning& Zoning Commission Hearing Date of: August 6,2020 (Findings on August 20, 2020) A. Findings of Fact 1. Hearing Facts(see attached Staff Report for the hearing date of August 6, 2020, incorporated by reference) 2. Process Facts(see attached Staff Report for the hearing date of August 6,2020, incorporated by reference) 3. Application and Property Facts(see attached Staff Report for the hearing date of August 6,2020, incorporated by reference) 4. Required Findings per the Unified Development Code(see attached Staff Report for the hearing date of August 6,2020, incorporated by reference) B. Conclusions of Law 1. The City of Meridian shall exercise the powers conferred upon it by the"Local Land Use Planning Act of 1975,"codified at Chapter 65, Title 67,Idaho Code(I.C. §67-6503). 2. The Meridian Planning&Zoning Commission takes judicial notice of its Unified Development Code codified at Title 11 Meridian City Code, and all current zoning maps thereof. The City of Meridian has,by ordinance, established the Impact Area and the Amended Comprehensive Plan of the City of Meridian,which was adopted April 19,2011,Resolution No. 11-784 and Maps. 3. The conditions shall be reviewable by the City Council pursuant to Meridian City Code § 11-5A. 4. Due consideration has been given to the comment(s)received from the governmental subdivisions providing services in the City of Meridian planning jurisdiction. 5. It is found public facilities and services required by the proposed development will not impose expense upon the public if the attached conditions of approval are imposed. 6. That the City has granted an order of approval in accordance with this decision,which shall be signed by the Chairman of the Commission and City Clerk and then a copy served by the Clerk upon the applicant,the Planning Department,the Public Works Department and any affected party requesting notice. CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2020-0076 Page 1 Item 2. F 9 7. That this approval is subject to the conditions of approval in the attached staff report for the hearing date of August 6,2020, incorporated by reference. The conditions are concluded to be reasonable and the applicant shall meet such requirements as a condition of approval of the application. C. Decision and Order Pursuant to the Planning & Zoning Commission's authority as provided in Meridian City Code § 11- 5A and based upon the above and foregoing Findings of Fact which are herein adopted, it is hereby ordered that: 1. The applicant's request for conditional use is hereby approved in accord with the conditions of approval in the staff report for the hearing date of August 6,2020,attached as Exhibit A. D. Notice of Applicable Time Limits Notice of Two(2)Year Conditional Use Permit Duration Please take notice that the conditional use permit,when granted, shall be valid for a maximum period of two(2)years unless otherwise approved by the City in accord with UDC 11-513-617.1. During this time,the applicant shall commence the use as permitted in accord with the conditions of approval, satisfy the requirements set forth in the conditions of approval, and acquire building permits and commence construction of permanent footings or structures on or in the ground. For conditional use permits that also require platting,the final plat must be signed by the City Engineer within this two(2)year period in accord with UDC 11-5B-6F.2. Upon written request and filed by the applicant prior to the termination of the period in accord with 11-5B-6.F.1,the Director may authorize a single extension of the time to commence the use not to exceed one (1)two (2)year period.Additional time extensions up to two(2)years as determined and approved by the Commission may be granted. With all extensions,the Director or Commission may require the conditional use comply with the current provisions of Meridian City Code Title 11. E. Notice of Final Action and Right to Regulatory Takings Analysis 1. The Applicant is hereby notified that pursuant to Idaho Code 67-8003, a denial of a conditional use permit entitles the Owner to request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight(28)days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. 2. Please take notice that this is a final action of the governing body of the City of Meridian. When applicable and pursuant to Idaho Code § 67-6521,any affected person being a person who has an interest in real property which may be adversely affected by the final action of the governing board may within twenty-eight(28)days after the date of this decision and order seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. F. Attached: Staff report for the hearing date of August 6 ,2020 CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2020-0076 Page 2 Item 2. 50 By action of the Planning&Zoning Commission at its regular meeting held on the 20th day of August ,2020. COMMISSIONER RYAN FITZGERALD, CHAIRMAN VOTED COMMISSIONER LISA HOLLAND,VICE CHAIRMAN VOTED COMMISSIONER RHONDA MCCARVEL VOTED COMMISSIONER ANDREW SEAL VOTED COMMISSIONER PATRICIA PITZER VOTED COMMISSIONER WILLIAM CASSINELLI VOTED COMMISSIONER NICK GROVE VOTED Ryan Fitzgerald, Chairman Attest: Chris Johnson, City Clerk Copy served upon the Applicant,the Planning and Development Services divisions of the Community Development Department,the Public Works Department and the City Attorney. By: Dated: 8/20/2020 City Clerk's Office CITY OF MERIDIAN FINDINGS OF FACT,CONCLUSIONS OF LAW AND DECISION&ORDER CASE NO(S). H-2020-0076 Page 3 irem2. EXHIBIT A ■ STAFF REPORT C� fE RIDIANn-=- COMMUNITY DEVELOPMENT DEPARTMENT A H O HEARING 8/6/2020 Legend DATE: ��Proje o' Lc�fl iron TO: Planning&Zoning Commission FROM: Alan Tiefenbach,Associate Planner x r , 208-489-0573 SUBJECT: H-2020-0076 Rock and Armor Fitness CUP LOCATION: 1649 E. Pine Avenue IT --- C -- I. PROJECT DESCRIPTION The Applicant has submitted an application for a conditional use permit to allow a 15,314 sf fitness and training center(Arts,Entertainment and Recreation Facility), along with a 3,600 square foot outdoor turf training and warm-up area. The subject property is in the I-L zone district and consists of two lots totaling 1.8 acres. II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 1.8 acres Future Land Use Designation General Industrial Existing Land Use(s) Vacant Proposed Land Use(s) Arts,Entertainment and Recreation Facility Lots(#and type;bldg./common) Two(2)building lots Neighborhood meeting date;#of May 21,2020 attendees: History(previous approvals) Nola Subdivision Preliminary—Final Plat PFP 04-008 Pagel Item 2. ■ B. Community Metrics Description Details Page Ada County Highway District No comments submitted Access(Arterial/Collectors/State Primary access will occur from existing access off E.Pine Hwy/Local)(Existing and Proposed) Avenue,secondary access will occur via internal drive aisle behind existing daycare to east at 1771 E.Pine Ave. and to N.Nola Rd. Existing Road Network Yes Fire Service No comments submitted Wastewater • Distance to Sewer N/A Services • Sewer Shed Five Mile Trunkshed • Estimated Project Sewer See application ERU's • WRRF Declining Balance 13.97 • Project Consistent with Yes WW Master Plan/Facility Plan • Comments • Additional 591 gpd of flow has been committed. • No proposed changes to public sewer infrastructure is shown within record.Any changes or modifications to the public sewer infrastructure shall be reviewed and approved by Public Works. Water • Distance to Water Services 0 • Pressure Zone 3 • Estimated Project Water See application ERU's • Water Quality No concerns • Project Consistent with Yes Water Master Plan • Impacts/Concerns • No new public water infrastructure proposed in this record. • There are two existing water stubs at the northern boundary that either need to be used or abandoned. Page 2 10 ?_ Elm 'A _ �. OF . � 4f}:._ _ ■ ■ !�F w CIE'■ ++++ } O i■■tea■■ HIM IIEa F� ,� ■ IEIII ■;:�� � F� �-�ii1 111E EEEEEE 111E �' ■■■■■ no Item 2. 54 III. APPLICANT INFORMATION A. Applicant: Matt Garner,Architecture Northwest—224 16th Ave South,Nampa,ID 83651 B. Owner: Timothy Williams— 1902 W. Mountain Man Dr.,Meridian,ID 83646 C. Representative: Matt Garner,Architecture Northwest—224 16th Ave South,Nampa, ID 83651 IV. NOTICING Planning&Zoning City Council Posting Date Posting Date Newspaper Notification 7/17/2020 Radius notification mailed to 7/14/2020 properties within 300 feet Site Posting Date 7/24/2020 NextDoor posting 7/14/2020 V. STAFF ANALYSIS A. Future Land Use Map Designation(https:llwww.meridiancitE.or /g compplan) General Industrial-This designation allows a range of uses that support industrial and commercial activities. Industrial uses may include warehouses, storage units, light manufacturing, flex, and incidental retail and offices uses. In some cases uses may include processing,manufacturing,warehouses, storage units, and industrial support activities. The subject site is already zoned Light Industrial(I-L). The proposed use is not one that is described specifically by the general industrial category of the Future Land Use Map. However, the present zoning allows an indoor recreation facility by conditional use. The proposed fitness center is a use determined to be appropriate in this zone district, subject to the specific use standards listed in UDC 11-4-3-2. B. Comprehensive Plan Policies (https://www.meridiancity.or /�pplan): Goals, Objectives, &Action Items: Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to the proposed use of this property(staff analysis in italics): • Encourage infill development. (3.03.01E) The Comprehensive Plan defines infill as "development on vacant parcels, or redevelopment of existing parcels to a higher and better use that is surrounded by developed property within the City of Meridian." The subject property is a vacant lot surrounded by existing development on all sides. This includes a daycare to the east, trucking company to the south, research and development uses across E. Pine Ave. and Page 4 Item 2. 55 residential at the northwest quadrant of the E. Pine Ave IN. Locust Grove intersection. The property has available water and sewer. This project would be considered infill development. Preserve private property rights and values by enforcing regulations that will prevent and mitigate against incompatible and detrimental neighboring uses. (3.05.01 C) The conditional use is a process to ensure any impacts associated with a particular use are mitigated.All uses directly adjacent to the subject property are commercial. • Require appropriate building design, and landscaping elements to buffer, screen,beautify, and integrate commercial, multifamily, and parking lots into existing neighborhoods. (5.01.02D) Building design and landscaping will be reviewed as part of the Certificate of Zoning Compliance(CZC) and administrative design review that would follow this proposal if it were approved. C. Existing Structures/Site Improvements: The subject property is presently vacant. The 25'landscape buffers that are required along E. Pine Ave. and N. Locust Grove Rd. were already installed with the infrastructure improvements required of the Nola Subdivision as were the required sidewalks. D. Proposed Use Analysis: The proposed use is a sports performance center for training and physical therapy. It specializes in strength conditioning and rehabilitation for athletes and is classified in UDC Table 11-2C-2 as an indoor recreation facility. This facility is not a "drop-in fitness center. Classes and personal sessions will operate by appointment only between 8:00 A.M. and 6:00 P.M. Outdoor training on the turf field will occur during the warmer months of May-November. The subject property is within the light industrial(I-L)zone district. This zone district is intended to provide for convenient employment centers of light manufacturing, research and development, warehousing, and distributing. The proposed use is not one of the uses described above. However, indoor and outdoor recreation facilities are allowed in the I-L zone district by conditional use. The proposed use complies with the zoning for the site but is subject to specific use standards as listed in I1-4-3-2. E. Specific Use Standards (UDC 11-4-3): An `Arts, Entertainment or Recreation Facility, Indoors and Outdoors"is subject to specific use standards as outlined in UDC 11-4-3-2. These standards include all outdoor recreation areas that are not fully enclosed maintaining a minimum setback of one hundred feet(100)from any abutting residential districts and outdoor activities only being allowed between six o'clock(6:00) A.M. and eleven o'clock(11:00)P.M. The subject property is surrounded by commercial and light industrial zoning, and the establishment only operates between 8:00 A.M. and 6:00 P.M. F. Dimensional Standards(UDC 11-2): Dimensional standards in the Light Industrial District(I-L) include street setbacks of 35 , arterial landscape buffers of 25 , 25'buffers to residential uses and a maximum building height of 50'. The proposed fitness and training center meets all dimensional standards. Page 5 Item 2. ■ G. Access(UDC 11-3A-3, 11-3H-4): The subject property is located at the southeast quadrant of E. Pine Ave. and N. Locust Grove Rd., both arterial roads. The primary access will be from an existing shared driveway off E. Pine Street approximately 300 feet back from the intersection on E. Pine Street. There is a second (internal) access to the site from N. Nola Rd at the east, along the south side (rear) of the existing daycare at 1771 E. Pine Avenue. The plat does not reflect a cross access easement between the subject property and 1771 E. Pine 4venue to N. Nola Rd. Staff recommends a condition of approval that an access easement be recorded and reflected on the site plan at time of CZC. This proposal was referred to ACHD, who estimated a total trip generation of 53 peak hour trips per day.ACHD did anticipate any decrease in level of service. There were no additional comments from ACHD. H. Parking(UDC 11-3C): The subject property is within the Light Industrial(I-L)zone district. Per UDC 11-3C-6B-2, parking in industrial districts is based on one (1)parking space per 2,000 square feet of gross floor area. However, the proposed use is a commercial use, not an industrial use. UDC 11-3C-2 allows the City to require a greater number of spaces in any application involving a conditional use permit. Based on the commercial parking standards of one (1)space per 500 sf of gross floor area, this use would require 31 parking spaces and 2 bicycle spaces. The site plan indicates 53 parking spaces and 5 bicycle spaces. 4s is required by UDC 11-3C-5, all internal 2-way drive aisles are at least 25'in width. I. Sidewalks(UDC 11-3A-17) Sidewalks were constructed with the subdivision. This includes a 7'attached sidewalk along both E. Pine Ave. and N. Locust Grove Rd.frontages. J. Parkways No parkways are proposed with this expansion. K. Landscaping(UDC 11-3B): UDC 11-2C-3 requires landscape buffers of a minimum width of 25'along arterial streets. These buffers (and 7'sidewalk) were installed per conditions of the Nola Subdivision Plat that was approved in 2005. The applicant will be required to landscape the parking lot per UDC 11-3B-8 including 5'wide landscape buffers adjacent to parking, loading and driveways, and landscape islands required for any parking lot with more than 12 spaces. The conceptual landscape plan submitted with this conditional use does appear to meet the requirements. Staff notes there are a number of trees in the required landscape buffers that appear to be dead or dying. This has been addressed in the "Tree Mitigation"section of the proposed landscape plan. Staff is recommending dead or dying trees be replaced as a condition of approval. L. Fencing(UDC 11-3A-6, I1-3A-7): Existing vinyl fencing is located along the eastern property lines (adjacent to the daycare) and there is existing chain link fence to the south (surrounding the trucking business). This fencing will be retained. The applicant has not shown any other fencing.4ny additional fencing would be required to comply with the fence standards in the UDC 11-3A-7. Page 6 Item 2. ■ M. Utilities All utilities for the proposed development are already in place. No additional services are needed. N. Building Elevations The applicant submitted conceptual elevations with this conditional use application. The elevations indicate a pre-engineered metal building connected to a smaller hand framed structure with stucco interior. The proposed elevations will be reviewed in detail at the time of Certificate of Zoning Compliance(CZC). However, there does appear to be several elements that might not meet the standards of the Architectural Standards Manual. The narrative and elevations call out metal siding whereas the ASM states untextured concrete panels and prefabricated steel panels are prohibited as field materials for building fagades, except when used with a minimum of two other qualifying field materials. The northern elevation (fronting E. Pine Ave) has a roofline that does not meet the requirements for buildings with rooflines 50 feet in length or greater incorporating roofline and parapet variations. (The southern roofline also does not meet these requirements but backs to the trucking company and is not visible). Specifics of the architecture will be reviewed and discussed at time of CZC and DES submittal; it is possible the applicant will need to request a design exception or comply with UDC and ASM design standards. VI. DECISION A. Staff: Staff recommends approval of the proposed conditional use permit with the conditions in Section VIII per the Findings in Section IX. B. The Meridian Planning&Zoning Commission heard this item on August 6, 2020. At the public hearing,the Commission moved to approve the sul iect conditional use uest. 1. Summary of the Commission public hearing: a. In favor: Matt Garner,Applicant,Timothy Williams, Owner b. In opposition:None c. Commenting: Matt Garner and Timothy Williams d. Written testimony:None e. Staff presenting application: Alan Tiefenbach f. Other Staff commenting on application:None 2. Key issue(s)of public testimony: a. None 3. Key issue(s)of discussion by Commission. a. The Planning Commission discussed the issue of industrial properties being developed for non-industrial uses. Page 7 Item 2. ■ b. The Planning Commission discussed whether the applicant's architect could make the architecture of the north and west sides more consistent. Matt Garner said he would work with staff on this during time of CZC. 4. Commission change(s)to Staff recommendation: a. Commission removed Condition 3.a as the City cannot condition this proposal on an adjacent property owner providing access easements. b. Commission revised Condition 3.b. to read"Cross access easements will be recorded and shown on the site plan with instrument number that provide access from E. Pine Avenue across the subject property and to 1771 E. Pine Avenue. Page 8 ppppppypr �ppppe� �v ��r�,�pA • 4 SUN i ,�M. fl�� L".� Oil O � • �� � � � y, • 1 - � ���R Ali� :r�■ ■��!!�lil�.iEi io 0 rim cm 21 min 0 Y � u p u m •ga u !■I Y ate.■ �■ o a 4 y Y 6i A o � L�III iiR I��IIL!!g 4iiiT !::=:: 'ilia iL!i!! AAA =iii_2ii ;u!iii2!!!��L•ii�ii2!!�� iiuiii_. r� °■ m vat e e � _� ■a p ♦i* 8 Item 2. ■ C. Conceptual Elevations(date: 6/5/2022) I I I I I a 1 WEST ELEVATION �wt sue-•�t -------------------------- ............................ -------.......------ ---- - I I a a 1 NORTA ELEVATION wui aw.tw• -- -1 I 1 71 I�HNHHNH I 1 1 I A I l \ SOUTH ELEVATION aau aw.r.e I I I I p Al ;4ATT e I . I EAST ELEVATION 4&6 Aw•" Page 10 ® El D. Conceptual Colored Elevations(dated: 7/20/2020) meow .,lria � Iw" "•`~= ►� i�"r�Yt!�'#�!i rSti��1��_ - �� � l�i♦� Srr _�I�� Isisilsiisisisiii#f� I�IIliliillP ����������� 1�����I1��ii�iiiil���;i�Iv��ii♦��ii��l�ii{�t��1�����i ■ �!�i[ a���llf roe ro� r�� �■I�� _�, ��� - y RO£KF RR UR Item 2. 62 VIII. CITY/AGENCY COMMENTS & CONDITIONS A. Planning 1. A Certificate of Zoning Compliance and administrative design review application is required to be submitted to the Planning Division and approved prior to submittal of building permit applications. The applicant will either meet all architectural requirements of the Architectural Standards Manual(ASM)or apply for a design exception as part of the CZC submittal. 2. The Applicant shall have a maximum of two(2)years to commence the use as permitted in accord with the conditions of approval listed above. If the use has not begun within two (2)years of approval, a new conditional use permit must be obtained prior to operation or a time extension must be requested in accord with UDC 11-5B-6F. 3. The site plan prepared by Architecture Northwest,dated July 27, 2020, is approved as submitted with the following modifications: a. A er-ess aeeess easement will be r-eeer-ded and shown an the site plan with instniffient number-noted that pr-evides aeeess from N.Nola Rd aer-ess the south side b. A Cross access easements will be recorded and shown on the site plan with instrument number that provides access from E. Pine Avenue across the subject property and to 1771 E. Pine Avenue. 4. The landscape plan prepared by Rodney Evans+Partners, dated July 27, 2020 is approved as submitted: 5. Parking requirements associated with the indoor/outdoor recreation facility shall comply with the commercial parking standards; 1 per 500 square feet of gross floor area. 6. Prior to issuance of Certificate of Occupancy,the applicant shall replace all dead or dying trees that are within the 25' wide landscape buffers adjacent to E. Pine Avenue and N. Locust Grove Road. 7. The Applicant shall comply with all bulk,use, and development standards of the applicable district listed in UDC Chapter 2 District regulations. 8. The Applicant shall comply with the outdoor service and equipment area standards as set forth in UDC 11-3A-12. 9. The Applicant shall comply with the structure and site design standards as set forth in UDC 11- 3A-19 and the Architectural Standards Manual. 10. The applicant shall comply with standards and installation for landscaping as set forth in UDC 11-313-5 and maintenance thereof as set forth in UDC 11-313-13. 11. The Applicant shall provide bicycle parking spaces as set forth in UDC 11-3C-6G consistent with the location and design standards as set forth in UDC 11-3C-5C. 12. The conditional use approval shall become null and void unless otherwise approved by the City if the applicant fails to 1) commence the use, satisfy the requirements, acquire building permits and commence construction within two years as set forth in UDC 11-5B-6F1; or 2)obtain approval of a time extension as set forth in UDC 11-5B-6F4. Page 12 Item 2. 63 B. Public Works 1. No proposed changes to public sewer infrastructure has been shown within record.Any changes or modifications to the public sewer infrastructure shall be reviewed and approved by Public Works. 2. There are two existing water stubs at the northern boundary that either need to be used or abandoned per Meridian Public Works Standards. C. ADA COUNTY HIGHWAY DISTRICT(ACHD) https:llweblink.meridiancily.org WWebLinkIDocView.aspx?id=192428&dbid=0&repo=MeridianC Lty- IX. FINDINGS A. Conditional Use Permit The Commission shall base its determination on the conditional use permit request upon the following: 1. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The site meets all dimensional and development regulations in the I-L zoning district. The site already contains landscape buffers,parking is adequate, and the parking area will be landscaped as required by UDC 11-3B-8. Commission finds the site is large enough to accommodate the proposed use. 2. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord with the requirements of this title. Commission finds the proposed Arts, Entertainment and Recreation Facility will be harmonious with the Comprehensive Plan per the analysis in Section V of this staff report. 3. That the design, construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. The subject site is within an industrially-zoned area. Directly south of the site is a trucking company. East of the property is an existing daycare.Across E. Pine Avenue to the north is research and development and office uses, with similar uses across N. Locust Grove Rd. to the west including auto body repair. The site will be adequately landscaped, and architecture will be required to meet the Architectural Design Manual(ASM) at time of Certificate of Zoning Compliance(CZC). The business will only operate between 8:00 A.M. to 6:00 P.M. and any training in the outdoor area will take place during this same time. Commission finds the proposed use should not change the character nature of the area as there is a mix of uses developed or developing in the area. 4. That the proposed use, if it complies with all conditions of the approval imposed,will not adversely affect other property in the vicinity. If the proposed Arts, Entertainment and Recreation Facility complies with the conditions of approval in Section VIII and UDC 11-4-3-2 as required, Commission finds the proposed use should not adversely affect other properties in the vicinity. Page 13 Item 2. 64 5. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools,parks,police and fire protection, drainage structures,refuse disposal, water, and sewer. The proposed use will be served adequately by all public facilities and services. 6. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. Commission finds the proposed use should not create any additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. 7. That the proposed use will not involve activities or processes,materials, equipment and conditions of operation that will be detrimental to any persons,property or the general welfare by reason of excessive production of traffic,noise, smoke, fumes, glare or odors. This proposal is for an Arts, Entertainment and Recreation Facility, by appointment only, in an area zoned for light industrial. The use would be surrounded by office and light industrial uses, as well as an existing daycare to the east. The proposed facility is appropriate in this location. 8. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. (Ord. 05-1170, 8-30-2005,eff. 9-15-2005) Commission is unaware of any natural, scenic, or historic features on this site; thus, Commission finds the proposed use should not result in damage of any such features. Page 14 Planning and Zoning Hearing Outline and Presentations Changes to Agenda: Item 5: Loose Screw Brewery (H-2020-0081) Application(s): Conditional Use Size of property, existing zoning, and location: This site consists of 1.98 acres of land, zoned Neighborhood Business District, and located at 1511 W. McMillan Road (SE quadrant of W. McMillan Rd and N. Linden Rd. Adjacent Land Use & Zoning: To the north (across W. McMillan Rd) is zoned C-G, west of the property (across N. Linden Rd) is zoned Limited Office, and to the southeast is zoned R-15. History: AZ-13-010 (original annexation), DA 114020372FP-15-001, A- 2019-0248 (Sawtooth Village Retail Building A – CZC/DES) Comprehensive Plan FLUM Designation: Mixed Use Neighborhood Summary of Request: Application for a conditional use permit (CUP) to allow a 2,200 sf brewery (defined as minor food and beverage products processing). This includes outdoor seating and potentially live music. The applicant will be leasing space within Building A of the Sawtooth Village Retail Center, which is still under construction. Because this property is within 300 feet of a residential district, a conditional use is required. Written Testimony: None Staff Recommendation: Approval with Conditions. Notes: This is a proposal for a conditional use to allow a 2,200 square foot brewery (defined as minor food and beverage products processing) as a tenant within the Sawtooth Village Retail Center, which is currently building out as two 10,000 square foot buildings. Residential borders the commercial center to the south and east. Per the UDC, a conditional use is required for minor food and beverage products processing when it is within 300 feet of residential. The brewery will be occupying the eastern end of Building A (western building). The brewery proposes outdoor seating in a plaza directly to the east (shared with a restaurant on the other side of the plaza). Outdoor live music is a possibility. The brewery tenant will be sharing parking with the other leasees in the development – 58 spaces are provided whereas 40 would be required. Parking should be adequate as not only does it exceed the minimum requirements, not all tenants have the same peak parking demand times (office and salons have different hours than restaurants and drinking establishments). Walkways already connect this center to the surrounding neighborhood, including a walkway from the plaza that leads directly into the adjacent multifamily. Staff supports this proposal but does want to ensure the establishment does not excessively impact the adjacent residential. Staff is recommending hours be limited from 11am-10PM and any outdoor activity associated with this business be limited to the 1,500 square foot plaza directly outside and adjacent to the east. Possible Motions: Approval After considering all staff, applicant and public testimony, I move to recommend approval to the City Council of File Number H- 2020-0081, as presented in the staff report for the hearing date of August 20, 2020, with the following modifications: (Add any proposed modifications to conditions) Denial After considering all staff, applicant and public testimony, I move to recommend denial to the City Council of File Number H-2020- 0081, as presented during the hearing on August 20, 2020, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number H-2020-0081 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance) Item #6: Victory Apartments (H-2020-0065) Application(s): Comprehensive Plan Map Amendment Annexation & Zoning Size of property, existing zoning, and location: This site consists of 18.45 acres of land, zoned RUT in Ada County, located at the SWC of W. Victory Rd. & S. Meridian Rd./SH-69. Adjacent Land Use & Zoning: North: Victory Rd., SFR and office uses South: SFR, zoned R-8 West: Rural residential, zoned RUT in Ada County East: S. Meridian Rd./SH-69; MFR apartments, zoned R-15; and SFR, zoned R-8 History: None Comprehensive Plan FLUM Designation: MDR Summary of Request: The Applicant requests an amendment to the Future Land Use Map contained in the Comprehensive Plan to change the land use designation on 18.45 acres of land from MDR to MHDR; and annexation of 18.45 acres of land with an R-15 zoning district. Written Testimony: Many letters of testimony have been received from neighbors on this project – mostly against the proposed application. Staff Recommendation: Approval Notes: Possible Motions: Approval After considering all staff, applicant and public testimony, I move to recommend approval to the City Council of File Number H- 2020-0065, as presented in the staff report for the hearing date of August 20, 2020, with the following modifications: (Add any proposed modifications to conditions) Denial After considering all staff, applicant and public testimony, I move to recommend denial to the City Council of File Number H-2020- 0065, as presented during the hearing on August 20, 2020, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number H-2020-0065 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance) Item #7: Pearson Subdivision (H-2020-0075) Application(s): Combined Preliminary/Final Plat Size of property, existing zoning, and location: This site consists of 3.98 acres of land, zoned R-4, located at 175 W. Paint Horse Lane. Adjacent Land Use & Zoning: To the west and south is outside City of Meridian area of impact—uses appear to be county residential; Meridian R-4 zoning and low density residential exist to the east and north. History: South Meridian Annexation (H-2015-0019) Comprehensive Plan FLUM Designation: Mixed Use Regional Summary of Request: The subject application is proposing to subdivide one 4 acre lot into two lots for the purposes of allowing the current owner of the parcel to deed the new lot over to her daughter so that her and her family are close-by, this includes helping her daughter with her newborn child. The subject property was annexed in 2015 as part of a larger annexation known as South Meridian Annexation. There is an existing Development Agreement (DA) associated with the original annexation and this property and this application constitutes development under City code. In reviewing the existing DA, the Applicant needs to apply for a Development Agreement Modification prior to the City Council hearing for this combined preliminary/final plat. Per the existing DA, the first modification is at no cost to the Applicant. The subject application has also received City Engineer and Public Works Director approval for a utilities waiver to not connect to City services at this time due to services being more than a half mile away. Staff finds that making a singular property owner pay for extending City services for a two lot subdivision is neither fair nor necessary. Central District Health (CDH) has also approved of an additional temporary well site and septic system—this fact further diminishes any concern Staff has with the Applicant’s application regarding water and sewer services. As noted, there is an existing single-family home on the subject property that is not connected to city services. This property, along with nearby properties, was annexed in 2015 but were not required to connect to City services at that time due to services not being available. This situation has not changed since 2015 for this area of South Meridian. However, when services do become available in Meridian Road, the Applicant will be required to connect to them as conditioned in this application and in the existing Development Agreement. Access to this development is proposed via an existing private lane, W. Paint Horse Lane. ACHD is not requiring any public road dedication due to the access not being changed—the subject application does not warrant a public road or road improvements at this time according to ACHD. In accord with the existing access, UDC 11-3H-4 requires that if an existing state highway access has an increase in intensity that it is to be removed upon development or dedicated to ACHD and be constructed as noted on the Master Street Map (MSM). Paint Horse Lane is shown as a future collector roadway on the MSM but the addition of one single-family home does not warrant the construction of a collector roadway at this time. With the DA Modification the Applicant needs to apply for prior to City Council, new DA provisions will address this and ensure any future development meets the required development standards. Staff and ACHD find that the existing private access is sufficient for one additional single family home. Because other abutting properties are not redeveloping at this time there is no feasible way for the Applicant and owner to comply with those requirements in 11-3H-4 and take access from anywhere else. In addition, adding one home does not create sufficient traffic to warrant construction of a collector roadway as shown on the MSM. However, Staff understands that should any more intensive redevelopment occur on site or on those surrounding properties, the access will be evaluated for compliance with these requirements. Staff is recommending DA provisions be added with the DA Modification application that requires a future collector street consistent with the MSM if/when this or adjacent properties redevelop with more intense uses consistent with the MU-R land use designation. To summarize, the subject application is proposing to subdivide one 4 acre lot into two lots for the purposes of allowing the current owner of the parcel to deed the new lot over to her daughter. Staff does not find that the City loses anything by approving this application and understands that this area may not redevelop for quite some time. Written Testimony: None Staff Recommendation: Staff recommends approval of the subject preliminary/final plat per the conditions of approval in the staff report. Notes: Possible Motions: Approval After considering all staff, applicant and public testimony, I move to recommend approval to the City Council of File Number H- 2020-0075, as presented in the staff report for the hearing date of August 20, 2020, with the following modifications: (Add any proposed modifications to conditions) Denial After considering all staff, applicant and public testimony, I move to recommend denial to the City Council of File Number H-2020- 0075, as presented during the hearing on August 20, 2020, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number H-2020-0075 to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance) th Item #8: Modern Craftsman (H-2020-0022) Continued from July 9 hearing to allow Applicant to review amount of proposed commercial development. Application(s): Rezone, Short Plat, Development Agreement Modification, Conditional Use Permit, Private Streets, and Administrative Design Review. Size of property, existing zoning, and location: This site consists of 23.63 acres of land, zoned C-C and R-15, located at the northeast corner of Black Cat Road and Chinden Boulevard. Adjacent Land Use & Zoning: R-4 and R-8 zoning and residential to the North; C-N zoning and future church site to the East; Chinden Blvd (Hwy 20/26) abuts the site to the south with Residential and a small portion of L-O zoning on the south side of Chinden; N. Black Cat abuts the site to the west with C-C zoning and future commercial planned on the west side of Black Cat, north of Chinden. History: AZ-06-004; MI-06-010/011; MI-07-004; MDA-10-004; MDA-14-006; (DA #’s 106151219, 107025555; 107141993, 110059432, & 2014-065517) Comprehensive Plan FLUM Designation: Mixed Use Community (MU-C) Summary of Request: FOR CHANGES MADE FOR COMMERCIAL PORTION ONLY: Modern Craftsman (H-2020-0022), was heard by the Commission on July 9, 2020. At that hearing the Commission continued the project to today in order for the Applicant to address Commission’s concerns with the limited amount of commercial development that was proposed as part of the project. In response, the Applicant has submitted revised plans to Planning Staff which has resulted in a number of recommended changes to the conditions of approval and development agreement. The main points are as follows: C-C zoning increased from approximately 2.2 acres to 4.2 acres and now includes that area containing the clubhouse. o The clubhouse now incorporates offices that residents may rent out and use for their home businesses or meetings, adding 1,050 square feet of leasable space. Applicant added a 5,070 square foot Vertically Integrated building along N. Black Cat Road. The corner commercial building (near intersection of Chinden and Black Cat) is proposed as a two-story structure with parking below the first level of one half of the building. o Two-story variation now allows building to have 19,450 square feet of commercial space—Staff fully supports the two-story concept. Total commercial square footage proposed for the site is now approximately 27,000 square feet. With the increase in commercial square footage, staff finds the site can accommodate smaller scale, more neighborhood serving commercial uses to serve area residents as discussed and envisioned by the Comprehensive Plan and discussed in public testimony at the previous hearing. Written Testimony: The Applicant responded to Staff’s memo with a request to remove one of the recommended conditions of approval regarding the corner commercial lot being required to be two-stories. Staff Recommendation: Staff recommends approval of the requested applications with the DA provisions and the conditions of approval contained in the staff report. Notes: Possible Motions: Approval After considering all staff, applicant and public testimony, I move to recommend approval to the City Council of File Number H- 2020-0022, as presented in the staff report for the hearing date of August 20, 2020, with the following modifications: (Add any proposed modifications to conditions) Denial After considering all staff, applicant and public testimony, I move to recommend denial to the City Council of File Number H-2020- 0022,, as presented during the hearing on August 20, 2020, for the following reasons: (You should state specific reasons for denial) Continuance I move to continue File Number H-2020-0022, to the hearing date of (insert continued hearing date here) for the following reason(s): (You should state specific reason(s) for continuance) h2 Planning & Zoning August 20, 2020 Commission Meeting Slide 1 h2 Agenda Item Numbers/Order: hoodc, 12/19/2006 FLUM Sawtooth Retail Center (south) viewed from adjacent multifamilySawtoothack of Retail Center viewed from W. McMillan Rd BreweryHereProposedSeatingOutdoorHereProposed Brewery Proposed HereOutdoor SeatingProposed here AERIALPLANNED DEVELOPMENTZONING MDRMHDR AERIALPLANNED DEVELOPMENTZONING FLUMPLANNED DEVELOPMENT Item 3. 65 (:> E IDIAN*-----, AGENDA ITEM ITEM TOPIC: Public Hearing Continued from July 16, 2020 for Horse Meadows Subdivision (H-2020-0060) by Riley Planning Services, Located at 710 N. Black Cat Rd. A.pnlicant Requests Continuance to September 17,2020 A. Request: Rezone of 4.71 acres of land from the R-4 zoning district (Medium-Low Density Residential) to the R-8 zoning district (Medium-Density Residential). B. Request: Preliminary Plat consisting of 27 single-family residential lots and 3 common lots on 4.71 acres of land in the R-4 zoning district. Item 3. F66 (:�N-WE IDIAN:-- IDAHO PUBLIC HEARING INFORMATION Staff Contact:Joseph Dodson Meeting Date: August 20, 2020 Topic: Public Hearing Continued from July 16, 2020 for Horse Meadows Subdivision (H-2020-0060) by Riley Planning Services, Located at 710 N. Black Cat Rd. A. Request: Rezone of 4.71 acres of land from the R-4 zoning district (Medium- Low Density Residential) to the R-8 zoning district (Medium-Density Residential); and, B. Request: Preliminary Plat consisting of 27 single-family residential lots and 3 common lots on 4.71 acres of land in the R-4 zoning district. Information Resources: Click Here for Application Materials Click Here to Sign Up to Testify at the Planning and Zoning Commission Public Hearing Item 4. 67 (:> E IDIAN*-----, AGENDA ITEM ITEM TOPIC: Public Hearing Continued from July 16, 2020 for Prescott Ridge (H- 2020-0047) by Providence Properties, LLC, Located on the South Side of W. Chinden Blvd. and on the East Side of N. McDermott Rd. APnlication Requires Continuance to Requested Date of September 17, 2020 A. Request: Annexation of 126.53 acres of land with R-8 (99.53 acres), R-15 (8.82 acres) and C-G (18.17 acres), zoning districts. B. Request: A Preliminary Plat consisting of 384 buildable lots, 35 common lots and 5 other lots on 126.53 acres of land in the R-8, R-15 and C-G zoning districts. PUBLIC HEARING SIGN IN SHEET DATE: August 20, 2020 ITEM # ON AGENDA: 4 PROJECT NAME: Prescott Ridge (H-2020-0047) PRINTED FULL NAME For Against Neutral Want to Testify YES OR NO 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Item 4. F68 (:�N-WE IDIAN IDAHO PUBLIC HEARING INFORMATION Staff Contact:Sonya Allen Meeting Date: August 20, 2020 Topic: Public Hearing for Prescott Ridge (H-2020-0047) by Providence Properties, LLC, Located on the South Side of W. Chinden Blvd. and on the East Side of N. McDermott Rd. A. Request:Annexation of 126.53 acres of land with R-8 (99.53 acres), R-15 (8.82 acres) and C-G (18.17 acres), zoning districts; and, B. Request: A Preliminary Plat consisting of 384 buildable lots, 35 common lots and 5 other lots on 126.53 acres of land in the R-8, R-15 and C-G zoning districts. Information Resources: Click Here for Application Materials Click Here to Sign Up to Testify at the Planning and Zoning Commission Public Hearing Item 5. 69 (:> E IDIAN*-----, AGENDA ITEM ITEM TOPIC: Public Hearing for Loose Screw Brewery (H-2020-0081) by Mary Murphy, Grand Peak, LLC, Located at 1511 W. McMillan Rd., Ste. 100 A. Request: A Conditional Use Permit for a 2,200 square foot brewery with a tasting area and retail showroom (i.e. minor food and beverage products processing) within 300 feet of a residential district/use on 0.95 of an acre of land in the C-N zoning district. PUBLIC HEARING SIGN IN SHEET DATE: August 20, 2020 ITEM # ON AGENDA: 5 PROJECT NAME: Loose Screw Brewery (h-202-0081) PRINTED FULL NAME For Against Neutral Want to Testify YES OR NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Item 5. ■ STAFF REPORTC�WEIIDIAN -- COMMUNITY DEVELOPMENT DEPARTMENT .►A H O HEARING 8/20/2020 Legend '2 DATE: 0 Pro - Lxa=or ,� TO: Planning&Zoning Commission q= FROM: Alan Tiefenbach,Associate Planner 208-489-0573 ENE 0 SUBJECT: H-2020-0081 in Loose Screw Beer Company-CUP LOCATION: 1511 W McMillan Road I. PROJECT DESCRIPTION The Applicant has submitted an application for a conditional use permit(CUP)to allow a 2,200 sf brewery(defined as minor food and beverage products processing). This includes outdoor seating and potentially live music. The applicant will be leasing space within Building A of the Sawtooth Village Retail Center,which is still under construction. Because this property is within 300 feet of a residential district, a conditional use is required. II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 1.98 acres(two lots containing two buildings) Future Land Use Designation Mixed Use Neighborhood Existing Land Use(s) Two commercial buildings under construction Proposed Land Use(s) Minor food and beverage processing Lots(#and type;bldg./common) 2,200 sf within one of two 10,000 sf buildings Neighborhood meeting date;#of June 23,2020— 14 signed in,no concerns expressed attendees: Page 1 Item 5. F71 Description Details Page History(previous approvals) A7-13-010(McLinder Subdivision),DA 114020372,PP-13- 022;FP-15-001 (Lot 27,Blk 1,McLinder Sub.2);A- 2019-0248(Sawtooth Village Retail Building A—CZC/DES) B. Community Metrics Description Details Page Ada County Highway District Traffic impact study not required. Access(Arterial/Collectors/State Access will occur from N. Linder Rd.and W.McMillan Hwy/Local)(Existing and Proposed) Rd.,both arterials. Existing Road Network Yes Fire Service No comments submitted Police Service No comments submitted Wastewater I I • Distance to Sewer N/A Services • Sewer Shed White Drain Trunkshed • Estimated Project Sewer See application ERU's • WRRF Declining Balance 13.97 • Project Consistent with Yes WW Master Plan/Facility Plan • Comments • Flow is committed • No proposed changes to public sewer infrastructure within record.Any changes shall be reviewed and approved by Public Works. Water • Distance to Water Services 0 • Pressure Zone • Estimated Project Water See application ERU's • Water Quality No concerns • Project Consistent with Yes Water Master Plan • Impacts/Concerns • No changes to public water infrastructure proposed Page 2 � m u ■ ■ _I� �_■uuul 1 _' Y - ■+w a Z■ u■11 uu141�u■■ ,.,�4 ' . I ZIZ • 11 ■■.��u a I .''� ';+ � � - - , - -� , � _+ .uuuuu 1 111 - .. . uuuu111u1 I• �- �� •'- - 111:I I- 1■ ■uuuw %. / = u ■ - I �� •� uuuY uuw uuuw. k " IIIIIIII ■ IIN 'ilc��•a .. iiiiii......- __...__ _ ■ ■L dk �� r r lit_I"�� INII fir... I - .I-"— I'a Wri .al!FR r� • w N 1' lull: �'on MIN u uu - Iluuir -.. - _ - - uw u* wiuiu` 111,; 111 ■ II 1.•1111 111 5 - - -- ME.MIIII1 . ■1111■111■•- • • ' 7 " 't _ I.. T. ' __ .. 'y}T'r — 1■�1 ■�+1 : 1.r� _ � - )i- ; 7 12 IN IN II 1 _•u■1■.1•�1 IIIIN .�.Y�N■— uuu■ •g-lil i '. __ .__._ _,�„ _ ._I. I IN MEN _ __ .� ' ICI 2 z rg1 2 z :INII■ :INII■ IN '+■■■ ri HE =I uuus I I uuus I I R■� 1111 uuu rIrI1Ql®II I■ZI 111 uuu rMII1Ql�11■IN I IZ ZI 111 9 N -uuuw uu uu • u!•uuuw uu uuullu 1 111 .uuu.1I1 1... • ■ ■■■.III III N 1.11 I I11 IIIINI — ■■■.IIINIIINI111 IIIINI • 11 III— NMI111111111 1111111 1 - 111111 11111111 ` _ III— 1111111111 1111111 1::■ II- n uuw 1::■ IlpIN ��-umul uuw 1 ■u■■ -u7■ -�1 SENSE�- ..u7■tiu N IIIIIIY uu-uuuw. � --,f.0 1�4�� R�'N x IIIIIIY�I,luuu-uuuw.� +�1•Ii ■ Ilu q = ■N uuu RI■1■I■'II ■ •�..1�a 1HNr■ IIN q ■iumm. . IIIIIIII -um !! 1�1 �- !! _ i•���������i -Iuu■■■■ =u - INII 2 � � -IIIIIIII! � 1�=-IY1II -. lul•2 - - uuu■ �rLfJl_.. . u - ■ I:u1 = - �niii ��■�= a :2�=� = inul ■ u - •�- lulls ■ u = uI N ---.1 Imo- lulls uuu■ •- ' I - u uuw. - uu1• _�= ' -6Yu I .-.■■ III■■■I INI _ . - IIIIIII- IINlllr .. --!■■■■■IIIII■--• - IIIII II 1111111111` IIIIII :- III IIIII II 1111111111 IIIIII •uu■ INIIIr�:- III III 51..1111 111 1111. 111111N1— NI IIIII `I-•1111 111 1111Y. 111111N1— ' ■ . - ■1111■111■•- ■1 IN1111111 -III �.@ III II . — ■1111■111■•- ■1 IN1111111 -III •IYIR il■ -. IN 1 IZ...■11■1 .� .1 - II� — •IYIR il■ -. 1 IZ...■11■1 .� .1 1■�1 ■ ■1 : 11■ 1 ��■ : - 1■�1 ■ ■1 : 11■ 1 ��■ = -� -- � -■uui�■■w Z�1 ■■■ I ra= - - �-:■1■! Z ■1■ Z" ■■■ I ra= uui 1■''i::u■ra■ iii3 •_ 5■rau .; = u��i::u■ra■- •_ 5■r+u �• iuuu ■1 1 {-••uuul•�1 IIIIN ...N■- u■■■■■ _0 IN ■1 1 �•uuul•�1 IIIIN ...N■- Nuu■ _� li1 ■n uu Ipu•u ■u■■ ■uuw- ■�■■ ■n uu Ipu•u ■u■■ ■uuw ■�■■ 1 1 , ■ , Item 5. 73 C. Representative: Mary Murphy, Grand Peak LLC—4202 N. Marcliffe Ave,Meridian ID 83704 IV. NOTICING Planning& Zoning City Council Posting Date Posting Date Newspaper Notification 7/31/2020 Radius notification mailed to 7/31/2020 properties within 300 feet Site Posting Date 8/5/2020 NextDoor posting 7/28/2020 V. STAFF ANALYSIS A. Future Land Use Map Designation(https://www.meridiancity.or /g compplan) Mixed Use Neighborhood-The purpose of this designation is to assign areas where neighborhood-serving uses and dwellings are seamlessly integrated into the urban fabric. The intent is to avoid predominantly single-use developments by incorporating a variety of uses.Non- residential uses in these areas tend to be smaller scale and provide goods or services that people typically do not travel far for(approximately one mile) and need regularly. The subject site is already zoned Neighborhood Business District(C-N). The proposed use will be leasing approximately 2,200 sf within a 10,000 sf building which is presently under construction as the Sawtooth Village Retail Center(two 10,000 sf buildings total). This complex will contain several restaurants, a gym,personal service uses such as nail salons, and the proposed brewery. A small brewery with occasional live music within a larger commercial complex adjacent to a multifamily neighborhood is exactly the type of local neighborhood serving use envisioned by the Comprehensive Plan. Also,pathways connect this complex to the adjacent neighborhood for better integration. The proposed brewery is a use determined to be appropriate in this zone district, subject to the specific use standards listed in UDC 11-4-3-46(discussed in specific use standards below). B. Comprehensive Plan Policies (https://www.meridiancity.or /g compplan): Goals, Objectives, &Action Items: Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to the proposed use of this property(staff analysis in italics): • Encourage infill development. (3.03.01E) The Comprehensive Plan defines infill as "development on vacant parcels, or redevelopment of existing parcels to a higher and better use that is surrounded by developed property within the City of Meridian." The brewery is proposed within a tenant space in a commercial center which is presently under construction. During the 2013 annexation and rezoning of this property, staff determined that the Sawtooth Village Retail Complex was infill development. Page 4 Item 5. 74 • Preserve private property rights and values by enforcing regulations that will prevent and mitigate against incompatible and detrimental neighboring uses. (3.05.01 Q The conditional use is a process to ensure any impacts associated with a particular use are mitigated. Based on the applicant's narrative, staff is recommending the hours of the establishment be limited from IIAM to IOPM. To further reduce impacts on adjacent residential properties staff recommends a condition of approval that all outdoor seating and events associated with this use be limited to the 1,500 square feet plaza space between Buildings A and B. • Minimize noise,lighting, and odor disturbances from commercial developments to residential dwellings by enforcing city code. As mentioned above, staff is recommended hours be limited from IIAM to IOPM as a condition of approval, and outdoor seating and events be limited. The building and site design has already been approved through Certificate of Zoning Compliance (CZC)A- 2019-0248 and no additional outdoor improvements are proposed with this project(other than outdoor seating). • Require appropriate building design, and landscaping elements to buffer, screen,beautify, and integrate commercial,multifamily, and parking lots into existing neighborhoods. (5.01.02D) Building design and landscaping was reviewed and approved with the Sawtooth Village Retail Center CZC. A 20'wide landscape buffer has been installed along the south property line adjacent to the multifamily residential. C. Existing Structures/Site Improvements: The proposed business will be a tenant within the Sawtooth Village Retail Center and will occupy the eastern end of Building A (the complex is comprised of two buildings). This development was approved in 2019 through CZCA-2019-0248 and is presently building out. D. Proposed Use Analysis: The proposed use will be a brewery and tasting area leasing 2,200 sf within a commercial building.Approximately 150 sf of the business will be dedicated to brewing and associated equipment, with the remainder for tasting.A brewery is categorized as minor food and beverage products processing and is use by right unless it is within 300 feet of a residential neighborhood. As the Sawtooth Village Retail Center abuts multifamily to the south (Mclinder Subdivision No 1) and single family residential to the east(Cobblefield Crossing) a conditional use is required. The applicant has stated they plan on 10 inside tables and 4-5 outside tables within a plaza just outside through several large doors and to the east. They will be sharing the plaza space with a restaurant at the west end of Building B on the other side of the plaza. The brewery will operate from IOAM to 9PM on weekdays and until IOPM on weekends. The proposed use complies with the zoning for the site but is subject to specific use standards as listed in 11-4-3-46. E. Specific Use Standards(UDC 11-4-3): UDC 11-4-3-46 allows minor food and beverage products processing with several limitations. The tenant space shall not exceed 5,000 sf, storage of materials, storage and equipment must be within fully enclosed structures, (outdoor)mechanical equipment associated with the manufacturing may be reviewed as integral architectural elements, alcohol serving is limited to Page 5 Item 5. 75 IIAM to IOPM, and a conditional use permit shall be required when the use is located within 300 feet of existing residential or a residential district. The business will operate within a 2,200 sf space, no outdoor equipment or storage is proposed, hours of operation will be limited from 11AM to IOPM, and this project is being reviewed as a conditional use due to the adjacent residential to the south and east. The proposed use complies with the specific use standards. As mentioned, to reduce impacts on adjacent residential, staff is recommending the hours of the establishment be limited from LOAM to IOPM and all outdoor seating and events associated with this use be limited to the 1,500 square feet plaza space between Buildings A and B. F. Dimensional Standards(UDC 11-2): This use will occupy a tenant space within a commercial complex which is presently building out. The development was found to adhere to dimensional standards during the review of Certificate of Zoning Conformance and Design Review which was issued in 2019(CZC A-2019-0248). G. Access(UDC 11-3A-3, 11-3H-4): Access to this development was already approved with the McLinder Subdivision (PP-13-022) and Sawtooth Village Retail Complex CZC. Two points ofprimary access occur; one from W. McMillan Rd and one from N. Linder Road. There are also two internal points of access (presently stubbed) at the east periphery of the property and to the undeveloped commercial property at 1385 W. McMillan Rd.As was requested with the June 24, 2020 pre-application meeting, the applicant submitted a copy of the recorded CC&R's that allow cross-access/cross- parking between all commercial lots in the center. This proposal was referred to ACHD, who mentioned a traffic impact study for this tenant was not required. There were no additional comments from ACHD. H. Parking(UDC 11-3C): UDC 11-3C-5B requires one space for every five hundred(500)square feet of gross floor area. This amounts to 40 parking spaces for the two 10,000 sf buildings. 58 parking spaces have already been approved per the Sawtooth Village Retail Building CZC. The UDC requires 2 bicycle parking spaces for the development; 6 are being provided. In addition to the additional parking spaces being provided, it is important to note different uses have different peak parking demand times. The Sawtooth Village Retail Center will lease several office spaces, restaurants, a brewery, a gym and a nail and hair salon. Office and salon uses have peak-parking demand times between 8"and 6PM, whereas restaurant and brewery uses have peak demand times after 6PM.As mentioned above, a cross parking agreement was recorded with the CC&Rs for this development. The parking to accommodate this use should be adequate. I. Sidewalks(UDC 11-3A-17) Detached sidewalks already exist along W. McMillan Rd. and N. Linder Rd. There is also a pathway that directly connects the plaza (where outdoor eating and music is proposed) to the adjacent multifamily at the south. Parkways No parkways are proposed with this project. Page 6 Item 5. 76 J. Landscaping(UDC 11-3B): Most of the 25'landscape buffers required along W. McMillan Rd. and N. Linder Rd. (arterials) have already been installed as part of the Sawtooth Village Retail Building complex (although there are several sections that have yet to be constructed due to construction activities). The required 20'residential buffer already exists to the south between the retail complex and the adjacent residential. Landscape islands will be constructed in the parking lot and several trees have been approved in the outdoor plaza. K. Fencing(UDC 11-3A-6, 11-3A-7): As the Sawtooth Village Retail Center is intended to be a commercial complex integrated into the adjacent residential neighborhood,fences do not exist. Conversely, several pathways lead from the neighborhood into this complex. L. Utilities All utilities for the proposed development are already in place. No additional services are needed. M. Building Elevations The Loose Screw Beer Company is a proposed tenant within a 2,200 square space at the eastern end of Building A of the Sawtooth Village Retail Center. The architecture for this complex was already reviewed and approved through the certificate of zoning compliance and design review process. This development is presently building out. VI. DECISION A. Staff: Staff recommends approval of the proposed conditional use permit with the conditions in Section VIII per the Findings in Section IX. Page 7 Item 5. ■ VII. EXHIBITS A. Approved Landscape Plan(CZC 2018-0052,March 7,2018) I I 1 t - 1 4 - I , Brewery Outd6f5f � Proposed Seating Here Proposed Here -- -- ----- r�--- f L/.N�9CI.PE PLOW B. Approved Elevations(CZC 2018-0052,March 7,2018) Brewery Proposed h F +k' y Outdoor Seating -' .Proposed Here Page 8 Item 5. 78 C. Site Photos (date: 8/10/2020) Sawtooth Retail Center viewed from W. McMillan Rd <= Outdoor Plaza Back of Sawtooth Retail Center(south) viewed from adjacent multifamily .e- Sawtooth Retail Center and outdoor plaza as viewed from W. McMillan Rd Page 9 Item 5. F79] VIII. CITY/AGENCY COMMENTS & CONDITIONS A. Planning 1. A Certificate of Zoning Compliance for Change in Use application is required to be submitted to the Planning Division and approved prior to certificate of occupancy. 2. The Applicant shall have a maximum of two(2)years to commence the use as permitted in accord with the conditions of approval. If the use has not begun within two(2)years of approval, a new conditional use permit must be obtained prior to operation or a time extension must be requested in accord with UDC 11-5B-6F. 3. Outdoor seating and events associated with the use shall be restricted to no more than 1,500 sf within the outdoor plaza as indicated on the approved landscape plan above. 4. Hours of operation shall be restricted to 11AM to IOPM. 5. Parking requirements associated with the minor food and beverage products processing shall comply with the commercial parking standards; 1 per 500 square feet of gross floor area. 6. The Applicant shall comply with the outdoor service and equipment area standards as set forth in UDC 11-3A-12. 7. The Applicant shall comply with the structure and site design standards as set forth in UDC 11- 3A-19 and the Architectural Standards Manual. 8. Applicant shall comply with all previous conditions associated with development of this site including AZ-13-010(McLinder Subdivision),DA 114020372,PP-13-022,FP-15-001 (Lot 27, Blk 1,McLinder Sub. 2), and A-2019-0248 (Sawtooth Village Retail Building A—CZC/DES). 9. Applicant shall comply with all specific use standards required for Minor Food and Beverage Products Processing,UDC 11-4-3-46. IX. FINDINGS A. Conditional Use Permit The Commission shall base its determination on the conditional use permit request upon the following: 1. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The site meets all dimensional and development regulations in the C-Nzoning district. The site is already developing with adequate landscape buffers, setbacks, and parking. Staff finds the site is large enough to accommodate the proposed use. 2. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord with the requirements of this title. The Comprehensive Plan identifies this area for mixed use neighborhood; neighborhood-serving uses and dwellings are seamlessly integrated into the urban fabric. Non-residential uses in these areas tend to be smaller scale and provide goods or services that people typically do not travel far for(approximately one mile) and need regularly. A neighborhood brewery connected to the adjacent residential including outdoor seating and live music is the type of neighborhood serving use envisioned by the Plan. Page 10 Item 5. 80 3. That the design,construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. The design of the Sawtooth Retail Center was approved in 2018 by CZC A-2018-0052 and the proposed use is one of the tenants proposing to lease within the center. Hours will be limited to between IOAM and IOPM and all outdoor seating and events associated with this use is recommended to be limited to the 1,500 sf outdoor plaza. This type of neighborhood serving brewery enhances the essential character of the area. 4. That the proposed use,if it complies with all conditions of the approval imposed,will not adversely affect other property in the vicinity. As mentioned, conditions to reduce impacts include limiting the hours of operation and the amount of area outdoor activities can occur. 5. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools,parks,police and fire protection, drainage structures,refuse disposal, water, and sewer. The proposed use will be served adequately by all public facilities and services. 6. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. Staff ,finds the proposed use should not create any additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. 7. That the proposed use will not involve activities or processes,materials,equipment and conditions of operation that will be detrimental to any persons,property or the general welfare by reason of excessive production of traffic,noise, smoke, fumes,glare or odors. This proposed minor food and beverage products processing use will share tenant space within a new commercial building, hours will be limited and staff recommends outdoor activities be limited to the plaza area. It will be located in an area recommended for neighborhood mixed use in an area characterized by commercial, multifamily residential at an arterial intersection. The use is appropriate in this location. 8. That the proposed use will not result in the destruction,loss or damage of a natural, scenic or historic feature considered to be of major importance. (Ord. 05-1170, 8-30-2005, eff. 9-15-2005) Staff is unaware of any natural, scenic, or historic features on this site; thus, Commission finds the proposed use should not result in damage of any such features. Page 11 Item 6. 81 (:> E IDIAN*-----, AGENDA ITEM ITEM TOPIC: Public Hearing for Victory Apartments (H-2020-0065) by Wendy Shrief,J-U-B Engineers, Inc., Located at the Southwest Corner of S. Meridian Rd./SH- 69 and W.Victory Rd. A. Request: Amendment to the Future Land Use Map contained in the Comprehensive Plan to change the designation on 18.45 acres of land from Medium Density Residential (MDR) to Medium High Density Residential (MHDR). B. Request: Annexation of 18.45 acres of land with an R-15 zoning district. i PUBLIC HEARING SIGN IN SHEET DATE: August 20, 2020 ITEM # ON AGENDA: PROJECT NAME. o u iv sii on (H-202- 060) � P i PRINTED FULL NAME For Against Neutral Want to Testify YES OR NO 1 ZVI) )c i -e-r 1V6 c Y�5 3 VU4 Pier 4 � 5 6 8 9 10 11 12 13 14 15 i i PUBLIC HEARING SIGN IN SHEET DATE: August 20, 2020 ITEM # ON AGENDA: 6 PROJECT NAME: Victory Apartments (H-2020-0065) j PRINTED FULL NAME For Against Neutral Want to Testify YES OR NO 1 "XI 2 W SDI 3 4 5 � 6 j 9 10 11_ 12 50-h J n-r 13 14 15 f----� Item 6. F82 (:�WE IDIAN:--- IDAHO PUBLIC HEARING INFORMATION Staff Contact:Sonya Allen Meeting Date: August 20, 2020 Topic: Public Hearing for Victory Apartments (H-2020-0065) by Wendy Shrief,J-U-B Engineers, Inc., Located at the Southwest Corner of S. Meridian Rd./SH-69 and W.Victory Rd. A. Request: Amendment to the Future Land Use Map contained in the Comprehensive Plan to change the designation on 18.45 acres of land from Medium Density Residential (MDR) to Medium High Density Residential (MHDR); and, B. Request: Annexation of 18.45 acres of land with an R-15 zoning district. Information Resources: Click Here for Application Materials Click Here to Sign Up to Testify at the Planning and Zoning Commission Public Hearing Item 6. F 3 STAFF REPORTC�WE COMMUNITY DEVELOPMENT DEPARTMENT HEARING August 20,2020 Legend DATE: IffProject Lacfl-fian TO: Planning&Zoning Commission FROM: Sonya Allen,Associate Planner 208-884-5533 SUBJECT: H-2020-0065 Victory Apartments—CPAM,AZ LOCATION: Southwest corner of S. Meridian Rd./SH- 69 and W.Victory Rd., in the NE '/4 ofr Section 24,Township 3N.,Range 1 W. ------ I. PROJECT DESCRIPTION The Applicant requests an amendment to the Future Land Use Map contained in the Comprehensive Plan to change the designation on 18.45 acres of land from Medium Density Residential(MDR)to Medium High Density Residential(MHDR); and annexation of 18.45 acres of land with an R-15 zoning district. II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 17 acres Future Land Use Designation Medium Density Residential(MDR) Existing Land Use Vacant/undeveloped land Proposed Land Use(s) Multi-family residential(MFR) Current Zoning RUT in Ada County Proposed Zoning R-15 (Medium High-Density Residential) Lots(#and type;bldg/common) NA(property is not proposed to be subdivided) Phasing plan(#of phases) NA Number of Residential Units(type 170 multi-family apartment units(2-plex and 4-plex style) of units) Density(gross&net) 10.0 gross/13.01 net Open Space(acres,total[%]/ NA buffer/qualified) Pagel Item 6. F84 Amenities 10' wide multi-use pathway along Meridian Rd./SH-69 Physical Features(waterways, The Ridenbaugh Canal runs along the northern boundary of hazards,flood plain,hillside) this site within a 100'wide easement(50' from centerline of canal) Neighborhood meeting date;#of April 16,2020; 7 attendees attendees: History(previous approvals) ROS#6419(2004)᲻ (2006) B. Community Metrics Description Details Page Ada County Highway District _ • Staff report(yes/no) Yes(draft) • Requires ACHD Commission No Action es/no • Existing Conditions S.Meridian Rd./SH-69 is improved with 4 travel lanes and a center turn lane,with no curb,gutter or sidewalk;W.Victory Rd. is improved with 2 travel lanes with no curb,gutter or sidewalk. • CIP/IFYWP Victory Rd.is listed in the CIP to be widened to 3-lanes from Meridian to Locust Grove Roads between 2026 and 2030 Access(Arterial/Collectors/State One(1)access is proposed via W.Victory Rd.; one(1) Hwy/Local)(Existing and Proposed) emergency access only is proposed via S.Meridian Rd./SH-69 Traffic Level of Service W.Victory Rd.—Better than"E"(acceptable) Stub Street/Interconnectivity/Cross A stub street is proposed to the west boundary for future Access extension and connectivity through the outparcel to Jocelyn Park subdivision Existing Road Network Public(W.Victory Rd. and S.Meridian Rd./SH-69) Existing Arterial Sidewalks/ None Buffers Proposed Road Improvements None Fire Service No comments were submitted as the project complies with Fire Code requirements. Police Service Distance to Police Station 3 miles Police Response Time 3 minutes(expected);4 minutes(average) Calls for Service 451 within a mile of the proposed development(between 6/1/19 and 5/31/20) %of calls for service split by See Section IX.D - priority Accessibility No concerns with access Specialty/resource needs No additional resources are required at this time—service is already provided in this area. Crimes 19(between 6/1/19 and 5/31/20) Crashes 6(between 6/1/19 and 5/31/20) Other Reports NA Page 2 Item 6. F85 West Ada School District Distance(elem,ins,hs) EmrDllm*nt 9IM Capacity of Schools Mary rAcphefsan Elernentaryr" 571 SW 1.7 #of Students Enrolled Victory Middle School 9Ar inns 11 Merldian IiighSchool zin 24W d,9 "budFkg the ZVZ1 school year Mary McPMkrwrl'F stwdt-t capacity will rorrr,iw w 575.d—TM t"l�W expansloo underway." Wastewater Distance to Sewer Services Approximately 300'west of the subject site in Victory Rd. Sewer Shed South Black Cat trunkshed Estimated Project Sewer ERU's See application WRRF Declining Balance 13.97 Project Consistent with WW Yes Master Plan/Facility Plan Impacts/Concerns No utility plans have been submitted for analysis,therefore no site specific conditions have been provided with this application.Applicant shall be required to submit utility designs as part of their CUP application and conditions will be conveyed at that time. Water Distance to Water Services Directly adjacent to the subject site in Victory Rd. Pressure Zone 4 Estimated Project Water ERU's See application Water Quality I NA Project Consistent with Water NA Master Plan Impacts/Concerns No utility plans have been submitted for analysis,therefore no site specific conditions have been provided with this application.Applicant shall be required to submit utility designs as part of their CUP application and conditions will be conveyed at that time. C. Project Maps Future Land Use Map Aerial Map (fLegend Legend PreyectLcca-nor IPYojec LCcC1 Lows city ERE li 51s n i�7 i ' l di R sid ti l Deg Sidi i F =H ig l Re ntia I Page 3 Item 6. F 6 Zoning Map Planned Development Map Legend IRLU Legend Pro-ea- Lxa-or R=$ R- I Project Lacaian -- RUT City Limih R- — Planned Parcels irminfurn w A R-4 R- RUT R4 tiJ 1 R-a R.1s RUT III. APPLICANT INFORMATION A. Applicant: Wendy Shrief,J-U-B Engineers,Inc. —250 S. Beechwood Ave., Ste. 201,Boise, ID 83709 B. Owner: SW Victory,LLC—P.O. Box 2020, Boise,ID 83701 C. Representative: Same as Applicant IV. NOTICING Planning&Zoning City Council Posting Date Posting Date Newspaper notification published in newspaper 7/31/2020 Radius notification mailed to property owners within 300 feet 7/29/2020 Public hearing notice sign posted 8/5/2020 on site Nextdoor posting 7/28/2020 Page 4 Item 6. 87 V. COMPREHENSIVE PLAN ANALYSIS LA"USE: This property is designated Medium Density Residential(MDR)on the Future Land Use Map (FLUM)in the Comprehensive Plan. The MDR designation allows for dwelling units at gross densities of 3 to 8 dwelling units per acre. The Applicant proposes an amendment to the FLUM to change the existing designation from MDR to Medium High-Density Residential(MHDR). The MHDR designation allows for a mix of dwelling types including townhouses, condominiums, and apartments. Residential gross densities should range from 8 to 12 dwelling units per acre. These areas are relatively compact within the context of larger neighborhoods and are typically located around or near mixed use commercial or employment areas to provide convenient access to services and jobs for residents. Developments need to incorporate high quality architectural design and materials and thoughtful site design to ensure quality of place and should also incorporate connectivity with adjacent uses and area pathways, attractive landscaping and a project identity. The Applicant proposes to develop the 17.01 acre site with a total of 170 multi-family apartments (two story 2-plex and 4-plex styles)at a gross density of 10.0 units per acre consistent with the density desired in MHDR designated areas. Transportation: The Master Street Map(MSM) does not depict any collector streets across this property. Goals,Objectives, &Action Items: Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to the proposed use of this property(staff analysis in italics): • "Encourage a variety of housing types that meet the needs, preferences, and financial capabilities of Meridian's present and future residents."(2.01.02D) The proposed 2 plex and 4 plex style apartments will contribute to the variety of residential categories in the City as desired.Single-family homes exist to the south(Meridian Heights),zoned R-8, and multi- family apartments (Red Tail) exist across the street to the east, zoned R-I5. • "Permit new development only where it can be adequately served by critical public facilities and urban services at the time of final approval, and in accord with any adopted levels of service for public facilities and services."(3.03.03F) City water and sewer service is available and can be extended by the developer with development in accord with UDC 11-3A-21. • "Avoid the concentration of any one housing type or lot size in any geographical area;provide for diverse housing types throughout the City." (2.01.01G) The proposed apartments with the existing and future single-family detached homes in this area should provide for diverse housing options in this area. Multi family apartments also exist across Meridian Rd./SH--69 to the east. • "Provide pathways, crosswalks,traffic signals and other improvements that encourage safe,physical activity for pedestrians and bicyclists."(5.01.01B) A 10 foot wide segment of the City s multi-use pathway system is proposed within the street buffer along S. Meridian Rd./SH--69 in accord with the Pathways Master Plan. • "Plan for transportation connectivity and the provision of adequate urban utilities and services for county enclaves."(3.03.04) A stub street is proposed from Victory Rd. to the out parcel at the southwest corner of the site for future extension and access from the west and south. Urban utilities and services will be provided with annexation and development of the property. Page 5 Item 6. 88 • "Encourage compatible uses and site design to minimize conflicts and maximize use of land." (3.07.00) The proposed multi family residential development and site design with 2 plex structures along the perimeter boundary as a transition between proposed 4 plex structures and existing and future single-family homes should be compatible. • "Support infill development that does not negatively impact the abutting, existing development. Infill projects in downtown should develop at higher densities, irrespective of existing development." (2.02.02C) The proposed residential infill development shouldn't negatively impact abutting development as existing uses are also residential in nature. • "Maintain a range of residential land use designations that allow diverse lot sizes,housing types, and densities."(2.01.01 C) The proposed MHDR FL UM designation for this property will contribute to the range of residential land use designations in this area of the City which currently consist mainly of low and medium density residential designations. • "Ensure development is connected to City of Meridian water and sanitary sewer systems and the extension to and through said developments are constructed in conformance with the City of Meridian Water and Sewer System Master Plans in effect at the time of development."(3.03.03A) The proposed development will connect to City water and sewer systems; services are proposed to be provided to and though this development in accord with current City plans. • "Require appropriate landscaping,buffers, and noise mitigation with new development along transportation corridors(setback,vegetation,low walls,berms, etc.)."(3.07.01C) The proposed development is required to provide a minimum 35 foot wide landscaped street buffer along S. Meridian Rd./SH--69 with noise mitigation in accord with the standards listed in UDC 11- 3H-4D. • "Require urban infrastructure be provided for all new developments, including curb and gutter, sidewalks,water and sewer utilities."(3.03.03G) Urban sewer and water infrastructure and curb, gutter and sidewalks are required to be provided with development. • "Encourage diverse housing options suitable for various income levels,household sizes, and lifestyle preferences."(2.01.01) The proposed multi family apartments in 2 plex and 4 plex configurations will contribute to the diverse housing options available in the southern portion of the City. • "Require all new development to create a site design compatible with surrounding uses through buffering, screening,transitional densities and other best site design practices."(3.07.01A) Because residential uses and zoning are proposed adjacent to existing and future residential uses and zoning, screening and buffering is not required by the UDC. Transitional densities are proposed (i.e. 2 Alex structures next to existing and future single-family homes). • "Encourage the development of high quality, dense residential and mixed use areas near in and around Downtown,near employment, large shopping centers,public open spaces and parks, and along major transportation corridors, as shown on the Future Land Use Map."(2.02.01E) The proposed medium high-density development is located along S. Meridian Rd./SH--69, a major Page 6 — Item 6. 89 transportation corridor, and in close proximity to office and future commercial uses to the north and northeast. • "Maximize public services by prioritizing infill development of vacant and underdeveloped parcels within the City over parcels on the fringe."(2.02.02) Development of the subject infill parcels will maximize public services. • "Annex lands into the corporate boundaries of the City only when the annexation proposal conforms to the City's vision and the necessary extension of public services and infrastructure is provided." (3.03.03) The proposed development plan is not consistent with the City's existing vision in terms that this property is designated for medium density residential uses but is consistent with the proposed MHDR FL UM designation requested with this application. Public services and infrastructure are proposed to be provided. VI. STAFF ANALYSIS A. COMPREHENSIVE PLAN MAP AMENDMENT(CPAM) As discussed above,the Applicant requests an amendment to the FLUM to change the future land use designation on 17.01 acres of land from MDR to MHDR for the development of 170 multi-family apartments at a gross density of 10.0 units per acre. An exhibit map showing the existing and proposed FLUM designations is included in Section VIII.A. The Applicant's request for approval of an increase in density for development on this site is based on recent market studies included in this application that corroborate the demand for housing in Meridian is high and a range and diversity of housing types is needed. As discussed above,the Comprehensive Plan encourages higher density residential uses adjacent to major transportation corridors such as S. Meridian Rd./SH-69 which lies along the eastern boundary of the site. Approval of the proposed amendment to MHDR will contribute to the range of residential land use designations and diversity in housing types and densities in this area as desired. For these reasons, Staff is in support of the request for a map amendment to MHDR. B. ANNEXATION&ZONING The Applicant proposes to annex 18.45 acres of land into the City with an R-15 (Medium High-Density Residential)zoning district consistent with the proposed FLUM designation of MHDR. A conceptual site plan and building elevations were submitted showing how the property is planned to develop with(170)2-story multi-family apartment units consisting of 2-plex and 4-plex style structures (see Section VIII.C). A total of(58)2-and 3-bedroom units in 2-plex and(112)2-and 3-bedroom units in 4-plex configurations are proposed. The proposed gross density of the development is 10.0 units per acre with a net density of 13.06 units per acre,which is consistent with that desired in the MHDR designated areas. This property along with the 4 acre rural residential out-parcel(Brewer/Schmidt) at the southwest corner of the site are enclaves surrounded by City annexed land. Annexation of this property will leave one parcel in the County. The Applicant states they have visited with that property owner about including their land in the annexation and FLUM amendment application but they prefer to remain as-is in the County. Remnant parcels such as this in the County create an inefficient provision of City services. Multi-family developments are listed as a conditional use in the R-15 zoning district per UDC Table 1I- 2A-2. Future development is subject to the dimensional standards listed in UDC Table 11-2A-7 for the Page 7 Item 6. 90 R-15 zoning district and the specific use standards for multi-family developments listed in UDC 11-4-3- 27. The site plan depicts access to the proposed development via a public street from W. Victory Rd., an arterial street; no stub streets exist to this property. Emergency access is proposed via S.Meridian Rd./SH-69 in two possible locations(only one access is required). A stub street is proposed at the west boundary for future extension and connectivity to an east/west local street planned in Jocelyn Park subdivision; this street will also eventually provide a connection to Victory Rd. from S. Peoria Way to the south if/when the out-parcel(Brewer/Schmidt)redevelops in the future. Direct access, except for one emergency only access via S. Meridian Rd./SH-69, is prohibited per UDC 11-3H-4B.2. Right-of-way for the public street should be dedicated to ACHD with development of the site through the subdivision process or other alternative process as required by ACHD. The bridge across the Ridenbaugh and other improvements noted in the ACHD report shall be completed to ACHD standards with development. Two-plex structures are proposed as a transition between the proposed 4-plex structures and the existing and future single-family homes at the south and west boundaries of the site. Staff recommends a 2:1 transition in dwelling units along these boundaries; minor adjustments may be necessary with the future CUP application to achieve this transition where more than 2 units abut each single-family home/lot. A total of 420 off-street parking spaces are depicted on the concept plan in garages, carports, surface and driveway parking. Based on the standards listed in UDC Table 11-3C-6 for multi-family developments, a minimum of 340 spaces are required with 170 of those in a covered carport or garage. A total of 50 spaces are proposed in excess of the minimum UDC standards. There are existing power poles on this site that may be located in an Idaho Power easement; if so, the easement should be vacated with redevelopment of the property. The Pathways Master Plan depicts a segment of the City's regional pathway on this site along S. Meridian Rd. The concept plan depicts a 10-foot wide pathway in accord with the Plan; landscaping is required on either side of the pathway in accord with the standards listed in UDC 11-3B-12C. A pedestrian bridge over the Ridenbaugh Canal is also proposed providing pedestrian access to a dog park proposed at the northeast corner of the site.A detached minimum 5-foot wide sidewalk is required along W.Victory Rd. in accord with UDC 11-3A-17. Qualified open space and site amenities are required to be provided in residential developments in accord with the standards listed in UDC 11-3G-3; these standards are in addition to the common open space, private usable open space and site amenities required in UDC 11-4-3-27 for multi-family developments. A minimum of 10% (1.7 acres)of qualified open space and one(1) site amenity is required. A central common area is depicted on the concept plan with a clubhouse, swimming pool and tot lot; a dog park is proposed at the northeast corner of the site across the Ridenbaugh Canal with access proposed via a pedestrian bridge; and a 10-foot wide multi-use pathway is proposed along S. Meridian Rd./SH-55 as amenities. A qualified open space exhibit is required to be submitted with the Conditional Use Permit application to ensure compliance with the minimum standards. With development, a minimum 35-foot wide street buffer is required to be constructed along S. Meridian Rd./SH-69, an entryway corridor; and a minimum 25-foot wide street buffer is required along W. Victory Rd., an arterial street, landscaped per the standards listed in UDC 11-3B-7C. Because there isn't adequate area next to Victory Rd. for a sidewalk between the street and the Ridenbaugh Canal,ACHD is requiring the sidewalk to be constructed on the south side of the canal in a permanent right-of-way easement. If the buffer area is entirely encumbered by the easement for the canal, a minimum 5- foot wide area outside of the easement is required for planting shrubs and trees. Page 8 Item 6. F-91 As part of the future development application,vertical curb, gutter and a 7-foot wide attached concrete sidewalk to cross the Ridenbaugh Canal on both the west and east sides for pedestrian connectivity with bridge railings will be required by ACHD. Plans for the bridge crossing over the canal are required to be submitted to ACHD for review and approval as required in their staff report(see Section IX.L for more information). Noise abatement is required to be provided for residential uses adjacent to a state highway(SH-69) in accord with the standards listed in UDC 11-311-41). The Ridenbaugh Canal runs along the northern boundary of the site.All canals are required to be piped unless used as a water amenity or linear open space as defined in UDC 11-1A-1 per UDC 11- 3A-6.Due to its large capacity,it's not feasible for the waterway to be piped.Therefore,the Applicant requests a waiver from City Council to leave the waterway open.Council may approve such a waiver if it finds that the public purpose requiring such will not be served and public safety can be preserved.To preserve public safety,Staff recommends a 6-foot tall wrought iron fence is provided adjacent to the canal. Conceptual building elevations were submitted for the 4-plex structures that are the same or similar to those constructed in Little Creek, east of Locust Grove Rd., south of Fairview Ave. (see Section VIII.D); elevations for the 2-plex structures were not submitted but he Applicant stated they will be very similar in design to the 4-plex structures. Building materials consist of a mix of vertical and horizontal siding with stone or brick veneer accents. All future structures are required to comply with the design standards listed in the Architectural Standards Manual. Detailed review of the elevations for compliance with these standards will take place with the Certificate of Zoning Compliance and Design Review application prior to application for building permits. The proposed annexation area is contiguous to City annexed property and is within the Area of City Impact Boundary.A legal description and exhibit map for the annexation area is included in Section VIII.B. The City may require a development agreement(DA)in conjunction with an annexation pursuant to Idaho Code section 67-6511A. To ensure the site develops as proposed with this application, Staff recommends a DA is required with the provisions discussed above and included in Section IX.A. VII. DECISION A. Staff: Staff recommends approval of the proposed amendment to the Future Land Use Map and Annexation& Zoning with the requirement of a Development Agreement per the provisions in Section VIII in accord with the Findings in Section IX. Page 9 m 1 1 1 111 _ � = �. ■ WINE Mon 0 r i ■�■ mom �� a moon INK Item 6. F 3 B. Annexation&Zoning Legal Description and Exhibit Map ('J•UB J-u-B COMPANIES ® wiooaN MAPPIMNG GROUP INC. J•U-B ENGINEERS.INC. EXHIBIT"A" VICTORY APARTMENTS ANNEXATION TO THE CITY OF MERIDIAN LEGAL DESCRIPTION Those portions of the Southeast Quarter of the Southeast Quarter of Section 24 and the Northeast Quarter of the Northeast Quarter of Section 25,Township 3 North, Range 1 West,Boise Meridian,City of Meridian,Ada County,Idaho,more particularly described as follows: BEGINNING at the northeast cornerof Section 25,Township 3 North,Range 1 West, Boise Meridian, from which the east quarter corner of said Section 25 bears South 00"25'44"West,2,642.97 feet; Thence S00°25'44"W,926.51 feet along the east line of the Northeast Quarter of the Northeast Quarter of said Section 25 to the northeast corner of Meridian Heights No.2 Subdivision according to the official plat thereof filed in Book 41 of Plats at Pages 3353 through 3354,Ada County Records; Thence along the northeasterly boundary of said Meridian Heights No.2 Subdivision the following four (4)courses: Thence N 89"21'10"W,25.00 feet; Thence N 60"10'49"W,562.21 feet; Thence N 58"42'19"W,210.37 feet; Thence N 63"32'19"W,212.25 feet; Thence N 00"30'08"E,452.66 feet departing from said northeasterly boundary to the south line of the Southeast Quarter of the Southeast Quarter of said Section 24; Thence N 89"21'43"W,434.41 feet along said south line to the southwest corner of said Southeast Quarter of the Southeast Qua rte r; Thence N 00"47'01"E,165.13 feet along the west line of said Southeast Quarter of the Southeast Quarter to the centerline of W.Victory Road; Thence along said centerline the following ten(10)courses: Thence N 52"45'48"E,58.84 feet to the beginning of a non-tangent curve; Thence along said non-tangent curve to the right an arc length of 27.08 feet,having a radius of 100.00 feet,a central angle of 15"30'48",a chord bearing of N 60"22'53" E and a chord length of 26.99 feet; Thence N 68"08'17"E,44.82 feet to the beginning of a curve; Thence along said curve to the right an arc length of 137.15 feet,having a radius of 250.00 feet,a central angle of 31"26'00",a chord bearing of N 83°51'17"E and a chord length of 135.44 feet; Page 1 of 2 VICTORYAPARTMENTS ANNEXATION TO THE CITY OF MERIDIAN LEGAL DESCRIPTION a 250 S.Beechwood Avenue,Suite 201,Boise,I❑83709 p 20&376-7330 a www.jub.com Page 11 Item 6. F 4 fJ•UB J-U-E COMPANIES rl wiovoN WAPP ie anour J•V-8 ENGINEERS,INC. Thence S 80"25'43"E,514.81 feet to the beginning of a non-tangent curve; Thence along said non-tangent curve to the right an arc length of 89.16 feet,having a radius of 350.00 feet,a central angle of 14"35'45",a chord bearing of 5 7307r49"E and a chord length of 88.92 feet to the beginning of a non-tangent curve; Thence along said non-tangent curve to the right an arc length of 113.33 feet,having a radius of 319.41 feet,a central angle of 20"19'42",a chord bearing of 5 56"42'33"E and a chord length of 112.73 feet; Thence 5 49"33'41"E,56.30 feet to the beginning of a curve; Thence along said curve to the left an arc length of 138.93 feet,having a radius of 200.00 feet,a central angle of 39"48'02",a chard bearing of 5 69"27'42"E and a chord length of 136.15 feet; Thence 5 89"21'43"E,213.76 feet to the POINT OF BEGINNING,containing 18.45 acres,more or less. END DESCRIPTION This description was prepared by me or under my supervision. If any portion of this description is modified or removed without the written consent of Robert L. Kazarinoff, PLS, all professional iiabiiity associated with this document is hereby declared null and void. Robert L.Kazarinoff,PLS 16642 0 Date -41 0E l� Q 30 APR 2020 Page 2of2 VICTORY APARTMENTS/ANNEXATION TO THE CITY OF MERIDIAN LEGAL DESCRIPTION a250S.BeechwoodAvenue,Suite 201,Boise,1a837Ce p 208-37&7330 iq www.jub.com Page 12 Item 6. F95 W. Victory Roo, �� 524�5L� Cj Cj r.: � — — — vv, Vi;:- i :l NB9'2,'43"W 434.41 RC::iI Cv in LEI ccs p o ,v. f • 0 100 200 p��c4• � � � rn "T ;+ Seale in Feet a ��Ci... C� IN Lei Till Lii = u -i r L i :-I L. n L E Ls o V5 m r 4F L E $ L E 30 APR 2020 fii Toole Curve = L• i :-I ill] Deltq rrarrf Hearin , CF,r 1 Le re 1 Y j € _. .... . .. 15'30'48 hrEti1''2'`3"E .... ff S 8?.1 5'45 S73':' E -1 1 13 u - -:: S5n r;2''.2'E _ 3a'4WO2. S-9'27,L2.,E l P y Victor Apartments n�amwr�,r an-�n�r�xzrErn: : SHEET ••M—= � ,s�.•r� �0 4N!f RYd: l Gil of Meridian Annexation ru tiY�i.�¢rwoeci w*.r rt-re�+tw=_��airrw 1 of 1 g }tee Partions of the SE114 of the SE114 of S,24 and the NE1i4 of the NEI+d of S,25 Township3 North,Range 1 West,Boise Meridian,fiaho Page 13 Item 6. F96 C. Conceptual Development Plan(dated: 8/13/20) JV --------------------------- _ m — _---I----__________ __E scare �_� UM w -_ � ----------------------- -- An ` ----- ------------------------------- l _ •� E FeaGlf28�Og Pa[ 1S enogem nOW spe vv»ii i �i Conceptual Project Summary I n 4 -; . . % T=I-1 Area 17.01 A— - - 13.06 Acres Net I- r————i m t \ R Toral uhR, no urft� 2 edmorn To li 34 Unit oa,ft B •. a all.70'Pahl edr Tvxni-l—omes 24 Uri 2 B edrnwn Ayartrnen[s 58 Uni6 f 39edm Apamnents 56 Lhii / �''\• Density on C Acreage 10-0 UrwNdAcre ��-Net A—W 13 01 UrA-JAcre TyP=2 nay , 1, ��-•,� a Mt ApxV k BOMIng I j �. P ed aO—g P—ded 420 comes a u L J A� RT j A1gcsIeQ SFR Taxnlianes � •\� To..�nax GYage P." Toxtq Gf—,Pff" 82 saaoea ; ' •�- Conceptual Site Plan - Meridian Rental Apartments-Scheme 12 updated Aug 13,2020 Page 14 Item 6. 97 D. Conceptual Building Elevations 5�16!i.°7�i.'�E!d 576�9,@A4iTl4,�J k�49REJ�5PT R�. RIRGkm-MYN �ai uooGL pp�.�vc�4 raFP MAM ,U woi+r<aris.ry +�.wAe-w-LISWimi m.rwe.wtaFrar i�r.4n x�W o�xirt�nr� s�:+WY4[t�lr� iwur� �rcm�aFF- rM.i�� „�c+xamcwnew ixrmaarnxmaw� smcamw.e wee nr J U} �y, 7 14�fu Y{f}x g U z 5� J .WI , 171 F I. I --.0 OA6 'I €adAaP.UErMMn rx�raQcruET rE o-: , €CYODtrP1Fr7Er] Ad L7 GP Exterior Elevation-Facade"A" Exfcnar Elevawflorr-Facade"B" Exterlor Elevation-Facade''C" kxteriior Elevation-Facada-0" Smith MetidIm&Wtsl Victory Road Apadrrtle Ft9 Miridimn Ydiho Page 15 Item 6. F98 min Exterior Elsvatiort=Facade"A" Exterior Elevation=Fa-cada"B" — Aw -3 Exterior Elevation-Facade"C" Exterior Elevatior►-Facade"a" South Meridian & West Viclkery Read Apartments theme 2 M n.1rl,en Itl MIN t, 1e,. � Extarlar Eleval Ion-Facade"A" Exterior Elevation-Facade"B" I Exiarior Elavatfari-Facade"C" Exk¢rior Elevation-Facade"0- South McNdian & Vilest Victory Road Apart rents Scheme 1 hl«ia � i .,ryr. v•i�1 Page 16 Item 6. F99 Exle rib r Elevation -Facade"A" Exterior Elevation-Facade'•6" Exterior Elevation-Facade"C" Exterior Elevation -facade"U" South Meridian & West Victory Reed Apartments Scheme K{YIiUIXIs fUa114 N4 Ft M31 l I Exterior Eievalkn-Facade "AE" Exterior Elevation.Facade"13" Exterior Elevation-Facade"C" Exteror Elevation-Facade"D" South Meridian & West V ictory Road Apartments Scheme 4 Ne rldl an. Idaho t".."" Page 17 Item 6. Fool IX. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING DIVISION 1. A Development Agreement(DA) is required as a provision of annexation of this property. Prior to approval of the annexation ordinance, a DA shall be entered into between the City of Meridian,the property owner(s)at the time of annexation ordinance adoption, and the developer. Currently, a fee of$303.00 shall be paid by the Applicant to the Planning Division prior to commencement of the DA. The DA shall be signed by the property owner and returned to the Planning Division within six(6)months of the City Council granting the annexation. The DA shall, at minimum, incorporate the following provisions: a. Future development of this site shall be generally consistent with the conceptual development plan and building elevations included in Section VIII and the provisions contained herein. b. Right-of-way for a public street extending from W.Victory Rd. through the site to the west boundary shall be dedicated to ACHD with development of the site. c. The bridge across the Ridenbaugh Canal and other improvements noted in the ACHD report included in Section IX.L shall be constructed to ACHD standards with development of this site. d. A conditional use permit application is required to be submitted and approved for the multi- family development in the R-15 zoning district per UDC Table 11-2A-2. e. Noise abatement shall be provided for residential uses adjoining State Highway 69 in accord with the standards listed in UDC 11-3H-4D. f. A 10-foot wide multi-use pathway is required within a 14-foot wide public pedestrian easement in the street buffer along S. Meridian Rd./SH-69 in accord with the Pathways Master Plan; landscaping is required on either side of the pathway in accord with the standards listed in UDC 11-3B-12C. g. Future development shall comply with the design standards listed in the Architectural Standards Manual. An application for Design Review shall be submitted and approved for the multi-family structures prior to submittal of building permit applications. h. All structures shall have fire sprinklers for fire protection; and secondary emergency access shall be provided to the site with the first phase of development. i. The Ridenbaugh Canal shall be piped as set forth in UDC 11-3A-613 unless otherwise waived by City Council. If Council approves a waiver to allow the canal to remain open, a 6-foot tall wrought iron fence shall be constructed along the canal to preserve public safety. j. Direct access, except for one emergency access,via S.Meridian Rd./SH-69 is prohibited per UDC 11-311413.2. B. PUBLIC WORKS 1. Site Specific Conditions of Approval None—No utility plans were submitted for analysis with this application.Utility designs shall be submitted with the Conditional Use Permit application. 2. General Conditions of Approval 2.1 Applicant shall coordinate water and sewer main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet,if cover Page 18 Item 6. E from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2.2 Per Meridian City Code(MCC),the applicant shall be responsible to install sewer and water mains to and through this development. Applicant may be eligible for a reimbursement agreement for infrastructure enhancement per MCC 8-6-5. 2.3 The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way(include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat,but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement(on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor,which must include the area of the easement(marked EXHIBIT A)and an 81/2"x I I"map with bearings and distances(marked EXHIBIT B)for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted,reviewed, and approved prior to development plan approval. 2.4 The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water(MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to prior to receiving development plan approval. 2.5 All existing structures that are required to be removed shall be prior to signature on the final plat by the City Engineer. Any structures that are allowed to remain shall be subject to evaluation and possible reassignment of street addressing to be in compliance with MCC. 2.6 All irrigation ditches, canals, laterals,or drains, exclusive of natural waterways, intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. 2.7 Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at(208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B. Whitney at(208)334-2190. 2.8 Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 2.9 Street signs are to be in place, sanitary sewer and water system shall be approved and activated, road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded,prior to applying for building permits. 2.10 A letter of credit or cash surety in the amount of 110%will be required for all uncompleted fencing, landscaping,amenities, etc.,prior to signature on the final plat. 2.11 All improvements related to public life, safety and health shall be completed prior to occupancy of the structures.Where approved by the City Engineer, an owner may post a performance surety for such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC 11-5C-3B. Page 19 Item 6. F102 2.12 Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process,prior to the issuance of a plan approval letter. 2.13 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 2.14 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 2.15 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.16 All grading of the site shall be performed in conformance with MCC 11-12-3H. 2.17 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. 2.18 The design engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 2.19 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 2.20 At the completion of the project,the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 2.21 A street light plan will need to be included in the civil construction plans. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A copy of the standards can be found at http://www.meridiancity.org/public_works.aspx?id=272. 2.22 The City of Meridian requires that the owner post to the City a performance surety in the amount of 125%of the total construction cost for all incomplete sewer,water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit,cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 2.23 The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20%of the total construction cost for all completed sewer,water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. C. FIRE DEPARTMENT No comments were received. Page 20 Item 6. ■ D. POLICE DEPARTMENT hllps://weblink.meridianciiy.org/WebLink/DocView.aspx?id=192080&dbid=0&repo=MeridianCiiy E. PARK'S DEPARTMENT No comments were received. F. NAMPA&MERIDIAN IRRIGATION DISTRICT(NMID) hllps://weblink.meridianciiy.or,e/WebLink/DocView.aspx?id=19203 8&dbid=0&repo=MeridianCiiy G. CENTRAL DISTRICT HEALTH DEPARTMENT(CDHD) https://weblink.meridiancity.org/WebLink/DocView.aspx?id=l 913 89&dbid=0&repo=MeridianCity H. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ) https://weblink.meridiancily.org/WebLink/DocView.aspx?id=191617&dbid=0&repo=MeridianCity I. WEST ADA SCHOOL DISTRICT(WASD) hllps://weblink.meridianci. .org/WebLink/DocView.aspx?id=192799&dbid=0&repo=Meridi4RCil y J. COMMUNITY PLANNING ASSOCIATION OF SOUTHWEST IDAHO(COMPASS) https://weblink.meridianciiy.org/WebLink/DocView.aspx?id=192105&dbid=0&repo=MeridiagCity K. ADA COUNTY DEVELOPMENT SERVICES https://weblink.meridiancity.org/WebLink/DocView.aspx?id=l91431&dbid=0&repo=MeridianCity L. ADA COUNTY HIGHWAY DISTRICT(ACHD)-DRAFT https://weblink.meridiancity.org/WebLink/DocView.aspx?id=193034&dbid=0&repo=MeridianCiiy X. FINDINGS A. Comprehensive Plan Map Amendment Upon recommendation from the Commission,the Council shall make a full investigation and shall, at the public hearing,review the application. In order to grant an amendment to the Comprehensive Plan,the Council shall make the following findings: 1. The proposed amendment is consistent with the other elements of the Comprehensive Plan. Stafffinds the proposed amendment to MHDR is consistent with the Comprehensive Plan in that higher density residential uses are desired along major transportation corridors (i.e. SH-69) and a diversity in housing types is desired in all areas of the City. 2. The proposed amendment provides an improved guide to future growth and development of the city. Stafffinds that the proposal to change the FL UM designation from MDR to MHDR will allow a higher density of residential development to occur in this area adjacent to SH-69, a major transportation corridor and in close proximity to I-84, which will provide an improved guide to future growth and development of the City. Page 21 Item 6. F104 3. The proposed amendment is internally consistent with the Goals, Objectives and Policies of the Comprehensive Plan. Stafffinds that the proposed amendment is consistent with the Goals, Objectives, and Policies of the Comprehensive Plan as noted in Section V. 4. The proposed amendment is consistent with the Unified Development Code. Stafffinds that the proposed amendment is consistent with the Unified Development Code. 5. The amendment will be compatible with existing and planned surrounding land uses. Stafffinds the proposed amendment will be compatible with abutting existing andfuture residential land uses and existing office and future commercial uses across Victory Rd. to the north and across SH-69 to the east. 6. The proposed amendment will not burden existing and planned service capabilities. Stafffinds that the proposed amendment will not burden existing andplanned service capabilities in this portion of the city. Sewer and water services are available to be extended to this site. 7. The proposed map amendment(as applicable)provides a logical juxtaposition of uses that allows sufficient area to mitigate any anticipated impact associated with the development of the area. Stafffinds the proposed map amendment provides a logical juxtaposition of uses and sufficient area to mitigate any development impacts to adjacent properties. 8. The proposed amendment is in the best interest of the City of Meridian. For the reasons stated in Section V and the subject findings above, Stafffinds that the proposed amendment is in the best interest of the City. B. Annexation and/or Rezone(UDC 11-5B-3E) Required Findings: Upon recommendation from the commission,the council shall make a full investigation and shall,at the public hearing,review the application. In order to grant an annexation and/or rezone,the council shall make the following findings: 1. The map amendment complies with the applicable provisions of the comprehensive plan; The Applicant is proposing to annex the subject 18.45 acre property with R-15 zoning and develop multi family apartments on the site at a gross density of 10.0 units per acre consistent with the proposed MHDR FLUM designation for this property. (See section V above for more information) 2. The map amendment complies with the regulations outlined for the proposed district, specifically the purpose statement; Stafffinds the proposed map amendment to R-I5 and development generally complies with the purpose statement of the residential districts in that it will contribute to the range of housing opportunities available in the City consistent with the Comprehensive Plan. 3. The map amendment shall not be materially detrimental to the public health,safety, and welfare; Stafffinds the proposed map amendment should not be detrimental to the public health, safety and welfare as the proposed multi family residential uses should be compatible with adjacent single- family uses in the area. Page 22 Item 6. Fo5l 4. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the city including,but not limited to, school districts; and Stafffinds City services are available to be provided to this development. 5. The annexation(as applicable)is in the best interest of city. Staff finds the proposed annexation is in the best interest of the City. Page 23 Item 7. L106 E IDIAN 'aAHO AGENDA ITEM ITEM TOPIC: Public Hearing for Pearson Subdivision (H-2020-0075) by Melanie Pearson, Located at 175 W. Paint Horse Ln. A. Request: A Combined Preliminary and Final Plat consisting of 2 building lots on 3.98 acres of land in the R-4 zoning district. 1 i PUBLIC HEARING SIGN IN SHEET DATE: August 20, 2020 ITEM # ON AGENDA: 7 i PROJECT NAME: Pearson Subdivision (H-2020-0075) I f i PRINTED FULL NAME For Against Neutral Want to Testify YES OR NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Item 7. 107 (:�N-WE IDIAN IDAHO PUBLIC HEARING INFORMATION Staff Contact:Joseph Dodson Meeting Date: August 6, 2020 Topic: Public Hearing for Pearson Subdivision (H-2020-0075) by Melanie Pearson, Located at 175 W. Paint Horse Ln. A. Request: A Combined Preliminary and Final Plat consisting of 2 building lots on 3.98 acres of land in the R-4 zoning district. Information Resources: Click Here for Application Materials Click Here to Sign Up to Testify at the Planning and Zoning Commission Public Hearing Item 7. ■ STAFF REPORT E COMMUNITY N -- COMMUNITY DEVELOPMENT DEPARTMENT HEARING 8/20/2020 Legend DATE: Project Location ; TO: Planning&Zoning Commission / FROM: Joe Dodson,Associate Planner 208-884-5533 SUBJECT: H-2020-0075 E , � Pearson Subdivision LOCATION: The site is located at 175 W.Paint Horse Lane,on the west side of S.Meridian Road approximately 1/4 mile south of Lake Hazel Road, in the SE 1/4 of the NE '/4 of Section 01, Township 2N.,Range - 1W. L PROJECT DESCRIPTION Request for a combined preliminary and final plat consisting of 2 building lots on 3.98 acres of land in the R-4 zoning district,by Melanie Pearson. II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 3.98(R-4 zoning district) Future Land Use Designation Mixed Use Regional Existing Land Use(s) Residential(one single-family home) Proposed Land Use(s) Detached Single-family Residential Lots(#and type;bldg./common) 2 total lots—2 single-family residential(one new lot) Phasing Plan(#of phases) Proposed as one phase Number of Residential Units(type 2 units—detached single-family homes of units) Density(gross&net) Gross—0.5 du/ac. Open Space(acres,total N/A—Project size is below the 5 acre minimum. [%]/buffer/qualified) Physical Features(waterways, Rawson Canal—runs along eastern property boundary hazards,flood plain,hillside) adjacent to Meridian Road(area of minimal flood hazard). Neighborhood meeting date;#of August 5,2020—no attendees. attendees: Distance to nearest City Park(+ 1.6 miles to Discovery Park(76.8 acres in size,roughly 30 size) acres of this park has been developed at this time) Page 1 Item 7. F-log] Description Details Page History(previous approvals) H-2015-0019(South Meridian Annexation);DA Inst. #2016-007442 B. Community Metrics Description Details Page Ada County Highway District • Staff report(yes/no) Letter received from ACHD • Requires ACHD Commission No Action(yes/no) Access(Arterial/Collectors/State Access is proposed via existing W.Paint Horse Lane,a Hwy/Local)(Existing and Proposed) private drive.No access is proposed to S.Meridian Road other than via existing access of Paint Horse Lane. Stub Street/Interconnectivity/Cross Other properties use existing W.Paint Horse Lane;no need Access for stub street access at this time. Existing Road Network Yes;private lane is existing and no new road dedication is proposed or required. Existing Arterial Sidewalks/ The subject property has a small area of arterial street Buffers frontage along S.Meridian Road.There are currently no improvements along this frontage.There is an existing berm and buffer. Proposed Road Improvements Applicant is not proposing nor required to improve any right-of-way along S.Meridian Road or Paint Horse Lane at this time. Fire Service No Comments—required turnaround is shown on property. Police Service No Comments West Ada School District No comments were received for this project. Wastewater • Distance to Sewer Services N/A • Sewer Shed MMML� South Black Cat Trunkshed • Estimated Project Sewer See application ERU's • WRRF Declining Balance 13.96 • Project Consistent with WW NO—Subdivision will be on septic until utilities are Master Plan/Facility Plan available in the area. • Additional Comments •Flow has been committed •Both units for this subdivision will be on septic. •No proposed changes to Public Sewer Infrastructure within Record.Any changes or modifications,to the Public Sewer Infrastructure,shall be reviewed and approved by Public Works. Water • Distance to Water Services N/A • Pressure Zone 5 • Estimated Project Water See application ERU's • Water Quality Concerns N/A Page 2 Item 7. 1 10 Description Details Page • Project Consistent with Water NO—no utilities are proposed with this subdivision as Master Plan they are not available at this time. • Impacts/Concerns There are no City utilities located in the area. The City Engineer will need to review and grant the utility variance request to not hook up to City water. C. Project Area Maps Future Land Use Map Aerial Map Legend Low Ride De Legend Resift Project Location • � Project Location High-Density Residential Med-High— MUI-RG Density Residential Medium Density Residential u .Zoning Map .Planned Development Map Legend 0 Legend Project Location aProject Location ------- R-4 ' y City Limits RUT R-15C-G Planned Parcels R-6 RUT I R4 ' R-4 - I ' RUT 'I 1 RR --- 1 � 1 � 1 , 1 J � � I I RUTC=2 q -------��---- II R-4 ; C°2 -- 1 1 RUT Page 3 Item 7. F-1111 III. APPLICANT INFORMATION A. Applicant: Melanie Pearson— 1717 N. 7t1i Street,Boise,ID 83702 B. Owner: Mary Taysom— 175 W. Paint Horse Lane,Meridian,ID 83642 C. Representative: Same as Applicant IV. NOTICING Planning& Zoning City Council Posting Date Posting Date Newspaper Notification 7/17/2020 Radius notification mailed to properties within 300 feet 7/14/2020 Site Posting 7/25/2020 Nextdoor posting 7/14/2020 V. STAFF ANALYSIS To be concise,the subject application is proposing to subdivide one 4 acre lot into two lots for the purposes of allowing the current owner of the parcel to deed the new lot over to her daughter so that her and her family are close-by,this includes helping her daughter with her newborn child. The subject property was annexed in 2015 as part of a larger annexation known as South Meridian Annexation(H-2015-0019).There is an existing Development Agreement(DA) associated with the original annexation and property and this application constitutes development under City code.In reviewing the existing DA,the Applicant needs to apply for a Development Agreement Modification prior to the City Council hearing for this combined preliminary/final plat.Per the existing DA,the first modification is at no cost to the Applicant. The subject property has also received City Engineer and Public Works Director approval for a utilities waiver to not connect to City services at this time due to services being more than a half mile away. Staff finds that making a singular property owner pay for extending City services for a two lot subdivision is neither fair nor necessary. Central District Health(CDH)has also approved of an additional temporary well site and septic system—this fact further diminishes any concern Staff has with the Applicant's application regarding water and sewer services. Please see further Staff analysis below. A. Future Land Use Map Designation(hgps://www.meridiancity.org/compplan) Mixed Use Regional—The purpose of this designation is to provide a mix of employment, retail, and residential dwellings and public uses near major arterial intersections. The intent is to integrate a variety of uses together,including residential,and to avoid predominantly single use developments such as a regional retail center with only restaurants and other commercial uses. Developments should be anchored by uses that have a regional draw with the appropriate supporting uses. For example, an employment center should have supporting retail uses; a retail Page 4 Item 7. F112 center should have supporting residential uses as well as supportive neighborhood and community services. The subject site is part of a large area in south Meridian with this future land use designation. However, much of these sites are already zoned R-4,medium-low density residential. This zoning does not allow or offer the Applicant the opportunity to develop the site in accordance with the future land use designation. Because this site is relatively small in comparison to most mixed use properties, Staff finds that the mixed use requirements and policies cannot be obtained at this time. These policies should not be aimed for at this time due to the fact that no other nearby properties offer any mix of uses and have not been redeveloped since their annexation in 2015—Staffs review shows all of the nearby properties to still be low-density residential homes. There is always the chance that in the future much of this area in south Meridian will redevelop with larger parcels of land.At that time, it will be up to the property owners to determine if redevelopment is applicable. B. Comprehensive Plan Policies(https://www.meridiancity.orglcompplan): The applicable Comprehensive Plan policies are cited below with Staff analysis in italics. "Avoid the concentration of any one housing type or lot size in any geographical area;provide for diverse housing types throughout the City"(2.01.01 G). The main purpose of the proposed development is to create a new lot for the Applicant to build a home nearby her mother, the existing property owner. All of the surrounding homes lay on large undeveloped lots even though they are annexed into the City. This subdivision will not change the existing character of the surrounding development and will add an additional single-family home for the City of Meridian. "Establish and maintain levels of service for public facilities and services,including water, sewer, police,transportation, schools,fire, and parks" (3.02.01 G).Staff finds that the existing and known development of the immediate area create conditions that do not allow for this property owner to connect to City water and sewer services as required by code. Public Works,Meridian Police Department and Meridian Fire have no objections to this small subdivision. No other services should be affected as the existing access is to remain. "Preserve,protect,and provide open space for recreation,conservation,and aesthetics" (4.05.01F).Due to the size of the subject property being less than S acres, there are no open space requirements. However, this application is only a two-lot subdivision where a majority of each parcel will be undeveloped and remain natural space for each property owner to enjoy. Although the proposed development does not align entirely with the current vision of the Comprehensive Plan, the predominate FL UM designation in the area is MU-R. Staff is of the opinion that it may be quite some time before City utilities are available to this area of Meridian and therefore supports the development of this property as it is consistent with the current R-4 zoning of the property.A mix of uses should occur in the vicinity with the redevelopment of the adjacent property to the north and east. For these reasons,staff believes the proposed development is generally consistent with the Comprehensive Plan. C. Existing Structures/Site Improvements: The subject site currently holds a single family home on the entire 4 acre parcel owned by the mother of the Applicant. This property, along with nearby properties,was annexed in 2015 but were not required to connect to City services at that time due to services not being available. This situation has not changed and because this subdivision is only for the purposes of creating one additional lot, Staff does not find it appropriate to require this owner to provide public utilities to their property at this time.However,when services do Page 5 Item 7. ■ become available in S. Meridian Road,the Applicant will be required to connect to them as conditioned in this application and the existing Development Agreement. D. Proposed Use Analysis: The proposed use is single-family residential; single-family detached dwellings are listed as principally permitted uses in the R-4 zoning district per UDC Table 11-2A-2. The average lot size is 2 acres with the largest lot being 2.6 acres in size. The proposed use complies with all UDC requirements for the R-4 zoning district. E. Dimensional Standards(UDC 11-2): The submitted Preliminary Plat and Final Plat show lots that are 1.36 and 2.62 acres in size. These proposed lot sizes are vastly larger than the minimum lot size requirement of 8,000 square feet for the R-4 zoning district. The existing R-4 zoning district also requires a minimum dwelling size of 1,400 square feet with the first floor gross area being at least 800 square feet. The proposed plat meets the UDC dimensional standards for the R-4 zoning district. In addition, any future home built on the new parcel will be required to meet the minimum dwelling size requirements as outlined in UDC Table 11-2A-5. F. Access(UDC 11-3A-3, 11-3H-4): Access to this development is proposed via an existing private lane,W. Paint Horse Lane. ACHD is not requiring any public road dedication due to the access not being changed—the subject application does not warrant a public road or road improvements at this time according to ACHD. In accord with the existing access,UDC 11-3H-4 requires that if an existing state highway access has an increase in intensity that it is to be removed upon development or dedicated to ACHD and be constructed as noted on the Master Street Map(MSM). Paint Horse Lane is shown as a future collector roadway on the MSM but the addition of one single-family home does not warrant the construction of a collector roadway at this time. With the DA Modification the Applicant needs to apply for prior to City Council,new DA provisions will address this and ensure any future development meets the required development standards. As noted above, the subject application is proposing to subdivide one 4 acre lot into two lots and is proposing to use the existing access; there is no proposal to add an additional access to the state highway. Staff and ACHD find that the existing private access is sufficient for one additional single family home. Because other abutting properties are not redeveloping at this time there is no feasible way for the Applicant and owner to comply with those requirements in 11-3H-4. In addition, adding one home does not warrant sufficient traffic to construct a collector roadway as shown on the MSM. However, Staff understands that should any more intensive redevelopment occur on site or surrounding the property, the access will be evaluated for compliance with these requirements. Staff is recommending DA provisions be added with the DA Modification application that requires a future collector street consistent with the MSM if/when this or adjacent properties redevelop with more intense uses consistent with the MU-R land use designation. G. Pathways (UDC 11-3A-8): Per UDC 11-3H-4C.4,the Applicant is required to construct a ten(10) foot multi-use pathway along the frontage that abuts S. Meridian Road(SH 69). The Applicant is not proposing a multi- use pathway along Meridian Road at this time. The Parks Department has reviewed this application for the applicability of the required multi- use pathway along Meridian Road. Per the comments received by Parks (see Section VIII.Q, the Applicant is not required to construct this section of the multi-use pathway along Meridian Road. Page 6 Item 7. ■ The closest pathway that is currently under construction is adjacent to Prevail Subdivision and is located approximately-% of a mile north of this and is on the opposite of Meridian Road. Because of this, this short segment of pathway would be constructed and then lead to nowhere for the foreseeable future. Therefore, Staff is recommending that the Applicant grant a multi-use pathway easement within the required street buffer prior to final plat signature. This future pathway is the only required pedestrian infrastructure at this time due to Paint Horse Lane being a private lane that will likely be removed or redeveloped when other, larger nearby properties redevelop in the future. H. Sidewalks(UDC 11-3A-17): No sidewalks are proposed with this development. See pathway analysis above for further clarification. As noted above, the Applicant will be using an existing private easement for access and therefore no streets are being constructed with this application. Sidewalks will be required in the future with the extension of the collector street as this area redevelops. I. Landscaping(UDC 11-3B): A 35-foot wide street buffer is required adjacent to S.Meridian Road, a state highway and entryway corridor, landscaped per the standards listed in UDC 11-3B-7C. The landscape plan depicts a 25 foot wide landscape buffer instead of the required 35 feet. The correct amount of landscaping and a berm/fence combination at least 10'above the height of Meridian Road centerline height in accord with UDC 11-3H-4D is shown on the submitted landscape plans (see Exhibit VIT D). Staff is recommending a condition of approval to correct the width of the required landscape buffer along the state highway—the buffer width shall begin its measurement into the site at the edge of the ultimate right-of-way for Meridian Road/SH 69. In accord with UDC 11-3B-7C,the required street buffer is to be placed in a common lot and owned and maintained by a homeowner's association. The nature of this two lot subdivision will not create a homeowner's association and therefore that requirement cannot be applied in this case.In addition, the submitted plat and landscape plans do not show the street buffer to Meridian Road in a common lot. Staff is recommending a condition of approval to amend the plat prior to City Council to show this lot in a common lot to be owned and maintained by the Applicant, Melanie Pearson. Parallel to Meridian Road, the Rawson canal runs through the eastern edge of the subject site. The required buffer landscaping is shown to be outside of the easement for the Rawson Canal meeting the Boise Project Board of Control(BPBC) requirements. In addition, the Meridian Lateral abuts the property along its southern boundary but is not on the subject site. The Applicant is not proposing any landscaping within its easement per the requirements of BPBC. J. Fencing(UDC 11-3A-61 11-3A-7): All fencing is required to comply with the standards listed in UDC 11-3A-7. The existing fencing along the boundary of the subject site is shown on the landscape plans. This fence appears to be open vision fencing and is proposed to be protected in place. In addition,the Applicant is proposing a 6-foot tall vinyl privacy fence along the top of the proposed landscape berm. The existing and proposed fencing appear to meet those standards listed in UDC 11-3A-7. K. Waterways(UDC 11-3A-6): The Rawson Canal runs along the eastern boundary of the subject site and appears to already be tiled. The Applicant has not proposed any improvements within its easement other than shrubs and grass as allowed by BPBC. Page 7 Item 7. 115 VI. DECISION A. Staff: Staff recommends approval of the requested combined preliminary and final plat application per the Findings in Section IX of this staff report. B. Commission: Enter Summary of Commission Decision. C. City Council: To be heard at future date. Page 8 Item 7. F116 VII. EXHIBITS A. Preliminary Plat(dated: April 30,2020) 1 � � c q@ mzz i j 'r2'�� }u'' = -- - - _ pn as [IF Io g WHO in I - A4 9 ,� N L X-PI 3 �- a -S� FF £ € _ Rnil F R+- 'p"k 2•� '� � �•i ���yL `J � §FN WHO" iiJ I = 2 _ Amy gz map 0 gT —• � p gip= ~ a B nN limn Page 9 Item 7. rl 17 B. Final Plat(dated: April 3O,2020) UXPLAT4SD ;. 5 52'S8' l`2 Co�A T 9TRyy oz �m ,„gyp `}_•y��-(`a'�t ?o o �2om - ��Tar�� m nPU zoan�r8 - z °u ar O a o m�.� dim`c�z n� ➢�'n zg }nz '1)� 6 $I F�1 7" 'O+J ��� maoi�A m mom; 10 t@ tJ H o HE mo n =g oop ter:,' ylb�'z �0 " i vi � _ �tx] rom z Sa A g� o n Fy�y ',w--,-o�- � I -,ICI C> M os m L m � v T>m INGREss GRE55 1 N a �czm w•�� i Na m`� y IRnpz =m � c Im TO BW .1320.9fi'--_-.- �TZ RlE ERIT m ; €gib°nAz >� �g� 1 mHGR-� AHI" ro�NYhf ` PRofFSsa -T['] I � i � � H& ® J • � �� n8m $�5�00 m� Rio a1S a � >,� • � I I I � c�g� �� 21�o8HM Io o m y ' W �r m�❑ I t7 z r x O p) S D QI -Drv'o o n O A z i p N e ❑ o A oz ,�Ano„ R y �_ ya ze,b'+ n m Z c O � • C1 m �~ Page 10 Item 7. F118] m�g�ggn imp ��� a�`io a ° " n '= A a ova om� - ° Usi N° oaN oAWN ill, n'm o �Tm;9m ° Win$ xmro 1-1 oova n 3 rU-r Z fD b•+ m u�' a o m sang am oa x` zr° � o= a „y y Q1 (1 (D O qapmS' �pF = -mm0o 1- � $• �o A< Nmo o� nagx IT von m1 m.3^G° m` �'��� NAND t co c S z ogmgm y �{ w BE 9 - g lost T Y ma 1 v- pon C yoo°c 33 M S Sy �oZ�tl r�� N6y � boo 12 %� » F � P � Page 11 Item 7. F 11-9 1 C. Landscape Plans(dated: 6/16/2020) ........ 1V-1d ALIVNIV41-13dd NVId 3WVOS(]Nv N1 JSUOH iNlVd 'M NOISIAI(ionS NOSHVAd Zt19S9 OHVG1 'NV1C118E LN LL -v MU�p F1 Lu q Lu Lu z LL� 29 0111 AE IM m e '� sE & s Ljn. Lu w"M -H I V R" eGGS S 0000® En TH N"I'01 z LLI z D Lu Lu -D Lu q it gbdx NN A2NNO? W O F- au Z Eke 10 A n- H L) WANT- E) 0 Czw A w t��q q NE"iy',V,, z �N 2 LU Lu z E. Page 12 Item 7. Fl 20] IV]d AHVNIMIJUd s-iivi 3(1 ]dVOSCINVI -V992 OH VOI 'NVIGIH3W ESHOH iNlVd 'm NOISIAI(IgnS NOSUVEICI 4 W 4 IT , HE LL -M I,- — 1, w p i LOL COD IL 0 di TI oll M Tj W Z 3 V�4 W- I 4 1E Tl� 10 gq 510 4 -Lq, LL LL po Wig M Mg qg, bus M z LLI LLI F- < LU 0 �5"P�7,E AM IWO MW <Z << U g Lu 0 H IL P: rj)Cc n Z LL, � io ON N� R IL n CL Page 13 Item 7. 121 D. Utilities Waiver Letter—City Engineer approval to delay utility hook-up (dated: July 30,2020) Mayor Robert E,Simison ETD AN � City Council Members: 1 1 1 Treg Sernf Brad Hoaglun Jae Berton Jessica Perreault Luke Cavener Liz Strader MEMORANDUM DATE: July 30,2020 TO: Mayor Robert Simison Members of the City Council CC: Warren Stewart,Joseph Dodson FROM: Dale Bolthouse RE: Waiver of water and sewer services connection for 175 Painted Horse Ln. The City of Meridian received an application to develop property at 175 Painted Horse Lane(see attached map). The property owner has requested a waiver to connect to the City's water and sewer systems. The requester is dividing their property to add an additional building lot. The property was annexed a.few years ago as part of the larger South Meridian Annexation. The existing property is served with well water and septic. City water and sewer services are likely several years away. Public Works has reviewed the application information for 475 Paint Horse Ln,along with other supporting documents.Based on the current distance to existing water and sewer infrastructure,and the fact the applicant is only requesting a two lot subdivision in order to build one additional home.the Public Works Department supports the request to waive the requirement to connect to the City's water and sewer system.However,we recommend the property owner enter into a Connection Agreement with the City of Meridian requiring them to connect to water and sewer services when those services are adjacent to the property.The following conditions should be included as part of that agreement: • Owner pays the applicable assessment fees required to connect at time of connection • Owner constructs the water and sewer service connections • All other required City of Meridian fees be paid • Development meets Planning and Zoning requirements Please feel free to contact Warren Stewart or me ifyou have any questions regarding this matter. ,�6a Dale Bolthouse Director of Public Works City of Meridian Public Works Attachment: Map of Request Location Public Works Department. 33 E_Broadway Avenue,Suite 200,Meridian,ID 83642 Phone 208-898-5500 .Fax 208-898-9551 .www.meridiancity.orq Page 14 Item 7. Fl 22 _ `� serroa W Amity Rd T --- -- ^ ; -E Ami-- Rd -•Citadel� � ; .�,.§ !. � +.'� Ne idran i e• ti =-• - S - llaw } .C. IEI -'I II EIj ' 8TJ Ra "?;wall Na o2 T? 1- z i_ WIL•��'R .140 ��C_I�_�—L r.'r:�v,ii7.i•;o-Oi—y�_ _ per Subdivisiarr - .L Apex - Subdivfsfon ■ W Lake Hazel-.Rd- E S fie. ...��f [ �' :. -. • �..rr•� �'�X'�v 4 1L�ilir 1}qi� L.O. Page 15 Item 7. F123] VIII. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING DIVISION 1. The Applicant shall apply for a concurrent Development Agreement Modification application prior to this application being heard in front of City Council and at a minimum the following new provisions shall be added to the amended DA: a. This development is not currently serviceable by Meridian Sanitary Sewer or Water Systems. The parcel owners shall be required to cease using their wells and septic systems and connect at their expense,to the Meridian Sanitary Sewer or Water Systems when they become available per MCC 9-1-4 and 9-4-8. b. Prior to City Engineer's signature on the final plat,the Applicant shall enter into a Connection Agreement with the City of Meridian in accord with the connection waiver letter attached in Exhibit VII.D. c. The applicant shall place W. Paint Horse Lane (a private road)in a separate 50-foot wide non-buildable lot for the construction of a public collector street in accordance with the Master Street Map. Timing for the extension of the roadway is predicated on the redevelopment of the parcel beyond two residential lots or with the redevelopment of the MU-R designated parcels to the north. At the time said roadway is constructed,the Applicant shall relinquish their rights to the use of said easement in favor of taking access from a future public street. 2. The final plat included in Section VII.B, dated April 30, 2020, shall be revised as follows prior to City Engineer signature on the plat: a. Revise the plat to add a 35-foot wide common lot along S. Meridian Road/SH 69 to hold the required landscape buffer starting at the western edge of ultimate right-of-way. b. Revise plat note#6 to add: "...; direct lot access to S. Meridian Road/SH 69 is prohibited." c. Add a 50-foot wide common lot along the northern property boundary over the existing W. Paint Horse Lane to reserve this area for future public right-of-way. d. Add a plat note that states the new common lot placed over the existing W. Paint Horse Lane is a non-buildable lot until such time that it is constructed as a collector roadway. 3. The landscape plan included in Section VII.C,dated June 18,2020, shall be revised prior to City Engineer signature on the plat: a. Revise the landscape plan to show a 35-foot wide landscape street buffer along S. Meridian Road/SH 69 that begins at the western edge of the ultimate right-of-way of Meridian Road. b. Revise the berm/fence combo exhibit to meet UDC I I-3H-4D requirements—the required berm/fence combo along Meridian Road shall be at least ten(10) feet high as measured from the centerline of the road and not from the edge of pavement. 4. Prior to City Engineer signature on the Final Plat,the applicant shall submit a public access easement for the required multi-use pathway along Meridian Road/SH 69 with the required landscape buffer,wholly outside of the right-of-way. Submit easements to the Planning Division for Council approval and subsequent recordation. The easements shall be a minimum of 14' wide(10' pathway+2' shoulder each side). Use standard City template for public access easement. Easement checklist must accompany all easement submittals. Coordinate with Kim Warren from the City of Meridian Parks Department. Page 16 Item 7. F124] 5. Future development shall be consistent with the minimum dimensional standards listed in UDC Table 11-2A-6 for the R-4 zoning district. 6. Off-street parking is required to be provided in accord with the standards listed in UDC Table 11-3C-6 for single-family dwellings based on the number of bedrooms per dwelling. 7. Provide a pressurized irrigation system consistent with the standards as set forth in UDC I I- 3A-15,UDC 11-3B-6 and MCC 9-1-28. 8. Upon completion of the landscape buffer installation,a written Certificate of Completion shall be submitted to the Planning Division verifying all landscape improvements are in substantial compliance with the approved landscape plan as set forth in UDC 11-3B-14. 9. Approval of this combined preliminary and final plat shall become null and void if the applicant fails to obtain the city engineer's signature on the plat within two(2)years of the approval of the combined preliminary and final plat. B. PUBLIC WORKS 1. Site Specific Conditions of Approval 1.1 A street light plan will need to be included in the final plat application. Street light plan requirements are listed in section 6-7 of the City's Design Standards. A future installation agreement for streetlights will be required for the required lights on Meridian Road. Contact the Meridian Transportation and Utility Coordinator for additional information. 1.2 This development is not currently serviceable by Meridian Sanitary Sewer or Water Systems. The parcel owners shall be required to cease using their wells and septic systems and connect at their expense,to the Meridian Sanitary Sewer or Water Systems when they become available per MCC 9-1-4 and 9-4-8. 2. General Conditions of Approval 2.1 A letter of credit or cash surety in the amount of 110%will be required for all uncompleted fencing, landscaping,amenities,etc.,prior to signature on the final plat. 2.2 All improvements related to public life, safety and health shall be completed prior to occupancy of the structures. Where approved by the City Engineer, an owner may post a performance surety for such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC 11-5C-3B. 2.3 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 2.4 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 2.5 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.6 All grading of the site shall be performed in conformance with MCC I I-12-3H. 2.7 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. 2.8 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. Page 17 Item 7. 125 C. PARK'S DEPARTMENT https:llweblink.meridianciU.ore/WebLink/DocView.aspx?id=191554&dbid=0&r0o=MeridianC hty D. CENTRAL DISTRICT HEALTH DEPARTMENT(CDH) https:llweblink.meridianciU.ore/WebLink/DocView.aspx?id=191386&dbid=0&r0o=MeridianC hty E. BOISE PROJECT BOARD OF CONTROL(BPBC) https:llweblink.meridianciU.org/WebLink/DocView.aspx?id=190916&dbid=0&r0o=MeridianC ky F. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ) https:llweblink.meridianciU.org/WebLink/Doc View.aspx?id=191398&dbid=0&r0o=MeridianC ky G. ADA COUNTY HIGHWAY DISTRICT(ACHD) https:llweblink.meridiancily.org/WebLink/DocView.aspx?id=192079&dbid=0&r0o=MeridianC iv IX. FINDINGS A. Combined Preliminary and Final Plat Findings: In consideration of a preliminary plat,combined preliminary and final plat,or short plat, the decision-making body shall make the following findings: 1. The plat is in conformance with the Comprehensive Plan; Stafffinds that the proposed plat, with Staff's recommendations, is in general compliance with the adopted Comprehensive Plan in regard to land use, density, transportation, and pedestrian connectivity. (Please see Comprehensive Plan Policies in, Section V of this report for more information) 2. Public services are available or can be made available and are adequate to accommodate the proposed development; Water and Sewer services cannot be provided to the subject property at this time. The City Engineer and Public Works Director have approved a waiver for this requirement(See Exhibit VILD). Staff finds that all other services are available for the subject property. (See Section VIII of the Staff Report for more details from public service providers) 3. The plat is in conformance with scheduled public improvements in accord with the City's capital improvement program; Because City water and sewer and any other utilities will be provided by the development at a later date as discussed above, Staff finds that the subdivision will not require the expenditure of capital improvement funds. 4. There is public financial capability of supporting services for the proposed development; Page 18 Item 7. F126] Staff finds there is public financial capability of supporting services for the proposed development based upon comments from the public service providers(i.e.,Police,Fire,ACHD, etc). (See Section VIII for more information.) 5. The development will not be detrimental to the public health, safety or general welfare; and, Staff is not aware of any health, safety, or environmental problems associated with the platting of this property.ACHD considers road safety issues in their analysis. 6. The development preserves significant natural,scenic or historic features. Staff is unaware of any significant natural, scenic or historic features that exist on this site that require preserving. The Applicant is not proposing any improvements along either waterway on or adjacent to the site other than landscaping outside of the applicable easements. Page 19 Item 8. L127 (:> E IDIAN*-----, AGENDA ITEM ITEM TOPIC: Public Hearing for Modern Craftsman at Black Cat(H-2020-0022) by Baron Black Cat, LLC, Located in the Northeast Corner of N. Black Cat Rd. and W. Chinden Blvd. (SH 20/26) A. Rezone a total of 23.63 acres of land for the purpose of reducing the C-C zone from approximately 8 acres to 4.42 acres and increase the R-15 zone from approximately 15.1 acres to approximately 19.2 acres. B. Short Plat consisting of 2 building lots and 2 common lots on 21.59 acres of land in the C- C and R-15 zoning districts. C. Conditional Use Permit for a multi-family development consisting of 196 residential units on 20.13 acres in the R-15 zone. D. Modification to the existing development agreements (Inst. Ws: 106151218; 107025555; 110059432; and 114054272) for the purpose of removing the subject property from the boundaries and terms of previous agreements and enter into a new one, consistent with the proposed development plan. PUBLIC HEARING SIGN IN SHEET DATE: August 20, 2020 ITEM # ON AGENDA: 8 PROJECT NAME: Modern Craftsman at Black Cat (H-2020-0022) PRINTED FULL NAME For Against Neutral Want to Testify YES OR NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Item 8. 128 (:�WE IDIAN:--- IDAHO PUBLIC HEARING INFORMATION Staff Contact:Joseph Dodson Meeting Date: August 20, 2020 Topic: Public Hearing for Modern Craftsman at Black Cat (H-2020-0022) by Baron Black Cat, LLC, Located in the Northeast Corner of N. Black Cat Rd. and W. Chinden Blvd. (SH 20/26) A. Rezone a total of 23.63 acres of land for the purpose of reducing the C-C zone from approximately 8 acres to 4.42 acres and increase the R-15 zone from approximately 15.1 acres to approximately 19.2 acres. B. Short Plat consisting of 2 building lots and 2 common lots on 21.59 acres of land in the C-C and R-15 zoning districts. C. Conditional Use Permit for a multi-family development consisting of 196 residential units on 20.13 acres in the R-15 zone. D. Modification to the existing development agreements (Inst. Ws: 106151218; 107025555; 110059432; and 114054272) for the purpose of removing the subject property from the boundaries and terms of previous agreements and enter into a new one, consistent with the proposed development plan. Information Resources: Click Here for Application Materials Click Here to Sign Up to Testify at the Planning and Zoning Commission Public Hearing Item 8. Mayor Robert E. Simison 129 E IDIAN.� City Council Members: =�� Treg Bernt Brad Hoaglun Joe Borton Jessica Perreault D A H O Luke Cavener Liz Strader August 20, 2020 MEMORANDUM TO: Planning and Zoning Commission CC: Kent Brown, Kent Brown Planning FROM: Joseph Dodson, Current Associate Planner RE: Modern Craftsman Continuance (H-2020-0022) Dear Commissioners, Modern Craftsman (H-2020-0022), was heard by Planning and Zoning Commission on July 9, 2020. At that hearing the Commission continued the project to the August 20, 2020 hearing date in order for the Applicant to address Commission's concerns with the limited amount of commercial development that was proposed as part of the project. Since the hearing, the Applicant has submitted revised plans to Planning Staff which has resulted in a number of recommended changes to the conditions of approval and development agreement. Please refer to the attachments and subsequent bullet points below regarding the changes since the Commission hearing. The revised plans show the following changes proposed by the applicant based on the Commission's deliberation: • C-C zoning increased from approximately 2.2 acres to 4.2 acres and now includes that area containing the clubhouse. o The clubhouse now incorporates offices that residents may rent out and use for their home businesses or meetings, adding 1,050 square feet of leasable space. • Applicant added a 5,070 square foot Vertically Integrated building along N. Black Cat Road. • The corner commercial building(near intersection of Chinden and Black Cat) is proposed as a two-story structure with parking below the first level of one half of the building. o Two-story variation now allows building to have 19,450 square feet of commercial space—Staff fully supports the two-story concept. Community Development Department - 33 E. Broadway Avenue, Suite 102, Meridian, ID 83642 Phone 208-884-5533 - Fax 208-888-6854 - www.meridiancity.org Item 8. F130] • Total commercial square footage proposed for the site is now approximately 27,000 square feet. With the increase in commercial square footage, staff finds the site can accommodate smaller scale, more neighborhood serving commercial uses to serve area residents as discussed and envisioned by the Comprehensive Plan. Further, the applicant has removed a row of commercial parking directly abutting the southern east-west street and added the required 5-foot landscape strip between the parking and the street as conditioned. Additional parking in this area has increased due to some of the parking being placed underneath the second level of the newly proposed 2-story commercial building. The increased commercial area has 88 parking spaces to be used between the corner commercial, the vertically integrated building, and clubhouse. The minimum required parking for the proposed commercial square footage is 56 spaces. Therefore, the proposed and revised plans show parking in excess of the requirements. The revised plans and commercial area have resulted in Staff modifying certain conditions and requesting new ones to coincide with the revisions. Staff recommends the following changes be made to the staff report by the Planning and Zoning Commission, noted with strikeout and underline changes below: • Lb—The 10-foot multi-use pathway along Chinden Boulevard shall be constructed with Phase 1 of the development.. And should be placed at least four(4) feet from the edge_ of the common lot abutting the common lot reserved for ITD. • Strike condition 3.d; Revise the !andseape plans te add a 5 feet wide landscape bi baeking out inte the path of 4affie en the private street. The buffer-shall be landseaped in aeeowith UT G 113B-8C. • Add DA provision#l.h—The Applicant shall vegetate the common lot(Lot 1, Block 11 reserved for future dedication to Idaho Transportation Department(ITD), with grass and not gravel until such time that this lot is dedicated to ITD. • Add DA provision#l.i—The proposed commercial building located near the intersection of N. Black Cat Road and W. Chinden Boulevard(SH 20/26) shall be constructed as a two-story structure as depicted in the submitted concept renderings and as noted on the revised CUP Site Plan. • Add DA provision l.j —The Vertically Integrated Residential Project area of the site shall adhere to the specific use standards as outlined in UDC 11-4-3-41. Exhibits: A. Revised Site Plan B. Revised Landscape Rendering C. New Vertically Integrated Building Rendering D. Corner Commercial Rendering—2-story Concept E. Original Corner Commercial Rendering— 1-story Concept F. Revised Rezone Exhibits 2 Item 8. 131 A. Revised Site Plan e Wn. I 9 �7=N I'= - \ ✓ - 1 r f 9 ! �6i�"' �� � I � •r • .� � '_ h ,� � oaf + Fi I u Ear II r � E • E ., - — II_ A A rF eta �• I g2 Id � I �� �• � - I I � - ! � III I ` I �� a 3 _ E �g AMR a u B �O z C LJ P S I—F E F�U—I[hl I-� ^� ��°�'4, iley Engineering,lnc. Z=om= �y DETACHED BARON BLACK CAT SUBDIVISION ph LEnulnnaninalPwxumclCaoo BARON PROPERTIES LLC - Tn 3 Item 8. F132] B. Revised Landscape Rendering om ----- _ - 3 r D n 1 � M - - _ I �® i - up � e mg go 4 Item 8. F133] C. New Vertically Integrated Building Rendering y e<� r� U W �Z m W O �J Z�6] FRON7 ISO VIEW �0 �Lr,e LEVELi-FLOOR PIAN-PRELIMINARY-GROSS AREA LEVEL'1=8,13B SF F` _ 4 V H Y Z qmU W U —a 0 4 0 J Z W m Q 4 REAR ISO VIEW LL(D Cr �Z� 0 ` � L f ��� _ � LH t q F 00 - o0 _I LEVEL2-FLOORPNN PRELIMINARY-GROSS ARFALEVEL�=5242SF .T AD 5 Item 8. 134 D. Corner Commercial Rendering—2-story Concept - VO U Y •. U C7 Z CO I-- � wJ Z Z 00 Q O — � C� Q � rU ILL. LU 0_ O M Z NO � U LU 0 O � p kF rJY PERSPECTIVE VIEWS i A0,0 6 Item 8. F135] E. Original Corner Commercial Rendering— 1-story Concept Qy GIO IL LLJ I Q - U Y J Z 00 F 0 Q U � OU ILL � OLU U � � z � O U w 0 0 2i < � © a ! _ -' .. W 19G6] PERSPECTIVE VIEWS A0.0 7 Item 8. F136] F. Revised Rezone Exhibits Sa~r26pe 300.46' f rd o n N 1 041 31 foil i I 00 `� II s19.12'20'W LL I 30.18' a J m Q C—C / U cn 184279 s.f. 0 p 4.23 a.c. � h Q F- i o a I� m j a P NQ Z Z I y�1G OSG�G o a 7729 rail A 1)l7oZ �O bIi Y G.G P•� b 1 I W. CHINDEN BLVD. 21 22 (U.S HIGHWAY 20/26) �4 N89'17'18"W 28T56' 1035.05' 22 28 27 S89'17'18"E 2647,24' 27 POB BASIS OF BEARING 9-IH w I G Y IDAHO EXHIBIT -- DRAWING FOR NO. 19-144 9gs5w EME� 35T MODERN CRAFTSMAN SUBDIVISION RHEF N0. SURVEYg�'3E -557D °^ EI C—C ZONING DISTRICT 1 I BOISDAH0 GROUP, L.LC LOCATED IN THE SW Jy DF THE SW Y OF SECTION 22.7.4N.,R.W. DNC.DATE B.N.,C11Y OF MERIDIAN,ADA COUNTY,IDAHO 8/3/2020 8 Item 8. Fl 37 N f� N N 25 100 aoa 0 50 200 600 �I SCALE: 1" = 200' ROCKBURY � SUBDIVISION SO'30'49"W 720.31' p G9G I a 7 729 1p OF ape �ki� o N z w� n¢ W u-)I 4J m0 W 0 r!n sl O ry 3 Do 001 DO Iro ,-I r:Vm lC� N 6 i rn 0 N /mn aC � a� z CD m� N U I < 2 U_ 2 565'06'21"E p 221.65' —/ m A NO'40'46"E � m 227.75' NO'40'53"E 359.40' z Nr boo N19'12'20"E z � po 30.i81 Go U S78'03'14"E'N BIDI0 L1 104.QQ' Ito C1 NO'30'42"E z NO'30'42"E 644J3_ N `v L���1_ --- --- 253,71' N. BLACK CAT RD. �y pro}:s—c^'3:ron Oe 19-14 dw dJING }Irnen A—t EXHIBIT __ DRAWING FOR JOB NO. DAHO ,8-144 �55w EME��gT MODERN CRAFTSMAN SUBDIVISION SHEET NO. SURVEY BOISE, R-15 ZONING DISTRICT 1of2 GROUP, LLC LOCATED IN THE SW Ya OF THE SW A.OF SECTION 22,T.4N.,RAW.. DWG.DATE B.M.,CITY OF MERIDIAN,ADA COUNTY,IDAHO 8/3/2020 9 Item 8. ■ STAFF REPORT E COMMUNITY N -- COMMUNITY DEVELOPMENT DEPARTMENT HEARING 7/9/2020 Legend DATE: Project Location TO: Planning&Zoning Commission FROM: Joe Dodson,Associate Planner 208-884-5533 - _ -_--- SUBJECT: H-2020-0022 Modern Craftsman at Black Cat LOCATION: The site is located in the northeast corner of N. Black Cat Rd. and W. Chinden Blvd. (SH 20/26),in the SW '/4 of the SW '/4 of Section 22,Township 4N., Range 1 W. Hip�.. L PROJECT DESCRIPTION • Rezone a total of 23.63 acres of land for the purpose of reducing the C-C zone from approximately 8 acres to 2.26 acres and increase the R-15 zone from approximately 15.1 acres to 21.37 acres; • Short Plat consisting of 2 building lots and 2 common lots on 21.59 acres of land in the C-C and R-15 zoning districts; • Conditional Use Permit for a multi-family development consisting of 196 residential units on 20.13 acres in the R-15 zone; • Modification to the existing development agreements (Inst. Ws: 106151218; 107025555; 110059432; and 114054272) for the purpose of removing the subject property from the boundaries and terms of previous agreements and enter into a new one, consistent with the proposed development plan, by Baron Black Cat, LLC Note: The Applicant is also applying for private streets and administrative design review. These applications are reviewed and approved by the Director, Commission action is not required. Analysis of the building and private street design are provided below in section V. IL SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 23.63 (R-15—21.37 acres;C-C—2.26 acres) Page 1 Item 8. 139 Description Details Page Future Land Use Designation Mixed Use Community Existing Land Use(s) Commercial(tree farm) Proposed Land Use(s) Multi-Family Residential and Commercial Lots(#and type;bldg./common) 4 total lots— 1 multi-family residential; 1 commercial; 1 common lots;and 1 other lot. Phasing Plan(#of phases) Proposed as one phase Number of Residential Units(type 196 single-family,for rent units(single-family style on a of units) single lot). Density(gross&net) Gross—8.7 du/ac.;Net— 10.54 du/ac. Open Space(acres,total 3.78 acres of qualified open space overall(approximately [%]/buffer/qualified) 17.5%)—2.36 acres for 11-3G requirements (approximately 10.9%);62,061 square feet proposed for 11-4-3-27(Multi-Family)standards. 1.89 acres of private open space is proposed(82,170 square feet;approximately 419 square feet per unit). Amenities 5 qualifying amenities— 10' multi-use pathway;pool; clubhouse;picnic area;and tot-lot(a dog park is also proposed but does not meet UDC requirements to be a qualifying site amentity). Physical Features(waterways, N/A hazards,flood plain,hillside) Neighborhood meeting date;#of January 13,2020—7 attendees; attendees: June 30,2020—4 attendees History(previous approvals) AZ-06-004;MI-06-010/011;MI-07-004;MDA-10-004; MDA-14-006; (DA#'s 106151219, 107025555; 107141993, 110059432,&2014-065517) B. Community Metrics Description Details Page Ada County Highway District • Staff report(yes/no) No • Requires ACHD Commission No Action(yes/no) Access(Arterial/Collectors/State Access is proposed via private streets off of Black Cat Rd. Hwy/Local)(Existing and Proposed) and Tree Crest Way.There are two access points proposed off of N.Black Cat and one off of W. Tree Crest Way. Traffic Level of Service Stub Street/Interconnectivity/Cross Applicant is proposing private streets throughout the Access development;a stub street connection is proposed to the eastern property in the northeast corner of the property (Rock Harbor Church site)and will connect with one of the driveway connections on that site.No other vehicle connections are proposed as the subject site is surrounded by streets on 3 of the 4 property boundaries. Existing Road Network No Existing Arterial Sidewalks/ Chinden Blvd(SH 20/26)abuts the southern property Buffers boundary and is currently a two-lane roadway with no improvements along its shoulder.There are no existing sidewalks along the state highway;the Applicant is proposing a 10-foot multi-use pathway within a common lot landscape buffer that will lay outside of the future ITD right-of-way for SH 20/26. Page 2 Item 8. F140] Description Details Page Proposed Road Improvements Distance to nearest City Park(+ 0.8 miles to Keith Bird Legacy Park(7.5 acres in size) size) Fire Service • Distance to Fire Station 2.2 miles from Fire Station#5 • Fire Response Time This project lies within the Meridian Fire response time goal of 5 minutes. • Resource Reliability Fire Station#5 reliability is 80%. • Risk Identification Risk Factor 2—residential with hazards(multi-family) • Accessibility Proposed project meets all required access,road widths, and turnarounds;Fire has signed off on Private Street layout. Police Service • Distance to Station 8.5 miles from Meridian Police Department • Response Time Approximately 5 '/2 minute response time to an emergency. • Call Data Between 2/1/2019- 1/31/2020,the Meridian Police Section VII. Department responded to 258 calls for service within a mile of the proposed development.The crime count on the calls for service was 14. See attached documents for details. Between 2/1/2019- 1/31/2020,the Meridian Police Department responded to 5 crashes within a mile of the proposed development. See attached documents for details. • Additional Concerns None West Ada School District • Distance(elem,ms,hs) Star Elementary—2.7 miles; Star Middle—5.0 miles; Meridian High School—5.3 miles. • Capacity of Schools Star Elementary—420 students Star Middle— 1000 students Meridian High School—2400 students • #of Students Enrolled Star Elementary—622 students Star Middle—704 students Meridian High School— 1995 students Water—Service will not be by the City of Meridian,as it falls within SUEZ North America service area. Wastewater • Distance to Sewer Services Directly adjacent • Sewer Shed North Black Cat Trunkshed • Estimated Project Sewer See application ERU's • WRRF Declining Balance 13.9 • Project Consistent with WW YES Master Plan/Facility Plan • Impacts/Concerns Design and number of units clustered together is of particular concern—staff is unclear as to how all units will be serviced.A utility layout depicting how all of the units will be serviced while still meeting design requirements will be required. Page 3 Item 8. 141 C. Project Area Maps Future Land Use Map Aerial Map .� Legend Low-Density, Legend eo, :;z, 0 . Project Location Residential LEI Project Location V' ON Phi' MU-RG1u Wig - ® Mediiuml - ® S tY Resident alLl CIVIC ll(LyL,L�LLLLW,.,LL` .t +•Il'Y/M sr _1. ,cCTTlll7n .rmTr-rrrrnYJ ■ ~d + - r fG- a'n-r'r�..:. Zoning Map Planned Development Map Legend 0 Legend - R-2 Project Location D Project Location RUT R-4 8. 1 City Limits y 2, R-8 R 2, Planned Parcels � ;-7-f m R1 C-NLED L-O' ® RUT ® � R_-8 R-4 �0711 &3}' R-4 RA .. ® � PAM �f ® � �❑� �f III. APPLICANT INFORMATION A. Applicant: Baron Black Cat LLC- 1401 17' Street, Ste. 700,Denver, CO 80202 Page 4 Item 8. F142] B. Owner: Same as Applicant C. Representative: Kent Brown Planning—3161 E. Springwood Drive,Meridian,ID 83642 IV. NOTICING Planning& Zoning City Council Posting Date Posting Date Newspaper Notification 5/l/2020 Radius notification mailed to properties within 300 feet 4/28/2020 Site Posting 6/26/2020 Nextdoor posting 4/28/2020 V. STAFF ANALYSIS A. Future Land Use Map Designation(https://www.meridiancity.org/compplan) Mixed Use Community—The purpose of this designation is to allocate areas where community- serving uses and dwellings are seamlessly integrated into the urban fabric. The intent is to integrate a variety of uses, including residential, and to avoid mainly single-use and strip commercial type buildings.Non-residential buildings in these areas have a tendency to be larger than in Mixed Use Neighborhood(MU-N)areas,but not as large as in Mixed Use Regional(MU- R)areas. Goods and services in these areas tend to be of the variety that people will mainly travel by car to,but also walk or bike to (up to three or four miles). Employment opportunities for those living in and around the neighborhood are encouraged. The subject site is surrounded by existing City of Meridian zoning and development that is both existing and planned(the adjacent parcels are entitled but some have not yet begun construction). The proposed land use of multi family residential and commercial are consistent with the land use types noted in the Future Land Use Map (FL UM)designation definitions and preferred uses. The proposed product type is by definition multi family(more than 2 units on a single building lot) but the Applicant has designed the units so to emulate single-family attached and detached structures that share mews and pedestrian pathways rather than public streets. The proposed unit types also provide more private open space than traditional multi family development,furthering its feel of single family residential. In addition, certain densities are required to be met for residential projects within the MU-C future land use designation. The proposed project as shown is approximately 8 du/ac, meeting the 6-1 S du/ac requirement(see community metrics above). Therefore, Stafffinds the density proposed with the short plat and rezone is consistent with the Future Land Use Map designations of Mixed Use Community(MU- C). Mixed-use designations also require at least three (3) types of land uses. The proposed project offers an area of commercial zoning that should accommodate multiple future uses. The commercial lot is proposed with two building sites that have multiple suites so there is potential that distinct land uses will be available on-site. When analyzing projects within the MU-C future land use designation, the approved and/or developed land uses nearby must be taken into account. Therefore, Staff has taken into account adjacent land uses that can be traveled between with relative ease. Directly to the east of this site is the future Rock Harbor Church site, a Page 5 Item 8. ■ different use than proposed with this project. Within a half mile to the west and off of Chinden Blvd., a mixed use project(Central Valley Plaza/Pollard Subdivision) is approved and will offer multiple additional uses and employment opportunities that these future residences could use. Within a half mile to the east, the new Costco building has been approved and is in the process of receiving building permit approval. Directly across N. Black Cat, more commercial development is proposed within the Fairbourne Subdivision. Staff initially had concerns with the overall site design but the Applicant has worked diligently to take Staffs comments into account, specifically in relation to this mixed-use policy: `Mixed use areas should be centered around spaces that are well-designed public and quasi-public centers of activity. Spaces should be activated and incorporate permanent design elements and amenities that foster a wide variety of interests ranging from leisure to play. These areas should be thoughtfully integrated into the development and further place-making opportunities considered." The Applicant added additional commercial area to the project and moved the open space to a more central location to help integrate the commercial with the proposed residential. Staff particularly finds the plaza area between the clubhouse and one of the commercial buildings as a great example of integrating the uses as the commercial building fronts on the plaza and would offer great pedestrian connectivity for residents in this project. Staff may prefer additional commercial on the subject site more in line with the existing zoning areas, but Staff also understands that nearby uses help mitigate the loss of commercial zoning on this specific parcel. Staff finds that the proposed layout generally meets the MU-C future land use designation policies and goals. The Applicant is also requesting to modify the recorded development agreements(Inst. #'s: 106151218; 107025555; 107141993; 110059432; and 2014-065517) for the purpose of removing the subject property from the boundary of the previous agreements and enter into a new development agreement(DA) consistent with the proposed development plan. Staff's recommended DA provisions are included in Section VIII.A1. The new DA is required to be signed by the property owner(s)/developer and returned to the City within 6 months of the Council granting approval of the MDA by City Council and subsequent recordation. The existing development agreement and subsequent addendums relate to a much larger area than this specific corner on Black Cat Road and Chinden Blvd. (Highway 20126). One of the addendums (from 2007) does directly address the existing tree farm and allows it to continue its use as a tree farm until such time that the property is redeveloped. Because this new development is one of the last portions of the larger area governed by the original DA to redevelop, the Applicant wishes to remove this project site from that DA and its subsequent addendums and enter into its own DA consistent with the proposed development plan. Stafffinds a new DA will allow the subject site to develop in a more cohesive and clean pattern while also eliminating the need to amend the existing DA any further. B. Comprehensive Plan Policies(https://www.meridiancity.orglcompplan): The applicable Comprehensive Plan policies are cited below with Staff analysis in italics. "Avoid the concentration of any one housing type or lot size in any geographical area;provide for diverse housing types throughout the City"(2.01.01 G).Modern Craftsman at Black Cat is offering a new type of development within the City of Meridian by proposing single-family attached and detached homes within a multi family setting. To both the north and to the west (across N. Black Cat Road) traditional detached single-family homes exist and are proposed. The Applicant hopes to add an additional housing type in this area that will delineate a new housing use in the City and add to the housing diversity available. Page 6 Item 8. F144] "Require all new development to create a site design compatible with surrounding uses through buffering, screening,transitional densities,and other best site design practices"(3.07.01A). The proposed site design incorporates mews,private streets, common open space, and different housing designs within the same parcel. Much of the surrounding development, especially the closest subdivisions, is of lower density, detached single-family development. Because of this, a lot of the public testimony received has requested that this subject site emulate these subdivisions. The subject site does not share the same future land use designation as the adjacent subdivisions and therefore cannot be developed in the same way. Despite being a mixed use designation, the Applicant has chosen to propose a development that is made up of mostly single-story structures. The Applicant did this in order to be more compatible with surrounding residential development. In regards to site design, the Applicant is proposing two-story townhomes along the eastern and western boundaries; these townhomes will abut a parking lot for the adjacent Rock Harbor Church on the east side of development and abut Black Cat along the western boundary and landscape buffer.Also along the eastern boundary is a smaller landscape buffer(approx. 10 feet wide) that is approximately 520 feet in length and proposed with 5 trees and a vinyl fence. The Applicant has also proposed a few of their larger detached structures (3-bedroom units)next to the proposed townhomes along Black Cat to help with buffering along the busy collector. Interior of these townhomes is the main component of this project, attached and detached single-story homes mostly laid out in a detached four Alex configuration. Sidewalks run throughout the development and these attached and detached units making for great pedestrian connectivity throughout the site. In addition, the Applicant has proposed two sidewalk connections out to the proposed multi-use pathway extension along Chinden to help with interconnectivity between parcels. Further pedestrian and open space analysis is in other sections of the staff report below. The Applicant is not proposing any vehicular accesses onto Chinden Blvd. which is a welcomed proposition for ITD and Staff. Reducing access points to arterial streets and state highways is a major goal within the City's Comprehensive Plan and helps funnel traffic in appropriate manners. Staff believes placing townhomes along Black Cat offers an appropriate buffer between the busy collector roadway and the single-story structures that make up a majority of the development. In addition, the subject site is bordered on three sides by public roads that have or will have landscape buffers. These landscape buffers and the public roads should offer a needed buffer. "Establish and maintain levels of service for public facilities and services,including water, sewer, police,transportation, schools,fire, and parks"(3.02.01 G).All public utilities are available for this project site due to the existing subdivision to the north,per Public Works comments. This project also lies within the Fire Department response time goal. Chinden Boulevard is currently being widened in multiple places along its corridor and will connect to the planned expansion of Highway 16. It is the intent of these road improvements to help with current and future congestion along Chinden Boulevard. To help mitigate this, the Applicant is not requesting any accesses onto Chinden but instead is proposing two access points to Black Cat and one access to N. Tree Farm Way, essentially the northern border of the property. West Ada School District has offered comments on this project and estimate an additional 156 school age children could reside in this community. Of the closest neighborhood schools, Star Elementary is the only school shown as currently over enrolled. West Ada also notes that future students in this area could attend the Owyhee High School and Pleasant View Elementary School—Pleasant View is scheduled to open in Fall 2020. Staff understands that school enrollment is a major issue to be dealt with but at least in the northwest Meridian area, some relief appears to be on the horizon with new schools opening up soon. Page 7 Item 8. 145 Staff finds that the existing and planned development of the immediate area create conditions for adequate levels of service to for this proposed project. "Preserve,protect,and provide open space for recreation, conservation,and aesthetics" (4.05.01F). The proposed project offers open space that meets and exceeds the minimum requirements in the unified development code (UDC). The Applicant has increased the amount of open space over the course of discussions with Staff which improves the overall project. There are three main areas of open space in this development but smaller, qualifying open space also exists throughout the project. These three main areas hold the proposed dog park, clubhouse and pool, tot-lot, a plaza shared between some commercial and the open space lot, and a central vista that connects both ends of the development with green space. This central vista is also anchored at each end with amenities making the open space flow and feel as part of the development. See further analysis in Section V.E and V.L. "Explore development and implementation of architectural and/or landscape standards for geographic areas of the City."(5.01.02F). The proposed project site is not within a specific area plan for the City but because it is a multi family product, it is subject to design review. The Applicant has submitted a concurrent administrative design review application that accompanies Staffs review of the conceptual elevations. The architecture proposed throughout the residential portion of the project offers modern design elements that include shed roof combinations that are combined with stucco and stone sidings,finished wood as a siding and accent material, and metal as an accent material. Staff not only finds the submitted elevations to be in compliance with the Architectural Standards Manual but also finds this type of architecture as unique and a welcome addition to the neighborhood. "Establish distinct,engaging identities within commercial and mixed use centers through design standards."(2.09.03A).As discussed above, the proposed product type and architecture would make Modern Craftsman at Black Cat a distinct area within the City. The Applicant has worked with Staff to offer a site design that provides some integration between the commercial and residential product types. In addition, there is a similar look and feel in the development created largely by the inclusion of the central vista and large amounts ofprivate open space for multi- family development.As noted above, Staff may desire more commercial on this parcel to offer more opportunity to be integrated, but Staff cannot and should not analyze this project without looking at the development around the subject site, without looking from a macro view of the surrounding area. When taking all of the surrounding area into consideration, Stafffinds that the proposed development meets a majority of the mixed-use policies and objectives. Staff finds this development to be generally consistent and in alignment with the Comprehensive Plan and a majority of the mired use policies. C. Existing Structures/Site Improvements: The site currently houses a tree farm that has a number of small mobile home type structures.All existing structures will be removed upon development of this site. In fact,under the terms of the existing DA,this use was to cease long before now. D. Proposed Use Analysis: The proposed use is multi-family residential and commercial;the commercial area is relatively small when compared to the residential, approximately 2 acres compared to 21 acres, respectively. Multi-family residential is a conditional use in R-15 zoning district per UDC Table 11-2A-2. The commercial area is already zoned and there are currently no tenants in place for the proposed commercial building suites. Because no tenants are currently known of, Staff cannot review those uses for compliance in the C-C zoning district. Commercial buildings require Page 8 Item 8. F146] Certificate of Zoning Compliance(CZC) and Design Review so at that time Staff will evaluate the uses for compliance. The multi-family development is proposed to be constructed in one phase and incorporate both detached and attached structures; of the 196 multi-family units,42 units are townhomes proposed along the eastern and western boundaries of the site. As discussed previously,the multi-family buildings are subject to design review and the Applicant has applied for this concurrently with the conditional use permit application. The Applicant did not provide elevations for the future commercial buildings;upon submittal of the required CZC,the Applicant will be required to submit concurrent design review for the commercial buildings. The Applicant has provided conceptual elevations of the Clubhouse and it shares in similar architecture with the proposed residential units as required by the specific use standards. The proposed use is not a traditional type of single family or multi family development, it is a hybrid of the two. The Applicant could have chosen to plat each one of these buildings individually; the Applicant could also have proposed traditional 4-story garden style apartments. Both potentials have their positives and negatives and the Applicant is proposing a different product type to the City of Meridian. The proposed units are a majority of single-story one, two, and three-bedroom detached units without garages. The Applicant is proposing more traditional apartment style parking but some units do have attached one-car garages. All of the townhome units also have attached garages on their .first floor. Largely, the proposed buildings in this development look like detached single-family homes but have on-street parking and less private open space than a standard 4,000 or 8,000 square foot lot. However, the Applicant is proposing vastly more private open space than is required by UDC for multi family development. UDC requires at least 80 square feet per unit and the Applicant is proposing an average of 400 square feet per unit via small private yards for every single unit. The design of this can be best seen on the open space exhibit(see Exhibit VII.C) and the fencing plan shown on the last page of the landscape plans (see Exhibit HID). To be clear, the main proposed use is single-family detached structures with on-street parking that all reside on one single building lot, making it a multi family development by definition. There are also traditional style townhome units but are also on the same building lot, making the whole residential product type multi family. E. Specific Use Standards(UDC 11-4-3): The proposed multi-family development use is subject to conditional use permit approval by the Planning and Zoning Commission and subject to specific use standards outlined in UDC 11-4-3- 27 and below: 11-4-3-27—Multi-Family Development: A. Purpose: 1. To create multi-family housing that is safe and convenient and that enhances the quality of life of its residents. 2. To create quality buildings and designs for multi-family development that enhance the visual character of the community. 3. To create building and site design in multi-family development that is sensitive to and well integrated with the surrounding neighborhood. 4. To create open space areas that contribute to the aesthetics of the community,provide an attractive setting for buildings, and provide safe,interesting outdoor spaces for residents. Page 9 Item 8. F147] B. Site Design: 1. Buildings shall provide a minimum setback of ten feet(10')unless a greater setback is otherwise required by this title and/or title 10 of this Code. Building setbacks shall take into account windows, entrances,porches and patios, and how they impact adjacent properties.Proposed project complies with this requirement. 2. All on-site service areas,outdoor storage areas,waste storage, disposal facilities, and transformer and utility vaults shall be located in an area not visible from a public street, or shall be fully screened from view from a public street. The site plan depicts screened trash enclosures; all proposed transformer/utility vaults shall also comply with this requirement. 3. A minimum of eighty(80) square feet of private,usable open space shall be provided for each unit. This requirement can be satisfied through porches,patios, decks, and/or enclosed yards. Landscaping, entryway and other accessways shall not count toward this requirement. In circumstances where strict adherence to such standard would create inconsistency with the purpose statements of this section,the Director may consider an alternative design proposal through the alternative compliance provisions as set forth in section 11-5B-5 of this title. The private, usable open space provided for each unit varies with each unit type but each one provides more than the required amount.According to the Applicant, the minimum private open space provided is 288 square feet, the maximum for any one unit would be approximately 869 square feet, and the average is approximately 419 square feet. Again, this proposed design offers private open space that is more akin to single-family developments but is still a multi family product and the type of housing that Baron Black Cat is aiming to provide. 4. For the purposes of this section,vehicular circulation areas,parking areas, and private usable open space shall not be considered common open space. These areas were not included in the common open space calculations for the site. 5.No recreational vehicles, snowmobiles,boats or other personal recreation vehicles shall be stored on the site unless provided for in a separate,designated and screened area. Applicant shall comply with this requirement. 6. The parking shall meet the requirements set forth in chapter 3, "Regulations Applying to All Districts",of this title. See analysis in staff report below. 7. Developments with twenty(20)units or more shall provide the following: a. A property management office. b. A maintenance storage area. c.A central mailbox location(including provisions for parcel mail)that provide safe pedestrian and/or vehicular access. d. A directory and map of the development at an entrance or convenient location for those entering the development. (Ord. 18-1773,4-24-2018) Per the submitted plans, the Applicant appears to meet these requirements. The site plan submitted with the Certificate of Zoning Compliance application shall depict these items. C. Common Open Space Design Requirements: 1. A minimum area of outdoor common open space shall be provided as follows: Page 10 Item 8. 148 a. One hundred fifty(150) square feet for each unit containing five hundred(500) or less square feet of living area. b. Two hundred fifty(250) square feet for each unit containing more than five hundred(500) square feet and up to one thousand two hundred(1,200) square feet of living area. c. Three hundred fifty(350) square feet for each unit containing more than one thousand two hundred(1,200) square feet of living area. Note: Open space standards found in UDC 11-3G AND those found in these specific use standards shall apply to this project.Please see the applicability section of both code sections. Staff analysis for both open space requirements is in Section V.L of this staff report instead of splitting the analysis into two parts. 2. Common open space shall be not less than four hundred(400) square feet in area,and shall have a minimum length and width dimension of twenty feet(20').Proposed open space submitted as meeting this requirement has been reviewed.All area labeled as qualified common open space on the open space exhibit complies with this requirement. 3. In phased developments,common open space shall be provided in each phase of the development consistent with the requirements for the size and number of dwelling units. This project is proposed to be developed in one(])phase. 4. Unless otherwise approved through the conditional use process, common open space areas shall not be adjacent to collector or arterial streets unless separated from the street by a berm or constructed barrier at least four feet(4) in height,with breaks in the berm or barrier to allow for pedestrian access. (Ord. 09-1394, 3-3-2009, eff.retroactive to 2-4- 2009). The buffer along N. Black Cat Road, a collector street, does not count toward the common open space requirements for these specific use standards. However, those areas along the arterial and collector roadways do count towards the minimum 10%required open space for the residential development as a whole. D. Site Development Amenities: 1. All multi-family developments shall provide for quality of life, open space and recreation amenities to meet the particular needs of the residents as follows: a. Quality of life: (1)Clubhouse. (2)Fitness facilities. (3)Enclosed bike storage. (4)Public art such as a statue. b. Open space: (1)Open grassy area of at least fifty by one hundred feet(50 x 100') in size. (2)Community garden. (3)Ponds or water features. (4)Plaza. c. Recreation: (1) Pool. Page 11 Item 8. F149] (2)Walking trails. (3)Children's play structures. (4) Sports courts. 2. The number of amenities shall depend on the size of multi-family development as follows: a. For multi-family developments with less than twenty(20)units,two (2)amenities shall be provided from two (2) separate categories. b. For multi-family development between twenty(20)and seventy five (75)units,three (3) amenities shall be provided,with one from each category. c. For multi-family development with seventy five(75)units or more, four(4) amenities shall be provided,with at least one from each category. d. For multi-family developments with more than one hundred(100)units,the decision making body shall require additional amenities commensurate to the size of the proposed development. 3. The decision making body shall be authorized to consider other improvements in addition to those provided under this subsection D,provided that these improvements provide a similar level of amenity. (Ord. 05-1170, 8-30-2005, eff. 9-15-2005) Based on 195proposed units, a minimum offour(4)amenities are required,however, the decision making body is authorized to consider other amenities in addition to those provided per the standards listed above in 2.d. The following amenities are proposed from the quality of life, open space and recreation categories:a clubhouse with offices for rent by the residents, a tot-lot, a swimming pool,picnic shelter with a BBQ area, a plaza, community garden, and a small fenced dog park area. Therefore, the Applicant is proposing 6 qualifying site amenities. The proposed dog park does not meet the UDC requirements to qualify as a site amenity due to it not being large enough and not showing the required trash receptacles or dog washing station.Even though it is not a qualifying amenity,Staff presumes it will be used often. Staff recommends that at least trash receptacles be added to the dog park area to ensure a clean and odorless experience is incurred.In addition to these amenities, the Applicant is proposing 102 self-storage lockers (each locker is 12 square feet)spread throughout each of the garage buildings so that residents may store small amounts of personal items onsite and near their units. This is also not a qualifying site amenity but Staff finds that these will likely be heavily used even though not all residents will be allowed to participate in it due to the difference in unit count and available lockers. E. Landscaping Requirements: 1. Development shall meet the minimum landscaping requirements in accord with chapter 3, "Regulations Applying to All Districts",of this title. 2. All street facing elevations shall have landscaping along their foundation. The foundation landscaping shall meet the following minimum standards: a. The landscaped area shall be at least three feet(3')wide. b. For every three(3) linear feet of foundation, an evergreen shrub having a minimum mature height of twenty four inches(24") shall be planted. c. Ground cover plants shall be planted in the remainder of the landscaped area. Page 12 Item 8. F_15o] The landscape plan provided appears to meet these specific use standard landscape requirements. (see Exhibit VII.D) F. Dimensional Standards(UDC 11-2): The commercial and multi-family residential lots appear to meet all UDC dimensional standards per the submitted plat. In addition, all private streets appear to meet all UDC dimensional standards per the submitted plans. In addition, all subdivision developments are also required to comply with Subdivision Design and Improvement Standards (UDC 11-6C-3). The proposed short plat and submitted plans appear to meet the UDC requirements of this section. G. Access(UDC 11-3A-3, 11-3H-4): Access is proposed via private streets off of N. Black Cat Rd. and W. Tree Crest Way. The two proposed access points to Black Cat Road have been approved by ACHD but typically access to Black Cat is limited by the City. The Applicant may request from City Council to keep the two access points as proposed, in accord with UDC 11-3A-3. The Applicant is also proposing an access in the northeast corner of the property via a shared driveway with the Rock Harbor Church site. Private streets are proposed throughout the development,with two running east-west(W. Waverton Ln. and W. Caragana Ln.) and two running north-south(N. Spurwing Ln and N. Agrarian Ln.). Access via Chinden Blvd. is prohibited and is not proposed.Due to the nature of the proposed use, Staff believes private streets are appropriate in this development. Private streets are required to comply with the design and construction standards listed in UDC 11-3F-4. The proposed private streets are 25 feet wide with 5-foot or 7-foot attached sidewalks on both sides. Both open and covered parking is provided along most of the private streets. Further parking analysis is discussed in the next section,Section V.H. In addition,private streets are required to be on their own common lot or within an easementper UDC 11-3F-3B.3 standards. The submitted plat does not appear to show this requirement;Staff is recommending a condition of approval to revise the plat to show compliance with this requirementprior to the City Council hearing. H. Parking(UDC 11-3C): Off-street parking is required to be provided in accord with the standards listed in UDC Table 11- 3C-6 for multi-family dwellings based on the number of bedrooms per unit. The submitted and revised plan named "Conditional Use Plan"appears to have the most up to date parking counts and show 497 spaces for the entire development. 436 are proposed for the residents, 28 are reserved for the clubhouse, and the remaining 33 are for the proposed commercial. Of the 436 for the residential units, 179 spaces are uncovered, 134 are covered carport spaces, and the remaining 123 are garage spaces. Across the different unit types there are 641-bedroom units, 100 2-bedroom units, and 32 3-bedroom units. The 1-bedroom units require 1.5 spaces per units, with at least one of the spaces being covered; the two and three bedroom units require 2 spaces per unit, also with at least one covered per unit. Therefore, the minimum amount of parking required for the multi family portion of this development is 360 spaces, with 196 of those required to be covered. Therefore, the proposed parking count exceeds the minimum UDC requirements. The commercial areas proposed in the southwest corner of the site is shown as 12,789 square feet that would be spread across two building pads—the smaller pad, approximately 2,000 square feet, shares a plaza with the tot-lot and open space area near the west-central portion of the site. For commercial uses, the parking requirement is one space for every 500 square feet and the proposed commercial area requires a minimum of 26 spaces. The Applicant has proposed 33 Page 13 Item 8. 551 spaces for the commercial area, exceeding the minimum amount required by the UDC.A portion of the proposed parking directly abuts the street and those utilizing the commercial parking would have to back into or drive directly onto the private street in order to exit those spaces. This is not prohibited by code but is far from ideal. Staff believes this type of parking set up may cause additional accidents and therefore recommends a redesign of the parking for the proposed commercial area. This redesign should minimally include a 5-foot wide landscape island along the edge of this proposed parking area to eliminate this conflict. The Applicant shall still provide the required number ofparking stalls based upon the gross floor area of the proposed commercial area. A parking plan can be seen in Exhibit VII.E. I. Pathways (UDC 11-3A-8): A 10-foot wide multi-use pathway is proposed along the entire W. Chinden Blvd. street frontage and is proposed to be placed within the required arterial street landscape buffer. The proposed pathway will be approximately 60-feet from the existing edge of right-of-way of Chinden Blvd. due to future widening projects. The Applicant is dedicating a separate, 60-foot wide,non- buildable lot along Chinden Blvd. for the future benefit of Idaho Transportation Department. This section of multi-use pathway will allow further safe pedestrian connection along the SH 20/26 corridor and will directly help connect this development with the adjacent Rock Harbor Church site to the east and with development to the west and across N. Black Cat. The multi-use pathway is also proposed to connect to a new 5-foot detached sidewalk along N. Black Cat and to two internal connections from within the development. These sidewalk connections offer further pedestrian connectivity between developments along the SH 20/26 corridor. The proposed sidewalks in this development are essentially micro-pathways. These pathways connect throughout the entire development and traverse through every mew as well. They offer increased pedestrian connection and give future residents the opportunity to walk rather than drive within the project site. J. Sidewalks(UDC 11-3A-17): Attached sidewalks are proposed along all internal private streets as part of the overall pedestrian circulation,in accord with the standards listed in UDC 11-3A-17. Part of the sidewalk plan places one within a long vista that connects all the way from the clubhouse/tot-lot area in the west of the site to the barbeque and picnic area in the east portion of the site. This area is proposed with landscaping adequate to offer both shade and green space but does not appear to be so convoluted with trees as to offer line of sight issues for public safety. Staff supports the sidewalk and pedestrian circulation plan for this development. See Exhibit VII.F. K. Landscaping(UDC 11-3B): A 35-foot wide street buffer is required adjacent to W. Chinden Blvd., a state highway system (SH 20/26), landscaped per the standards listed in UDC 11-3B-7C. A 35-foot wide common lot is depicted on the plat to the interior of the 60-foot wide common lot for future ITD purchase. There is also a required 20-foot wide landscape buffer adjacent to N. Black Cat, a residential collector roadway. This required landscape buffer should also be placed into common lot(s)per UDC standards in 11-3B-7C.2; Staff is recommending a condition of approval to amend the plat to show the entire buffer along N. Black Cat within a common lot. Per UDC I I-3H-4D,and within the required buffer along SH 20/26,the Applicant is also required to build a noise attenuation wall or wall and berm combination at least 10-feet in height,measured from the height of the centerline of the highway. The Applicant is proposing a wall/berm combination that appears to Page 14 Item 8. ■ meet the height requirement. Staff notes that this wall is also required to modulate over the course of its length. The submitted landscape plans do not appear to show this modulation so the Applicant will be required to correct the plans prior to final plat submittal. On the submitted landscape plans,there are no proposed trees or shrubs shown within the required landscape buffer between the commercial lot and SH 20/26. This area of the landscape buffer is also required to be landscaped and Staff is recommending a condition of approval to include landscaping in this area beyond grasses. See Section VII.D for the submitted landscape plans. Landscaping is required along all pathways (including micro-pathways) in accord with the standards listed in UDC 11-3B-12C. The total lineal feet of pathways with the required and proposed number of trees are NOT included in the Landscape Calculations table on the submitted landscape plans, sheet LA. The addition of this data in the calculations table will be required as a condition of approval. Common open space is required to be landscaped in accord with the standards listed in UDC 11- 3G-3E. The total square footage of common open space and the required number of trees to demonstrate compliance with UDC standards is NOT included in the Landscape Calculations table. The addition of this data in the calculations table will be required as a condition of approval. The City Arborist has also made comments on the subject application regarding its landscaping, specifically on the type of tree species proposed. Fraxinus "Ash"tree species attract a specific and invasive pest and it is the request of the City Arborist that projects start trying to replace these types of trees with other tree species. Therefore, Staff is recommending a condition of approval that the Applicant work with the City Arborist on an appropriate alternative to their proposed `Ash"tree selection. L. Qualified Open Space (UDC 11-3G): A minimum of 10%qualified open space meeting the standards listed in UDC 11-3G-313 is required. Based on the proposed plat of 21.59 acres,a minimum of 2.16 acres of qualified common open space should be provided to satisfy this requirement. In addition,because this is a multi-family development within a residential zoning district,the common open space standards listed within the specific use standards,UDC 11-4-3-27, also apply. The Applicant's open space calculations do not accurately depict the amount of required and proposed open space for the multi-family specific use standards; Staff is recommending a condition to correct this prior to City Council.According to Staffs calculations, a minimum of 55,000 square feet (or 1.26 acres) of additional qualifying common open space should be provided. Combined, the required amount of minimum qualifying open space that should be provided is 3.42 acres. According to the open space exhibit(see Exhibit VII.C),the applicant is proposing a total of 3.78 acres of qualified open space. There are a number of small areas throughout the development that are still green space but are not qualifying open space. Of the 3.78 acres proposed,2.36 acres is proposed to meet the overall minimum 10%requirement(2.36 acres equates to 10.9%). This qualified open space consists of a 10-foot multi-use pathway,common lots with open space areas, and required street buffers along adjacent roadways. This area exceeds the minimum UDC requirements. The remaining 1.42 acres of open space is proposed to meet the specific use standards for multi- family development. These areas of open space consist of the mews between unit blocks (including the long vista that connects the east side of the development with the west side of the site), some end cap landscaped areas along streets, and smaller areas of open space that meet the Page 15 Item 8. F153 minimum 20' x 20' dimensions. The open space proposed to meet the specific use standards exceeds the minimum UDC requirements. As noted above, the common open space provided with this development exceeds the minimum amounts required by code. In addition, the Applicant is proposing much more additional private open space than is required by code. Staff and the Applicant worked diligently together to design the open space in such a way to integrate the commercial uses with the residential as required in the MU-Cpolicies and goals. The Applicant responded to these conversations by providing a community garden area that can be shared by the commercial building and the nearby residents. Perhaps a future restaurant as one of the commercial tenants could utilize this garden area for fresh produce in their daily operations. In addition, the Applicant proposed additional commercial space that shares a plaza space with the clubhouse and residents. There are a plethora of potential uses for this including a farmer's market style use or pop-up shops where tenants can utilize the sidewalk space for further interaction with customers. This plaza area is directly linked with the long vista in the center of the development via micro pathways and stamped/colored concrete across the private streets. Staff appreciates the additional delineation of pedestrian and vehicular travel ways but wishes the Applicant would have proposed more stamped/colored concrete throughout the development to add more character to the development and its pedestrian circulation. However, Staff supports the connection of open space from one end of the site to the other and the fact that the vista and open space areas are anchored by an amenity on the east end and amenities and commercial space on the west end of the site. All in all, Stafffinds that the proposed common and private open space are sufficient for a project of this size and proposed use. M. Qualified Site Amenities (UDC 11-3G): Based on the area of the proposed short plat(21.59 acres),a minimum of one (1)qualified site amenity is required to be provided per the standards listed in UDC 11-3G-3C. The applicant proposes one(1) qualified amenity to satisfy the requirements in this section of the UDC, a 10-foot multi-use pathway along SH 20/26. All other site amenities (analyzed in an above section) are meant to satisfy the specific use standard amenity requirements. The proposed multi- use pathway meets the minimum UDC standards. As noted above, the Applicant is proposing a small dog park in the northwest corner of the subject site(it is not a qualifying site amenity).Multi family specific use standards do not allow this area to count as open space if it up against a collector roadway(Black Cat Road) unless separated from the street by a berm or barrier at least 4-feet in height with breaks in it to allow for pedestrian access.According to the submitted landscape plan, there appears to be no such berm or barrier along this corner other than a fence meant to delineate the actual dog park. Therefore, the proposed dog park area is not qualifying open space or a qualifying amenity for the multi family requirements. However, it is qualifying open space under the general minimum 10%requirement. N. Fencing(UDC 11-3A-61 11-3A-7): All fencing is required to comply with the standards listed in UDC 11-3A-7. Fencing is proposed as shown on the landscape plan and meets UDC standards as proposed. O. Building Elevations(UDC 11-3A-19 I Architectural Standards Manual): As discussed in the comprehensive plan policies analysis, Staff believes most of the submitted elevations meet the required Architectural Standards. The applicant has submitted a concurrent design review application and staff finds the submitted architecture of the residential portion of Page 16 Item 8. F154 the development complies with the ASM except for those elevations for the proposed townhome style units. Commercial elevations were not submitted with this application but future buildings should incorporate similar architectural features to ensure a cohesive design as envisioned by the Comprehensive Plan and ASM.A separate DES will be required for the Commercial portion of the development. The submitted elevations for the proposed townhome home units show only one field material, stucco. The ASM requires at least two field materials for multi family development for facades as long as those shown. Staff recommends the Applicant include more of the proposed lap siding along both the front and rear facades to meet the intent of the ASM goals. In addition, the ASM notes that no two multi family buildings should look the same. To ensure compliance with at least the intent of this requirement, the Applicant should create differentiation between some of the 6- plex, townhome buildings through differing architectural designs and color palettes. Staff is recommending conditions of approval to correct this. VI. DECISION A. Staff: Staff recommends approval of the requested conditional use permit, short plat,rezone, and development agreement modification applications per the Findings in Section IX of this staff report. The Director approved the private street and administrative design review applications. B. Commission: Enter Summary of Commission Decision. C. City Council: To be heard at future date. Page 17 Item 8. F155] VII. EXHIBITS A. Rezone Legal Descriptions and Exhibit Maps EXHIBIT DESCRIPTION FOR MODERN CRAFTSMAN SUBDIVISION R-15 ZONING DISTRICT A portion of Lots 1 and 2, Block 1 of Puma Subdivision as filed in Book 71 of Plats at Pages 7263 through 7264, records of Ada County, Idaho and a portion of the SW 114 of the SW 114 of Section 22,TAN.,R.1 W., B.M.,City of Meridian,Ada County, Idaho more particularly described as follows: Commencing at the SW corner of said Section 22 from which the S114 corner of said Section 22 bears South 89'1718"East, 2647.24 feet; thence along the South boundary line of said Section 22 South 89°17'18"East,287.86 feet to the REAL POINT OF BEGINNING; thence leaving said South boundary line North 00°40'53"East,356.80 feet; thence North 89'19'07"West, 150.19 feet; thence 3.70 feet along the arc of a non-tangent curve to the right,said curve having a radius of 100.00 feet, a central angle of 02'07'14"and a long chord which bears South 20°41'00"West, 3.70 feet; thence South 21°44'37"West,46.35 feet; thence North 68915'23"West,23.88 feet; thence 37.06 feet along the arc of curve to the left,said curve having a radius of 100.00 feet, a central angle of 21°13'54"and a long chord which bears North 78°52'20"West, 36.84 feet; thence North 89'29'17"West, 62.18 feet to a point on the West boundary line of said Section 22; thence along said West boundary line North 00°30'42"East, 573.44 feet; thence leaving said West boundary line and along the southerly boundary line of Tree Farm Subdivision No.2 as filed in Book 114 of Plats at Pages 16914 through 16921, records of Ada County, Idaho and the northwesterly extension thereof South 78°03'14" East, 104.00 feet to an angle point on the southerly boundary line of Lot 2, Block 7 of said Tree Farm Subdivision No. 2; thence along said southernly boundary line of said Tree Farm Subdivision No.2 the following 5 course and distances: thence 61.63 feet along the arc of a non-tangent curve to the left, said curve having a radius of 1,552.00 feet,a central angle of 02°16'31"and a long chord which bears North 10'48'30"East,61.63 feet; Page 1 of 2 Page 18 Item 8. 156 thence North 55°40'41"East, 10.27 feet; thence 151.39 feet along the arc of a non-tangent curve to the right, said curve having a radius of 700.00 feet, a central angle of 12°23'31"and a long chord which bears South 71*18'06"East, 151.10 feet; thence South 65°06'21"East,221.65 feet; thence 56.81 feet along the are of a non-tangent curve to the left, said curve having a radius of 850.00 feet,a central angle of 03°49'45"and a long chord which bears South 67°01'18"East, 56.80 feet to a corner common to Lot 2, Block 7 of said Tree Farm Subdivision No.2, and Lot 1, Block 7 of Tree Farm Subdivision No. 1 as filed in Book 113 of Plats at Pages 16498 through 16505, records of Ada County, Idaho; thence along the South boundary line of said Lot 1, Block 7 the following 4 courses and distances: thence 135.28 feet along the arc of curve to the left,said curve having a radius of 850.00 feet, a central angle of 09°07'08"and a long chord which bears South 73°29'44"East, 135.14 feet; thence South 78°03'14"East,263.21 feet; thence 183.86 feet along the arc of curve to the left, said curve having a radius of 841.73 feet, a central angle of 12°30'53"and a long chord which bears South 84'18,41"East, 183.49 feet; thence 237.50 feet along the arc of a non-tangent curve to the left,said curve having a radius of 841.73 feet, a central angle of 16°09'58"and a long chord which bears North 81°20'52" East,236,71 feet to the SE corner of said Lot 1, Block 7, point also being a point on the West boundary line of said Rockbury Subdivision; thence South 00°30'49"West,720.31 feet along said West boundary line and the southerly extension thereof to a point on the South boundary line of said Section 22; thence along said South boundary line North 89'17'18"West, 1,035.75 feet to the REAL POINT OF BEGINNING, Containing 21.37 acres, more or less. a 7729 � OF 19� h4Y G.G Page 2 of 2 Page 19 Item 8. Fl 57 —1 \ 7 N h N N 25 100 400 0 50 200 '00 r7 ml SCALE: 1" = 200' s BDWS ON 50'30'49"W 720.31' L L - - SG OD 7 729 X 6 N r��6j�IZA'� o .� O I T� .��Z- d G�74YG.C�� wc3 �1 �a a Nm Lo r,� Wl of �N a N 3j DO am O"f to too / Do N r of off Z \ �� z 0 rn N U I Q 1 � N LD Vi a: o N o i 1-1 S65'06'21"E O�J i p 221.65' /f > / m 5 N8919'07"W NO'40'53"E 356.80' Ld 150.19' 0 z C1 L1 1900 S78'03'14"E L4 1,004.00' L2 C3 cl /�0 0 42"E.573.44' SO'30'42"W N N LLL N. BLACK CAT RD. 325.00 N DO -MaEnn CwfLunor B men! i" M—ll 1—1 nr AM EXHIBIT — DRAWING FOR 19 NO. 9555 W EMERALD 8T. MODERN CRAFTSMAN SUBDIVISION sHEET NO. SURVEY ;2aee4'"57a�'°° R-15 ZONING DISTRICT 1of2 GROUPLLC LOCATED IN THE SW V. DF THE SW 4OF SECTION 22,T.4N..RAW., DWG.DATE > B.N.,CITY DK MERIDIAN.ADA COUNTY,IDAHO 8/58/2020 Page 20 Item 8. 158 8 op~y2°23'3y. 9°OT uq. R 850 s78°03'14„e 2 x 56 o=12°30'53" D 10°0°' m R=841.73 R 841.73 v O� p1 M °a,ten a 3 150.19 a n89 19'6T4r o r�i ra y o N W O m C SG�L 1035.76 n89°17'18"w CL 7729 12 gIle OF~OPT Y G.G4* Modern Craftsman Sub R-15 Zone Closure Sheet 6/20/2020 Scale: 1 inch=200 feet Fife: Tract 1:21.3674 Acres,Closure:n35.4345w 0.01 k.(11384942),Perimeter-4435 ft. 01 n00,4053e 356.8 14 Lt,r-850.00,delta=003.4945,chord=s67.011 Se 56.80 02 n89.1907w 15019 15 Lt,r=850.00,delta=009.0708,chord=s73.2944e 135.14 03 Rt,r-100,00,delta=002.0714,chard=s2D.4100w 3.70 16 s78.0314e 263.21 04 s21.4437w 46.35 17 Lt,r=841.73,delta=012.3053,chord=s84.1841e 183.49 05 n68.1523w 23.98 18 Lt,r=841.73,delta=016.0958,chord=n81.2052e 236.71 06 Lt,r=100.00,delta=021.1354,chord=n78.5220w 38.84 19 s00.3049w 720.31 07 n89.2917w 62.18 20 n89.1718w 1035 75 08 n00.3042e 573.44 09 08.0314e 104 10 Lt,r=1552.00,delta=002.1631,chord=n10.4830e,61.63 11 n55.4041 a 10.27 12 Rt,rn700.00,delta=012.2331,chard-571.1806e 151.10 13 565.0621 a 221.65 Page 21 Item 8. 159 EXHIBIT DESCRIPTION FOR MODERN CRAFTSMAN SUBDIVISION C-C(COMMERCIAL,)ZONING DISTRICT A portion of Lots 1 and 2, Block 1 of Puma Subdivision as filed in Book 71 of Plats at Pages 7263 through 7264, records of Ada County, Idaho and a portion of the SW 114 of the SW 114 of Section 22,TAN., R.1 W., B.M., City of Meridian,Ada County, Idaho more particularly described as follows: BEGINNING at the SW corner of said Section 22 from which the S114 corner of said Section 22 bears South 89'17'18"East,2647.24 feet; thence along the West boundary line of said Section 22 North 00°30'42"East, 325.00 feet; thence leaving said West boundary line South 89°29'17"East, 62.18 feet; thence 37.06 feet along the arc of curve to the right,said curve having a radius of 100,00 feet, a central angle of 21'13'54"and a long chord which bears South 78°52'20"East, 36,84 feet; thence South 68'15'23"East, 23.88 feet; thence North 21°44'37"East,46.35 feet; thence 3.70 feet along the arc of curve to the left,said curve having a radius of 100.00 feet, a central angle of 02'07'14"and a long chord which bears North 20°41'00" East, 3.70 feet; thence South 89'19'07"East, 150.19 feet; thence South 00°40'53"West, 356.80 feet to a point on the South boundary line of said Section 22; thence along said South boundary line North 89'17'18"West, 287.86 feet to the REAL POINT OF BEGINNING. Containing 2.26 acres, more or less. a. 7729 �ffff# G.C Page 22 Item 8. Fl 60 CURVE TABLE N r N N CURVE RADIUS LENGTH CHORD DIST. CHORD BRG. DELTA Cl 100.00 3.70 3.70 N20'41'00"E 2'07'14' C2 100.00 37.06 36.84 S78'52'20"E 2173'S4" N n \ 0 M N 0 } N z 50'40'53"W 356.8-7 — �, _ I N m V1 GO Q W f- In 1� 0)00 4 J Q� 00 m Imo(} I W V mI 0 N u rl oD[ Z U�N Ni U U�mc•' 31 C1 (V }} 00 7 N 21'44'37"E j� 46.35' �I S68'15'23"E CC Z' 23.88' M N m 1 LND'30'42"E 325_00' __ /N N O_ N. BLACK CAT RD. N O ,---) � 10 40 160 a 7729 9- 0 2D 80 320 {P�Z�PLC Prb OF\p SCALE: 1" = 80' �g4r G.ro, dui"c oa.. c. me io-oi: EXHIBIT _ DRAWING FORroe f9F'44 I DAHO — � q?MW Eb4Ea LD SY MODERN CRAFTSMAN SUBDIVISION SHEET NO, SURVEY Bp8 B4I"5 093704 C—C ZONING DISTRICT GROUP, L LC LOCATED IN THE SW 4 OF THE SW Y.OF SECTION 22,T.4N.,RAW., DWG'DATE B.M.,Ck7Y OF MERIDIAN,ADA COUNTY.IOAM0 5/18/2020 Page 23 Item 8. 161 s89°19'07"e 150.19 �v n s89°29'17"e 2.18 ry a c 3 in m� m � Rm N o R M 0 \O �-LA 267.86 O n89°1716"w a. 7729 OF Y G'c��Q Modern Craftsman Sub C-C Zone Closure Sheet 6/20/2020 Scale: 1 inch=60 feet File: Tract 1:2.2572 Acres(98324 Sq.Feet),Closure:s74.0239e 0.01 ft.(1l110992),Perimeter=1293 ft. 01 n00.3042e 325 08 s00.4053w 356.E 02 s89.2917e 62.18 09 r189.1718w 287.36 03 Rt,r--100.00,delta=021.1354,chord=s78.5220e 36.84 04 s68.1523e 23.88 05 n21 A437e 46.35 06 Lt,r=100 00,delta=002.0714,chord=n20,4100e 3.70 07 s89.1907e 150.19 Page 24 Item 8. ■ B. Short Plat(dated: June 2020) Ci p'e 8. am y ~ W Ww a� 6v1 Wz y ui0o =E. i 6s �s1r"' ��g� LnF- f, c°pMa B° ��__°E x `e w 6 € s''.+o c' a gym° 1 c�_s w ° ° cs n ZTow� z Tr �waoa 6Ss o msm o n S s- V) w Z Q N O Q Z n n i LA ���'�Q £!➢Ol'ad 4L4'NB i d 3 w o- enswuxre.wre�nox - -w oW Z IA.94.00OOdS---- h9r85 Al.®4.OLU�S � m Q O i o j� 0 '6 Il 1 M1 _ 8 Y S S 8 AV �ry/ I4I d °ec "a "e � "e "ac ZE —_-- ao•¢sa�.u,xabN -- +pia c� ^;' �s - - � omxxj � � „ x � Page 25 Item 8. Fl 63 � ore o = ova R k'-71 fL99l Jd bll'NB ¢ tlim NOISNI0ans Atiremoa a •I M,MAE, :� Y9Yg7 M.BYA[Ap5 � 1 7 1•, �IA� . ti— g g a I I "bfw .zl i I � 3YS tll I I. W I s n �. �_ _� I n��e wii♦ � 3 ri3 4y,,21, B�Sxi�g - ' Z9'GFL M 4E,oJ.i11 i � y z m aU'ESL 3.16.pGODN JdX 3NtJ� e RS n?IIrldNn 8 . �eulbd Page 26 Item 8. F164] C. Open Space Exhibit(date: 1/23/2020) - I — I , I- ,I I 1 I i 1 � I I • • h I " vW. i I, � U. 7 a I � e • - Ij j' !7l x �. J . 1 . I • Il I n� 71I., �z I , tj o� 20 I ' I I I m GM.uN � rim my O z - CONCEPTUAL OPEN SPACE EXHIBIT $ a Iley Engineering,Inc. off_- DETACHED BARON BLACK CAT SUBDIVISION - �,, Cm�Exxixmrinu�Pwuninn�CAUG BARON PROPERTIES LLC Page 27 Item 8. 165 D. Landscape Plans(date: 6/18/2020) z � g 3 D La Z - S i s - < c R O, r �I Il ;a � a I r , T n z - n IF mhmk - D - vi tt i r � - �. _ n . I n i -- m • ♦ i ---� s I =� g I II III rA m 11 r , II n ® I _ I m zl Page 28 Item 8. Fl 66 / f � C J' l 1 v P 1 y 17, rw A d r a i -r II f t 7 M t MODERN CRAFTSMAN u r = 3 AT BLACK CAT i la aE �► = =a BARON DEVELOPMENT CONCEPT LANDSCAPE PLAN k =� Page 29 Item 8. Fl 67 --- _ - —y N.oLaac car ro- h � 7 II � � I I. eFLL —— - MAT CHLINELS y . m $yam m gv 6 a MODERN CRAFTSMAN r = 3 AT BLACK CAT FI'4! & r z 9 BARON DEVELOPMENT �� ^�'€ "' =N CONCEPT LANDSCAPE PLAN Page 30 Item 8. Fl 68 MATCHLINE L2 ,/ JWA a HL� I; r a I I r 15 _ j I I. rF I + K I r T a � II' I I -=teefl x rn 11 a P MODERN CRAFTSMAN k- AT BLACK CAT S = s for a BARON DEVELOPMENT °y m CONCEPT LANDSCAPE PLAN Page 31 Item 8. ■ a $ e Do k c R aow � 71 0M UP ` m � � Av o$ III III � � c i II1 _ IPH z qW NN S m < z �� am L! ►lI � S Cl i ss �" am F�= a s Mq wow a o _ MODERN CRAFTSMAN ! ]�s g a r �0 3 AT BLACK CAT a� a, y`"ae°7i e 'o;'ve P wa BARON DEVELOPMENT m N CONCEPT LANDSCAPE PLAN E44 Page 32 Item 8. Fl 70 t 4 rl III- I I: �r O 1 r a In r' � I Ih � r - T L 1 1 �L ti 13, o a � ➢ s� m m * m pgqj L I T� MODERN CRAFTSMAN r 3 AT BLACK CAT ass '3iiiiir r,,.r X BARON DEVELOPMENT CONCEPT LANDSCAPE PLAN e� iSirm h Page 33 Item 8. Fl 71 coo n 1�® !Iti I D u m r I r D I - z n I 0 J [!1 s m n x I � III 10ru 1 1 s ug Z Page 34 Item 8. ■ E. Parking Plan(date: 5/1/2020) AL k ,n I L r m � I " _ I 7 i I m =� 0 1= c i t i I r m � L •Tl t7 � � �'O ➢� N N O ND ➢ � fll z Ik _ - I -JI :.E �'---I�I G - I I II i Y J p , 77 II mo - I I Tij I I r _ JL f - - -- I MODERN CRAFTSMAN AT BLACK CAT o �m .Eo F li I�§' �:: ARCHITECTURAL SITE PLAN 5;�p o ; a` BLACK CAT d CHINDEN ROADS - -� MERMAN.IDAHOZIP Page 35 Item 8- 173 F. Pedestrian Circulation Plan :k I N L LiTj r F I I 1 I Y I i d — a `l 1 y 'A I O i - 1 'n I x L 3 y _ o ty Y z CONCEPTUAL CIRCULATION MAP -1,° "� �'_'£ Iley En�meenng,Inc.'_d •e DETACHED BARON BLACK CAT SUBDIv610N BARON PROPERTIES LL— -1-1 Page 36 Item 8. 174 G. Conceptual Building Elevations MOEEPIN CRAFTSMAN AT BLACK CAT ELI I SOUTHWEST ELEVATION Clubhouse Elevation CLUBHOUSE SOUTHEAST ELEVATION MODPN CRAFTSMAN AT BLACK CAT LINE E-Im A' SINGLE SLOPE ROOF FRONTABW HIP ROOF FRONT VIEW W17 Ei.-... AlitI E EEL SINGLE SLOPE ROOF BACK NEW ❑� L L - I' I � ICED-7BATHDUPLEX FLOOR PLAN vw.�..�.W���.» HIP ROOF-BACK VIEW Page 37 Item 8. Fl 75 MODERN CRAFTSMAN AT BLACK CAT Z-1 IA SINGLE SLOPE ROOF.FRONT VIEW HIP ROOF.FRONT NEW EllWL'. � SINGLE SLOPE ROOF-BACK VIEW ME - � -- — — 2BED-2EATH-A FLOo R PLAN HIP ROOF.BACK VIEW MODERN CRAFTSMAN AT BLACK CAT C'JL'JRPxETIEm LINE SINGLE SLOPE ROOF FRONTVIEW HIP ROOF FRONTVIEW �. m r ..I a�IV---; �W� ' CJLJRPDLETIE�Nf SINGLE SLOPE ROOF EACH VIEW '❑�■.�:'. 2 BEO.2 BATH-0 FLOOR PLAN HIPROOF SAONVIEW Page 38 Item 8. Fl 76 MODERN CRAFTSMAN AT BLACK CAT �OLOP PDLERE p2 SINGLE SLOPE ROOF FRONT VIEW HIP ROI FRONT VIEW nts SINGLE SLOPE ROOF-BACK VIEW 11PI _-_-_- 2BE0-2BATH-GARAGE FLOOR PLAN HIP ROOF-BACK VIEW - MODERN CRAFTSMAN AT BLACK CAT . � _ — Elm —. SINGLE SLOPE ROOF-FRONTVIEW ; HIP ROOF FRONT VIEW IF[ N:..�.e.,.E. ME rTr1 ' .s SINGLE SLOPE ROOF-BACK VIEW i - - C �• 3 BED BATH FLOOR PLAN HIPROOF-BACKVIEW Page 39 I I' � III • 1(; IIIIIIII —■ a�y � YII El AT BLACK CAT 77, ENMY FEATURE CRAFTSMAN CRAFTSMANMODEPN AT SI-ACK CAT 771 FLOOR PLAN Page 40 Item 8. Fl 78 MODERN CRAFTSMAN AT BLACK CAT rt FRONT VIEW Ell i FL J�I � _ it - l - L T 6 — 'TII - i —T —I �l iT ����I TOWNHOUSES.cFLEX FLOOR PLAN LEVEL MODERN CRAFTSMAN AT BLACK CAT Elm eACK VIEW T�3 1 iL F1 J ) .. ; LI 11 I I � TOwNH WSEE-fi PLEX \ FLOOR PLAN-LEVEL 2 ,. Page 41 Item 8. F179] VIII. CITY/AGENCY COMMENTS & CONDITIONS A. PLANNING DIVISION 1. The subject property shall no longer be subject to the terms of the existing Development Agreements(DA) (Inst. Ws: 106151218; 107025555; 107141993; 110059432; and 2014- 065517)upon the property owner(s)entering into a new agreement. The new DA shall be signed by the property owner(s) and returned to the Planning Division within six(6)months of the City Council granting subject modification. The new DA shall incorporate the following provisions: a. Future development of this site shall be generally consistent with the submitted plat, site plan, landscape plan, open space exhibit, and conceptual building elevations for included in Section VII and the provisions contained herein. b. The 10-foot multi-use pathway along Chinden Boulevard shall be constructed with Phase 1 of the development. c. Direct lot access to W. Chinden Boulevard(SH 20/26) shall be prohibited. d. The existing accesses onto Chinden Boulevard and N. Black Cat Road shall be closed upon development of the subject site. e. Additional right-of-way shall be reserved for dedication to Idaho Transportation District for the future widening of Chinden Boulevard, as shown on the plat as Lot 1,Block 1. f. The only approved access to N. Black Cat Road is the northernmost access shown on the proposed CUP Plan as W. Waverton Lane,unless City Council approves the second access in accord with UDC 11-3A-3. g. The required landscape street buffers shall be constructed and vegetated along the entire perimeter(along N. Black Cat and Chinden Boulevard)with the first phase of development. 2. The short plat included in Section VII.B, dated June 2020, shall be revised as follows prior to the City Council hearing: a. Revise the plat to include the entire required landscape buffer along N. Black Cat Road in a common lot(s)per UDC 11-313-7C.2. b. Add common lot or perpetual ingress/egress easement for the private streets in accord with UDC 11-3F-3B.3. c. Stamped and signed by the licensed land surveyor. 3. The landscape plan included in Section VII.D, dated 06/18/2020, shall be revised as follows prior to submittal of the Certificate of Zoning Compliance application: a. The Landscape Calculations/Requirements table shall include the following: 1)the total linear feet of pathways and the required number of trees per UDC I 1-313-12);the total square footage of common open space and required number of trees per UDC 11-3G-3E. b. Revise the landscape plans to show the required modulation in the required noise attenuation wall along W. Chinden Blvd. in accord with UDC 11-31-1-41). c. Revise the landscape plans and add trees, shrubs, and other vegetative ground cover to the areas of the landscape buffers between the future commercial buildings and Chinden Blvd. and Black Cat Road in accord with UDC 11-313-7C Page 42 Item 8. F180] d. Revise the landscape plans to add a 5-foot wide landscape buffer along the northern boundary of the commercial parking area to eliminate conflict of cars backing out into the path of traffic on the private street. The buffer shall be landscaped in accord with UDC 11-3B-8C. e. Revise the landscape plans to show trash receptacles and bags for waste disposal throughout the proposed dog park area. 4. The residential elevations included in Section VII.G,dated February 2020, shall be revised as follows at least 10 days prior to the City Council hearing: a. Add additional area of a secondary field material for the proposed townhome units to help break up the large amount of stucco as a field material. b. Create at least two(2)more design palettes for the proposed townhome units to include at the least different color palettes and field material combinations. c. Continue the stone material along the bottom of all building facades of the proposed clubhouse. 5. The Open Space Exhibit calculations table shall be corrected to reflect the correct amount of common open space required per the specific use standards in UDC 11-4-3-27. 6. Future development shall be consistent with the minimum dimensional standards listed in UDC Table 11-2A-6,UDC Table 11-2B-3, and those listed in the specific use standards for multi-family development,UDC 11-4-3-27. 7. Off-street parking is required to be provided in accord with the standards listed in UDC Table 11-3C-6 for multi-family dwellings based on the number of bedrooms per unit. 8. With the CZC submittal,the Applicant shall correct the applicable plans to show additional colored or stamped concrete (or similar)of the main pedestrian sidewalk that traverses through the center of development to further delineate the pedestrian pathways. 9. The Applicant shall work with the City Arborist on an appropriate alternative to their proposed"Ash"tree selection and obtain approval from the City Arborist prior to Final Plat approval. 10. The Applicant shall comply with all ACHD conditions of approval. 11. The Applicant shall obtain Administrative Design Review approval for the future commercial buildings with the submittal of the Certificate of Zoning Compliance for the entire site. The architecture of the commercial buildings shall complement that of the residential portion of the project. 12. The Applicant shall obtain Certificate of Zoning Compliance approval for the entire subject site prior to applying for any building permit. 13. Comply with the outdoor service and equipment area standards as set forth in UDC 11-3A- 12. 14. Provide a pressurized irrigation system consistent with the standards as set forth in UDC 11- 3A-15,UDC 11-3B-6 and MCC 9-1-28. 15. Upon completion of the landscape installation, a written Certificate of Completion shall be submitted to the Planning Division verifying all landscape improvements are in substantial compliance with the approved landscape plan as set forth in UDC 11-3B-14. Page 43 Item 8. 181 17. The applicant and/or assigns shall comply with the private street standards as set forth in UDC 11-3F-3 and 11-3F-4. 18. The conditional use approval shall become null and void unless otherwise approved by the City if the applicant fails to 1)commence the use, satisfy the requirements,acquire building permits and commence construction within two years as set forth in UDC 11-5B-6F.1; or 2) obtain approval of a time extension as set forth in UDC 11-5B-6F.4. 19. Prior to issuance of Certificate of Occupancy on any building,the applicant shall submit a public access easement for the multi-use pathway(s) along Chinden Boulevard to the Planning Division for approval by City Council and subsequent recordation. 20. Business hours of operation within the C-C zoning district shall be limited from 6 am to 11 pm as set forth in UDC 11-2B-3A.4. B. PUBLIC WORKS 1. Site Specific Conditions of Approval 1.1 Design and number of units clustered together is of particular concern—staff is unclear as to how all units will be serviced.A utility layout depicting how all of the units will be serviced while still meeting design requirements shall be required. 1.2 Sanitary sewer mainlines are not allowed within common drives, only sewer services (reminder that a maximum of three services are allowed into a manhole,with a minimum 30- degrees of angle separation). 1.3 A street light plan will need to be included in the final plat application. Street light plan requirements are listed in section 6-7 of the City's Design Standards. A fixture installation agreement is required for the streetlights on Chinden Blvd. Contact the Meridian Transportation and Utility Coordinator for additional information. 1.4 Water service to this site is being proposed via extension of water mains under the jurisdiction of SUEZ North America. 1.5 Though the City of Meridian will not own or maintain the water system in this development, final fire hydrant location shall be coordinated with and receive approval from the Meridian Public Works Department and Meridian Fire Department prior to construction plan approval. 1.6 Structures of 3600 square feet and larger including the garage, shall comply with the fire flow, and hydrant requirements of appendix b and c of the 2015 International Fire Code. 1.7 Prior to construction plan approval,the applicant shall submit documentation from SUEZ North America indicating that they have approved the water plans. 1.8 Prior to scheduling of a pre-construction meeting,the applicant shall submit documentation from SUEZ North America that all of their requirements have been met to be able to go to construction. 2. General Conditions of Approval 2.1 Applicant shall coordinate water and sewer main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service outside of a public right-of-way. Minimum cover over sewer mains is three feet,if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. Page 44 Item 8. ■ 2.2 Per Meridian City Code(MCC),the applicant shall be responsible to install sewer and water mains to and through this development. Applicant may be eligible for a reimbursement agreement for infrastructure enhancement per MCC 8-6-5. 2.3 The applicant shall provide easement(s)for all public water/sewer mains outside of public right of way(include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall not be dedicated via the plat,but rather dedicated outside the plat process using the City of Meridian's standard forms. The easement shall be graphically depicted on the plat for reference purposes. Submit an executed easement(on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor,which must include the area of the easement(marked EXHIBIT A)and an 81/2"x I I"map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. Add a note to the plat referencing this document. All easements must be submitted,reviewed, and approved prior to development plan approval. 2.4 The City of Meridian requires that pressurized irrigation systems be supplied by a year- round source of water(MCC 12-13-8.3). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not available,a single-point connection to the culinary water system shall be required. If a single-point connection is utilized,the developer will be responsible for the payment of assessments for the common areas prior to prior to receiving development plan approval. 2.5 All existing structures that are required to be removed shall be prior to signature on the final plat by the City Engineer. Any structures that are allowed to remain shall be subject to evaluation and possible reassignment of street addressing to be in compliance with MCC. 2.6 All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting, crossing or laying adjacent and contiguous to the area being subdivided shall be addressed per UDC 11-3A-6. In performing such work,the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. 2.7 Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Engineering Department at(208)898-5500 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources Contact Robert B.Whitney at(208)334-2190. 2.8 Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact Central District Health for abandonment procedures and inspections(208)375-5211. 2.9 Street signs are to be in place, sanitary sewer and water system shall be approved and activated,road base approved by the Ada County Highway District and the Final Plat for this subdivision shall be recorded,prior to applying for building permits. 2.10 A letter of credit or cash surety in the amount of 110%will be required for all uncompleted fencing,landscaping,amenities,etc.,prior to signature on the final plat. 2.11 All improvements related to public life, safety and health shall be completed prior to occupancy of the structures. Where approved by the City Engineer, an owner may post a performance surety for such improvements in order to obtain City Engineer signature on the final plat as set forth in UDC 11-5C-3B. Page 45 Item 8. F183] 2.12 Applicant shall be required to pay Public Works development plan review,and construction inspection fees, as determined during the plan review process,prior to the issuance of a plan approval letter. 2.13 It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 2.14 Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 2.15 Developer shall coordinate mailbox locations with the Meridian Post Office. 2.16 All grading of the site shall be performed in conformance with MCC 11-12-3H. 2.17 Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill,where footing would sit atop fill material. 2.18 The design engineer shall be required to certify that the street centerline elevations are set a minimum of 3-feet above the highest established peak groundwater elevation. This is to ensure that the bottom elevation of the crawl spaces of homes is at least 1-foot above. 2.19 The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 2.20 At the completion of the project,the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 2.21 A street light plan will need to be included in the civil construction plans. Street light plan requirements are listed in section 6-5 of the Improvement Standards for Street Lighting. A copy of the standards can be found at http://www.meridiancity.org/public_works.aspx?id=272. 2.22 The City of Meridian requires that the owner post to the City a performance surety in the amount of 125%of the total construction cost for all incomplete sewer,water and reuse infrastructure prior to final plat signature. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 2.23 The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20%of the total construction cost for all completed sewer,water and reuse infrastructure for duration of two years. This surety will be verified by a line item cost estimate provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety,which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. C. FIRE DEPARTMENT https:llweblink.meridiancity.orglWebLinkIDocView.aspx?id=184359&dbid=0&repo=MeridianC Lty Page 46 Item 8. F184] D. POLICE DEPARTMENT https://weblink.meridiancity.org/WebLink/DocView.aspx?id=184598&dbid=0&r0o=MeridianC iv E. PARK'S DEPARTMENT https:llweblink.meridiancily.org/WebLink/DocView.aspx?id=185184&dbid=0&repo=MeridianC iv F. COMMUNITY PLANNING ASSOCIATION OF SOUTHWEST IDAHO(COMPASS) https:llweblink.meridiancily.org/WebLink/DocView.aspx?id=184930&dbid=0&r0o=MeridianC iv G. BOISE PROJECT BOARD OF CONTROL https:llweblink.meridiancily.org/WebLink/Doc View.aspx?id=184482&dbid=0&r0o=MeridianC iv H. NAMPA&MERIDIAN IRRIGATION DISTRICT https:llweblink.meridiancily.org/WebLink/DocView.aspx?id=184914&dbid=0&r0o=MeridianC iv I. CENTRAL DISTRICT HEALTH DEPARTMENT https:llweblink.meridiancily.org/WebLink/DocView.aspx?id=184498&dbid=0&r0o=MeridianC J. DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ) https:llweblink.meridiancily.org/WebLink/Doc View.aspx?id=184482&dbid=0&r0o=MeridianC hty K. ADA COUNTY HIGHWAY DISTRICT(ACHD) https:llweblink.meridianciU.org/WebLink/DocView.aspx?id=190915&dbid=0&r0o=MeridianC hty IX. FINDINGS A. Annexation and/or Rezone(UDC 11-5B-3E) Required Findings: Upon recommendation from the commission,the council shall make a full investigation and shall,at the public hearing,review the application.In order to grant an annexation and/or rezone,the council shall make the following findings: 1. The map amendment complies with the applicable provisions of the comprehensive plan; Staff finds the proposed zoning map amendment to adjust the areas of the existing R-15 and C-C zoning districts and subsequent development is consistent with the Comprehensive Plan, if all conditions of approval are complied with. 2. The map amendment complies with the regulations outlined for the proposed districts, specifically the purpose statement; Page 47 Item 8. 185 Staff finds the proposed zoning map amendment and request for the development of multi- family residential will contribute to the range of housing opportunities available within the City. Staff finds the proposed addition of commercial within the development is generally consistent with the purpose statement of the commercial district and future land use designation of Mixed Use Community. 3. The map amendment shall not be materially detrimental to the public health,safety, and welfare; Staff finds the proposed zoning map amendment should not be detrimental to the public health, safety and welfare. 4. The map amendment shall not result in an adverse impact upon the delivery of services by any political subdivision providing public services within the city including,but not limited to, school districts; and Staff finds the proposed zoning map amendment will not result in an adverse impact on the delivery of services by any political subdivision providing public services within the City. 5. The annexation(as applicable)is in the best interest of city. The subject property is already annexed; therefore Staff finds that this finding is not applicable. B. Short Plat Findings: In consideration of a preliminary plat,combined preliminary and final plat,or short plat, the decision-making body shall make the following findings: 1. The plat is in conformance with the Comprehensive Plan; Staff finds that the proposed plat, with Staff's recommendations, is in substantial compliance with the adopted Comprehensive Plan in regard to land use, density, transportation, and pedestrian connectivity. (Please see Comprehensive Plan Policies in, Section V of this report for more information) 2. Public services are available or can be made available and are adequate to accommodate the proposed development; Staff finds that public services will be provided to the subject property with development. (See Section VIII of the Staff Report for more details from public service providers) 3. The plat is in conformance with scheduled public improvements in accord with the City's capital improvement program; Because City water and sewer and any other utilities will be provided by the development at their own cost, Staff finds that the subdivision will not require the expenditure of capital improvement funds. 4. There is public financial capability of supporting services for the proposed development; Staff finds there is public financial capability of supporting services for the proposed development based upon comments from the public service providers(i.e.,Police,Fire,ACHD, etc). (See Section VII for more information) 5. The development will not be detrimental to the public health, safety or general welfare; and, Page 48 Item 8. F187] 6. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. All public facilities and services are readily available for the subject site so Staff finds that the proposed use will not be detrimental to the economic welfare of the community or create excessive additional costs for public facilities and services. 7. That the proposed use will not involve activities or processes,materials,equipment and conditions of operation that will be detrimental to any persons,property or the general welfare by reason of excessive production of traffic,noise,smoke,fumes, glare or odors. Although traffic will likely increase in the vicinity with the proposed use, all major roadways adjacent to the site are planned for improvements in the near future. Therefore, Staff finds the proposed use will not be detrimental to any persons,property, or the general welfare. 8. That the proposed use will not result in the destruction,loss or damage of a natural, scenic or historic feature considered to be of major importance. (Ord. 05-1170,8-30- 2005,eff. 9-15-2005) Staff is not aware of any such features; the proposed use should not result in damage of any such features. D. Private Street Findings: In order to approve the application,the director shall find the following: 1. The design of the private street meets the requirements of this article; The Director finds that the proposed private street design meets the requirements. 2. Granting approval of the private street would not cause damage,hazard,or nuisance,or other detriment to persons,property,or uses in the vicinity; and The Director finds that the proposed private streets would not cause damage, hazard, or nuisance, or other detriment to persons,property, or uses in the vicinity if all conditions of approval are met. 3. The use and location of the private street shall not conflict with the comprehensive plan and/or the regional transportation plan.(Ord. 05-1170,8-30-2005,eff. 9-15-2005) The Director finds the use and location of the private streets do not conflict with the comprehensive plan or the regional transportation plan because the proposed design meets all requirements. 4. The proposed residential development(if applicable)is a mew or gated development. (Ord. 10-1463, 11-3-2010,eff. 11-8-2010) NA Page 50 Item 8. F186] Staff is not aware of any health, safety, or environmental problems associated with the platting of this property. ACHD considers road safety issues in their analysis but has not provided comments at this time. 6. The development preserves significant natural,scenic or historic features. Staff is unaware of any significant natural, scenic or historic features that exist on this site that require preserving. C. Conditional Use Permit Findings: The commission shall base its determination on the conditional use permit request upon the following: 1. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. Staff finds that the submitted conditional use plat appears to meet all dimensional and development regulations in the R-15 zoning district in which it resides. 2. That the proposed use will be harmonious with the Meridian comprehensive plan and in accord with the requirements of this title. Staff finds the proposed use of multi family residential and commercial are harmonious with the comprehensive plan designation of Mixed-Use Community and the requirements of this title. 3. That the design,construction,operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. Despite the proposed use being different than the residential uses closest to the subject site, Staff finds the design, construction, and proposed operation and maintenance will be compatible with other uses in the general neighborhood and should not adversely change the essential character of the same area. 4. That the proposed use,if it complies with all conditions of the approval imposed,will not adversely affect other property in the vicinity. Staff finds the proposed use, if it complies with all conditions of approval imposed, will not adversely affect other property in the vicinity. 5. That the proposed use will be served adequately by essential public facilities and services such as highways,streets,schools,parks,police and fire protection,drainage structures,refuse disposal,water,and sewer. Staff finds the proposed use will be served adequately by essential public facilities and services as all services are readily available and nearby streets are currently being widened to accommodate additional traffic flow. Page 49 Applicant's Presentation Modern Craftsman at Black CatCommercial Integration VALUECASE STUDIESRENOVATION ADD - CLUBHOUSE INTERIOR VERTICALLYRESIDENTIAL AND COMMERCIALINTEGRATED - COMMERCIAL BUILDING WITH POPUP UNITS- COMMERCIAL CORNER STORY CONCEPT-TWO– COMMERCIAL CORNER STORY CONCEPT-SINGLE–