PZ - Phasing Exhibit EMERGENCY VEHICLE ACCESS
TO E.LAKE HAZEL RD. * BUILDING PERMITS WILL NOT BE ISSUED FOR
PHASES 2 OR 3 UNTIL A STREET CONNECTION,
MEETING MERIDIAN FIRE DEPT. REQUIREMENTS,
IS CONSTRUCTED EITHER THROUGH THE
ADJACENT CHURCH PROPERTY TO E. LAKE
HAZEL RD., OR THROUGH THE PROPERTY TO THE
SOUTH TO S. EAGLE RD.,OR BY SOME OTHER
PHASE 1 SECONDARY ACCESS AGREEABLE TO THE
MERIDIAN FIRE DEPT.
BRIDGE TO CHURCH
PROPERTY WITH FUTURE
CONNECTION TO
E.LAKE HAZEL RD.
PHASE 2*
**BUILDING
PERMITS WILL NOT
BE ISSUED FOR
PHASE 4 UNTIL
PUBLIC STREET
CONNECTION IS
PROVIDED PHASE 4** PHASE 3*
THROUGH THE X ��
ADJACENT
PROPERTY TO THE
SOUTH.
STUB STREET TO THE SOUTH
WITH FUTURE CONNECTION
TO S.EAGLE RD.
N
Phasing Plan
0 300 600
(1) 1 Feet