2020-07-14 ACHD   1 Epic Storage/ MER20-0071/ H-2020-0058 Development Services Department Project/File: Epic Storage/ MER20-0071/ H-2020-0058 This is a rezone from R-8 to C-G and a Conditional Use Permit application to construct a 29,400-sf RV and outdoor storage facility on 4.43-acres. Lead Agency: City of Meridian Site address: 1345 W Overland Road Staff Approval: July 14, 2002 Applicant: Jarron Langston 917 S Allante Place Boise, ID 83709 Representative: Glenn Walker 1891 N Wildwood Street Boise, ID 83713 Staff Contact: Stacey Yarrington, Planner III Phone: 387-6171 E-mail: syarrington@achdidaho.org A. Findings of Fact 1. Description of Application: The applicant is requesting approval of a rezone from R-8 (Medium density Residential) to C-G (General Retail and Service Commercial) and a Conditional Use Permit application to allow for the construction of a 29,400 square feet of RV and outdoor storage with valet services. The applicant’s proposal is not consistent with the City of Meridian’s Future Land Use Map that designates this area as Medium density Residential . 2. Description of Adjacent Surrounding Area: Direction Land Use Zoning North Light Industrial I-L South Medium density Residential R-8 East Rural Urban Transition RUT West Medium-high density Residential R-15 3. Site History: ACHD has not previously reviewed this site for a development application. 4. Adjacent Development: The following developments are pending or underway in the vicinity of the site: • Sagewood West, a 53-lot residential development located directly east of the site was approved by ACHD on May 7, 2020. 2 Epic Storage/ MER20-0071/ H-2020-0058 • Meridian Fire Station No. 6, a fire statio n located west of the site was approved by ACHD in March 2018. 5. Transit: Transit services are not available to serve this site. 6. New Center Lane Miles: The proposed development includes 0 centerline miles of new public road. 7. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 8. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): There are no roadways, bridges or intersections in the general vicinity of the project that are in the Integrated Five Year Work Plan (IFYWP). • Linder Road is listed in the CIP to be widened to 5 -lanes from Victory Road to Overland Road between 2021 and 2025. • Linder Road is listed in the CIP to be widened to 5 -lanes from Franklin Road to Overland Road between 2031 and 2035. This is to be a joint project with ITD. • The intersection of Overland Road and Linder Road is listed in the CIP to be widened to 5- lanes on the north leg, 5 -lanes on the south, 6-lanes east, and 6-lanes on the west leg, and signalized between 2031 and 2035. 9. Roadways to Bikeways Master Plan: ACHD’s Roadways to Bikeways Master Plan (BMP) was adopted by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to implement the Planned Bicycle Network to support bicycling as a viable transportation option for Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of good repair in order to ensure they are consistently available for use, promote awareness of existing bicycle routes and features, and support encouragement programs, and to facilitate coordination and cooperation among local jurisdictions in implementing the Roadway s to Bikeways Plan recommendations. The BMP identifies Overland Road as a Level 3 facility. B. Traffic Findings for Consideration 1. Trip Generation: This development is estimated to generate 6 vehicle trips per hour in the PM peak hour (1 existing), based on the Institute of Transportation Eng ineers Trip Generation Manual, 10th edition. 2. Condition of Area Roadways Traffic Count is based on Vehicles per hour (VPH) * Acceptable level of service for a five -lane principal arterial is “E” (1,780 VPH). 3. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD’s most current traffic counts. • The average daily traffic count for Overland Road east of Linder Road was 8,957 on 02/07/2018. Roadway Frontage Functional Classification PM Peak Hour Traffic Count PM Peak Hour Level of Service Overland Road 256-feet Principal Arterial 637 Better than “E” 3 Epic Storage/ MER20-0071/ H-2020-0058 C. Findings for Consideration 1. Overland Road a. Existing Conditions: Overland Road is improved with 5-travel lanes, vertical curb, gutter, and 7-foot wide sidewalk abutting the site. There is between 104 -feet of right-of-way for Overland Road (50-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards , including the Master Street Map and Livable Streets Design Guide . The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard 7-lane street section shall be 96-feet (back-of-curb to back-of-curb) within 120- feet of right-of-way. This width typically accommodates three travel lanes in each direction, a continuous raised or landscaped median with intermittent turn lanes, and safety shoulders. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right -of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right -of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right -of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the side walk is required to provide increased safety and protection of pedestrians. Consult the District’s planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are en couraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed out side of the dedicated right-of-way. The easement shall encompass the ent ire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Overland Road is designated in the 4 Epic Storage/ MER20-0071/ H-2020-0058 MSM as a Planned Commercial Arterial with 7-lanes and on-street bike lanes, a 96-foot street section within 120-feet of right-of-way. c. Applicant Proposal: The applicant is not proposing any right -of-way dedication or improvements to Overland Road abutting the site. d. Staff Comments/Recommendations: Overland Road is fully improved as a 5-lane roadway with curb, gutter, and sidewalk. Therefore, no additional street improvements are required as part of this application. However, the applicant should be required to dedicate ad ditional right- of-way to total 60-feet from centerline of Overland Road abutting the site. The right-of-way dedication is impact fee eligible for compensation. Consistent with District Minor Improvements policy, the applicant should be required to repair or replace any broken or deteriorated curb, gutter, and sidewalk on Overland Road abutting the site. 2. Driveways Overland Road a. Existing Conditions: There is an existing 35-foot wide driveway onto Overland Road from the site located at the site’s east property line. b. Policy Access Points Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. Access Policy: District policy 7205.4.7 states that direct access to principal arterials is typically prohibited. If a property has frontage on more than one street, access shall be taken from the street having the lesser functional classification. If it is necessary to take access to the higher classified street due to a lack of frontage, the minimum allowable spacing shall be based on Table 1b under District policy 7205.4 .7, unless a waiver for the access point has been approved by the District Commission. Driveways, when approved on a principal arterial shall operate as a right-in/right-out only, and the District will require the construction of a raised median to restri ct the left turning movements. Driveway Location Policy: District policy 7205.4.7 requires driveways located on principal arterial roadways to be located a minimum of 355-feet from the nearest intersection for a right- in/right-out only driveway. Full-access driveways are not allowed on principal arterial roadways. Successive Driveways: District policy 7205.4.7 Table 1b, requires driveways located on principal arterial roadways with a speed limit of 45 MPH to align or offset a minimum of 450-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7205.4.8 restricts high-volume driveways (100 VTD or more) to a maximum width of 36-feet and low-volume driveways (less than 100 VTD) to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high- volume driveways with 100 VTD or more. Curb return type driveways with 15 -foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7205.4.8, the applicant should be required to pave the driveway its full w idth and at least 30- feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7205.4.8 . 5 Epic Storage/ MER20-0071/ H-2020-0058 Temporary Access Policy: District Policy 7202.4.2 identifies a temporary access as that which “is permitted for use until appropriate alternative access becomes available”. Temporary access may be granted through a development agreement or similar method, and the developer shall be responsible for providing a financial guarantee for the f uture closure of the driveway. Cross Access Easements/Shared Access Policy: District Policy 7202.4.1 states that cross access utilizes a single vehicular connection that serves two or more adjoining lots or parcels so that the driver does not need to re -enter the public street system. c. Applicant’s Proposal: The applicant is proposing to utilize the existing 35 -foot wide driveway onto Overland Road from the site located along the site’s east property line and 205 -feet east of an existing driveway. d. Staff Comments/Recommendations: The applicant's proposal does not meet District Access Management, Successive Driveway, and Driveway Location policies as the proposed driveway does not meet the minimum 450 -feet offset requirement from an arterial roadway. However, staff recommends a modification of policy to allow the 35-foot wide driveway as a temporary full access driveway located along the site’s east property line, due to the fact that the site does not have access to a lesser street and restricting the driveway to right -in/right-out would restrict the fire department access directly west of the site. This is a 54% modification to the dimensional standards and is approved at the Deputy Director of Development and Technical Services’ discretion. 3. Tree Planters Tree Planter Policy: Tree Planter Policy: The District’s Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8 -feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10 -feet. 4. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10 -feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40 -foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontro lled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 5. Other Access Overland Road is classified as an arterial roadway. Other than the access specifically approved with this application, direct lot access is prohibited to this roadway. D. Site Specific Conditions of Approval 1. Dedicate additional right-of-way to total 60-feet from centerline of Overland Road abutting the site. Right-of-way dedication is impact fee eligible. 2. Repair or replace any damaged or deficient curb, gutter, and sidewalk on Overland Road abutting the site. 3. The 35-foot wide driveway located along the site’s east property line is approved as a temporary full access driveway. 4. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 5. Payment of impact fees is due prior to issuance of a building permit. 6 Epic Storage/ MER20-0071/ H-2020-0058 6. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right -of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right -of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non - compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant’s engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District’s Tree Planter policy is required for all landscaping proposed within ACHD right -of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right -of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1 -811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387 -6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant’s authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to o btain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is grante d by the ACHD Commission. F. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 7 Epic Storage/ MER20-0071/ H-2020-0058 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 1. Vicinity Map 2. Site Plan 3. Utility Coordinating Council 4. Development Process Checklist 5. Appeal Guidelines 8 Epic Storage/ MER20-0071/ H-2020-0058 VICINITY MAP 9 Epic Storage/ MER20-0071/ H-2020-0058 SITE PLAN 10 Epic Storage/ MER20-0071/ H-2020-0058 Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5) working days upon notification of required right of way improvements by Highway entities, developers shall provid e written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the sc ale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 11 Epic Storage/ MER20-0071/ H-2020-0058 Development Process Checklist Items Completed to Date: Submit a development application to a City or to Ada County The City or the County will transmit the development application to ACHD The ACHD Planning Review Section will receive the development application to review The Planning Review Section will do one of the following: Send a “No Review” letter to the applicant stating that there are no site specific conditions of approval at this time. Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: For ALL development applications, including those receiving a “No Review” letter: • The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.) • The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) Driveway or Property Approach(s) • Submit a “Driveway Approach Request” form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. Working in the ACHD Right-of-Way • Four business days prior to starting work have a bonded contractor submit a “Temporary Highway Use Permit Application” to ACHD Construction – Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50’ or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) Sediment & Erosion Submittal • At least one week prior to setting up a Pre-Construction Meeting an Erosion & Sediment Control Narrative & Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. Idaho Power Company • Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. Final Approval from Development Services is required prior to scheduling a Pre-Con. 12 Epic Storage/ MER20-0071/ H-2020-0058 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the Development Services Manager when it is alleged that the Development Services Manager did not properly apply this section 71 01.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of a ppeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or t he facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is be ing appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the a ppeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager’s reply to the notice of appeal. A copy of the decision being a ppealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify , amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing.