Loading...
CC - Engineer Statement ailey Engineering,Inc. CIVIL ENGINEERINGIPLANNINGICADD July 28, 2020 Meridian Public Works Department 33 E Broadway Street Meridian, Idaho 83642 RE: Baraya Subdivision No. 6 To Whom it May Concern: This letter is to provide certification for Baraya Subdivision No. 6 that all street finished centerline elevations are set a minimum of three (3) feet above the highest established groundwater elevations. This information is based on MTI geotechnical report dated September 29, 2005 as well as a groundwater update report by dated December 4, 2018. Sincerely, �S\pN A L FNG <-/G\sTER�o�G� 07/2si2020 N1��.�8 2 Kevin Craig, P.E. 9T Project Engineer �F�N SFC�P�c� cc: BEI Project No. C2013-026 1119 E. State Street, Suite 210 ♦ Eagle, Idaho 83616 ♦ Tel.: 208-938-0013 www.baileyengineers.com