Loading...
CC - Groundwater Letter7/29/2020 B201057g_gwletter Mr. Zach Evans Zach Evans Construction, Inc. 7761 West Riverside Drive, Suite 100 Eagle, ID 83714 (208) 853-1205 Re:Groundwater Leter Calvary Chapel 3727 East Lake Hazel Road Meridian, ID Dear Mr. Evans: Geotechnical Engineer Senior Geotechnical Engineer Enclosures: Groundwater Data This letter has been prepared to verify seasonal high groundwater as determined through regular monitoring unavailable at the time of the previously issued MTI Geotechnical Engineering Report (B201057g).Descriptions of general site characteristics and the proposed project are available in the previous report. Unless otherwise noted in this letter,all initial recommendations, limitations,and warranties expressed in the previous report must be adhered to. The following table represents groundwater data collected for the site.It should be noted that these levels will fluctuate from year to year, and are limited to the data collected. MTI will continue to monitor these wells on a bi-weekly basis. MTI appreciates this opportunity to be of service to you and looks forward to working with you in the future. If you have questions, please call (208) 376-4748. Respectfully Submitted, Materials Testing & Inspection Jacob Schlador, P.E.Reviewed by:Monica Saculles, P.E. 7/29/2020 B201057g_gwletter Date Monitored 7/9/2020 4.50 A 4.60 A 3.67 A 7/18/2020 2.74 3.05 3.17 Legend: A Initial reading/depth recorded at time of piezometer installation. Groundwater Depth (Feet bgs) TP-3TP-1 TP-2