Loading...
CC - Storm Drainage Calcs HORROCKS 11.11- (D E N G I N E E R S MEMORANDUM TO: Amanda McNutt, City of Meridian FROM: Rob Sunderlage, Horrocks Engineers DATE: June 15, 2020 SUBJECT: Victory Commons Common Improvements Phase 1 Drainage The Common Improvements Phase 1 at Victory Commons has been designed by Horrocks Engineers.The site consists of 16.7 acres at the north east corner of the intersection of E Victory Rd and S Meridian Rd. A right turn lane along S Meridian Rd will be added in a future phase.T This plan set includes the addition of a 23,810 square foot(0.55 ac) asphalt road through the site and the addition of public utilities. A temporary 10'x 10'x 4' infiltration bed will be utilized to treat a portion of the drainage generated from the road with the rest infiltrating into the existing soil.A C value of 0.95 and time to concentration of 10 minutes were utilized for flow calculation.The temporary infiltration bed will handle 400 cubic feet of runoff, intended to capture as much runoff as possible from the proposed asphalt drive. In the final developed condition of the site, each lot/building will have on-site stormwater disposal systems that dispose of all water for each respective lot. 208-895-2520 1 Horrocks.com 2775 West Navigator Drive,Suite 210,Meridian,ID 83642