Loading...
PZ - Phasing Exhibit EMERGENCY VEHICLE ACCESS TO E.LAKE HAZEL RD. * BUILDING PERMITS WILL NOT BE ISSUED FOR PHASES 2 OR 3 UNTIL A STREET CONNECTION, MEETING MERIDIAN FIRE DEPT. REQUIREMENTS, IS CONSTRUCTED EITHER THROUGH THE ADJACENT CHURCH PROPERTY TO E. LAKE HAZEL RD., OR THROUGH THE PROPERTY TO THE SOUTH TO S. EAGLE RD.,OR BY SOME OTHER PHASE 1 SECONDARY ACCESS AGREEABLE TO THE MERIDIAN FIRE DEPT. BRIDGE TO CHURCH PROPERTY WITH FUTURE CONNECTION TO E.LAKE HAZEL RD. PHASE 2* **BUILDING PERMITS WILL NOT BE ISSUED FOR PHASE 4 UNTIL PUBLIC STREET CONNECTION IS PROVIDED PHASE 4** PHASE 3* THROUGH THE X �� ADJACENT PROPERTY TO THE SOUTH. STUB STREET TO THE SOUTH WITH FUTURE CONNECTION TO S.EAGLE RD. N Phasing Plan 0 300 600 (1) 1 Feet