Loading...
CC - Engineer Statement km E N G I N E E R I N G May 12,2020 Project No.20-031 City of Meridian 33 E. Broadway Ave., Suite 210 Meridian, Idaho 83642 RE: Hill's Century Farm North Subdivision No.2 To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets, as shown on the Hill's Century Farm North Subdivision No. 2 plans are designed a minimum of three (3) feet above the seasonal high ground water elevation stated in the Limited Geotechnical Engineering Report for Hill's Century Farm North Subdivision, dated 1/21/2020, prepared by MTI. Please feel free to contact me at 208.639.6939 if you should have questions or require any additional information. Sincerely, KM Engineering,LLP Digitally signedby Lachlin C Kinsella, P.E. Date.2020.05.12 13:45:29-06'00' Lachlin Kinsella, P.E. Project Manager 9233 West State Street • Boise, Idaho 83714 • 208.639.6939 • kmengllp.com