Loading...
2020-07-20 COMPASS Communities in Motion 2040 2. 0 Development Review The Community Planning Association of Southwest Idaho (COMPASS) is the metropolitan planning organization (MPO) for Ada and Canyon Counties. COMPASS has developed this review as a tool for local governments to evaluate whether land developments are consistent with the goals of Communities in Motion 2040 2.0 (CIM 2040), the regional long-range transportation plan for Ada and Canyon Counties. This checklist is not intended to be prescriptive, but rather a guidance document based on CIM 2040 2.0 goals. Development Name: Pura Vida Ridge Ranch Agency: Meridian CIM Vision Category: Future Neighborhoods New households: 157 New jobs: 0 Exceeds CIM forecast: No CIM Corridor: Lake Hazel Road Level of Stress considers facility type, number of vehicle �� Pedestrian level of stress: R lanes, and speed. Roads with G or PG ratings better Bicycle level of stress: R support bicyclists and pedestrians of all ages and comfort levels. '• Housing within 1 mile: 1,090 A good jobs/housing balance - a ratio between 1 and Jobs within 1 mile: 290 1.5 - reduces traffic congestion. Higher numbers Jobs/Housing Ratio: 0.3 indicate the need for more housing and lower numbers indicate an employment need. Nearest police station: >4 miles Developments within 1.5 miles of police and fire �! Nearest fire station: 2.5 miles stations ensure that emergency services are more efficient and reduce the cost of these important public services. Farmland consumed: Yes ,Farmland contributes to the local economy, creates Farmland within 1 mile: 1,178 acres additional jobs, and provides food security to the region. •� Development in farm areas decreases the productivity �and sustainability of farmland. r- Nearest bus stop: 3.3 miles Residents who live or work less than 1/2 mile from Nearest public school: 1.2 miles critical services have more transportation choices. Nearest public park: 0.7 miles Walking and biking reduces congestion by taking cars off P011Nearest grocery store: >4 miles the road, while supporting a healthy and active lifestyle. Recommendations This location is still in a predominately farmland area on the fringe of urban development. Schools, parks, grocery stores, and employment centers are likely accessed only by vehicle and the closest transit services are located more than three miles away. ValleyConnect 2.0 proposes bus service from southeast Meridian to downtown Eagle via Lake Hazel Road. The closest bus stop would be less than 1/4 mile in distance when that route is operational. The site plan includes many micro-paths, trails, and pathways, including along the Ten Mile Creek, which will provide non-motorized access to employment centers and shopping in southern Meridian. Lake Hazel Road is included in the COMPASS Transportation Improvement Program (Key # RD209-18). This project will widen Lake Hazel Road from Eagle Road to Cloverdale Road to five lanes with curb, gutter, and ten-foot multi-use pathway facility. Construction is scheduled for 2024. More information about COMPASS and Communities in Motion 2040 2.0: Web: www.compassidaho.org Email info@compassidaho.org .�'�. CO M PAS S More information about the development review process: 1111 r http://www.compassidaho.orci/dashboard/devreview.htm � WIN COMMUNITY PLANNING ASSOCIATION ' of Southwest Idaho Lake Hazel Road, Cloverdale Road to Five Mile Road, Ada County FF — g i Regionally Significant: ❑� ❑ Inflated COMPASS PM: Federal PM: T ; Key# : RD207-29 Am Requesting Agency: ACHD O a Project Year: PD - Total Previous Expenditures: $0 - Total Programmed Cost: $7,269 A Total Cost(Prev.+ Prog.): $7,269 °� 7u ProJject Descri tion : Widen Lake Hazel Road from Cloverdale Road to Five Mile Road in Ada Hati�� p � County to five lanes with curb,gutter, and ten-foot multi-use pathways. Funding Source Local(Regionally Significant) Program Local M Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year* Engineering Engineering Engineering Consulting 2022 0 896 5 0 0 0 I 901 I 0 901 2023 0 0 438 0 0 0 I 438 I 0 438 2024 0 0 322 0 0 0 I 322 I 0 322 PD 0 0 0 194 299 5,115 I 5,608 I 0 5,608 Fund $0 $896 $765 $194 $299 $5,115 $7,269 $0 $7,269 Totals: Lake Hazel Road, Eagle Road to Cloverdale Road, Ada County Regionally Significant: 0 El Inflated COMPASS PM: Federal PM: m Key#: RD209-18 E Requesting Agency: ACHD Project Year: 2024 We raMi Total Previous Expenditures: $0 Total Programmed Cost: $8,551 Total Cost(Prev.+ Prog.): $8,551 Project Description : Widen Lake Hazel Road from Eagle Road to Cloverdale Road in Ada County to five lanes with curb, gutter, and ten-foot multi-use pathway facility. Funding Source Local (Regionally Significant) Program ocal Match 7.34% Cost Preliminary Preliminary Right-of-Way Utilities Construction Construction Total Federal Share Local Share Year" Engineering Engineering Engineering Consulting 2022 0 740 4 0 0 0 I 744 689 55 2023 0 0 201 0 0 0 201 186 15 2024 0 0 0 10 309 7,287 7,606 I 7,048 558 Fund $0 $740 $205 $10 $309 $7,287 $8,551 $7,923 $628 Totals: 'PD=Preliminary Development(projects with development activity Sorted by Project Name Page 31 of 92 but no programmed year of construction) All Values in Thousands of Dollars Friday,June 19,2020 102 9:25AM