2020-06-15 Parks - Revised Pathways Conditions
Reviewer: Kim Warren / Pathways Project Manager
Planner Assigned: Sonya Allen Date: 15 June 2020- REVISED
Project Name: Quartet Northeast File No: H-2020-0017- PP, AZ
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to submittal of the final plat for City Engineer signature, the applicant shall submit a public
access easement for two multi-use pathways. One shall be located on the north side of the Five
Mile Drain, connecting from Black Cat Road to the east project boundary. Pathway shall be
located outside of the NMID easement unless permission is obtained to place all or part of
pathway within the easement. Additionally, applicant shall provide a multi-use pathway
connection extending from the Five Mile Drain to the north project boundary. This pathway shall
be detached from and run along the east side of the proposed collector road to the north project
boundary. This alternate alignment is approved per graphic exhibit submitted by Mike
Wardle/Brighton Corp. dated 8 June 2020.
Submit easement paperwork to the Planning Division for Council approval and subsequent
recordation. Easements shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side).
Use standard City template for public access easement. Easement checklist must accompany all
easement submittals.
3. Construct multi-use pathways per typical paving section(s) shown in the Meridian Pathways
Master Plan Chapter 3.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. 6’ high open vision fencing shall be installed between pathways and (live) water irrigation canals
and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other
fence details per UDC 11-3A-7. Drains are not considered to be live water.
6. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements.
7. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district, the developer shall work with Pathways Project Manager to achieve a pathway
design that meets both City and irrigation district objectives. City requirements as stated shall
Rev. 04.23.19
not (nor are they intended to) override those of the irrigation district having jurisdiction over the
project area.
Rev. 04.23.19
X
PATHWAY ALTERNATIVE received from Mike Wardle 8 June 2020