Loading...
Plumbing Summary_Campania Office Complex Bld AMeridian. Building Services Plumbing Summary This plumbing summary should include all new plumbing, fixtures being planned for the project. If any fixtures are to be demolished or removed, please make note of this in the space provided. Please indicate total count of new fixtures listed below: Water closets (toilets) Urinals Lavatories (bathroom sinks) �- Bar Sinks Clinic Sinks -.MMPMO '' Floor Sinks x—'► Kitchen Sinks (single faucet) ^� Kitchen Sinks (dual faucets) �' Laundry Sinks Mop Sinks Washup/Handwash Sinks —' Dishwashers Clothes Washers Bathtubs or Tub/Shower Combos V" Showers Drinking Fountains (each hi-lo fountain counts as 1) Floor drains 00 Hose Bibs Plumbing fixtures to be demolished or removed. Please explain. Rev: 8/2012-cs