Loading...
PZ - Staff Report 7-9 Page 1 HEARING DATE: 7/9/2020 TO: Planning & Zoning Commission FROM: Alan Tiefenbach, Associate Planner 208-489-0573 SUBJECT: H-2020-0051 Ustick Marketplace Storage Phase II LOCATION: 3535 N. Records Avenue I. PROJECT DESCRIPTION The Applicant has submitted applications for a conditional use permit and administrative design review for a self-service storage facility on 1 acre of land in the C-G zoning district. This is the second phase of an existing facility to add 116 additional storage units. Note: The administrative design review application is reviewed and approved by the Director; Commission action is not required. Analysis of the building design is provided below in section V. II. SUMMARY OF REPORT A. Project Summary Description Details Page Acreage 1.11 acres Future Land Use Designation Mixed Use Regional Existing Land Use(s) Commercial Proposed Land Use(s) Commercial Lots (# and type; bldg./common) One (1) building lot Neighborhood meeting date; # of attendees: April 6, 2020 STAFF REPORT COMMUNITY DEVELOPMENT DEPARTMENT Page 2 Description Details Page History (previous approvals) A-2019-0287 (PBA), A-2018-0156 (CZC), DA #104107404 and #107126901 B. Community Metrics Description Details Page Ada County Highway District Only standard comments. • Staff report (yes/no) No • Requires ACHD Commission Action (yes/no) No Access (Arterial/Collectors/State Hwy/Local)(Existing and Proposed) Property has existing access from two Collectors - W. Baldcypress Way and N. Records Ave. Existing Road Network Yes Fire Service See comments section Wastewater • Distance to Sewer Services N/A • Sewer Shed Five Mile Trunkshed • Estimated Project Sewer ERU’s See application • WRRF Declining Balance 13.95 • Project Consistent with WW Master Plan/Facility Plan Yes • Comments Flow has been committed. No proposed changes to public sewer infrastructure within record. Any changes or modifications to the public sewer infrastructure must be reviewed and approved by Public Works. Water • Distance to Water Services 0 • Pressure Zone 3 • Estimated Project Water ERU’s See application • Water Quality No concerns • Project Consistent with Water Master Plan Yes • Impacts/Concerns There were no utilities shown on the submitted site plan. The City only referenced the CAD file submitted for the proposed water infrastructure review. Reduce the size of the proposed water main throughout this development to 8". End the proposed water main with a temporary blowoff to facility future extension to the west. Page 3 C. Project Area Maps Future Land Use Map Aerial Map Zoning Map Planned Development Map III. APPLICANT INFORMATION A. Applicant: Sun Mountain Investments LLC – 2371 Eastdale Dr. Boise, ID 83712 B. Owner: Sun Mountain Investments LLC – 2371 Eastdale Dr. Boise, ID 83712 Page 4 C. Representative: Rick Stewart, Babcock Design – 800 W. Main Street, Ste 940, Boise, ID 83702 IV. NOTICING Planning & Zoning Posting Date City Council Posting Date Newspaper Notification 6/19/2020 Radius notification mailed to properties within 300 feet 6/16/2020 Site Posting Date 6/25/2020 NextDoor posting 6/16/2020 V. STAFF ANALYSIS A. Future Land Use Map Designation (https://www.meridiancity.org/compplan) Mixed Use Regional - The purpose of this designation is to provide a mix of employment, retail, and residential dwellings and public uses near major arterial intersections. The intent is to integrate a variety of uses together, including residential, and to avoid predominantly single use developments such as a regional retail center with only restaurants and other commercial uses. Developments should be anchored by uses that have a regional draw with the appropriate supporting uses. The subject site is already annexed, zoned (C-G), and presently contains 341 storage units. The development agreement supports a broad range of commercial uses by right, as well as residential uses by conditional use. This proposal will be a second phase for an additional 116 units. B. Comprehensive Plan Policies (https://www.meridiancity.org/compplan): Goals, Objectives, & Action Items: Staff finds the following Comprehensive Plan policies to be applicable to this application and apply to the proposed use of this property (staff analysis in italics): • Preserve private property rights and values by enforcing regulations that will prevent and mitigate against incompatible and detrimental neighboring uses. (3.05.01C) The conditional use is a process to ensure any impacts associated with a particular use are mitigated. • Require appropriate building design, and landscaping elements to buffer, screen, beautify, and integrate commercial, multifamily, and parking lots into existing neighborhoods. (5.01.02D) Page 5 Building design and landscaping is being reviewed as part of the Certificate of Zoning Compliance (CZC) being processed concurrently with this proposal. As long as the landscaping is enhanced as mentioned below, the design and landscaping will be appropriate to buffer, screen and integrate the development into the neighborhood. • Support beautiful and high quality development that reinforces neighborhood character and sustainability. (5.01.02) The proposed expansion would allow 116 new units in 3 buildings. The subject property is within a large area zoned C-G and is bordered by existing residential to the north and east. Phase One consisted of 341 units in 10 buildings. The applicant completed the first phase design through a Certificate of Zoning Compliance (CZC). This resulted in a self-storage facility with quality architecture and dense landscaping which respects the adjacent residential. This phase (Phase Two) proposes similar architecture to the first phase, but significantly less landscape density along W. Baldcypress St. As long as the Applicant increases the density of landscaping in this area as discussed in the landscaping section below (and added as a condition of approval) staff believes this proposal would result in appropriate building design, high quality development and mitigate against detrimental neighboring uses. C. Existing Structures/Site Improvements: A Certificate of Zoning Compliance (CZC) was approved in January of 2019 for the first phase of a self-storage facility. This consisted of 341 storage units in 10 buildings and 52,000 total square feet of gross floor area. This proposal would add an additional 116 units in four buildings and 24,126 additional square feet adjacent and to the west of the existing facility. D. Proposed Use Analysis: The subject property is within the General Retail and Service Commercial District (C-G). This zone district is intended to be the largest scale and broadest mix of retail, office, service, and light industrial uses. A “Storage Facility, Self Service” is a conditional use in the C-G zoning district, as shown in UDC Table 11-2B-2. It is subject to specific use standards per UDC 11-4-3-34. E. Specific Use Standards (UDC 11-4-3): A “Storage Facility, Self Service” is subject to specific use standards as outlined in UDC 11-4-3-34. These standards include not being used for residences, structures being at least 25’ apart, the facility being required to be screened from view, a secondary access required, and no outdoor storage of materials. The proposed development meets these requirements. F. Dimensional Standards (UDC 11-2): The existing and proposed commercial structures meet all dimensional standards. Page 6 G. Access (UDC 11-3A-3, 11-3H-4): Access will be provided from W. Baldcypress St. to the north and N. Records Ave. to the east. These accesses are existing and serve the Phase One self-storage that is already constructed. Self-storage is a low traffic generating use and therefore staff anticipates negligible traffic impacts from this development. ACHD has not offered any site specific comments. H. Parking (UDC 11-3C): Per UDC 11-3C-6B.1, parking is based on gross floor area of office space for self-service storage facilities. A 555 square foot office was constructed with the first phase, which required 2 parking stalls whereas 3 were provided. 2 bicycle spaces were also provided. This phase does not propose any additional office space, therefore the existing parking is adequate. As is required by UDC 11-3C-5, all internal 2-way drive aisles are at least 25’ in width. I. Sidewalks (UDC 11-3A-17) Sidewalks were constructed with the subdivision. This included a 5’ detached sidewalk along the N. Records Ave. frontage and a 5’ attached sidewalk along the W. Baldcypress St. frontage. J. Parkways No parkways are proposed with this expansion. K. Landscaping (UDC 11-3B): UDC 11-2B-3 requires landscape buffers of a minimum width of 20’ along Collector Streets. Twelve-foot wide landscape buffers were installed with the first phase of the development along the property frontages on W. Baldcypress St. and N. Records Ave. (both Collector Streets). The buffers were reduced from 20’ to 12’ wide because the approved plat for this property only required a 10-foot wide landscape buffer, which pre- dates the current UDC requirement. The landscape buffer along N. Records Ave contains dense landscaping of trees and shrubs that very effectively screens the exterior walls of the development. However, the existing buffer along W. Baldcypress St. (north) contains only trees and the existing ground cover. According to the submitted conceptual landscape plan, no additional landscaping is proposed in this area. One required finding of a conditional use is that the “design will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity, and that such use will not adversely change the essential character of the same area.” There is an additional finding that “the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity.” The proposed development is in a visible location directly across the street from existing residential on two sides. To ensure the project is compatible with these residential uses Page 7 and the existing character of the neighborhood, staff recommends the buffer along W. Baldcypress St. be increased to the density and quality of the N. Records Ave. buffer. This will be addressed at time of Certificate of Zoning Compliance. L. Fencing (UDC 11-3A-6, 11-3A-7): The majority of the “fencing” in the existing self-storage facility is the backs of the self- storage buildings. There is some existing 8’ high metal fencing filling gaps where buildings do not exist. Phase Two will incorporate several small sections of the same style fencing at the western portion of the site; otherwise comparable buildings and architecture will serve as the barrier. M. Utilities All utilities for the proposed development are already in place. As this phase is only for 116 more storage units, no additional services are needed. N. Building Elevations A design review (DES) application was submitted concurrently with this proposal (administrative processes).The existing buildings are 12-14 feet in height (the entrance “cupolas at the office are 25’ in height). Materials consist of a combination of corrugated metal, hardie board, metal panels and stone as a column base and accent material. The roof consists of standing seam metal. The building elevations as proposed consists of the same architecture and materials. Some of the architecture may not comply with all the requirements of the Architectural Standards Manual (ASM). For example, the elevations show rooflines greater than 50’ in length that do not incorporate roofline and parapet variations. As another example, the use of metal as a primary field material is not allowed by the ASM. However, the existing facility is high quality and a significant amount of landscape screening occurs along N. Records Ave. As long as the northern landscape buffer is increased as recommended, staff will support the above-mentioned design the design as proposed. With the CZC application, the applicant should submit and obtain approval of a design standards exception as outlined in the ASM. Page 8 VI. DECISION A. Staff: Staff recommends approval of the proposed conditional use permit with the conditions in Section VIII per the Findings in Section IX. Page 9 VII. EXHIBITS A. Pictures of Existing Facility View from N. Records looking west N. Records Ave landscape buffer View of Phase Two lot from W. Baldcypress looking south. Existing W. Baldcypress buffer. Page 10 B. Proposed Site Plan (date: 4/22/2022) Page 11 C. Proposed Landscape Plan (dated: 4/22/2020) Page 12 D. Building Elevations (date: 4/22/2020) VIII. CITY/AGENCY COMMENTS & CONDITIONS A. Planning 1. Future development of this site shall comply with the provisions of Development Agreements 104107404 and 107126901 as well as A-2018-0156 (CZC),associated with AZ-04-009 (Market Square) and the conditions contained herein. 2. The Developer/Owner shall comply with the specific use standards listed in UDC 11-4-3- 34, Self-Service Storage Facility. The application submitted with the Certificate of Zoning Compliance application shall demonstrate compliance with these standards. 3. The site/landscape plan submitted with the Certificate of Zoning Compliance application shall be revised as follows: a. The landscape buffer along W. Baldcypress Way shall be revised to reflect a density and materials of trees, shrubs and groundcover consistent with the existing landscape buffer along N. Records Avenue as is approved for CZC A-2018-0156. 4. A Certificate of Zoning Compliance application is required to be submitted to the Planning Division and approved prior to submittal of building permit applications. The Page 13 applicant will either meet all architectural requirements of the Architectural Standards Manual (ASM) or apply for a design exception as part of the CZC submittal. Staff will support design exceptions for the architecture as proposed with this CUP so long as conditions regarding the W. Baldcypress St. landscape buffer are satisfied. 5. The Applicant shall have a maximum of two (2) years to commence the use as permitted in accord with the conditions of approval listed above. If the use has not begun within two (2) years of approval, a new conditional use permit must be obtained prior to operation or a time extension must be requested in accord with UDC 11-5B-6F. B. Public Works Site Specific Conditions: 1. Reduce the size of the proposed water main throughout this development to 8". 2. End the proposed water main with a temporary blowoff to facility future extension to the west. General Conditions: 1. The applicant shall install mains to and through this development; applicant shall coordinate main size and routing with the Public Works Department, and execute standard forms of easements for any mains that are required to provide service. Minimum cover over sewer mains is three feet, if cover from top of pipe to sub-grade is less than three feet than alternate materials shall be used in conformance of City of Meridian Public Works Departments Standard Specifications. 2. Water service to this site is available via extension of existing mains adjacent to the development. The applicant shall be responsible to install water mains to and through this development, coordinate main size and routing with Public Works. 3. All improvements related to public life, safety and health shall be completed prior to occupancy of the structures. 4. Upon installation of the landscaping and prior to inspection by Planning Department staff, the applicant shall provide a written certificate of completion as set forth in UDC 11-3B-14A. 5. The City of Meridian requires that the owner post to the City a warranty surety in the amount of 20% of the total construction cost for all completed sewer, and water infrastructure for a duration of two years. This surety amount will be verified by a line item final cost invoicing provided by the owner to the City. The surety can be posted in the form of an irrevocable letter of credit, cash deposit or bond. Applicant must file an application for surety, which can be found on the Community Development Department website. Please contact Land Development Service for more information at 887-2211. 6. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to the issuance of a plan approval letter. Page 14 7. It shall be the responsibility of the applicant to ensure that all development features comply with the Americans with Disabilities Act and the Fair Housing Act. 8. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 9. Developer shall coordinate mailbox locations with the Meridian Post Office. 10. All grading of the site shall be performed in conformance with MCC 11-1-4B. 11. Compaction test results shall be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 12. The applicants design engineer shall be responsible for inspection of all irrigation and/or drainage facility within this project that do not fall under the jurisdiction of an irrigation district or ACHD. The design engineer shall provide certification that the facilities have been installed in accordance with the approved design plans. This certification will be required before a certificate of occupancy is issued for any structures within the project. 13. At the completion of the project, the applicant shall be responsible to submit record drawings per the City of Meridian AutoCAD standards. These record drawings must be received and approved prior to the issuance of a certification of occupancy for any structures within the project. 14. The applicant shall provide easement(s) for all public water/sewer mains outside of public right of way (include all water services and hydrants). The easement widths shall be 20-feet wide for a single utility, or 30-feet wide for two. The easements shall be dedicated via using the City of Meridian’s standard forms. Submit an executed easement (on the form available from Public Works), a legal description prepared by an Idaho Licensed Professional Land Surveyor, which must include the area of the easement (marked EXHIBIT A) and an 81/2” x 11” map with bearings and distances (marked EXHIBIT B) for review. Both exhibits must be sealed, signed and dated by a Professional Land Surveyor. DO NOT RECORD. 15. Applicant shall be responsible for application and compliance with and NPDES permitting that may be required by the Environmental Protection Agency. 16. Any existing domestic well system within this project shall be removed from domestic service per City Ordinance Section 9-1-4 and 9 4 8 contact the City of Meridian Water Department at (208)888-5242 for inspections of disconnection of services. Wells may be used for non-domestic purposes such as landscape irrigation if approved by Idaho Department of Water Resources. 17. Any existing septic systems within this project shall be removed from service per City Ordinance Section 9-1-4 and 9 4 8. Contact the Central District Health Department for abandonment procedures and inspections. 18. The City of Meridian requires that pressurized irrigation systems be supplied by a year- round source of water (MCC 9-1-28.C.1). The applicant should be required to use any existing surface or well water for the primary source. If a surface or well source is not Page 15 available, a single-point connection to the culinary water system shall be required. If a single-point connection is utilized, the developer will be responsible for the payment of assessments for the common areas prior to development plan approval. 19. All irrigation ditches, canals, laterals, or drains, exclusive of natural waterways, intersecting, crossing or laying adjacent and contiguous to the area being developed shall be addressed per UDC 11-3A-6. In performing such work, the applicant shall comply with Idaho Code 42-1207 and any other applicable law or regulation. C. Ada County Highway District (ACHD) https://weblink.meridiancity.org/WebLink/DocView.aspx?id=190497&dbid=0&repo=Me ridianCity D. Meridian Fire Department (MFD) 1. Fire Flow: Commercial and office occupancies will require a fire-flow consistent with International Fire Code Appendix B to service the proposed project. Fire hydrants shall be placed per Appendix C. 2. Water Supply: Final approval of the fire hydrant locations shall be by the Meridian Fire Department or their designee in accordance with International Fire Code Section (IFC) 508.5.4 as follows: a. Fire hydrants shall have a Storz LDH connection in place of the 4 ½” outlet. The Storz connection may be integrated into the hydrant or an approved adapter may be used on the 4 1/2" outlet. b. Fire hydrants shall have the Storz outlet face the main street or parking lot drive aisle. c. Fire hydrants shall be placed on corners when spacing permits. d. Fire hydrants shall not have any vertical obstructions to outlets within 10’. e. Fire hydrants shall be placed 18” above finished grade to the center of the Storz outlet. f. Fire hydrants shall be provided to meet the requirements of the Meridian Water Dept. Standards. g. Show all proposed or existing hydrants for all new construction or additions to existing buildings within 1,000 feet of the project. 3. Water Supply: Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 feet (122 m) from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the code official as set forth in International Fire Code Section 507.5.1. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2 the distance requirement shall be 600 feet (183). Page 16 a. For Group R-3 and Group U occupancies, the distance requirement shall be 600 feet (183 m). b. For buildings equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1 or 903.3.1.2, the distance requirement shall be 600 feet (183 m). c. Roadways: In accordance with International Fire Code Section 503.2.5 and Appendix D, any roadway greater than 150 feet in length that is not provided with an outlet shall be required to have an approved turn around. Phasing of the project may require a temporary approved turn around on streets greater than 150' in length with no outlet. Cul-D-Sacs shall be 96’ in diameter minimum and shall be signed “No Parking Fire Lane” per International Fire Code Sections 503.3 & D103.6. d. Roadways: All entrances, internal roads, drive aisles, and alleys shall have a turning radius of 28’ inside and 48’ outside, per International Fire Code Section 503.2.4. e. Roadways: Emergency response routes and fire lanes shall not be allowed to have traffic calming devices installed without prior approval of the Fire Code Official. National Fire Protection IFC 503.4.1. f. Access: Operational fire hydrants, temporary or permanent street signs, and access roads with an all-weather surface are required to be installed before combustible construction material is brought onto the site, as set forth in International Fire Code Section (IFC) 501.4. IX. FINDINGS A. Conditional Use Permit The Commission shall base its determination on the conditional use permit request upon the following: 1. That the site is large enough to accommodate the proposed use and meet all the dimensional and development regulations in the district in which the use is located. The site meets all the dimensional and development regulations in the C-G zoning district. There are already 341 storage units in 10 buildings and this proposal would add an additional 116 units. Staff finds the site is large enough to accommodate the proposed use. 2. That the proposed use will be harmonious with the Meridian Comprehensive Plan and in accord with the requirements of this title. Staff finds the proposed self-storage will be harmonious with the Comprehensive Plan per the analysis in Section V of this staff report. The proposed storage facility will provide a needed service within close proximity to residential uses. Page 17 3. That the design, construction, operation and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area. The proposed self-storage facility is the second phase to an existing facility surrounded on two sides by existing residential. The architecture and landscape buffers associated with the existing facility are good quality and provide adequate screening. However, the landscaping buffer proposed along W. Baldcypress Ave. contains existing trees and grass but does not contain the density provided with the N. Records Avenue buffer. To ensure the proposed facility is compatible with the existing residences and character of the general vicinity, staff recommends the density of the northern landscape buffer be increased to what is existing with the eastern landscape buffer (N. Records Avenue). 4. That the proposed use, if it complies with all conditions of the approval imposed, will not adversely affect other property in the vicinity. If the proposed self-storage complies with the conditions of approval in Section VII as required, Staff finds the proposed use should not adversely affect other properties in the vicinity. 5. That the proposed use will be served adequately by essential public facilities and services such as highways, streets, schools, parks, police and fire protection, drainage structures, refuse disposal, water, and sewer. The proposed use is within an existing self-storage and these services are already being provided. As the current project is only for additional storage units, no additional infrastructure is necessary. Staff finds the proposed use will be served adequately by all public facilities and services. 6. That the proposed use will not create excessive additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. Staff finds the proposed use should not create any additional costs for public facilities and services and will not be detrimental to the economic welfare of the community. 7. That the proposed use will not involve activities or processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. As mentioned, this proposal is to add 3 additional buildings to a complex of 10 existing self-storage buildings. The project is not located in a prime commercial location, is behind an existing Lowes, and is bordered on both sides by existing residential. The proposed facility is appropriate in this location. 8. That the proposed use will not result in the destruction, loss or damage of a natural, scenic or historic feature considered to be of major importance. (Ord. 05-1170, 8-30- 2005, eff. 9-15-2005) Staff is unaware of any natural, scenic, or historic features on this site; thus, Staff finds the proposed use should not result in damage of any such features.