Loading...
2020-07-16 Parks(AWE IDIAN:--- Parks and Recreation Reviewer: Kim Warren / Pathways Project Manager Planner Assigned: Joseph Dodson Project Name: Jocelyn Park Sub File No: H-2020- 0067 Date: 16 July 2020 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. No multi -use pathways are required with this project as part of the Pathway Master Plan. The City supports the proposed pedestrian connections as shown, with the recommendation that micropath access from Lone Pine Ave to the common open space at east be relocated 2-3 lots to the north for better views into the site to accommodate drive -by surveillance and enhance resident safety. 3. Any pathway constructed through subdivision common areas shall be separate from Irrigation District access roads and/or facilities. 4. 6' high open vision fencing shall be installed between pathways and (live) water irrigation canals (such as the Ridenbaugh) as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3- 5. All other fence details per UDC 11-3A-7. 5. No fencing installed along pathways shall prohibit access by Nampa Meridian Irrigation District to their facilities. 6. Project developer shall be responsible for obtaining license agreement and other permission(s) as required for constructing within irrigation district easements. Note that his may also apply to any fence constructed along easement boundary. 7. Should any discrepancy exist between these conditions of approval and the requirements of the irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway design that meets both City and irrigation district objectives. City requirements as stated shall not (nor are they intended to) override those of the irrigation district having jurisdiction over the project area. Rev. 02.3.1.20