CC - Engineer Statement ailey Engineering,Inc.
CIVIL ENGINEERINGIPLANNINGICADD
July 28, 2020
Meridian Public Works Department
33 E Broadway Street
Meridian, Idaho 83642
RE: Baraya Subdivision No. 5
To Whom it May Concern:
This letter is to provide certification for Baraya Subdivision No. 5 that all street finished centerline
elevations are set a minimum of three (3) feet above the highest established groundwater
elevations. This information is based on MTI geotechnical report dated September 29, 2005 as
well as a groundwater update report by dated December 4, 2018.
Sincerely,
�S\pNAL FNG
�G\STF QUO�j<\
Q 07/28/2020
N�1 882
'Gr� O
Kevin Craig, P.E. Ir 9TF O F \pP
Project Engineer /N S. CRP\
cc: BEI Project No. C2013-026
1119 E. State Street, Suite 210 ♦ Eagle, Idaho 83616 ♦ Tel.: 208-938-0013
www.baileyengineers.com