Loading...
2020-08-12 COMPASS Communities in Motion 2040 2. 0 Development Review The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2040 2.0 (CIM 2040), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2040 2.0 goals. Development Name: Skybreak Agency: Meridian CIM Vision Category: Future Neighborhoods New households: 353 New jobs: 0 Exceeds CIM forecast: Yes CIM Corridor: Eagle Road Level of Stress considers facility type, number of vehicle �� Pedestrian level of stress: R lanes, and speed. Roads with G or PG ratings better Bicycle level of stress: R support bicyclists and pedestrians of all ages and comfort levels. '• Housing within 1 mile: 710 A good jobs/housing balance - a ratio between 1 and Jobs within 1 mile: 140 1.5 - reduces traffic congestion. Higher numbers Jobs/Housing Ratio: 0.2 indicate the need for more housing and lower numbers indicate an employment need. Nearest police station: >4 miles Developments within 1.5 miles of police and fire i� Nearest fire station: 2.9 miles stations ensure that emergency services are more efficient and reduce the cost of these important public services. Farmland consumed: Yes ,Farmland contributes to the local economy, creates Farmland within 1 mile: 1,231 acres additional jobs, and provides food security to the region. •� Development in farm areas decreases the productivity �and sustainability of farmland. r- Nearest bus stop: 3.7 miles Residents who live or work less than 1/2 mile from Nearest public school: 1.5 miles critical services have more transportation choices. Nearest public park: 1.1 miles Walking and biking reduces congestion by taking cars off P011Nearest grocery store: >4 miles the road, while supporting a healthy and active lifestyle. Recommendations This proposal exceeds growth forecasted for this area. Transportation infrastructure may not be able to support the new transportation demands. The proposal is on the fringe of urban development in an area removed from employment centers and existing public transportation. The closest transit services are located more than two miles away. ValleyConnect 2.0 proposes bus service along Lake Hazel Road from south Meridian to downtown Eagle with 30-minute frequencies in the peak hours. The closest bus stop would be less than 1/2 mile in distance when that route is operational. Both Eagle Road and Lake Hazel Road are programmed for improvements in the COMPASS Transportation Improvement Program. Eagle Road will be widened, from Lake Hazel Road to Amity Road, to five lanes with sidewalks and a level three bike facility (Key #RD216-04). Construction is scheduled for 2021. Lake Hazel Road will be widened, from Eagle Road to Cloverdale Road, to five lanes with multi-use pathways (Key #RD209-18). Construction is scheduled for 2024. More information about COMPASS and Communities in Motion 2040 2.0: Web: www.compassidaho.org Email info@compassidaho.orq More information about the development review process: http://www.compassidaho.org/dashboard/devreview.htm Eagle Road, Amity Road to Victory Road, Meridian Regionally Significant: 0 0 Inflated COMPASS PM: Federal PM: Key# : RD207-33 Congestion Reduction/System Reliability . Vlctory Rd Requesting Agency: ACHD Transportation Safety Housing CU Project Year: 2021 Community Infrastructure Total Previous Expenditures: $541 Total Programmed Cost: $5,114 �, Total Cost(Prev.+ Prog.): $5,655 r4_2.0 --' I Project Description : Widen Eagle Road from Amity Road to Victory Road in the City of Meridian to five lanes with curb-gutter, sidewalk, and level three bike lanes. Project includes enhanced pedestrian crossing facility at Rome Drive and a roundabout at Eagle Road and Zaldia Drive. Funding Source Local (Regionally Significant) Program Hwy-Local Partnerships Local Match 100.00% Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2021 0 0 0 4 0 5,110 I 5,114 I 0 5,114 Fund $0 $0 $0 $4 $0 $5,110 $5,114 $0 $5,114 Totals: Eagle • . • Lake Hazel Road to Amity Road, Meridian �' 1 Regionally Significant: 0 El Inflated COMPASS PM: Federal PM: k", Key# : RD216-04 Congestion Reduction/System Reliability �t Requesting Agency: ACHD Transportation Safety Project Year: 2021 Housing Total Previous Expenditures: $16 Community Infrastructure oLak Total Programmed Cost: $5,539 2 Total Cost(Prev.+ Prog.): $5,555 0 J Project Description : Widen Eagle Road from Lake Hazel Road to Amity Road in the City of Meridian to five lanes with curb, gutter, sidewalk and a level three bike facility. Project includes a roundabout at Taconic Drive. Funding Source Local (Regionally Significant) Program Hwy-Local Partnerships Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2020 0 0 525 0 0 0 I 525 0 525 2021 0 0 0 4 0 5,010 I 5,014 0 5,014 Fund $0 $0 $525 $4 $0 $5,010 $5,539 $0 $5,539 Totals: *PD=Preliminary Development(projects with development activity Sorted by Project Name Page 15 of 93 but no programmed year of construction) All Values in Thousands of Dollars Monday,July 27,2020 86 10:31 AM Lake Hazel Road, Cloverdale Road toFive MileRoad, • . County �yrT o f Regionally Significant: 0 ❑ Inflated COMPASS PM: Federal PM: T �; Key# : RD207-29 Congestion Reduction/System Reliability - Requesting Agency: ACHD Transportation Safety O La Project Year: PD Housing Total Previous Expenditures: $0 Community Infrastructure _ Total Programmed Cost: $7,269 p Total Cost(Prev.+ Prog.): $7,269 Y�'' 77 Project Description : Widen Lake Hazel Road from Cloverdale Road to Five Mile Road in Ada J p County to five lanes with curb, gutter, and multi-use pathways. Funding Soural (Regionally Sigmnft`Progr nerships al Match 100.00° Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2022 0 896 5 0 0 0 I 901 I 0 901 2023 0 0 438 0 0 0 I 438 I 0 438 2024 0 0 322 0 0 0 I 322 0 322 PD 0 0 0 194 299 5,115 5,608 0 5,608 Fund $0 $896 $765 $194 $299 $5,115 $7,269 $0 $7,269 Totals: Lake Hazel Road, Eagle Road to Cloverdale Road, Ada County Regionally Significant: 0 Inflated COMPASS PM: Federal PM: A Key# : RD209-18 Congestion Reduction/System Reliability Requesting Agency: ACHD Transportation Safety Project Year: 2024 Housing Total Previous Expenditures: $0 Community Infrastructure uAWR Hazel Total Programmed Cost: $8,551 Total Cost(Prev.+ Prog.): $8,551 Project Description : Widen Lake Hazel Road from Eagle Road to Cloverdale Road in Ada County to five lanes with curb, gutter, and multi-use pathways. Funding Source Local (Regionally Significant) Progra ocal Match 7.34% Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2022 0 740 4 0 0 0 744 689 55 2023 0 0 201 0 0 0 201 186 15 2024 0 0 0 10 309 7,287 7,606 7,048 558 Fund $0 $740 $205 $10 $309 $7,287 $8,551 $7,923 $628 Totals: *PD=Preliminary Development(projects with development activity Sorted by Project Name Page 31 of 93 but no programmed year of construction) All Values in Thousands of Dollars Monday,July 27,2020 102 10:31 AM