2020-07-10 ACHD CH LJ Mary May, President
Kent Goldthorpe,Vice-President
Rebecca W.Arnold,Commissioner
6O1WM4';fr U to 5"Clel Sara M. Baker,Commissioner
Jim D. Hansen,Commissioner
July 10, 2020
To: Melanie Pearson (via email)
1717 N 7t" Street
Boise, ID 83702
Subject: Taysom & Pearson/ MPP20-0022/ H-2020-0075
175 W Paint Horse Lane
This is a preliminary &final plat to create 2 lots on 3.98-acres
The Ada County Highway District has reviewed the submitted application for the preliminary plat
referenced above and has determined that there are no improvements required to the adjacent
street(s). The proposed preliminary plat is approved without conditions.
The applicant will be required to pay all platting and review fees prior to final plat approval.
If you have any questions, please contact me at (208) 387-6171.
Sincerely,
Stacey Ycwr'nOOTV
Stacey Yarrington
Planner III
Development Services
cc: Project File
City of Meridian (via email)
Mary Taysom (via email)
Sharp & Smith Engineers (via email)
Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 2O8-387-6100• FX 345-7650•www.achdidaho.org
Traffic Information
This development is estimated to generate XXX additional vehicle trips per day (XX existing); and
XXX additional vehicle trips per hour in the PM peak hour (XX existing), based on the Institute of
Transportation Engineers Trip Generation Manual, 10t" edition.
Condition of Area Roadways:
Traffic Count is based on Vehicles per hour VPH
Roadway Frontage Functional PM Peak Hour PM Peak Hour
Classification Traffic Count Level of Service
**State Highway XX-feet Arterial
Road Name
ACHD Road 1 XX-feet Arterial
ACHD Road 2 XX-feet Collector
ACHD Road 3 XX-feet Local N/A
* Acceptable level of service for a two-lane principal arterial is "E" (690 VPH).
* Acceptable level of service for a three-lane principal arterial is "E" (880 VPH).
* Acceptable level of service for a four-lane principal arterial is "E" (1,330 VPH).
* Acceptable level of service for a five-lane principal arterial is "E" (1,770 VPH).
* Acceptable level of service for a seven-lane principal arterial is "E" (2,660 VPH).
* Acceptable level of service for a two-lane minor arterial is "D" (550 VPH).
* Acceptable level of service for a three-lane minor arterial is "D" (720 VPH)
* Acceptable level of service for a four-lane minor arterial is "D" (1,200 VPH).
* Acceptable level of service for a five-lane minor arterial is "D" (1,540 VPH).
*Acceptable level of service for a two-lane one-way street is "D" (1,360) "E" (1,700).
*Acceptable level of service for a three-lane one-way street is "D" (2,040) "E" (2,550).
*Acceptable level of service for a four-lane one-way street is "D" (2,720) "E" (3,400).
* Acceptable level of service for a two-lane collector is "D" (425 VPH).
* Acceptable level of service for a three-lane collector is "D" (530 VPH).
** ACHD does not set level of service thresholds for State Highways.
Average Daily Traffic Count (VDT):
Average daily traffic counts are based on ACHD's most current traffic counts
• The average daily traffic count for Street Name north/south/east/west of Road Name
was traffic count on date.
• The average daily traffic count for Street Name north/south/east/west of Road Name
was traffic count on date.
Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 2O8-387-6100•FX 345-7650•www.achdidaho.org