Loading...
REVISED Landscape Plan2 3 M 5 I v Ims C C FUTURE BUILDING AREA LANDSCAPE PLAN 20 0 20 40 60 SCALE: 1 "= 20'-0" CALLOUT NUMBERS CA L LO U T NOTES NREFER OTES BO NOUVMBERED 1. VISION TRIANGLE 2. SLIDING VEHICULAR GATE 3. PROPOSED PARKING AREA 4. PROPOSED DOG RUN 5. PICNIC TABLES ON CONCRETE PAD 6. TRASH RECEPTACLE 7. TRASH ENCLOSURE 8. PAVER AREA 9. MONUMENT SIGN 10. WATER FEATURE LOT # 8 1.962 ACRES FUTURE BUILDING AREA PLANT SCHEDULE QTY KEY BOTANICAL NAME COMMON NAME SIZE NOTES DECIDUOUS SHADE TREES 5 AP Acer trun. x Acer plat. 'Warrenred' Parkway Maple 2" CAL. B&B Class II - 30' H x 25' W 2 CB Carpinus betulus 'Frans Fontaine' Frans Fontaine Hornbeam 2" CAL. B&B Class II - 35' H x 15' W 4 LT Liriodendron tulipifera Tulip Tree 2" CAL. B&B Class II - 65' H x 35' W SHRUBS/PERENNIALS/ORNAMENTAL GRASSES 32 BB Buddleja 'Blue Chip' LO AND BEHOLD Butterfly Bush #5 2' H x 2' W 40 CT Cerastium tomentosum 'YoYo' Snow -in -Summer #1; 36" O.C. 8" H x 18" W 18 EF Euonymous fortunei 'Emerald Gaiety' Emerald Gaiety Wintercreeper Euonymous #1 4' H x 3' W 26 HS Helictotrichon sempervirens'Saphirsprudel' Sapphire Fountain Blue Oat Grass #1 3' H x 3' W 17 MP Miscanthus 'Purpurascens' Flame Grass #2 5' H x 3' W 40 VO Viburnum opulus 'Nanum' Dwarf European Cranberry Bush #5 3' H x 4' W FUTURE Ln BUILDING AREA LANDSCAPE LEGEND + 3 � �{ TREES/PLANTS TO BE INSTALLED - - - - - - - - - - CUT EDGE AS DETAILED PROPERTY LINE (VERIFY) - 6-0" CHAIN LINK FENCE 3-0" HEIGHT FENCE, MATERIAL TO BE DETERMINED BY OWNER BASALT COLUMN WATER FEATURE 2 QUANTITY (�C PLANT IDENTIFICATION KEY "< MAINTAINED LAWN AREA 1" MINUS BLACK PERMA BARK MULCH AT 3" DEPTH OVER DEWITT PR05 WEED BARRIER ARTIFICIAL TURF PAVERS, COLOR, STYLE AND MATERIAL TO BE DETERMINED BY OWNER CONCRETE, COLOR AND PATTERN TO BE DETERMINED BY OWNER oa PROJECT INFORMATION LANDSCAPE REQUIREMENTS TOTAL PROPERTY SIZE= 85,500 S.F. - 1.96 ACRES ZONING DISTRICT= I-L LOT IMPROVEMENTS AREA= 85,500 S.F. TOTAL BUILDING COVERAGE: 42,238 S.F. PROPOSED BUILDING COVERAGE: 7,072 S.F. FUTURE BUILDING COVERAGE: 35,166 S.F. HARDSCAPE COVERAGE: 34,018 S.F. LANDSCAPE COVERAGE: 9,244 S.F. NUMBER OF PARKING STALLS PROVIDED: 1 STANDARD STALLS 0 COMPACT STALLS 1 ADA STALLS TOTAL: 2 STALLS NUMBER OF BICYCLE PARKING SPACES REQUIRED: (1 STALLS/25 REQUIRED STALLS) = 1 BICYCLE STALLS NUMBER OF BICYCLE PARKING SPACES PROVIDED: PROPOSED ONE EXISTING RACK (ONE RACK = 7 STALLS) SETBACKS: WEST - 0 FEET NORTH - 0 FEET EAST - 0 FEET SOUTH - 0 FEET TOTAL NUMBER OF TREES: TOTAL NUMBER OF TREE SPECIES: ; SPECIES REQUIRED PROVIDED PARKING LOT TREES - LANDSCAPE BUFFER REQUIREMENTS: WEST PARKING LOT LANDSCAPE BUFFER (I-L): 285 LIN. FT. (PROPERTY LINE) 29 LIN. FT. (PARKING LOT AREA) 10 FT. WIDTH BUFFER PROVIDED (5 FT. LANDSCAPE BUFFER REQUIRED) REQUIRED TREES - 1 PROVIDED TREES - 1 NORTH BOUNDARY LANDSCAPE BUFFER (I-L): 300 LIN. FT. 10 FT. BUFFER PROVIDED (0 FT. BUFFER REQUIRED) REQUIRED TREES - 0 PROVIDED TREES - 5 EAST PARKING LOT LANDSCAPE BUFFER (I-L): 285 LIN. FT. (PROPERTY LINE) 29 LIN. FT. (PARKING LOT AREA) 10 FT. WIDTH BUFFER PROVIDED (5 FT. LANDSCAPE BUFFER REQUIRED) REQUIRED TREES - 1 PROVIDED TREES - 1 SOUTH BOUNDARY LANDSCAPE BUFFER (E. JEWELL STREET): 300 LIN. FT. (60 LIN. FT. OF ASPHALT) 10 FT. BUFFER PROVIDED (FT. LANDSCAPE BUFFER REQUIRED) REQUIRED TREES - 7 PROVIDED TREES - 7 LANDSCAPE NOTES - - W o Px Q5 JL 'APaQa�� RP� RODNEY EVANS + PARTNERS + + + + reandpartners.com + 208-514-3300 + 1014 S. LaPointe, Boise, Idaho 83706 1. CONTRACTOR SHALL REPORT TO LANDSCAPE ARCHITECT ALL CONDITIONS WHICH IMPAIR AND/OR PREVENT THE PROPER EXECUTION OF THIS WORK, PRIOR TO BEGINNING WORK. 2. NO MATERIAL SUBSTITUTIONS SHALL BE MADE WITHOUT THE LANDSCAPE ARCHITECT'S PRIOR WRITTEN APPROVAL. ALTERNATE MATERIALS OF SIMILAR SIZE AND CHARACTER MAY BE CONSIDERED IF SPECIFIED PLANT MATERIALS CAN NOT BE OBTAINED. 3. COORDINATE ALL WORK WITH ALL OTHER SITE RELATED DEVELOPMENT DRAWINGS. 4. COORDINATE WORK SCHEDULE AND OBSERVATIONS WITH LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION START-UP. 5. ALL PLANT MATERIAL SHALL BE INSTALLED AS PER DETAILS. 6. ALL PLANT MATERIAL SHALL CONFORM TO THE AMERICAN NURSERYMAN STANDARDS FOR TYPE AND SIZE SHOWN. PLANTS WILL BE REJECTED IF NOT IN A SOUND AND HEALTHY CONDITION. 7. IN THE EVENT OF A PLANT COUNT DISCREPANCY, PLANT SYMBOLS SHALL OVERRIDE SCHEDULE QUANTITIES AND CALL OUT SYMBOL NUMBERS. 8. ALL PLANTING BEDS SHALL BE COVERED WITH A MINIMUM OF 3" DEPTH OF 1" MINUS BLACK PERMA BARK MULCH. APPLY PRE -EMERGENT HERBICIDE PRIOR TO MULCH APPLICATION. SUBMIT SAMPLE FOR APPROVAL. 9. ALL PLANT MATERIAL SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR BEGINNING AT THE DATE OF ACCEPTANCE BY THE OWNER. REPLACE ALL PLANT MATERIAL FOUND DEAD OR NOT IN A HEALTHY CONDITION IMMEDIATELY WITH THE SAME SIZE AND SPECIES AT NO COST TO THE OWNER. 10. FINISH GRADES SHALL PROVIDE A SMOOTH TRANSITION WITH ADJACENT SURFACES AND ENSURE POSITIVE DRAINAGE IN ACCORDANCE WITH THE SITE CIVIL GRADING PLAN. 11. AMEND EXISTING APPROVED TOPSOIL AT A RATIO OF THREE CUBIC YARDS OF APPROVED COMPOST PER 1000 SQUARE FEET. ROTO-TILL ORGANIC MATTER A MINIMUM OF 6 INCHES INTO TOPSOIL. 12. FERTILIZE ALL TREES AND SHRUBS WITH 'AGRIFORM' PLANTING TABLETS. QUANTITY PER MANUFACTURER'S RECOMMENDATIONS. 13. ALL PLANTING BEDS SHALL HAVE A MINIMUM 18" DEPTH OF TOPSOIL. LAWN AREAS SHALL HAVE A MINIMUM 12" DEPTH OF TOPSOIL. SPREAD, COMPACT, AND FINE GRADE TOPSOIL TO A SMOOTH AND UNIFORM GRADE 3" BELOW ADJACENT SURFACES OF PLANTER BED AREAS, 1-1/21, BELOW ADJACENT SURFACES OF TURF SOD AREAS, AND 1" BELOW ADJACENT SURFACES OF TURF SEED AREAS. 14. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES ARE INSUFFICIENT. VERIFY SUITABILITY AND CONDITION OF TOPSOIL AS A GROWING MEDIUM. PERFORM SOIL TEST/ ANALYSIS AND PROVIDE ADDITIONAL AMENDMENT AS DETERMINED BY SOIL TESTS. TOPSOIL SHALL BE A LOOSE, FRIABLE, SANDY LOAM, CLEAN AND FREE OF TOXIC MATERIALS, NOXIOUS WEEDS, WEED SEEDS, ROCKS, GRASS OR OTHER FOREIGN MATERIAL AND A HAVE A PH OF 5.5 TO 7.0. IF ONSITE TOPSOIL DOES NOT MEET THESE MINIMUM STANDARDS, CONTRACTOR IS RESPONSIBLE TO EITHER: A) PROVIDE APPROVED IMPORTED TOPSOIL, OR B) IMPROVE ON -SITE TOPSOIL WITH METHODS APPROVED BY THE LANDSCAPE ARCHITECT. 15. IF IMPORTED TOPSOIL FROM OFF -SITE SOURCES IS REQUIRED, ENSURE IT IS FERTILE, FRIABLE, NATURAL LOAM, SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAY LUMPS, BRUSH, WEEDS AND OTHER LITTER, AND FREE OF ROOTS, STUMPS, STONES LARGER THAN 2 INCHES IN ANY DIMENSION, AND OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. A) OBTAIN TOPSOIL FROM LOCAL SOURCES OR FROM AREAS HAVING SIMILAR SOIL CHARACTERISTICS TO THOSE FOUND ON THE PROJECT SITE. OBTAIN TOPSOIL ONLY FROM NATURALLY, WELL -DRAINED SITES WHERE TOPSOIL OCCURS AT A DEPTH OF NOT LESS THAN 4 INCHES. B) REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY, TOXICITY, AND GENERAL TEXTURE BY A RECOGNIZED COMMERCIAL OR GOVERNMENT AGENCY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS SHALL BE FURNISHED TO THE OWNER'S REPRESENTATIVE BY THE CONTRACTOR. NO TOPSOIL SHALL BE DELIVERED IN A FROZEN OR MUDDY CONDITION. ACIDITY/ALKALINITY RANGE - PH. 5.5 TO 7.6. 16. IMMEDIATELY CLEAN UP ANY TOPSOIL OR OTHER DEBRIS ON THE SITE CREATED FROM LANDSCAPE OPERATIONS AND DISPOSE OF PROPERLY OFF SITE. 17. TREES SHALL NOT BE PLANTED WITHIN THE 10'-0" CLEAR ZONE OF ALL STORM DRAIN PIPE, STRUCTURES, OR FACILITIES. 18. STORM DRAINAGE FACILITIES MUST BE PROTECTED FROM ANY AND ALL CONTAMINATION DURING THE CONSTRUCTION AND INSTALLATION OF THE LANDSCAPE IRRIGATION SYSTEM. 19. IN THE EVENT OF A DISCREPANCY, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. WEED ABATEMENT NOTES: 0 C 1. ALL AREAS TO BE PLANTED OR HYDROSEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO PLANTING OR HYDROSEEDING. 2. .......... » .......... » .. » ........ .... » ... ».............................» . » ....... ».................»................»................»................» ........, 3. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. 4. CONTRACTOR SHALL OPERATE THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN (14) DAYS. AT CONCLUSION OF THIS WATERING PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE (3-5) DAYS. 5. • • • • • .. • • • • • » • • • » • • .. • .. • 000 • • • • •• • •» • » • • » • • • • • • » • • • • 0. • • • • ». SPECIFICATIONS AND INSTRUCTIONS. DO NOT WATER FOR AT LEAST SEVEN (7) DAYS. REMOVE WEEDS FROM THE SITE. 6. IF ANY EVIDENCE OF WEED GERMINATION EXISTS AFTER TWO (2) APPLICATIONS, CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. 7. AT THE TIME OF PLANTING AND HYDROSEEDING, ALL PLANTING AREAS SHALL BE WEED FREE. IRRIGATION NOTES: 1. ALL LANDSCAPED AREAS SHALL HAVE AN AUTOMATIC UNDERGROUND SPRINKLER SYSTEM WHICH INSURES COMPLETE COVERAGE AND PROPERLY ZONED FOR REQUIRED WATER USES. EACH HYDROZONE IS TO BE IRRIGATED WITH SEPARATE INDIVIDUAL STATIONS. 2. PLANTER BEDS AND LAWN AREAS ARE TO HAVE SEPARATE HYDRO -ZONES. 3. POP-UP SPRINKLER HEADS SHALL HAVE A MINIMUM RISER HEIGHT OF 4 INCHES AT LAWN AREAS AND 18" AT PLANTER BEDS. 4. PLANTER BEDS ARE TO HAVE DRIP IRRIGATION SYSTEM OR POP-UP SPRAY SYSTEM. ANNUALS, PERENNIALS GROUND COVERS OR SHRUB MASSINGS SHALL HAVE A POP-UP SPRAY SYSTEM. 5. ELECTRONIC WATER DISTRIBUTION/ TIMING CONTROLLERS ARE TO BE PROVIDED. MINIMUM CONTROLLER REQUIREMENTS ARE AS FOLLOWS: a. PRECISE INDIVIDUAL STATION TIMING b. RUN TIME CAPABILITIES FOR EXTREMES IN PRECIPITATION RATES c. AT LEAST ONE PROGRAM FOR EACH HYDROZONE d. SUFFICIENT MULTIPLE CYCLES TO AVOID WATER RUN-OFF e. POWER FAILURE BACKUP FOR ALL PROGRAMED INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 6. INDIVIDUAL VALVED WATERING STATIONS WILL BE DESIGNED AND INSTALLED TO PROVIDE WATER TO RESPECTIVE HYDRO -ZONES. 7. THE IRRIGATION SYSTEM SHALL BE DESIGNED TO PROVIDE 100% HEAD TO HEAD COVERAGE WITH TRIANGULAR SPACING. 8. SPRINKLER HEADS SHALL BE ADJUSTED TO REDUCE OVERSPRAY ONTO IMPERVIOUS SURFACES (BUILDINGS, SIDEWALKS, DRIVEWAYS, AND ASPHALT AREAS). 9. PROVIDE MINIMUM (1) QUICK COUPLER VALVE PER EACH (6) AUTOMATIC VALVE ZONES. APPROVE Q.C.V. LOCATIONS WITH LANDSCAPE ARCHITECT. I Zmi It MON 0 pzw N(r,�/ � p N '/ M U-) N NO - (n 00 I� M U-)W w0Ln vj wU Q Q O Q N (DQ w v� ~ = r w LU�_ Uv Q�� o0LLa~_r _ �M0LL U=a Z U W 0 CO z W M m (a!1 > z~ W0UU z0�z�-z0W>-=Qui 00w=C7Qw =z WCz7 a O �' W a U w r 2 w ow O mUDZp U�Dazw=Hw�O 00�= aaw�O_F-- MU H W U O O� z Q W 0 O L W Q� c~n z go zF__ W�ovW��oz ���° m=ao?�zzwWou aQ�z Q~u)0 °, W>�z z��0 ==zU0wW0v0 u0a~ MU��WUOwaUH (Az Q V�_~ W m J= p g� z z� U z w=_� Q C7 .� -�=a �CeLL oU) < z� 0 a 0 w zLL a �zz0UW =Wai-O- OMi > QQHwP LLB ~Zz�ZLL�w zzOaU O_�zC7waQ0_jw gOzaH MzzOwD_J�=a a = D6�D0ce=MWMW a cn 0 U W� Q, W~� Z z 0= =0U0za =aaz=zOO�zH HUQQQ HOD�H�HUOQO OF BRA o ao �54 IT4'o o �� 4NDS u."? o°oo °O000UUvoo�o°°o N 00 0 z Q 0 LU V) J w 3: LU LJJ 0 011 V) z w O U z IL E U V) w w Q 0 Q J w 0 DATE: APRI L 2020 DRAWN BY: BSS/LP CHECKED BY: BSS JOB NUMBER: 20035 SHEET TITLE CZC - DR DOCUMENTS LANDSCAPE PLAN SHEET NUMBER L-1.0 1 3 0 5 � 6 SHEET