Loading...
2020 04-13 TMX Office 7 Photometric TestAMERIBEN BUILDING - PHASE IIPROPOSED BUILDING #7A13 @ 30'A24 @ 30'A44 @ 30'A44 @ 30'A24 @ 30'A24 @ 30'A24 @ 30'A44 @ 30'A44 @ 30'0.90.80.70.70.80.70.60.60.60.60.60.50.50.60.60.50.40.30.30.30.21.10.90.91.01.11.00.80.80.80.80.70.70.80.90.90.70.50.50.40.40.31.21.11.11.41.51.41.11.01.01.00.90.91.01.31.31.10.70.60.50.50.41.41.31.41.92.21.91.41.21.21.21.11.21.41.81.91.51.00.70.60.60.41.61.51.72.43.12.51.61.41.31.41.31.41.72.52.81.91.20.90.70.60.51.91.81.82.43.02.41.81.71.61.61.51.61.82.63.02.01.41.10.90.70.52.02.01.92.53.02.61.81.91.81.71.81.81.82.62.92.01.51.31.00.80.61.92.01.72.42.42.61.81.91.91.81.91.91.82.12.91.91.41.41.10.80.61.81.91.82.53.12.61.81.91.81.81.81.91.82.72.92.11.51.41.00.80.61.61.71.82.43.02.41.81.71.61.61.61.71.82.42.82.01.41.20.90.80.61.41.51.62.43.22.61.71.51.41.41.41.51.72.73.02.01.31.00.80.70.51.21.21.52.02.32.01.51.21.21.31.21.21.52.12.21.71.10.80.70.60.51.01.01.11.41.61.51.21.11.01.11.01.01.21.41.51.20.80.70.60.50.40.90.80.91.01.11.10.90.80.90.90.80.80.91.01.00.80.60.50.50.40.30.70.70.70.80.90.80.70.70.70.70.60.60.60.70.70.60.40.40.40.30.30.60.60.60.60.70.60.60.60.60.50.50.60.50.50.60.60.60.50.50.50.40.70.70.60.60.50.50.40.90.90.80.70.60.50.41.11.00.90.70.60.50.41.41.21.00.80.70.50.41.61.51.21.00.80.60.41.81.81.71.51.10.70.52.82.52.82.11.40.90.62.92.72.92.11.40.90.62.01.91.91.61.10.80.51.71.61.31.10.80.60.41.51.31.10.90.70.60.41.31.21.00.90.70.60.41.11.11.00.90.70.50.41.01.01.00.90.80.50.40.91.01.00.90.80.50.40.81.01.11.01.00.60.40.81.01.31.31.20.80.40.91.11.51.71.50.80.51.01.41.62.21.91.00.61.11.61.81.91.91.20.81.31.81.81.91.71.30.90.80.80.80.81.01.41.71.61.10.80.60.60.50.41.41.91.92.01.81.31.00.90.90.91.01.31.92.62.21.41.00.80.70.50.41.61.92.02.22.21.41.00.91.01.01.21.52.13.12.61.51.20.90.80.60.41.82.02.22.72.41.41.01.01.11.21.41.62.02.82.41.61.41.10.90.70.42.22.22.42.62.21.41.01.01.11.31.61.52.12.82.61.51.51.20.90.70.42.62.42.42.32.11.51.01.01.11.31.51.62.22.82.61.51.51.20.90.70.43.22.72.42.11.91.41.01.01.11.21.41.52.02.82.31.61.41.00.80.60.43.83.12.62.21.81.31.01.01.01.01.21.42.13.12.61.51.20.90.70.60.4(801) 359-3158 Fax: (801) 521-4114 Salt Lake City, Utah 84116 1040 North 2200 West, Suite 100 REVISIONS: DESCRIPTIONDATE 4/10/2020NO.DATE..............................SHEET TITLESHEET NO.CHECKED........................JOB NO...........................DRAWN............................20050.01E101T.GORSETHT.GORSETHE101SITEPHOTO-METRICSELECTRICAL PLANAE101SCALE: 1" = 20'-0"PRELIMINARYStatisticsDescriptionSymbolAvgMaxMinMax/MinAvg/MinCalc Zone #1 - TMX Building #71.3 fc3.8 fc0.2 fc19.0:16.5:1ScheduleSymbolLabelQuantityManufacturerCatalog NumberDescriptionLampNumber LampsFilenameLumens Per LampLight Loss FactorWattageA131COOPER LIGHTING SOLUTIONS - LUMARK (FORMERLY EATON)PRV-C25-D-UNV-T3-BZ-7050PREVAIL AREA AND ROADWAY LUMINAIRE (2) 70 CRI, 5000K LEDS AND TYPE III OPTICS, BRONZE PAINTED FINISH Retail, Roadway, Sidewalk, Site, Street, Substation, Security, Corrosion Resistant, Vandal Resistant, Wet Location ABSOLUTE PHOTOMETRY IS BASED ON CALIBRATION FACTORS CREATED USING LAB LUMEN STANDARDS IN GONIOPHOTOMETER WITH TEST DISTANCE OF 28.75 FEET2PRV-C25-D-UNV-T3-BZ-7050.ies67140.9596A244COOPER LIGHTING SOLUTIONS - LUMARK (FORMERLY EATON)PRV-C25-D-UNV-T4-BZ-7050PREVAIL AREA AND ROADWAY LUMINAIRE (2) 70 CRI, 5000K LEDS AND TYPE IV OPTICS, BRONZE PAINTED FINISH Retail, Roadway, Sidewalk, Site, Street, Substation, Security, Corrosion Resistant, Vandal Resistant, Wet Location ABSOLUTE PHOTOMETRY IS BASED ON CALIBRATION FACTORS CREATED USING LAB LUMEN STANDARDS IN GONIOPHOTOMETER WITH TEST DISTANCE OF 28.75 FEET2PRV-C25-D-UNV-T4-BZ-7050.ies66890.95192