Loading...
2020-07-07 ACHD Draft Staff Report   1 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Development Services Department Project/File: Apex Southeast Subdivision/ MPP20-0009/ H-2020-0057 This is an annexation, rezone and preliminary plat application to develop 237 residential lots, 2 commercial lots, 30 common lots and 10 other lots on 81.63 acres and a development agreement modification with the City of Meridian. Lead Agency: City of Meridian Site address: The southeast corner of Lake Hazel Road and Locust Grove Road Commission Meeting: XXXX, 2020 Staff Approval: XXXX, 2020 Applicant: Brighton Murgoitio 2929 W. Navigator Drive Meridian, ID 83642 Representative: Michael D. Wardle 2929 W. Navigator Drive, #400 Meridian, ID 83642 Staff Contact: Paige Bankhead, E.I. Phone: 387-6293 E-mail: pbankhead@achdidaho.org A. Findings of Fact 1. Description of Application: The applicant is requesting approval of an annexation and rezone and preliminary plat application to develop 237 residential lots for single family homes, 130 multi- family units, 2 commercial lots, 30 common lots and 10 other lots on 81.63 acres. The applicant is also requesting to modify a development agreement with the City of Meridian based on the proposed development. The property is zoned R-8 based on the recent annexation and rezoning application. The City of Meridian’s Future Land Use Map designates this area as medium density residential and a neighborhood center. 2. Description of Adjacent Surrounding Area: Direction Land Use Zoning North Community Business District/Medium-High Density Residential C-C/R-15 South Rural Urban Transition (Ada County), Medium-Low Density Residential RUT, R-4 East Rural Urban Transition (Ada County), Medium-Low Density Residential RUT, R-4 West Medium Density Residential R-8 Vicinity Map 2 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 3. Site History: ACHD staff previously reviewed this site as Apex Rezoning/MER20-0068 in June 2020. The requirements of this staff report are consistent with those of the prior action. 4. Adjacent Development: The following developments are pending or underway in the vicinity of the site:  Lavender Height Subdivision, a 187-lot residential development located to the northeast of the site approved by ACHD on March 27, 2020.  Apex Northwest Subdivision, a 120-residential lot and 11 commercial lot development located to the northwest of the site and currently under review by ACHD. 5. Transit: Transit services are not available to serve this site. 6. Gas Pipeline: The Williams Pipeline falls within the proposed development. Coordination with the owner of the pipeline prior to final design is recommended to ensure that their requirements are met. ACHD requires written approval from the owner of the pipeline prior to plan acceptance if public street improvements are proposed or required within the pipeline easement. 7. New Center Lane Miles: The proposed development includes 0.XX centerline miles of new public road. 8. Impact Fees: There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 9. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):  Eagle Road is scheduled in the IFYWP to be widened to 5-lanes from Lake Hazel Road to Amity Road in 2023.  Eagle Road is scheduled in the IFYWP to be widened to 5-lanes from Amity Road to Victory Road in 2021.  The intersection of Lake Hazel Road and Eagle Road is scheduled in the IFYWP to be widened to 5-lanes on the north leg, 4-lanes on the south leg, 3-lanes on the west leg and 4- lanes on the east leg and signalized in 2023.  Lake Hazel Road is listed in the CIP to be widened to 3-lanes from Locust Grove Road to Eagle Road between 2026 and 2030.  Lake Hazel Road is listed in the CIP to be widened to 3-lanes from Meridian Road (SH-69) to Locust Grove Road between 2026 and 2030.  Amity Road is listed in the CIP to be widened to 5-lanes from Locust Grove Road to Eagle Road between 2026 and 2030.  The intersection of Lake Hazel Road and Locust Grove Road is listed in the CIP to be reconstructed as a single lane roundabout to be widened to 3-lanes on the north leg, 2-lanes on the south, 2-lanes east, and 3-lanes on the west leg with a westbound bypass right turn bypass lane between 2026 and 2030. The intersection is listed in the draft 2020 CIP anticipated to be adopted in August of 2020, as a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the north and south legs of the intersection.  The intersection of Lake Hazel Road and SH-69 is listed in the CIP to be widened to 7-lanes on the north, south, west and east legs and signalized between 2026 and 2030.  The intersection of Locust Grove Road and Amity Road is listed in the CIP to widened to 4- lanes on the north leg, 3-lanes on the south leg, 5-lanes on the west leg and 6-lanes on the east leg and signalized between 2026 and 2030. 3 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057  Lake Hazel Road is listed in the draft CIP that is anticipated to be accepted in August 2020 to be widened to 5-lanes between Eagle Road and Locust Grove Road.  Lake Hazel Road is listed in the draft CIP that is anticipated to be accepted in August 2020 to be widened to 5-lanes between Locust Grove Road and SH-69 (Meridian Road). 12. Roadways to Bikeways Master Plan: ACHD’s Roadways to Bikeways Master Plan (BMP) was adopted by the ACHD Commission in May of 2009 and was update in 2018. The plan seeks to implement the Planned Bicycle Network to support bicycling as a viable transportation option for Ada County residents with a wide range of ages and abilities, maintain bicycle routes in a state of good repair in order to ensure they are consistently available for use, promote awareness of existing bicycle routes and features and support encouragement programs and to facilitate coordination and cooperation among local jurisdictions in implementing the Roadways to Bikeways Plan recommendations. The BMP identifies Lake Hazel Road and Locust Grove Road as Level 3 facilities. The BMP also identifies a level 1 facility on the new collector roadway within the site. The applicant will construct the new collectors consistent with the MSM and the Roadways to Bikeways Master plan. B. Traffic Findings for Consideration 1. Trip Generation: This development is estimated to generate 3,007 additional vehicle trips per day; 290 additional vehicle trips per hour in the PM peak hour, based on the traffic impact study. 2. Traffic Impact Study Kittelson & Associates prepared a traffic impact study for the proposed Apex Southeast Subdivision and Apex Northwest Subdivision. An executive summary of the findings as presented by Kittelson & Associates can be found as Attachment 3. The executive summary is not the opinion of ACHD staff. ACHD has reviewed the submitted traffic impact study for consistency with ACHD policies and practices, and may have additional requirements beyond what is noted in the summary. ACHD Staff comments on the submitted traffic impact study can be found below under staff comments. The traffic impact study included an analysis of two preliminary plat applications, Pinnacle/Apex Northwest and Pinnacle/Apex Southeast. The applicant has indicated that both preliminary plats will be final platted concurrently. Because of this, both preliminary plat applications will include the same findings and recommendations, as presented in the traffic impact study, and the thresholds for improvements will be reported the same. 4 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Intersections, Roadway Segments and Accesses Analyzed in TIS ROADWAY SEGMENT To Eagle Road 5 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Proposed First Phases of Pinnacle/Apex Northwest and Pinnacle/Apex Southeast 3. Mitigation/Required Improvements a. Policy: Mitigation Proposals: Mitigation recommendations shall be provided within the report. At a minimum, for each roadway segment and intersection that does not meet the minimum acceptable level of service planning threshold or v/c ratio, the report must discuss feasible measures to avoid or reduce the impact to the system. To be considered adequate, measures should be specific and feasible. Mitigation may also include:  Revision to the Phasing Plan to coincide with the District’s planning Capital Projects.  Reducing the scope and/or scale of the project. Alternative Mitigation Measures: 7106.7.3 states that if traditional mitigation measures such as roadway widening and intersection improvements are infeasible as determined by ACHD, the TIS may recommend alternative mitigation measures. Alternative mitigation measures shall demonstrate that impacts from the project will be offset.  If the impacted roadway segments and/or intersections are programmed as funded in the Integrated Five Year Work Plan (IFYWP) or the Capital Improvements Plan (CIP); no alternative mitigation is required. Phase 1 6 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057  If the impacted roadway segments and/or intersections are not programmed in either the IFYWP or the CIP; the applicant may (i) analyze the shoulder hour and (ii) provide a safety analysis to determine alternative mitigation requirements. o If the impacted roadway segments and intersections meet the minimum acceptable level of service planning thresholds in the shoulder hour the applicant may suggest feasible alternative mitigation such as: sidewalks, bike facilities, connectivity, safety improvements, etc. within 1.5 miles of the proposed development. o If the shoulder hour planning thresholds are exceeded the applicant may request to enter into a Development Agreement and pay into the Priority Corridor Fund an amount determined by the ACHD to offset impacts from the project.  Alternative Mitigation may also include: o Revision to the Phasing Plan to coincide with the District’s future Capital Projects. o Reducing the scope and/or scale of the project. Level of Service Planning Thresholds: District Policy 7206.4.1 states that, Level of Service Planning Thresholds have been established for principal arterials and minor arterials within ACHD’s Capital Improvement Plan and are also listed in section 7106. Unless otherwise required to provide a Traffic Impact Study under section 7106, a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic shall not be required to provide mitigation for a roadway or intersection that currently exceeds the minimum acceptable level of service planning threshold or V/C ratio. b. Staff Comments/Recommendations: Locust Grove Road - Lake Hazel Road to Amity Road The TIS recommends that Locust Grove Road between Amity Road and Lake Hazel Road be widened to 3-lanes with the development of 460 units, or when 460 PM peak hour trips are generated by the site. The proposed PM peak hour site traffic is 28% of the total 2025 traffic for this segment of Locust Grove Road and this segment of Locust Grove Road is not listed in the CIP or scheduled in the IFYWP. The applicant has proposed to enter into a CDA with ACHD to widen Locust Grove Road to 3- lanes from Lake Hazel Road north approximately a quarter mile, abutting the Apex Northwest Subdivision site. Staff agrees with the TIS findings and the applicant’s proposal. Typically, the applicant would be required to widen the remaining segment of Locust Grove Road or provide alternative mitigation measures since the site traffic is greater than 10% of the 2025 total traffic consistent with District policy. However, the remaining segment of Locust Grove Road is off- site and there is not enough existing right-of-way available to widen the roadway to 3-lanes. In addition, there are primarily single-family homes that access this segment of Locust Grove and there are no new subdivisions proposed at this time that will access Locust Grove Road. Therefore, no additional improvements should be required beyond the applicant’s proposal to improve Locust Grove Road abutting the Pinnacle/Apex Northwest site to 3-lanes. This segment of Locust Grove Road is not listed in the current CIP or the IFYWP, but is listed as future 3-lane minor arterial roadway in ACHD’s draft 2020 CIP anticipated to be adopted in August of 2020. If the applicant chooses to move forward with this development application prior to the completion of ACHD’s 2020 CIP updated, then the applicant would not be compensated for the Locust Grove Road right-of-way dedication or proposed roadway improvements. Depending on the timing of this development, this segment of Locust Grove Road may be included in the next CIP update estimated to be completed in August 2020. If this segment of 7 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 roadway is included in the 2020 CIP prior to the dedication of right-of-way and the construction of the proposed roadway improvements then proposed, then the applicant should enter into a CDA with ACHD to improve Locust Grove Road abutting the site as a 3-lane roadway, as proposed. See Finding for consideration 4 below. Locust Grove Road/Lake Hazel Road Intersection The TIS recommends a single-lane roundabout with a westbound right-turn bypass lane at the intersection of Locust Grove Road and Lake Hazel Road be constructed to mitigate the impacts of the 2025 background traffic or with the development of 100 units or when 100 PM peak hour trips are generated by the development. The study notes that an 3X3 interim signal would be acceptable mitigation. Additionally, the TIS recommends a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the south leg when the development generates 440 PM peak hour trips. The intersection of Lake Hazel Road and Locust Grove Road is listed in the current CIP to be reconstructed as a multi-lane roundabout with 3-lanes on the north leg, 2-lanes on the south, 2- lanes on the east, and 3-lanes on the west leg with a westbound bypass right turn bypass lane between 2026 and 2030. However, the intersection is listed in the draft 2020 CIP anticipated to be adopted in August of 2020, as a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the north and south legs of the intersection. The applicant has proposed to enter into a CDA with ACHD to improve the intersection as a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the south leg, as listed in the 2020 CIP with the first phase of the development. See Finding 2 Below. Off-site Amity Road - Locust Grove to Eagle Road The TIS recommends that Amity Road between Locust Grove Road and Eagle Road be widened to 3-lanes for the 2025 background traffic or with the development of 173 units, or the site generates 173 PM peak hour trips; and 5-lanes with the development of 370 units, or the site generates 370 PM peak hour trips. This segment of Amity Road is listed in the CIP to be widened to 5-lanes between 2026 and 2030. It is infeasible for the applicant to widen this segment of Amity Road due to right-of-way constrains. Therefore, consistent with ACHD’s Alternative Mitigation policy, no improvements to Amity Road between Locust Grove and Eagle Road are required as part of this application. It should be noted that this segment of Amity Road has center left turn lanes at all major subdivision access points, allowing the roadway to function as a 3-lane minor arterial roadway. Amity Road/Locust Grove Road Intersection The TIS recommends installing a traffic signal and constructing left turn lanes on all legs at the Locust Grove Road/Amity Road intersection when the development generates 55 PM peak hour trips. This intersection is listed in the CIP to be widened to 4-lanes on the north leg, 3-lanes on the south leg, 5-lanes on the west leg and 6-lanes on the east leg and signalized between 2026 and 2030. Additionally, the DRAFT 2021-2025 Integrated Five Year Work Plan includes the installation of an interim 3X3 signal at this intersection in 2023. Therefore, consistent with ACHD’s Alternative Mitigation Measures policy, no improvements to the Amity Road/Locust Grove Road intersection are required as part of this application. SH-69/Lake Hazel Road Although the SH-69/Lake Hazel Road intersection is anticipated to operate at an overall acceptable level of service under total traffic conditions in 2025, the TIS recommends the construction of a westbound right-turn lane on Lake Hazel Road at the intersection of SH- 69/Lake Hazel Road for the 2025 background traffic or when the development generates 187 PM peak hour trips prior to 2025. The site traffic at this intersection is only 4% of the total 8 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 2025 traffic. Therefore, consistent with District policy 7205.3.1 Level of Service Planning Threshold, which states, a proposed development with site traffic less than 10% of the existing downstream roadway or intersection peak hour traffic shall not be required to provide mitigation; no improvements are required for this intersection on the Lake Hazel legs of the intersection. However, the applicant should discuss with the City of Meridian and ITD to determine if any improvements are necessary for this intersection, this intersection is proposed to be included as part of ITD’s SH-69 study in the future. Access Analysis The traffic impact study included an access analysis to demonstrate that proposed access points on to Lake Hazel Road and Locust Grove Road are necessary to serve the site. The traffic impact study did not demonstrate that the access points are necessary to serve the site from a traffic perspective, but that the access points are needed for circulation, to maintain acceptable level of service thresholds on local residential and collector roadways, and to prevent the traveling public from traveling through local residential streets to access commercial land uses. Additionally, the analysis showed that the access points will not have operational deficiencies and access spacing requirements are met. Specific to the Pinnacle Southeast preliminary plat; in addition to being necessary based on the TIS, access G on Locust Grove Road located 660-feet south of Lake Hazel Road and access F into Lake Hazel Road located at the quarter mile east of Locust Grove, are shown as commercial collectors on the MSM. Based on the findings and recommendations of the South Meridian Transportation Plan, access F will be restricted to left-in/right-in/right-out in the future. Staff recommends that this access be approved as a temporary full access. Staff’s recommendation is due to the fact that this access is a commercial collector on the MSM. A dedicated eastbound right-turn lane should be constructed at access F, based on the TIS. Access E on Lake Hazel Road is proposed to be right-in/right-out only and be located 695-feet east of Locust Grove Road. A right-in/right-out only access in this location is consistent with the South Meridian Transportation Plan. A dedicated right-turn lane should be constructed at this intersection based on the findings of the TIS. Access G, H, and I on Locust Grove Road located 660-feet, 1,550-feet, and 2,655-feet south of Lake Hazel Road meet District policy and should be approve, as proposed. Turn lanes are not recommended at these intersections. 9 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 4. Condition of Area Roadways Traffic Count is based on Vehicles per hour (VPH) * Acceptable level of service for a two-lane principal arterial is “E” (690 VPH). * Acceptable level of service for a two-lane minor arterial is “E” (575 VPH). ** ACHD does not set level of service thresholds for State Highways. 5. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD’s most current traffic counts.  The average daily traffic count for SH-69 north of Lake Hazel Road was 28,395 on 10/24/2019.  The average daily traffic count for Lake Hazel Road west of Locust Grove Road was 4,901 on 12/9/2019.  The average daily traffic count for Lake Hazel Road east of Locust Grove Road was 6,326 on 8/29/2019.  The average daily traffic count for Locust Grove Road north of Lake Hazel Road was 5,933 on 12/9/2019.  The average daily traffic count for Locust Grove Road south of Lake Hazel Road was 1,485 on 5/22/2018.  The average daily traffic count for Amity Road east of Locust Grove Road was 8,658 on 12/9/2019. C. Findings for Consideration 1. South Meridian Transportation Plan The South Meridian Transportation Plan (SMTP) is a long-range planning tool used to identify future roadway, intersection, and corridor needs in the South Meridian Area. Providing a framework for future roadway improvements based on the land use designations. The plan was created in Roadway Frontage Functional Classification PM Peak Hour Traffic Count PM Peak Hour Level of Service Existing Plus Project SH-69** 780-feet Principal Arterial 1,513 N/A N/A Lake Hazel Road (west of Locust Grove Rd) 2,640-feet Principal Arterial 330 Better than “D” Better than “E” Lake Hazel Road (east of Locust Grove Rd) 1,320-feet Principal Arterial 351 Better than “D” Better than “E” Locust Grove Road (north of Lake Hazel Rd) 1,320-feet Minor Arterial 255 Better than “D” “F” Locust Grove Road (south of Lake Hazel Rd) 2,640-feet Minor Arterial 143 Better than “D” Better than “E” Amity Road 0-feet Minor Arterial 465 Better than “D” “F” 10 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 collaboration with the City of Meridian and was adopted by the ACHD Commission in September of 2009. The SMTP recommends the following abutting and within and abutting the site:  Preserving right-of-way for the future widening of Lake Hazel Road to 5-lanes and the construction of 6-foot wide detached sidewalks on Lake Hazel Road.  Preserving right-of-way for future widening of Locust Grove Road to 3-lanes and the construction of 7-foot wide detached sidewalks.  Preserving right-of-way for future construction of a 2-lane residential collector roadway and the construction of 5-foot wide detached sidewalks.  Preserving right-of-way for future construction of a 3-lane commercial collector roadways and the construction of 6-foot wide detached sidewalks. 2. Lake Hazel Road/Locust Grove Road Intersection The traffic impact study notes that Locust Grove/Lake Hazel intersection is anticipated to the exceed acceptable level of service planning threshold LOS “E” when the development generates 100 PM peak hour trips and will need to be improved with either a single lane roundabout or enter into a Cooperative Development Agreement (CDA) with ACHD to construct the Locust Grove/Lake Hazel intersection as a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the south leg with the first phase of the development. The intersection of Lake Hazel Road and Locust Grove Road is listed in the current CIP to be reconstructed as a multi-lane roundabout with 3-lanes on the north leg, 2-lanes on the south, 2- lanes on the east, and 3-lanes on the west leg with a westbound bypass right turn bypass lane between 2026 and 2030. However, the intersection is listed in the draft 2020 CIP anticipated to be adopted in August of 2020, as a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the north and south legs of the intersection. If the applicant chooses to enter into a CDA with ACHD to improve the intersection as a multi-lane roundabout, as proposed prior to adoption of the 2020 CIP, then only the improvements listed in the 2016 CIP 3-lanes on the north leg, 2-lanes on the south, 2-lanes on the east, and 3-lanes on the west leg with a westbound bypass right turn bypass lane) would be eligible for reimbursement through the CDA. If the applicant waits until after adoption of the 2020 CIP, to enter into a CDA with ACHD, then the full intersection improvement proposed to by the applicant would be consistent with the intersection improvement listed in the CIP and would be impact fee eligible for reimbursement through a CDA. The applicant should be required to enter into a CDA with ACHD for the widening of Locust Grove Road/Lake Hazel Road intersection to a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the north and south legs of the intersection prior to ACHD’s signature on the first final plat. The Cooperative Development Agreement should include the intersection construction, contract requirements, as well as allocation of costs. ACHD will only provide reimbursement for the costs of permanent roadway improvements consistent with the IFYWP and CIP. Interim improvements are not eligible for reimbursement and all costs would be the responsibility of the applicant. In order to ensure the roadway will be improved when warranted, the following items must be in place prior plans acceptance for the final plat necessitating the improvements.  Cooperative Development Agreement;  Financial surety provided by the applicant meeting the terms of the Cooperative Development Agreement;  Dedication of all of the right-of-way necessary to complete the road widening project. 11 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 If the applicant decides to not fully improve Locust Grove Road/Lake Hazel Road intersection, then consistent with findings and recommendations of the traffic impact study, the applicant should be required to install an interim 3 X 3 signalized, prior to ACHD’s signature on the final plat that contains the 101st building lot. In order to install the interim signal at the Locust Grove Road/Lake Hazel Road intersection the applicant will need to obtain plan approval, purchase the signal equipment, and enter into a signal agreement with ACHD. The applicant will need to order and purchase the signal hardware as ACHD does not have these materials available for this project. The signal agreement should include requirements that the intersection be designed as a 3 X 3 intersection with three 12-foot wide travel lanes: one receiving lane, one dedicated left turn lane, and one thru/right lane on each approach; that the applicant is responsible for all costs associated with the design, and installation of the interim signal, hardware, and that interim improvements are not eligible for reimbursement by ACHD. In order to ensure the Locust Grove Road/Lake Hazel Road intersection will be improved when warranted, the following items must be in place prior to plans acceptance of the final plat that contains the 101st building lot:  Signal Agreement;  Full design and approved plans for the intersection. 3. Lake Hazel Road a. Existing Conditions: Lake Hazel Road is improved with 2-travel lanes and no curb, gutter or sidewalk abutting the site. There is 50-feet of right-of-way for Lake Hazel Road (25-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of-Way Width Policy: District Policies 7205.2.1 & 7205.5.2 state that the standard 5-lane street section shall be 72-feet (back-of-curb to back-of-curb) within 96- feet of right-of-way. This width typically accommodates two travel lanes in each direction, a continuous center left-turn lane, and bike lanes on a minor arterial and a safety shoulder on a principal arterial. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. 12 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District’s planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Lake Hazel Road is designated in the MSM as a Mobility Arterial with 5-lanes and on-street bike lanes, a 72-foot street section within 100-feet of right-of-way abutting the site. Landscape Medians Policy: District policy 7205.5.15 states that landscape medians are permissible where adequate pavement width is provided on each side of the median to accommodate the travel lanes and where the following is provided:  The median is platted as right-of-way owned by ACHD.  The width of an island near an intersection is 12-feet maximum for a minimum distance of 150-feet. Beyond the 150-feet, the island may increase to a maximum width of 30-feet.  At an intersection that is signalized or is to be signalized in the future, the median width shall be reduced to accommodate the necessary turn lane storage and tapers.  The Developer or Homeowners Association shall apply for a license agreement if landscaping is to be placed within these medians.  The license agreement shall contain the District’s requirements of the developer including, but not limited to, a “hold harmless” clause; requirements for maintenance by the developer; liability insurance requirements; and restrictions.  Vertical curbs are required around the perimeter of any raised median. Gutters shall slope away from the curb to prevent ponding. c. Applicant Proposal: The applicant has proposed enter into a Cooperative Development Agreement with ACHD to improve Lake Hazel Road abutting the site with four 11.5-foot wide travel-lanes, a 19-foot wide median or a center left turn lane, vertical curb, gutter, 8-foot wide planter strips and 10-foot wide detached concrete sidewalks within 109-feet of right-of-way to 120.5-feet of right-of-way. The applicant has proposed to construct dedicated right-turn lanes on Lake Hazel Road at Peak Avenue and Vertex Way. 13 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 d. Staff Comments/Recommendations: This segment of Lake Hazel Road is listed in the current CIP to be widened to 3-lanes between 2026 and 2030. However, this segment is listed in the draft 2020 CIP anticipated to be adopted in August of 2020, to be widened to 5-lanes. If the applicant chooses to widen Lake Hazel Road, as proposed prior to adoption of the 2020 CIP, then only the improvements listed in the 2016 CIP to widen Lake Hazel Road to 3-lanes would be eligible for reimbursement through the CDA. If the applicant waits until after adoption of the 2020 CIP, to enter into a CDA with ACHD, then widening Lake Hazel Road to 5-lanes as proposed to by the applicant would be consistent with the improvements listed in the CIP and would be impact fee eligible for reimbursement through a CDA. The applicant’s proposal to construct this segment of Lake Hazel Road as a 83.5-foot wide street section exceeds the MSM and CIP street section width which requires this segment of Lake Hazel Road to be constructed as a 5-lane Mobility Arterial, a 72-foot wide street section within 100-feet of right-of-way. The applicant should be required to enter into a CDA with ACHD for the widening of Lake Hazel road to 5-lanes, a 72-foot street section within 100-feet of righty- of-way consistent with the MSM prior to ACHD’s signature on the first final plat. The Cooperative Development Agreement should include the roadway construction, contract requirements, as well as allocation of costs. ACHD will only provide reimbursement for the costs of permanent roadway improvements consistent with the IFYWP and CIP. Interim improvements are not eligible for reimbursement and all costs would be the responsibility of the applicant. In order to ensure the roadway will be improved when warranted, the following items must be in place prior plans acceptance for the final plat necessitating the improvements.  Cooperative Development Agreement;  Financial surety provided by the applicant meeting the terms of the Cooperative Development Agreement;  Dedication of all of the right-of-way necessary to complete the road widening project. The applicant’s proposal for the sidewalk width exceeds the SMTP which requires a minimum 6-foot wide sidewalk. At a minimum, the applicant should be required to construct a 6-foot wide sidewalk consistent with the SMTP. The applicant may construct a 10-foot wide sidewalk, however, ACHD will only contribute funds for the construction of a 6-foot wide sidewalk. The applicant’s proposal to construct a 19.5-foot wide median on Lake Hazel Road at Peak Avenue and taper it to 8.5-feet at Vertex Way meets District policy and should be approved, as proposed. This improvement is not eligible for compensation in the CDA with ACHD. The roadway center island should be platted as right-of-way owned by ACHD. The applicant or 14 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 homeowner’s association should enter into a license agreement with ACHD for any landscaping proposed to be located within the center landscape island. If the applicant decides to not fully improve Lake Hazel Road abutting the site, then consistent with ACHD policy, the following improvements should be constructed.  Dedicate additional right-of-way to total 50-feet from the centerline of Lake Hazel Road abutting the site, consistent with the MSM.  Widen the pavement on Lake Hazel Road to 17-feet from the centerline of the roadway abutting the site with a 3-foot wide gravel shoulder.  Construct a minimum 6-foot wide detached concrete sidewalk located a minimum of 41- feet from the centerline of Lake Hazel Road abutting the site, consistent with the SMTP. Provide a permanent right-of-way easement for detached sidewalks located outside of the dedicated right-of-way.  Construct a dedicated eastbound left-turn lane at Vertex Way to be used in future for future access to the north.  Extend the turn lane east of Vertex Way on Lake Hazel Road to create a left-turn lane for Vertex Way.  Construct a raised median at Peak Avenue to restrict the access to right-in/right-out only. The applicant’s proposal to construct the dedicated right-turn lanes on Lake Hazel Road at Peak Avenue and Vertex Way meets District policy and should be approved, as proposed consistent with the findings of the TIS. 4. Locust Grove Road a. Existing Conditions: Locust Grove Road is improved with 2-travel lanes and no curb, gutter or sidewalk abutting the site. There is 50-feet of right-of-way for Locust Grove Road (25-feet from centerline). b. Policy: Arterial Roadway Policy: District Policy 7205.2.1 states that the developer is responsible for improving all street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Master Street Map and Typology Policy: District Policy 7205.5 states that the design of improvements for arterials shall be in accordance with District standards, including the Master Street Map and Livable Streets Design Guide. The developer or engineer should contact the District before starting any design. Street Section and Right-of Way Width Policy: District Policy 7205.2.1 & 7205.5.2 states that the standard 3-lane street section shall be 46-feet (back-of-curb to back-of-curb) within 70 feet of right-of-way. This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Right-of-Way Dedication: District Policy 7205.2 states that The District will provide compensation for additional right-of-way dedicated beyond the existing right-of-way along arterials listed as impact fee eligible in the adopted Capital Improvements Plan using available impact fee revenue in the Impact Fee Service Area. No compensation will be provided for right-of-way on an arterial that is not listed as impact fee eligible in the Capital Improvements Plan. 15 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 The District may acquire additional right-of-way beyond the site-related needs to preserve a corridor for future capacity improvements, as provided in Section 7300. Sidewalk Policy: District Policy 7205.5.7 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all arterial streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District’s planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Frontage Improvements Policy: District Policy 7205.2.1 states that the developer shall widen the pavement to a minimum of 17-feet from centerline plus a 3-foot wide gravel shoulder adjacent to the entire site. Curb, gutter and additional pavement widening may be required (See Section 7205.5.5). ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, arterial street requirements, and specific roadway features required through development. This segment of Locust Grove Road is designated in the MSM as a Residential Arterial with 3-lanes and on-street bike lanes, a 46-foot street section within 74-feet of right-of-way. c. Applicant Proposal: The applicant has proposed improve Locust Grove Road abutting the site with three 12-foot wide travel-lanes with, 6.5-foot wide bike lines, vertical curb, gutter, 8-foot wide planter strips and 5-foot wide detached concrete sidewalks within 77-feet of right-of-way. Staff Comments/Recommendations: This segment of Locust Grove Road is not listed in the CIP or in the draft CIP that is anticipated to be adopted in August 2020. The applicant’s proposal to construct Locust Grove Road abutting the site as a 50-foot wide street section with vertical curb, gutter, an 8-foot wide planter strip and 5-foot wide concrete sidewalk exceeds ACHD policy which requires right-of-way dedication, pavement widening, and the construction of sidewalk on arterial roadways and the MSM which identifies Locust Grove Road as a 46-foot wide street section. At a minimum the applicant should be required to:  Dedicate additional right-of-way to total 37-feet from the centerline of Locust Grove Road abutting the site, consistent with the MSM.  Widen the pavement on Locust Grove Road to 17-feet from the centerline of the roadway abutting the site with a 3-foot wide gravel shoulder. 16 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057  Construct a minimum 7-foot wide detached concrete sidewalk located a minimum of 30- feet from the centerline of Locust Grove Road abutting the site, consistent with the SMTP. Provide a permanent right-of-way easement for detached sidewalks located outside of the dedicated right-of-way.  Construct center left turn lanes on Locust Grove Road at all street intersections. If the applicant chooses to fully improve Locust Grove Road abutting the site, then it would be improved as a 3-lane residential arterial, a 46-foot wide street section with vertical curb, gutter, and 5-foot wide detached (or 7-foot attached) concrete sidewalk within 74-feet of right-of-way. If street trees are desired, then 8-foot wide planter strips should be provided. This segment of Locust Grove Road is not listed in the CIP or IFYWP, therefore, compensation for right-of-way dedication and improvements will not be provided. 5. Vertex Way/Tower Street a. Existing Conditions: There are no collector roadways within the site. b. Policy: Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for improving all collector frontages adjacent to the site or internal to the development as required below, regardless of whether access is taken to all of the adjacent streets. Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector street is designated with a typology on the Master Street Map, that typology shall be considered for the required street improvements. If there is no typology listed in the Master Street Map, then standard street sections shall serve as the default. Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard right-of-way width for collector streets shall typically be 50 to 70-feet, depending on the location and width of the sidewalk and the location and use of the roadway. The right-of-way width may be reduced, with District approval, if the sidewalk is located within an easement; in which case the District will require a minimum right-of-way width that extends 2-feet behind the back-of- curb on each side. The standard street section shall be 46-feet (back-of-curb to back-of-curb). This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Sidewalk Policy: District policy 7206.5.6 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all collector streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District’s planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway features required through development. A new collector roadway was identified on the MSM with the street typology of Residential Collector. The new collector roadway should intersect 17 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Lake Hazel Road at the quarter mile east of Locust Grove Road and intersect Locust Grove Road approximately at the quarter mile south of Lake Hazel Road. The Commercial Collector typology as depicted in the Livable Street Design Guide recommends a 2-lane roadway with bike lanes, a 36-foot street section within 50 to 70-feet of right-of-way. c. Applicant Proposal: The applicant has proposed to construct Vertex Avenue to intersect Lake Hazel Road and extend it though the site transitioning to Tower Street to intersect Locust Grove Road. The applicant has proposed to construct Vertex Avenue as a 36-foot wide streets section with 2-lanes, bike lanes, vertical curb, gutter, an 8-foot wide planter strip and 5-foot wide detached concrete sidewalks within 63-feet of right-of-way. d. Staff Comments/Recommendations: The applicant’s proposal for the street section meets District policy and the MSM and should be approved, as proposed. The applicant should be required to construct 6-foot wide detached concrete sidewalks consistent with the SMTP. The applicant should be required to dedicate additional right-of-way that extends 2-feet behind the back of sidewalk. For detached sidewalk, the applicant may also reduce the width of the right- of-way to 2-feet behind the back-of-curb and provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind the back of sidewalk. 6. Via Roberto Street a. Existing Conditions: There are no collector roadways within the site. b. Policy: Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for improving all collector frontages adjacent to the site or internal to the development as required below, regardless of whether access is taken to all of the adjacent streets. Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector street is designated with a typology on the Master Street Map, that typology shall be considered for the required street improvements. If there is no typology listed in the Master Street Map, then standard street sections shall serve as the default. Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard right-of-way width for collector streets shall typically be 50 to 70-feet, depending on the location and width of the sidewalk and the location and use of the roadway. The right-of-way width may be reduced, with District approval, if the sidewalk is located within an easement; in which case the District will require a minimum right-of-way width that extends 2-feet behind the back-of- curb on each side. The standard street section shall be 46-feet (back-of-curb to back-of-curb). This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. Sidewalk Policy: District policy 7206.5.6 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all collector streets. A parkway strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District’s planter width policy if trees are to be placed within the parkway strip. Sidewalks constructed next to the back-of-curb shall be a minimum of 7-feet wide. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. 18 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Half Street Policy: District Policy 7206.2.2 required improvements shall consist of pavement widening to one-half the required width, including curb, gutter and concrete sidewalk (minimum 5-feet), plus 12-feet of additional pavement widening beyond the centerline established for the street to provide an adequate roadway surface, with the pavement crowned at the ultimate centerline. A 3-foot wide gravel shoulder and a borrow ditch sized to accommodate the roadway storm runoff shall be constructed on the unimproved side. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway features required through development. A new collector roadway was identified on the MSM with the street typology of Residential Collector. The new collector roadway should intersect Locust Grove Road at the half mile south of Lake Hazel Road and intersect SH-69 at the half mile north of Locust Grove Road. The Residential Collector typology as depicted in the Livable Street Design Guide recommends a 2-lane roadway with bike lanes, a 36-foot street section within 50 to 70-feet of right-of-way. c. Applicant Proposal: The applicant has proposed to construct Via Roberto Street to intersect Locust Grove Road and extend the street along the site’s south property to stub to the site’s east property line. The applicant has proposed to construct Via Roberto Street as a 36-foot wide street section with 2-lanes, bike lanes, vertical curb and gutter, with an 8-foot wide planter strip and 5-foot wide concrete sidewalk on the north side of the street. d. Staff Comments/Recommendations: The applicant’s proposal exceeds the District policy which requires pavement widening to ½ of the required with, including curb, gutter and sidewalk, plus 12-feet of pavement widening beyond the centerline of the roadway, and a 3- foot wide gravel shoulder and borrow ditch constructed on the improved side. At a minimum the applicant should be required to construct Via Roberto Street as ½ of a 36- foot wide residential collector street section with vertical curb, gutter, an 8-foot wide planter strip and 5-foot wide concrete sidewalk on the north side of the street plus 12-feet of additional pavement widening beyond the centerline of the roadway and construct a 3-foot wide gravel shoulder and borrow ditch sized to accommodate the roadway storm runoff on the unimproved side of the street. The applicant should be required to dedicate right-of-way to encompass the improvements that extends to from behind the borrow ditch to 2-feet behind the back of sidewalk. For detached sidewalk, the applicant may also reduce the width of the right-of-way to 2-feet behind the back-of-curb and provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind the back of sidewalk. If the applicant chooses to fully improve Via Robert Street, then it would be constructed as a 36-foot wide residential collector roadway with vertical curb, gutter, an 8-foot wide planter strip and 5-foot wide detached concrete sidewalk consistent with the MSM. The applicant should be required to dedicate right-of-way that extends 2-feet behind the back of sidewalk on each side. For detached sidewalk, the applicant may also reduce the width of the right-of-way to 2- feet behind the back-of-curb and provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind the back of sidewalk. 7. Internal Local Roads a. Existing Conditions: There are no local roadways within the site. b. Policy: Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improving all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. 19 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than 47-feet wide and that the standard street section shall be 33-feet (back-of-curb to back-of-curb). Standard Urban Local Street—33-foot Street Section and Right-of-way Policy: District Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of- curb) for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 47-feet of right-of-way. For the City of Kuna and City of Star: Unless otherwise approved by Kuna or Star, the standard street section shall be 36-feet (back-of-curb to back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 50-feet of right-of-way. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8-feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District’s Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right- of-way line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to provide a minimum turning radius of 45-feet; in rural areas or for temporary cul-de-sacs the emergency service providers may require a greater radius. Landscape and parking islands may be constructed in turnarounds if a minimum 29-foot street section is constructed around the island. The pavement width shall be sufficient to allow the turning around of a standard AASHTO SU design vehicle without backing. The developer shall provide written approval from the appropriate fire department for this design element. The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case basis. This will be based on turning area, drainage, maintenance considerations and the written approval of the agency providing emergency fire service for the area where the development is located. Landscape Medians Policy: District policy 7207.5.16 states that landscape medians are permissible where adequate pavement width is provided on each side of the median to accommodate the travel lanes and where the following is provided:  The median is platted as right-of-way owned by ACHD.  The width of an island near an intersection is 12-feet maximum for a minimum distance of 150-feet. Beyond the 150-feet, the island may increase to a maximum width of 30-feet. 20 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057  At an intersection that is signalized or is to be signalized in the future, the median width shall be reduced to accommodate the necessary turn lane storage and tapers.  The Developer or Homeowners Association shall apply for a license agreement if landscaping is to be placed within these medians.  The license agreement shall contain the District’s requirements of the developer including, but not limited to, a “hold harmless” clause; requirements for maintenance by the developer; liability insurance requirements; and restrictions.  Vertical curbs are required around the perimeter of any raised median. Gutters shall slope away from the curb to prevent ponding. c. Applicant’s Proposal: The applicant has proposed to construct the internal local roads as 33- foot wide local street sections with rolled curb, gutter, 8-foot wide planter strips and 5-foot wide detached concrete sidewalks within 60-feet of right-of-way. The applicant has proposed to construct the entry portion of Peak Avenue at Via Roberto Way and Lake Hazel Road as a 54-foot wide street section with a 12-foot wide center landscape island, two 21-foot wide travel lanes with vertical curb, gutter, 8-foot wide planter strip and 5- foot wide detached concrete sidewalk within 81-feet of right-of-way. d. Staff Comments/Recommendations: The applicant’s proposal for the internal local street sections meet District policy and should be approved, as proposed. The applicant should be required to dedicate additional right-of-way to total 2-feet of right-of-way behind the back of sidewalk, or provide a permanent easement that extends from the right-of-way line to 2-feet behind the back of sidewalk. The roadway center island should be platted as right-of-way owned by ACHD. The applicant or homeowner’s association should enter into a license agreement with ACHD for any landscaping proposed to be located within the center landscape island. 8. Alleys a. Existing Conditions: There are no alleys within the site. b. Policy: New Alley Policy: District Policy 7210.3.1 requires the minimum right-of-way width for all new residential alleys shall be a minimum of 16-feet or a maximum of 20-feet. If the residential alley is 16-feet in width building setbacks required by the land use agency having jurisdiction shall provide sufficient space for the safe backing of vehicles into the alley (see Section 7210.3.3). The minimum right-of-way width for all new commercial or mixed-use alleys shall be 20-feet. All alleys shall be improved by paving the full width and length of the right-of-way. Dedication of clear title to the right-of-way and the improvement of the alley, and acceptance of the improvement by the District as meeting its construction standards, are required for all alleys contained in a proposed development. Alley Length Policy: District Policy 7210.3.2 states that alleys shall be no longer than 700- feet in length. If the lead land use agency having jurisdiction requires a shorter block length, the alley shall be no longer than the agency’s required block length. Alley Parking & Setbacks Policy: District Policy 7210.3.3 states that parking within the alley right-of-way is prohibited. “No Parking” signs are required to be installed by the developer. The signs should be located at the alley/street intersections. Parking which is entered from the alley shall be designed so the minimum clear distance from the back of the parking stall to the opposite side of the alley is 20-feet for all perpendicular parking. Setbacks for structures taking access from the alley should be closely coordinated with the lead land use agency. The setbacks shall either discourage parking within the alley (where it may 21 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 partially block or occur within the right-of-way) or allow adequate area for one perpendicular parking pad. In order to discourage parking, building setbacks shall be minimal from the alley right-of-way line, while still achieving the required 20-feet of back-up space from a garage or other parking structure to the opposite side of the alley (i.e. 4-foot setback + 16-foot alley= 20- feet for back-up space). Alley Intersections and Offsets Policy: District policy 7210.3.7 states that alleys should intersect public streets at each end. In specific circumstances as outlined in the policies below, the District may consider allowing an alley to intersect a public street at only one end. A 90- degree angle of intersection shall be designed where practical. In no case shall the intersecting angle be less than 75-degrees, as measured from centerline of intersecting street. An access to an alley shall be located a minimum of 50-feet from the nearest street (measured centerline to centerline). Alley/Local Street Intersections Policy: District Policy 7210.3.7.2 states that alleys may intersect all types of local streets including minor local streets. Alleys shall generally be designed with a curb cut type approach when intersecting a local street. Alleys shall generally intersect streets in the middle of the block equally offsetting the intersecting streets. Alleys shall either align with alley/street intersections or provide a minimum 100-foot offset (measured centerline to centerline) from other local street intersections. For alley intersections with local streets, the District may consider a reduced offset if the lead land use agency’s required lot size allows for shorter buildable lots. c. Applicant Proposal: The applicant has proposed to construct an alley extending from Steeple Avenue to Capstone Avenue located 145-feet south of Ambition Street. The applicant has also proposed to construct an alley extending from Steeple Avenue to Capstone Avenue and locate it 145-feet north of Spire Street. The applicant has proposed to construct the alleys within 20- feet of right-of-way and pave the alleys their entire width and length. d. Staff Comments/Recommendations: The applicant’s proposal meets District policy and should be approved, as proposed. 9. Roadway Offsets a. Existing Conditions: There are no roadways within the site. b. Policy: Local Street Intersection Spacing on Principal Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. If it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 1,320-feet as measured from all other existing roadways as identified in Table 1b (7205.4.7). Local Street Intersection Spacing on Minor Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. If it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 660-feet as measured from all other existing roadways as identified in Table 1a (7205.4.6). Collector Offset Policy: District policy 7205.4.6 states that the optimum spacing for new unsignalized collector roadways intersecting minor arterials is 1,320-feet as identified in Table 1a. District policy 7205.4.7 states that the optimum spacing for new unsignalized collector roadways intersecting principal arterials is 1,320-feet as identified in Table 1b. 22 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 District policy 7206.4.5, states that the preferred spacing for a new local street intersecting a collector roadway to align or offset a minimum of 330-feet from any other street (measured centerline to centerline). Local Offset Policy: District policy 7207.4.2, requires local roadways to align or provide a minimum offset of 125-feet from any other street (measured centerline to centerline). c. Applicant’s Proposal: The applicant has proposed to construct the following roads to intersect Lake Hazel Road, a principal arterial:  Vertex Way (Access F), a collector road, 1,350-feet east of Locust Grove Road.  Peak Avenue (Access E), a local road, 695-feet east of Locust Grove Road, and is proposed to be restricted to right-in/right-out access only. The applicant has proposed to construct the following roads to intersect Locust Grove Road:  Tower Street (Access G), a collector road, 660-feet south of Lake Hazel Road  Inflection Street, a local road (Access H), 890-feet south of Tower Street  Via Roberto Street, a collector road (Access I), 1,105-feet south of Inflection Street The applicant has proposed to construct the following local roads to intersect Vertex Avenue, a collector road:  Zenith Avenue 215-feet east of Locust Grove Road  Steeple Avenue 295-feet east of Zenith Avenue  Peak Avenue 190-feet east of Steeple Avenue  Capstone Avenue 185-feet east of Peak Avenue  Cadence Avenue 290-feet east of Capstone Avenue The applicant has proposed to construct Peak Avenue, a local road, to intersect Via Roberto Street 695-feet east of Locust Grove Road. d. Staff Comments/Recommendations: The traffic impact study included an access analysis to demonstrate that proposed access points on to Lake Hazel Road and Locust Grove Road are necessary to serve the site. The traffic impact study did not demonstrate that the access points are necessary to serve the site from a traffic perspective, but that the access points are needed for circulation, to maintain acceptable level of service thresholds on local residential and collector roadways, and to prevent the traveling public from traveling through local residential streets to access commercial land uses. Additionally, the analysis showed that the access points will not have operational deficiencies and access spacing requirements are met. In addition to being necessary based on the TIS, Tower Street (access G) on Locust Grove Road located 660-feet south of Lake Hazel Road and Vertex Way (access F) onto Lake Hazel Road located at the quarter mile east of Locust Grove, are shown as commercial collectors on the MSM. Based on the findings and recommendations of the South Meridian Transportation Plan, Vertex Way will be restricted to left-in/right-in/right-out in the future. Staff recommends that this access be approved as a temporary full access. Staff’s recommendation is due to the fact that this access is a commercial collector on the MSM. A dedicated eastbound right-turn lane should be constructed at Vertex Way, based on the TIS. Peak Avenue (Access E) on Lake Hazel Road is proposed to be right-in/right-out only and be located 695-feet east of Locust Grove Road. A right-in/right-out only access in this location is 23 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 consistent with the South Meridian Transportation Plan. A dedicated right-turn lane should be constructed at this intersection based on the findings of the TIS. Tower Street, Inflection Street and Via Roberto Street (Access G, H, and I) on Locust Grove Road located 660-feet, 1,550-feet, and 2,655-feet south of Lake Hazel Road meet District policy and should be approved, as proposed. Turn lanes are not recommended at these intersections. MSM Collectors within the Site Proposed Access Points The applicant’s proposal to construct the local roads to intersect Vertex Way and Tower Street do not meet the District’s Local Street Intersection Spacing on a Collector Roadway which states that new local streets intersecting a collector roadway to align or offset a minimum of 330-feet from any other street. The applicant should be required to revise the offsets to meet District policy. 10. Stub Streets a. Existing Conditions: There are no stub streets within or to the site. b. Policy: Stub Street Policy: District policy 7206.2.4.3 (collectors) states that stub streets will be required to provide circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7206.2.4 (collector) except a temporary cul- de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, “THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS STREET WILL BE EXTENDED AND WIDENDED IN THE FUTURE.” In addition, stub streets must meet the following conditions:  A stub street shall be designed to slope towards the nearest street intersection within the proposed development and drain surface water towards that intersection; unless an alternative storm drain system is approved by the District.  The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. 24 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Temporary Dead End Streets Policy: 7206.2.4.4 (collector) requires that the design and construction for cul-de-sac streets shall apply to temporary dead end streets. The temporary cul-de-sac shall be paved and shall be the dimensional requirements of a standard cul-de-sac. The developer shall grant a temporary turnaround easement to the District for those portions of the cul-de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. c. Applicant Proposal: The applicant has proposed to construct a collector road, Via Roberto Street, to intersect Locust Grove Road along the south property line and stub it to the east property line. Staff Comments/Recommendations: The applicant’s proposal to stub Via Roberto Street to the east property line meets District policy and is consistent with the MSM and should be approved, as proposed. The applicant should be required to install a sign at the terminus of Via Roberto Street stating that, “THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS ROAD WILL BE EXTENDED AND WIDENED IN THE FUTURE.” Via Roberto Street extends greater than 150-feet in length requiring the construction of a temporary turnaround. The applicant should be required to construct a paved temporary turnaround meeting the dimensional requirements of a standard cul-de-sac at the terminus of Via Roberto Street. The applicant should be required to grant a temporary turnaround easement to the District for any portion of the cul-de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. 11. Driveways 11.1 Vertex Way and Tower Street a. Existing Conditions: There are no collector roadways within the site. b. Policy: Access Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. District Policy 7206.1 states that the primary function of a collector is to intercept traffic from the local street system and carry that traffic to the nearest arterial. A secondary function is to service adjacent property. Access will be limited or controlled. Collectors may also be designated at bicycle and bus routes. Driveway Location Policy (Signalized Intersection): District policy 7206.4.3 requires driveways located on collector roadways near a signalized intersection to be located outside the area of influence; OR a minimum of 440-feet from the signalized intersection for a full-access driveway and a minimum of 220-feet from the signalized intersection for a right-in/right-out only driveway. Dimensions shall be measured from the centerline of the intersection to the centerline of the driveway. Driveway Location Policy (Stop Controlled Intersection): District policy 7206.4.4 requires driveways located on collector roadways near a STOP controlled intersection to be located outside of the area of influence; OR a minimum of 150-feet from the intersection, whichever is greater. Dimensions shall be measured from the centerline of the intersection to the centerline of the driveway. 25 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Successive Driveways: District policy 7206.4.5 Table 1, requires driveways located on collector roadways with a speed limit of 25 MPH and daily traffic volumes greater than 100 VTD to align or offset a minimum of 245-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7206.4.6 restricts high-volume driveways (100 VTD or more) to a maximum width of 36-feet and low-volume driveways (less than 100 VTD) to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high- volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Width Policy: District policy 7208.4.3 restricts commercial driveways to a maximum width of 40-feet. Most commercial driveways will be constructed as curb-cut type facilities. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7206.4.6, the applicant should be required to pave the driveway its full width and at least 30- feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7206.4.6. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing streets adjacent to a proposed development may be required. These improvements are to correct deficiencies or replace deteriorated facilities. Included are sidewalk construction or replacement; curb and gutter construction or replacement; replacement of unused driveways with curb, gutter and sidewalk; installation or reconstruction of pedestrian ramps; pavement repairs; signs; traffic control devices; and other similar items. c. Applicant’s Proposal: The applicant has proposed 2 commercial lots that will abut a collector roadway, Vertex Way and Tower Street. d. Staff Comments/Recommendations: The future development of these 2 commercial lots will be subject to the District policies listed above. 12. Traffic Calming a. Speed Control and Traffic Calming Policy (Local): District policy 7207.3.7 states that the design of local street systems should discourage excessive speeds by using passive design elements. If the design or layout of a development is anticipated to necessitate future traffic calming implementation by the District, then the District will require changes to the layout and/or the addition of passive design elements such as horizontal curves, bulb-outs, chokers, etc. The District will also consider texture changes to the roadway surface (i.e. stamped concrete) as a passive design element. These alternative methods may require maintenance and/or license agreement. b. Staff Comments/Recommendations: Spire Street, Ambition Street and Adventure Street are greater than 750-feet in length and will need to be redesigned to reduce the length of the roadways or to include the use of passive design elements. Speed humps/bumps and valley gutter will not be accepted as traffic calming. The applicant should be required to submit a revised preliminary plat showing the redesigned roadways for review and approval prior to ACHD’s signature on the first final plat 13. Tree Planters Tree Planter Policy: Tree Planter Policy: The District’s Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 14. Landscaping 26 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 15. Other Access Lake Hazel Road is classified as a principal arterial roadway, Locust Grove Road is classified as a minor arterial roadway, and Vertex Way and Tower Street are classified as collector roadways. Other than the access specifically approved with this application, direct lot access is prohibited to these Lake Hazel Road, Locust Grove Road and Via Roberto Street. Direct lot access for the proposed commercial parcels onto Vertex Way and Tower Street will be reviewed at the time of the future development application. Direct lot access onto Vertex Way and Tower Street for the residential lots south of these streets is prohibited and should be noted on the final plat. D. Site Specific Conditions of Approval 1. If the applicant chooses to enter into a CDA with ACHD to improve the Lake Hazel Road/Locust Grove Road intersection as a multi-lane roundabout, as proposed prior to adoption of the 2020 CIP, then only the improvements listed in the 2016 CIP 3-lanes on the north leg, 2-lanes on the south, 2-lanes on the east, and 3-lanes on the west leg with a westbound bypass right turn bypass lane would be eligible for reimbursement through the CDA. If the applicant waits until after adoption of the 2020 CIP, to enter into a CDA with ACHD, then the full intersection improvement proposed to by the applicant would be consistent with the intersection improvement listed in the CIP and would be impact fee eligible for reimbursement through a CDA. 2. Enter into a CDA with ACHD for the widening of Locust Grove Road/Lake Hazel Road intersection to a multi-lane roundabout with 4-lanes on the east and west legs and 2-lanes on the north and south legs of the intersection prior to ACHD’s signature on the first final plat. The Cooperative Development Agreement should include the intersection construction, contract requirements, as well as allocation of costs. ACHD will only provide reimbursement for the costs of permanent roadway improvements consistent with the IFYWP and CIP. Interim improvements are not eligible for reimbursement and all costs would be the responsibility of the applicant. In order to ensure the roadway will be improved when warranted, the following items must be in place prior plans acceptance for the final plat necessitating the improvements.  Cooperative Development Agreement;  Financial surety provided by the applicant meeting the terms of the Cooperative Development Agreement;  Dedication of all of the right-of-way necessary to complete the road widening project. 3. If the applicant decides to not fully improve Locust Grove Road/Lake Hazel Road intersection, the applicant should be required to install an interim 3 X 3 signalized, prior to ACHD’s signature on the final plat that contains the 101st building lot. In order to install the interim signal at the Locust Grove Road/Lake Hazel Road intersection the applicant will need to obtain plan approval, purchase the signal equipment, and enter into a signal agreement with ACHD. The applicant will need to order and purchase the signal hardware as ACHD does not have these materials available for this project. The signal agreement should include requirements that the intersection be designed as a 3 X 3 intersection with three 12-foot wide travel lanes: one receiving lane, one dedicated left turn lane, and one thru/right lane on each approach; that the applicant is responsible for all costs associated with 27 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 the design, and installation of the interim signal, hardware, and that interim improvements are not eligible for reimbursement by ACHD. In order to ensure the Locust Grove Road/Lake Hazel Road intersection will be improved when warranted, the following items must be in place prior to plans acceptance of the final plat that contains the 101st building lot:  Signal Agreement;  Full design and approved plans for the intersection. 4. If the applicant chooses to widen Lake Hazel Road, as proposed, prior to adoption of the 2020 CIP, then only the improvements listed in the 2016 CIP to widen Lake Hazel Road to 3-lanes would be eligible for reimbursement through the CDA. If the applicant waits until after adoption of the 2020 CIP, to enter into a CDA with ACHD, then widening Lake Hazel Road to 5-lanes as proposed to by the applicant would be consistent with the improvements listed in the CIP and would be impact fee eligible for reimbursement through a CDA. 5. Enter into a CDA with ACHD for the widening of Lake Hazel Road to 5-lanes, a 72-foot street section within 100-feet of right-of-way with a 6-foot wide detached concrete sidewalk prior to ACHD’s signature on the first final plat. The Cooperative Development Agreement should include the roadway construction, contract requirements, as well as allocation of costs. ACHD will only provide reimbursement for the costs of permanent roadway improvements consistent with the IFYWP and CIP. Interim improvements are not eligible for reimbursement and all costs would be the responsibility of the applicant. In order to ensure the roadway will be improved when warranted, the following items must be in place prior plans acceptance for the final plat necessitating the improvements.  Cooperative Development Agreement;  Financial surety provided by the applicant meeting the terms of the Cooperative Development Agreement;  Dedication of all of the right-of-way necessary to complete the road widening project. The applicant may construct a 19.5-foot wide median on Lake Hazel Road at Peak Avenue and taper it to 8.5-feet at Vertex Way with the widening of Lake Hazel Road to 5-lanes, as proposed. This improvement is not eligible for compensation in the CDA with ACHD. If landscaping is proposed, it should be platted as right-of-way owned by ACHD. The applicant or homeowner’s association should enter into a license agreement with ACHD for any landscaping proposed to be located within the center landscape island. 6. If the applicant decides to not fully improve Lake Hazel Road abutting the site, then consistent with ACHD policy, the following improvements should be constructed.  Dedicate additional right-of-way to total 50-feet from the centerline of Lake Hazel Road abutting the site, consistent with the MSM.  Widen the pavement on Lake Hazel Road to 17-feet from the centerline of the roadway abutting the site with a 3-foot wide gravel shoulder.  Construct a minimum 6-foot wide detached concrete sidewalk located a minimum of 41- feet from the centerline of Lake Hazel Road abutting the site, consistent with the SMTP. Provide a permanent right-of-way easement for detached sidewalks located outside of the dedicated right-of-way. 28 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057  Construct a dedicated eastbound left-turn lane at Vertex Way to be used in future for future access to the north.  Extend the turn lane east of Vertex Way to the Vertex Way intersection on Lake Hazel Road to create a left-turn lane for Vertex Way.  Construct a raised median at Peak Avenue to restrict the access to right-in/right-out only. 7. If the draft CIP is adopted in August 2020, the applicant will receive compensation for the 100-feet of right-of-way dedication for Lake Hazel Road consistent with District policy. If the draft CIP is not adopted in August 2020, no additional compensation will be given for right-of-way dedication greater than 76-feet because the CIP specifies that only 76-feet of right-of-way is required at this time for this segment of Lake Hazel Road. 8. Construct a dedicated eastbound right-turn lane on Lake Hazel Road at Vertex Way. 9. Construct a dedicated eastbound right-turn lane on Lake Hazel Road at Peak Avenue. 10. Dedicate additional right-of-way to total 37-feet from the centerline of Locust Grove Road abutting the site. Compensation will not be provided for this right-of-way dedication. 11. Widen the pavement on Locust Grove Road to 17-feet from the centerline of the roadway abutting the site with a 3-foot wide gravel shoulder. Improvements for this segment of Locust Grove Road is not eligible for compensation. 12. Construct a minimum 7-foot wide detached concrete sidewalk located a minimum of 30-feet from the centerline of Locust Grove Road abutting the site. Provide a permanent right-of-way easement for detached sidewalks located outside of the dedicated right-of-way. 13. Center left turn lanes should be constructed on Locust Grove Road at all street intersections. 14. If the applicant chooses to fully improve Locust Grove Road abutting the site, then it would be improved as a 3-lane residential arterial, a 46-foot wide street section with vertical curb, gutter, and 5-foot wide detached (or 7-foot attached) concrete sidewalk within 74-feet of right-of-way. If street trees are desired, then 8-foot wide planter strips should be provided. 15. Construct Peak Avenue to intersect Lake Hazel Road 695-feet east of Locust Grove Road, as proposed. Restrict it to right-in/right-out only with a median. 16. Construct Vertex Way to intersect Lake Hazel Road 1,350-feet to the east of Locust Grove Road, as proposed. This access may be restricted to left-in/right-in/right-out only at the discretion of ACHD at any time. 17. Construct Tower Street to intersect Locust Grove Road 660-feet south of Lake Hazel Road, as proposed. 18. Construct Inflection Street to intersect Locust Grove Road 890-feet south of Tower Street, as proposed. 19. Construct Via Roberto Street to intersect Locust Grove Road 1,105-feet south of Inflection Street, as proposed. 20. Construct Peak Avenue to intersect Via Roberto Street 695-feet east of Locust Grove Road, as proposed. 21. Construct Vertex Way and Tower Street as a 36-foot wide residential collector street section with vertical curb, gutter, an 8-foot wide planter strip and 6-foot wide concrete sidewalk, as proposed. Dedicate right-of-way that extends to 2-feet behind the back of sidewalk on each side. For detached sidewalk, the applicant may reduce the right-of-way width to 2-feet behind the back of curb and 29 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind the back of sidewalk. 22. Construct one collector road, Via Roberto Street, along the south property line and stub it to the east property line, as proposed. Install a sign at the terminus of Via Roberto Street stating that, “THIS IS A DESIGNATED COLLECTOR ROADWAY. THIS ROAD WILL BE EXTENDED AND WIDENED IN THE FUTURE.” Construct a paved temporary turnaround meeting the dimensional requirements of a standard cul- de-sac at the terminus of Via Roberto Street. Grant a temporary turnaround easement to the District for any portion of the cul-de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. 23. Construct Via Roberto Street as ½ of a 36-foot wide residential collector street section with vertical curb, gutter, an 8-foot wide planter strip and 5-foot wide detached concrete sidewalk on the north side of the street plus 12-feet of additional pavement widening beyond the centerline established for the street with a 3-foot wide gravel shoulder and a borrow ditch sized to accommodate the roadway storm runoff on the south side of the street. Dedicate right-of-way to encompass the improvements that extends to from behind the borrow ditch to 2-feet behind the back of sidewalk. For detached sidewalk, the applicant may also reduce the width of the right-of-way to 2-feet behind the back-of-curb and provide a permanent right-of-way easement that extends from the right-of- way line to 2-feet behind the back of sidewalk. 24. If the applicant chooses to fully improve Via Robert Street, then it should be constructed as a 36- foot wide residential collector roadway with vertical curb, gutter, an 8-foot wide planter strip and 5- foot wide detached concrete sidewalk. The applicant should be required to dedicate right-of-way that extends 2-feet behind the back of sidewalk on each side. For detached sidewalk, the applicant may also reduce the width of the right-of-way to 2-feet behind the back-of-curb and provide a permanent right-of-way easement that extends from the right-of-way line to 2-feet behind the back of sidewalk. 25. Construct all local roads intersecting Vertex Way and Tower Street to be offset at least 330-feet. 26. Construct the internal local roads as 33-foot wide local street sections with rolled curb, gutter, 8- foot wide planter strips and 5-foot wide detached concrete sidewalks within 60-feet of right-of-way, as proposed. 27. Construct the entry portion of Peak Avenue at Via Roberto Street and Lake Hazel Road as a 54- foot wide street section with a 12-foot wide center landscape island, two 21-foot wide travel lanes with vertical curb, gutter, 8-foot wide planter strip and 5-foot wide detached concrete sidewalk within 81-feet of right-of-way, as proposed. Plat the roadway center island as right-of-way owned by ACHD. Enter into a license agreement with ACHD for any landscaping proposed to be located within the center landscape island. 28. Construct a 20-foot wide paved alley within 20-feet of right-of-way from Steeple Avenue to Capstone Avenue and locate it 145-feet south of Ambition Street, as proposed. 29. Construct a 20-foot wide paved alley within 20-feet of right-of-way from Steeple Avenue to Capstone Avenue and locate it 145-feet north of Spire Street, as proposed. 30. Redesign Spire Street, Ambition Street and Adventure Street to reduce the length of the roadways or to include passive design elements and submit a revised preliminary plat showing the redesigned roadways for review and approval prior to ACHD’s signature on the first final plat. Speed humps/bumps and valley gutter will not be accepted as traffic calming. 30 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 31. Other than access specifically approved with this application, direct lot access is prohibited to Lake Hazel Road and Locust Grove Road and should be noted on the final plat. Direct lot access for the proposed commercial parcels onto Vertex Way and Tower Street will be reviewed at the time of the future development application. Direct lot access onto Vertex Way and Tower Street for the residential lots south of these streets is prohibited and should be noted on the final plat. 32. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 33. Payment of impact fees is due prior to issuance of a building permit. 34. Comply with all Standard Conditions of Approval. E. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA) requirements. The applicant’s engineer should provide documentation of ADA compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District’s Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District’s Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant’s authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property which is the subject of this application, shall require the applicant 31 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. F. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. G. Attachments 1. Vicinity Map 2. Site Plan 3. Utility Coordinating Council 4. Development Process Checklist 5. Request for Reconsideration Guidelines OR Appeal Guidelines VICINITY MAP 32 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 SITE PLAN 33 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Ada County Utility Coordinating Council Developer/Local Improvement District Right of Way Improvements Guideline Request Purpose: To develop the necessary avenue for proper notification to utilities of local highway and road improvements, to help the utilities in budgeting and to clarify the already existing process. 1) Notification: Within five (5) working days upon notification of required right of way improvements by Highway entities, developers shall provide written notification to the affected utility owners and the Ada County Utility Coordinating Council (UCC). Notification shall include but not be limited to, project limits, scope of roadway improvements/project, anticipated construction dates, and any portions critical to the right of way improvements and coordination of utilities. 2) Plan Review: The developer shall provide the highway entities and all utility owners with preliminary project plans and schedule a plan review conference. Depending on the scale of utility improvements, a plan review conference may not be necessary, as determined by the utility owners. Conference notification shall also be sent to the UCC. During the review meeting the developer shall notify utilities of the status of right of way/easement acquisition necessary for their project. At the plan review conference each company shall have the right to appeal, adjust and/or negotiate with the developer on its own behalf. Each utility shall provide the developer with a letter of review indicating the costs and time required for relocation of its facilities. Said letter of review is to be provided within thirty calendar days after the date of the plan review conference. 3) Revisions: The developer is responsible to provide utilities with any revisions to preliminary plans. Utilities may request an updated plan review meeting if revisions are made in the preliminary plans which affect the utility relocation requirements. Utilities shall have thirty days after receiving the revisions to review and comment thereon. 4) Final Notification: The developer will provide highway entities, utility owners and the UCC with final notification of its intent to proceed with right of way improvements and include the anticipated date work will commence. This notification shall indicate that the work to be performed shall be pursuant to final approved plans by the highway entity. The developer shall schedule a preconstruction meeting prior to right of way improvements. Utility relocation activity shall be completed within the times established during the preconstruction meeting, unless otherwise agreed upon. Notification to the Ada County UCC can be sent to: 50 S. Cole Rd. Boise 83707, or Visit iducc.com for e-mail notification information. 34 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Development Process Checklist Items Completed to Date: Submit a development application to a City or to Ada County The City or the County will transmit the development application to ACHD The ACHD Planning Review Section will receive the development application to review The Planning Review Section will do one of the following: Send a “No Review” letter to the applicant stating that there are no site specific conditions of approval at this time. Write a Staff Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Write a Commission Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its conformance to District Policy. Items to be completed by Applicant: For ALL development applications, including those receiving a “No Review” letter:  The applicant should submit one set of engineered plans directly to ACHD for review by the Development Review Section for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee assessment.)  The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, including, but not limited to, driveway approaches, street improvements and utility cuts. Pay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Non-Subdivisions) Driveway or Property Approach(s)  Submit a “Driveway Approach Request” form to ACHD Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. Working in the ACHD Right-of-Way  Four business days prior to starting work have a bonded contractor submit a “Temporary Highway Use Permit Application” to ACHD Construction – Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50’ or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) Sediment & Erosion Submittal  At least one week prior to setting up a Pre-Construction Meeting an Erosion & Sediment Control Narrative & Plan, done by a Certified Plan Designer, must be turned into ACHD Construction to be reviewed and approved by the ACHD Stormwater Section. Idaho Power Company  Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. Final Approval from Development Services is required prior to scheduling a Pre-Con. 35 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Request for Appeal of Staff Decision 1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of the final decision made by the Development Services Manager when it is alleged that the Development Services Manager did not properly apply this section 7101.6, did not consider all of the relevant facts presented, made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the interpretation or enforcement of the ACHD Policy Manual. a. Filing Fee: The Commission may, from time to time, set reasonable fees to be charged the applicant for the processing of appeals, to cover administrative costs. b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the Secretary and Clerk of the District, which must be filed within ten (10) working days from the date of the decision that is the subject of the appeal. The notice of appeal shall refer to the decision being appealed, identify the appellant by name, address and telephone number and state the grounds for the appeal. The grounds shall include a written summary of the provisions of the policy relevant to the appeal and/or the facts and law relied upon and shall include a written argument in support of the appeal. The Commission shall not consider a notice of appeal that does not comply with the provisions of this subsection. c. Time to Reply: The Development Services Manager shall have ten (10) working days from the date of the filing of the notice of appeal to reply to the notice of the appeal, and may during such time meet with the appellant to discuss the matter, and may also consider and/or modify the decision that is being appealed. A copy of the reply and any modifications to the decision being appealed will be provided to the appellant prior to the Commission hearing on the appeal. d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the appeal will be noticed and scheduled on the Commission agenda at a regular meeting to be held within thirty (30) days following the delivery to the appellant of the Development Services Manager’s reply to the notice of appeal. A copy of the decision being appealed, the notice of appeal and the reply shall be delivered to the Commission at least one (1) week prior to the hearing. e. Action by Commission: Following the hearing, the Commission shall either affirm or reverse, in whole or part, or otherwise modify, amend or supplement the decision being appealed, as such action is adequately supported by the law and evidence presented at the hearing. 36 DRAFT Apex Southeast/ MPP20-0009/ H-2020-0057 Request for Reconsideration of Commission Action 1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 11:00 a.m. 2 days prior to the Commission’s next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d. If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission.