2020-08-12 ACHD Draft Development Services Department AO ACHD 'I 5iia­e 60,-�a-v c11 Project/File: Victory Apartments/ MER20-0079/ H-2020-0065 This is an annexation with rezone from RUT to R-15 and an amendment to the Future Land Use Map in the Comprehensive Plan from MDR to MHDR application. The site is located on 18.5-acres. Lead Agency: City of Meridian Site address: SWC of Meridian Road and Victory Road Staff Approval: XXXX, 2020 Applicant: SW Victory, LLC PO Box 51298 Idaho Falls, ID 83405 Representative: J-U-B Engineers, Inc. Wendy Shrief 250 S Beechwood Boise, ID 83709 Staff Contact: Stacey Yarrington, Planner III Phone: 387-6171 E-mail: syarrington(@achdidaho.org A. Findings of Fact 1. Description of Application: The applicant is requesting approval for annexation with rezone from RUT (Rural Urban Transition)to R-15 (Medium-high density Residential) and an amendment to the Future Land Use Map in the Comprehensive Plan from MDR (Medium Density Residential) to MHDR (Medium High Density Residential) application. A concept plan was provided as part of the application for a multi-family development consisting of 172-units. The site is located on 18.5-acres. 2. Description of Adjacent Surrounding Area: Direction I Land Use Zoning North Medium-low density Residential, Limited-Office R-4, L-O South Medium density Residential R-8 East Medium-high density Residential, Medium density Residential R-15, R-8 West Medium density Residential R-8 3. Site History: ACHD has not previously reviewed this site for a development application. 4. Adjacent Development: The following developments are pending or underway in the vicinity of the site: • Jocelyn Park, consisting of 74 buildable lots is located west of the site and currently under review by ACHD staff. 1 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 • Biltmore Estates Subdivision, consisting of 159 buildable lots located southwest of the site was approved by ACHD in March 2014. • Edgehill Subdivision, consisting of 116 buildable lots, is located at the southeast corner of Victory Road and Linder Road, was approved by ACHD in December 2015. • Brundage Estates Subdivision, consisting of 366 buildable lots, is located off Linder Road just south of Victory Road, was approved by ACHD in May 2016. • Timberline Subdivision, consisting of 59 buildable lots located directly west of the site was approved by ACHD in December 2017. • Stapleton Subdivision, consisting of 212 buildable lots and 1 multi-family lot located south of the site was approved by ACHD in February 2019. • Graycliff Estates Revised Subdivision, consisting of 200 buildable lots and 2 multi-family lots (224-units) located south of the site was approved by ACHD in March 2020. 5. Transit: Transit services are not available to serve this site. 6. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs, and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. . . Detectable warnings should be placed across the full width of the ramp. FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. 7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 8. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): (If no improvements listed/scheduled) There are no roadways, bridges or intersections in the general vicinity of the project that are in the Integrated Five Year Work Plan (IFYWP). • Victory Road is listed in the CIP to be widened to 3-lanes from Meridian Road to Locust Grove Road between 2026 and 2030. 9. Roadways to Bikeways Master Plan: ACHD's Roadways to Bikeways Master Plan (BMP)was adopted by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to implement the Planned Bicycle Network to support bicycling as a viable transportation option for Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of good repair in order to ensure they are consistently available for use, promote awareness of existing bicycle routes and features and support encouragement programs and to facilitate coordination and cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan recommendations. The BMP identifies Victory Road as Level 3 facilities. 2 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 B. Traffic Findings for Consideration 1. Trip Generation: This development is estimated to generate 1,259 vehicle trips per day; 96 vehicle trips per hour in the PM peak hour, based on the Institute of Transportation Engineers Trip Generation Manual, 10th edition. 2. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service **State Highway 69/ 865-feet Principal Arterial 1,807 N/A Meridian Road Victory Road 1,470-feet Minor Arterial 279 Better than "E" * Acceptable level of service for a two-lane minor arterial is "E" (575 VPH). ** ACHD does not set level of service thresholds for State Highways. 3. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for SH-69/Meridian Road north of Victory Road was 36,018 on 06/19/2019. • The average daily traffic count for Victory Road east of Linder Road was 3,398 on 01/29/2020. C. Findings for Consideration This application is for an annexation and rezone only. Listed below are some findings for consideration that the District may identify when it reviews a future development application. The District may add additional findings for consideration when it reviews a specific redevelopment application. 1. South Meridian Transportation Plan The South Meridian Transportation Plan (SMTP) is a long-range planning tool used to identify future roadway, intersection, and corridor needs in the South Meridian Area. Providing a framework for future roadway improvements based on the land use designations. The plan was created in collaboration with the City of Meridian and was adopted by the ACHD Commission in September of 2009. The SMTP recommends widening Victory Road to 3-lanes from Meridian Road to Locust Grove Road. 2. State Highway SH-69 /Meridian Road SH-69/Meridian Road is under the jurisdiction of the Idaho Transportation Department (ITD). The applicant, the City of Meridian, and ITD should work together to determine if additional right-of-way or improvements are necessary on SH-69/Meridian Road. 3. Victory Road a. Existing Conditions: Victory Road is improved with 2-travel lanes, 25 to 40-feet of pavement, and no curb, gutter or sidewalk abutting the site. There is between 50 to 80-feet of right-of-way for Victory Road (25 to 40-feet from centerline). 3 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2 states that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-curb) within 70 feet of right-of-way. This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Victory Road is designated in the MSM as a Residential Arterial with 3-lanes and on-street bike lanes, a 46-foot street section within 74-feet of right-of-way. c. Staff Comments/Recommendations: Victory Road is listed in the CIP for improvements between 2026 and 2030. To accommodate the future widening, the applicant should be required to dedicate additional right-of-way to total 37-feet from centerline of Victory Road abutting the site as part of the future development application. Right-of-way dedication is impact fee eligible for compensation. 4 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 The Ridenbaugh Canal is located south of Victory Road and the site's north boundary. Victory Road is currently improved with 14 to 18-feet of pavement from centerline and 3-foot gravel shoulders abutting the canal as shown below. Typically, the applicant would be required to improve Victory Road with 17-feet of pavement from centerline; however, due to the close location of the Ridenbaugh Canal in relation to Victory Road, there is insufficient area to make the improvement. Therefore, staff recommends no additional pavement widening be required with the future development application. .��r'� -'�.r•���yam•." � � .w�"'. -'r° - As part of the future development application, the applicant should be required to construct 5- foot wide sidewalk along Victory Road abutting the site. However, due to the location of the canal, staff recommends that the sidewalk be placed in a permanent right-of-way easement on the south side of the canal as there is insufficient area to construct the improvement within the right-of-way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the sidewalk. The applicant should tie into improvements that are planned as part of the Jocelyn Park Subdivision west of the site. As part of the future development application, the applicant should be required to construct vertical curb, gutter and 7-foot wide attached concrete sidewalk to cross the Ridenbaugh Canal on both the west and east sides of the site to provide for pedestrian connectivity. The applicant should install a bridge railing consistent with current ACHD standards. 4. Internal Streets a. Existing Conditions: There are no existing streets within the site. b. Policy: Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improving all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than 47-feet wide and that the standard street section shall be 33-feet (back-of-curb to back-of-curb). Standard Urban Local Street-33-foot Street Section and Right-of-way Policy: District Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of- curb)for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 47-feet of right-of-way. 5 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 Continuation of Streets Policy: District Policy 7207.2.4 states that an existing street, or a street in an approved preliminary plat, which ends at a boundary of a proposed development shall be extended in that development. The extension shall include provisions for continuation of storm drainage facilities. Benefits of connectivity include but are not limited to the following: • Reduces vehicle miles traveled. • Increases pedestrian and bicycle connectivity. • Increases access for emergency services. • Reduces need for additional access points to the arterial street system. • Promotes the efficient delivery of services including trash, mail and deliveries. • Promotes appropriate intra-neighborhood traffic circulation to schools, parks, neighborhood commercial centers, transit stops, etc. • Promotes orderly development. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to provide a minimum turning radius of 45-feet; in rural areas or for temporary cul-de-sacs the emergency service providers may require a greater radius. Landscape and parking islands may be constructed in turnarounds if a minimum 29-foot street section is constructed around the island. The pavement width shall be sufficient to allow the turning around of a standard AASHTO SU design vehicle without backing. The developer shall provide written approval from the appropriate fire department for this design element. The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case basis. This will be based on turning area, drainage, maintenance considerations and the written approval of the agency providing emergency fire service for the area where the development is located. Stub Street Policy: District policy 7207.2.4 (local) states that stub streets will be required to provide circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7207.2.5.4 (local), except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 6 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 In addition, stub streets must meet the following conditions: • A stub street shall be designed to slope towards the nearest street intersection within the proposed development and drain surface water towards that intersection; unless an alternative storm drain system is approved by the District. • The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. Temporary Dead End Streets Policy: District policy 7207.2.4 (local) requires that the design and construction for cul-de-sac streets shall apply to temporary dead end streets. The temporary cul-de-sac shall be paved and shall be the dimensional requirements of a standard cul-de-sac. The developer shall grant a temporary turnaround easement to the District for those portions of the cul-de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. Landscape Medians Policy: District policy 7207.5.16 states that landscape medians are permissible where adequate pavement width is provided on each side of the median to accommodate the travel lanes and where the following is provided: • The median is platted as right-of-way owned by ACHD. • The width of an island near an intersection is 12-feet maximum for a minimum distance of 150-feet. Beyond the 150-feet, the island may increase to a maximum width of 30-feet. • At an intersection that is signalized or is to be signalized in the future, the median width shall be reduced to accommodate the necessary turn lane storage and tapers. • The Developer or Homeowners Association shall apply for a license agreement if landscaping is to be placed within these medians. • The license agreement shall contain the District's requirements of the developer including, but not limited to, a "hold harmless" clause; requirements for maintenance by the developer; liability insurance requirements; and restrictions. • Vertical curbs are required around the perimeter of any raised median. Gutters shall slope away from the curb to prevent ponding. c. Staff Comments/Recommendations: The applicant's concept plan indicates that a local street is proposed to intersect Victory Road and stub to the site's west property line. Therefore, as part of the future development application, the applicant should be required to design and construct the internal local street as a 33-foot street section with curb, gutter, and 5-foot wide concrete sidewalk within 47-feet of right-of-way. Detached sidewalk may be located outside of the right-of-way within a permanent right-of-way easement to 2-feet behind back of sidewalk. The applicant should stub the local street to the west to provide for future connectivity. The applicant should construct the stub street to be no greater in length than 150-feet or provide a temporary turnaround consistent with District Stub Street policy. The applicant should be required to provide signage stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." 7 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 5. Roadway Offsets a. Existing Conditions: There are no roadways within the site. b. Policy: Local Street Intersection Spacing on Minor Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. If it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 660-feet as measured from all other existing roadways as identified in Table 1 a (7205.4.6). Local Offset Policy: District policy 7206.4.5, requires local roadways to align or offset a minimum of 330-feet from a collector roadway (measured centerline to centerline). District policy 7207.4.2, requires local roadways to align or provide a minimum offset of 125- feet from any other street (measured centerline to centerline). c. Staff Comments/Recommendations: The submitted concept plan shows that a local street is proposed to intersect Victory Road in alignment with Alfani Way north of the site located approximately 634-feet west of SH-69/Meridian Road. The applicant's proposal meets the intent of the policy, as the new local street is proposed to align with Alfani Way on the north side of Victory Road abutting the site and should be approved, as proposed 6. Driveways Local Street Name a. Existing Conditions: There are no existing driveways internal to the site. b. Policy: Driveway Location Policy: District policy 7207.4.1 requires driveways near intersections to be located a minimum of 75-feet (measured centerline-to-centerline) from the nearest local street intersection, and 150-feet from the nearest collector or arterial street intersection. Successive Driveways: District Policy 7207.4.1 states that successive driveways away from an intersection shall have no minimum spacing requirements for access points along a local street, but the District does encourage shared access points where appropriate. Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required, residential driveways shall be restricted to a maximum width of 20-feet and may be constructed as curb-cut type driveways. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway. c. Staff Comments/Recommendations: The applicant's concept plan indicates that there are two proposed driveways onto a new local street in alignment with each other, however, the location and distance from Victory Road, an arterial street is not determined. Therefore, as part of the future development application, the applicant should be required to construct any driveways onto the new proposed local street to be a minimum 150-feet from Victory Road. 7. Bridge for Ridenbaugh Canal Crossing The District will require that the applicant submit the bridge plans for the crossing of the Ridenbaugh Canal for review and approval prior to the pre-construction meeting and final plat approval. Note: all plan submittals for bridges or pipe crossings of irrigation facilities should be submitted to ACHD for review no later than December 15th for construction in the following year prior to irrigation season. 8 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 8. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 9. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 10. Other Access Victory Road is classified as a minor arterial roadway. Other than the access specifically approved with this application, direct lot access is prohibited to this roadway and should be noted on the final plat. D. Site Specific Conditions of Approval This application is for an annexation only. Site specific conditions of approval will be established as part of the future development application. 1. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 2. Payment of impact fees is due prior to issuance of a building permit. 3. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant's engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking 9 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled)are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 1. Vicinity Map 2. Site Plan 3. Utility Coordinating Council 4. Development Process Checklist 5. Request for Reconsideration Guidelines 10 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 VICINITY MAP all � 1r� �� � �)'r •� Off. lietOn iK(1--.- r T e i Lek C t IF . .,,:�; 11 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 SITE PLAN �-�-� i ------ _ - - --- ---------------- --______ ______________________________._--�i,� % �Landsw&,art •�• ._ -_--_-_-_-_-_-_-_-_-_-_-_l`-~_ \ " o Pa- r----I LIA 6 ti Project Summary • a I ,£ - I ojl TM,I SileA— 17 01 Acres Gross 13.06Acres Net H `—•—•—•—i = j •\ ° +w I ; / •\•` real Housing unna Ire unna 'T• asa,rlarw 2 Bedroom Town Homes 2 Unns / / \• -I soaea«,a,io Pam 3 Betlmwn Town eras 2a IJni[s \ S Lenewzpe 2 Bedroom Apadmenls 50 Unds zBadrPPm+oeaApadmeMs so una: Densily cn Gross Acreage 11.1 UnI IA— j/ /\•\ D-ity Prt Nat Acreage 1a 2 Nn,:._ Typd 1 z�q % ��.`• ,�/ Parkingl quired ME spaces PadOng PmWdetl 42B Spaces na crown Pawn >,lospeces r Guce PaPmg i es�vicez Aaachetl P4 Pks gultlbg / � `' 1 I Free Staiing Garay Parpng 1p spares ! Flat[:ara)e Pailr9 1a spares ' / , •` �i &Fa OrFsxaJ PaalnA 16 sp&[w I_ Preliminary Site Plan -Meridian Rental Apartments-Scheme 10 Npdaled July 31,2020 12 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5)working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to:50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 13 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 Development Process Checklist Items Completed to Date: ®Submit a development application to a City or to Ada County ®The City or the County will transmit the development application to ACHD ®The ACHD Planning Review Section will receive the development application to review ®The Planning Review Section will do one of the following: ❑Send a"No Review" letter to the applicant stating that there are no site specific conditions of approval at this time. ®Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. ®Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: ❑For ALL development applications, including those receiving a "No Review" letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD,then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services(ACHD)for ANY work in the right-of-way, including, but not limited to,driveway approaches, street improvements and utility cuts. ❑Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) ❑ Driveway or Property Approach(s) • Submit a "Driveway Approach Request"form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. ❑Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"to ACHD Construction—Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) ❑ Sediment&Erosion Submittal • At least one week prior to setting up a Pre-Construction Meeting an Erosion &Sediment Control Narrative&Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. ❑ Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. ❑ Final Approval from Development Services is required prior to scheduling a Pre-Con. 14 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the Development Services Manager when it is alleged that the Development Services Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10)working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager's reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 15 DRAFT Victory Apartments/ MER20-0079/ H-2020-0065